Press Release-II-06-008, NRC to Discuss 2005 Performance at Sequoyah Nuclear Power Plant

From kanterella
(Redirected from ML060870105)
Jump to navigation Jump to search
Press Release-II-06-008: NRC to Discuss 2005 Performance at Sequoyah Nuclear Power Plant
ML060870105
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/28/2006
From:
Office of Public Affairs Region II
To:
Category:Press Release
References
Press Release-II-06-008
Download: ML060870105 (2)


Text

NRC NEWS UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF PUBLIC AFFAIRS, REGION II 61 Forsyth Street SW, Atlanta GA 30303 Web Site: www.nrc.gov No. II-06-008 March 28, 2006 CONTACT: Ken Clark (404)562-4416 E-mail: OPA2@nrc.gov Roger Hannah (404)562-4417 NRC TO DISCUSS 2005 PERFORMANCE AT SEQUOYAH NUCLEAR POWER PLANT The Nuclear Regulatory Commission staff is scheduled to meet with Tennessee Valley Authority officials April 5 to discuss the NRCs annual assessment of safety performance at the Sequoyah nuclear power plant, located near Soddy-Daisy, Tenn. The period covered is the calendar year 2005.

The 2:00 p.m. meeting at the Sequoyah Training Center is open to public observation. Before the meeting ends, NRC staff will be available to answer public questions on the plants safety performance, as well as the agencys role in ensuring safe operation of the facility.

Each year the NRC staff assesses the performance of the Sequoyah plant and all of the nations other commercial nuclear power plants, NRC Region II Administrator William Travers said.

This meeting gives us a chance to discuss our assessment with the company, with local officials and with residents near the plant. Our aim is to make this information available to the public and answer any questions people may have about our oversight.

The report says the Sequoyah plant operated safely during 2005. The NRC uses color-coded inspection findings and performance indicators to assess nuclear plant performance. The colors start with green and increase to white, yellow or red, commensurate with the safety significance of the issues involved. Both Sequoyah reactors received green inspection findings from the NRC during 2005, which means that all were of low safety significance. As a result, Sequoyah will receive the baseline, or normal, level of NRC inspections during 2006.

A letter sent from the NRC Region II Office to plant officials addresses the performance of the plant during the period and will serve as the basis for the meeting discussion. It is available on the NRC web site at www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/seq_2005q4.pdf .

Routine inspections are performed by NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region II Office in Atlanta, and the agencys headquarters in Rockville, Md. In addition to the baseline inspections in 2006, the NRC plans inspections of Sequoyahs Independent Spent Fuel (Dry Cask) Storage Installation and inspections of Unit 2 containment building sumps and the Unit 2 reactor pressure vessel heads and head penetration nozzles. These inspections are part of the agencys review of sump clogging and vessel head penetration cracking at pressurized water reactors.

Current performance information for Sequoyah Unit 1 is available on the NRCs web site at www.nrc.gov/NRR/OVERSIGHT/ASSESS/SEQ1/seq1_chart.html and at www.nrc.gov/NRR/OVERSIGHT/ASSESS/SEQ2/seq2_chart.html for Sequoyah Unit 2 .