Page 1 of 43 Exelon Nuclear Job Performance Measure Reactivation of SRO License JPM Number: A-N-a Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date
Page 2 of 43 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
- 1. Task description and number, JPM description and number are identified.
- 2. Knowledge and Abilities (K/A) references are included.
- 3. Performance location specified. (In-plant, control room, or simulator)
- 4. Initial setup conditions are identified.
- 5. Initiating and terminating cues are properly identified.
- 6. Task standards identified and verified by SME review.
- 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
- 9. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
SME/Instructor Date SME/Instructor Date SME/Instructor Date
Page 3 of 43 Revision Record (Summary)
New JPM.
Page 4 of 43 SIMULATOR SETUP INSTRUCTIONS Use any IC that accommodates other JPMs.
This is a table top JPM utilizing Simulator procedures.
HANDOUT PREPARATION Fill out OP-AA-105-102, Attachment 2 up to but not including Shift Manager Approval for a fictitious SRO License holder.
In the Hours on Shift table, enter 4 shifts of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as a Unit Supervisor. Enter 1 shift of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as the WEC supervisor.
Page 5 of 43 INITIAL CONDITIONS
- 1. You are the Shift Manager.
- 2. An SRO is in the process of license reactivation.
- 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
INITIATING CUE The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and return it to me.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Page 6 of 43 The time clock starts when the candidate acknowledges the initiating cue.
Page 7 of 43 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
Cue: Provide the Examinee the provided marked up copy of OP-AA-105-102,.
- 1. Review OP-AA-105-102, Attachment 2.
Reviews OP-AA-105-102,.
- 2. Check that Hours on Shift are applicable for license reactivation.
Notes that 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> listed in the Hours on Shift are for WEC Supervisor which does not count toward the 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> required.
- 3. Check that licensee has the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.
Determines that licensee has ONLY 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> toward the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.
- 4. Report the results of the review to the Shift Operations Superintendent (SOS).
Returns without signing OP-AA-105-102, Attachment 2 to the SOS.
Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift.
Cue: As the SOS, acknowledge the report.
END JPM Stop Time:_________
Page 8 of 43 Operators Name: ___________________________________
Job
Title:
Title:
Reactivation of SRO License JPM Number: A-N-a Revision Number:
00 Task Number and
Title:
299L024, Maintain an Active License K/A Number and Importance: 2.1.5
--/3.5 Suggested Testing Environment:
Simulator Actual Testing Environment:
- Simulator Plant Control Room Testing Method
- Simulate Alternate Path: Yes
- No
- Perform SRO Only
- ; Yes No Time Critical:
Yes
- No Estimated Time to Complete
15 minutes Actual Time Used: _______minutes
References:
OP-AA-105-102, Rev. 07, NRC Active License Maintenance EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 9 of 10 INITIAL CONDITIONS
- 1. You are the Shift Manager.
- 2. An SRO is in the process of license reactivation.
- 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
INITIATING CUE The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and return it to me.
Page 10 of 10
Page 11 of 10 Exelon Nuclear Job Performance Measure Verify LPCI System Valve Operability And Timing JPM Number: A-N-c Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date
Page 12 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
- 12. Task description and number, JPM description and number are identified.
- 13. Knowledge and Abilities (K/A) references are included.
- 14. Performance location specified. (In-plant, control room, or simulator)
- 15. Initial setup conditions are identified.
- 16. Initiating and terminating cues are properly identified.
- 17. Task standards identified and verified by SME review.
- 18. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 19. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
- 20. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
SME/Instructor Date SME/Instructor Date SME/Instructor Date
Page 13 of 10 Revision Record (Summary)
Page 14 of 10 SIMULATOR SETUP INSTRUCTIONS Use any IC that accommodates other JPMs.
This is a table top JPM utilizing Simulator procedures.
PROCEDURE PREPARATION Mark up a copy of DOS 1500-01, LPCI System Valve Operability And Timing, to indicate that testing is complete.
For MO 2-1501-20A, enter a close stroke time in the ALERT range of the DISACM.
For MO 2-1501-38A, enter a close stroke time in the REQUIRED ACTION range of the DISACM.
For ALL other valves, enter a time within the ACCEPTABLE range.
Page 15 of 10 INITIAL CONDITIONS You are the Unit 2 Unit Supervisor.
The Unit 2 Aux NSO just completed surveillance DOS 1500-01, LPCI System Valve Operability And Timing, as required by the IST program.
INITIATING CUE Review the surveillance and report to the Shift Manager the acceptability and required actions, if any, based on the results of your review.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
Page 16 of 10 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 1. Verify Acceptance Criteria met.
Reviews Checklist A, LPCI System Valve Operability and Timing and determines the following:
MO 2-1501-20A stroke close time is in the ALERT range of the DISACM.
MO 2-1501-38A stroke close time is in the REQUIRED ACTION range of the DISACM.
- 2. Per Acceptance Criteria, refer to ER-AA-321.2 and determine that MO 2-1501-20A should be restroked.
Per Acceptance Criteria, refers to ER-AA-321 Attachment 2.2 and determines that MO 2-1501-20A should be restroked.
- 3. Per Acceptance Criteria and ER-AA-321.2, determine that MO 2-1501-38A should be declared inoperable.
Per Acceptance Criteria and ER-AA-321 Attachment 2.2, determines that MO 2-1501-38A should be declared inoperable.
Page 17 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 4. Refer to Tech Specs and determine that section 3.6.1.3 Primary Containment Isolation Valves (PCIVs) Condition A applies for MO 2-1501-38A.
Refers to Tech Specs and determines that section 3.6.1.3 Primary Containment Isolation Valves (PCIVs) Condition A applies for MO 2-1501-38A.
LCOs:
- Isolate the affected penetration flow path within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- Verify the affected penetration flow path is isolated once per 31 days.
- 5. Refer to Tech Specs and determine that section 3.6.2.3 Suppression Pool Cooling Condition A applies for MO 2-1501-38A if the flow path is isolated.
Refer to Tech Specs and determine that section 3.6.2.3 Suppression Pool Cooling Condition A applies for MO 2-1501-38A if the flow path is isolated.
LCOs:
- Restore suppression pool cooling subsystem to OPERABLE status within 7 days.
- 6. Dispatch an operator to inspect MO 2-1501-38A.
Dispatches an operator to inspect MO 2-1501-38A.
Cue: As the operator, acknowledge the order.
- 7. Notify the IST Coordinator.
Notifies the IST Coordinator.
Cue: As the IST Coordinator, acknowledge the notification.
Page 18 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 8. Report results of surveillance to the Shift Manager.
Reports the following to the Shift Manager:
o MO 2-1501-20A stroke close time is in the ALERT range of the DISACM and should be restroked.
o MO 2-1501-38A stroke close time is in the REQUIRED ACTION range of the DISACM and is inoperable.
o Per Tech Spec, the MO 2-1501-38A flow path is required to be isolated within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
o If the 2-1501-38A flow path is isolated, then restore suppression pool cooling subsystem to OPERABLE status within 7 days.
Cue: As the Shift Manager, acknowledge report. If the examinee does not report the required action for isolating the flow path, direct the examinee to determine if any actions are required if the flow path is isolated.
END JPM Stop Time:_________
Page 19 of 10 Operators Name: ___________________________________
Job
Title:
Title:
Verify LPCI System Valve Operability And Timing JPM Number: A-N-c Revision Number:
00 Task Number and
Title:
298L057, Perform an operability check of the following pieces of equipment: MO/AO Valves.
K/A Number and Importance: 2.2.12
--/3.4 Suggested Testing Environment:
Simulator Actual Testing Environment:
- Simulator Plant Control Room Testing Method
- Simulate Alternate Path: Yes
- No
- Perform SRO Only
- ; Yes No Time Critical:
Yes
- No Estimated Time to Complete
15 minutes Actual Time Used: _______minutes
References:
DOS 1500-01, R 27, LPCI System Valve Operability And Timing Dresden In-Service Testing Acceptance Criteria Manual (DISACM)
EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-d Page 20 of 8 INITIAL CONDITIONS You are the Unit 2 Unit Supervisor.
The Unit 2 Aux NSO just completed surveillance DOS 1500-01, LPCI System Valve Operability And Timing, as required by the IST program.
INITIATING CUE Review the surveillance and report to the Shift Manager the acceptability and required actions, if any, based on the results of your review.
A-N-d Page 21 of 8
A-N-d Page 22 of 8 Exelon Nuclear Job Performance Measure CCSW Activity Calculation JPM Number: A-N-d Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-d Page 23 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
- 23. Task description and number, JPM description and number are identified.
- 24. Knowledge and Abilities (K/A) references are included.
- 25. Performance location specified. (in-plant, control room, or simulator)
- 26. Initial setup conditions are identified.
- 27. Initiating and terminating cues are properly identified.
- 28. Task standards identified and verified by SME review.
- 29. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 30. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
- 31. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
SME/Instructor Date SME/Instructor Date SME/Instructor Date
A-N-d Page 24 of 8 Revision Record (Summary)
Revision 00, New for ILT 05-1 NRC Exam
A-N-d Page 25 of 8 SIMULATOR SETUP INSTRUCTIONS
- 2. This is a tabletop JPM utilizing simulator procedures.
- 3. Ensure a calculator is available at the NSO desk and memory/display is secured.
EXAMINEE HANDOUT PREPARATION
- 1. Prepare a unmarked copy of DOS 1500-08.
- 2. Fill out a Data Sheet showing the Chemistry sample results for 3A LPCI Hxthat includes the following results:
A-N-d Page 26 of 8 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 3. ALL Circulating Water pumps and Service Water pumps are running.
INITIATING CUE Perform the DOS 1500-08 Data Sheet 1 calculations for 3A LPCI HX ONLY..
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-d Page 27 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
Note: Provide the clean copy of DOS 1500-08 and the Chemistry Data Sheet to the examinee when the initiating cue is given.
Note: Calculator is available at U2 NSO desk.
Completes DOS 1500-08 Data Sheet 1 for 3A LPCI HX with the results matching those on the provided KEY.
END JPM Stop Time:_________
A-N-d Page 28 of 8 Operators Name: ___________________________________
Job
Title:
Title:
Verify CCSW Activity Calculation JPM Number:
A-N-d Revision Number:
01 Task Number and
Title:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: 2.2.11; 2.7 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment:
- Simulator Plant Control Room Testing Method
- Simulate Alternate Path: Yes
- No
- Perform SRO Only
- ; Yes No Time Critical:
Yes
- No Estimated Time to Complete
- 13 minutes Actual Time Used: _______minutes
References:
DOS 1500-08, R15, Discharge of Containment Cooling Service Water (CCSW) from Low Pressure Coolant Injection (LPCI) Heat Exchanger During CCSW Pump Operation EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 29 of 13 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 3. ALL Circulating Water pumps and Service Water pumps are running.
INITIATING CUE Perform the DOS 1500-08 Data Sheet 1 calculations for 3A LPCI HX ONLY..
Page 30 of 13
Page 31 of 13 Exelon Nuclear Job Performance Measure Determine Emergency Classification JPM Number: A-N-e Revision Number: 00 Date: 10/05 Developed By:
Instructor Date Approved By:
Training Department Date
Page 32 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
- 34. Task description and number, JPM description and number are identified.
- 35. Knowledge and Abilities (K/A) references are included.
- 36. Performance location specified. (In-plant, control room, or simulator)
- 37. Initial setup conditions are identified.
- 38. Initiating and terminating cues are properly identified.
- 39. Task standards identified and verified by SME review.
- 40. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 41. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
- 42. Pilot test the JPM:
- a. verify cues both verbal and visual are free of conflict, and
- b. ensure performance time is accurate.
SME/Instructor Date SME/Instructor Date SME/Instructor Date
Page 33 of 13 Revision Record (Summary)
From Bank: S-EP-01
Page 34 of 13 SIMULATOR SETUP INSTRUCTIONS Use any IC that accommodates other JPMs.
This is a table top JPM utilizing Simulator procedures.
Page 35 of 13 INITIAL CONDITIONS This is a time critical JPM You are required to locate the appropriate procedures for this JPM.
You are the Shift Emergency Director.
An event has occurred resulting in the following conditions:
Evaluator - Give examinee the attached condition sheet.
Evaluator copy is on next page.
INITIATING CUE Review the event, determine notification requirements and perform ONE of the following:
- 1. IF an emergency condition exists:
Determine EAL(s) (Ignore discretionary EALs).
Complete a NARS Form. Give the completed NARS Form to the WEC Supervisor. He will make the state notification.
OR;
- 2. IF NO emergency condition exists:
Determine ENS notification requirement.
Fill out ENS form
Page 36 of 13 An event has occurred resulting in the following conditions:
A manual Reactor Scram was successful prior to an automatic scram signal, one hour ago.
15 min. into the event, TR-22 tripped on Sudden Pressure.
Coolant activity is 320 µCi/g I-131.
Drywell radiation monitors indicate 90 R/hr.
Drywell Pressure = 1.22 psig.
Reactor Building Area Temperatures:
AREA TEMPERATURE (°F)
HPCI Room 90 Shutdown Cooling Pump room 95 Shutdown Cooling Hx Room 105 Clean Up Demin Room 85 Clean Up Pump Hx Area 90 Isolation condenser Area 85 Reactor Building Area Radiation Levels:
AREA RADIATION (mr/hr)
HPCI Cubicle 80 East LPCI Pump Area 8
West LPCI Pump Area 6
East CRD Module Area 20 West CRD Module Area 30 Vessel Instrument Rack Area 20 Clean Up System Area 25 Isolation Condenser Area 6
Wind direction = 282 deg.
Wind speed = 10 mph Any parameters not listed are in a normal band.
Any equipment not listed is operating as expected.
Page 37 of 13 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
- (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
Page 38 of 13 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
START OF FIRST TIME CRITICAL PORTION (15 min.)
Note: Give examinee the attached condition sheet.
- 9. Determine if any EALs exist.
Identifies EALs:
FA1: Loss or Potential Loss of Fuel Clad or RCS Barrier. (2.a Coolant activity >300 µCi/gm) o MU1: Unplanned loss of all offsite AC power to a units ECCS buses.
- 10. Determine final classification of an ALERT.
Determines highest classification of an ALERT FA1 within 15 minutes.
END OF FIRST TIME CRITICAL PORTION START OF SECOND TIME CRITICAL PORTION (12 min.)
Note: The notification is required to be made within 15 min. Therefore, the NARS form must be filled out with enough time left to make the actual call within the 15 min. limit.
- 11. Locate the correct form.
Examinee obtains clean copy of EP-MW-114-100-F-01 from simulator drawer.
Note: When the Examinee has located the NARS form, give him the provided blank copy of the NARS form.
Note: If asked, REMIND examinee that this is the initial notification.
- 12. Complete UTILITY MESSAGE NO.
Examinee enters a 1.
Page 39 of 13 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 13. Complete STATE MESSAGE NO.
Examinee enters a N/A.
- 14. Mark STATUS corresponding to the appropriate status description.
Examinee marks [B]. (It is NOT considered UNSAT if the examinee marks [A], as this is simulated as a real event.)
- 15. Mark the appropriate station.
Examinee marks [D].
- 16. Mark the correct CLASSIFICATION LEVEL.
Examinee marks [B] ALERT (FA1).
- 17. Complete ACCIDENT CLASSIFIED.
Examinee records the time that the Cue was acknowledged, todays date, and FA1 for the EAL#.
- 18. Complete ACCIDENT TERMINATED.
Examinee enters N/A.
- 19. Mark appropriate RELEASE STATUS category.
Examinee marks [A].
- 20. Mark letter corresponding to TYPE OF RELEASE.
Examinee marks [A].
- 21. Fill in the WIND DIRECTION and WIND SPEED.
Examinee fills 282o for wind direction and 10 for wind speed as MILES/HR. Wind speed in METERS/SEC is marked N/A.
- 22. Complete PROTECTIVE ACTION RECOMMENDATIONS Examinee determines Protective Action Recommendation of NONE and marks [A].
- 23. Completes ADDITIONAL INFORMATION blank.
Examinee enters None.
Page 40 of 13 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 24. Complete Verified With blank.
Examinee enters N/A.
Cue: If asked, no verifier available.
- 25. Obtain Shift Manager permission to transmit NARS message.
Signs as Shift Manager to transmit NARS message.
- 26. Direct WEC Supervisor to make State notification within 15 min. of classification.
Directs WEC Supervisor to make State notification within 15 min. of classification.
Cue: Acknowledge direction.
END OF SECOND TIME CRITICAL PORTION END JPM Stop Time:_________
Page 41 of 13 Operators Name: ___________________________________
Job
Title:
Title:
Determine Emergency Classification JPM Number: A-N-e Revision Number:
00 Task Number and
Title:
295L160, Perform the duties of the Shift Emergency Director K/A Number and Importance: 2.4.38
--/4.0 Suggested Testing Environment:
Simulator Actual Testing Environment:
- Simulator Plant Control Room Testing Method
- Simulate Alternate Path: Yes
- No
- Perform SRO Only
- Yes
- No Time Critical
- Yes No Estimated Time to Complete
27 minutes Actual Time Used: _______minutes Time Critical Portions of JPM: 15 minutes to declare classification.
12 minutes to fill out NARS form (so enough time is left to notify state within 15 min.)
References:
EP-AA-1004, Rev. 18, Dresden Annex EP-AA-111, Rev. 10, Emergency Classification and Protective Actions Recommendations EP-AA-114-100, Rev. 05, Midwest Region OffSite Notifications EP-AA-114-100-F-01, Rev. B, Nuclear Accident Reporting System (NARS) Form EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 42 of 9 INITIAL CONDITIONS You are the Shift Manager.
An event has occurred resulting in the following conditions:
A manual Reactor Scram was successful prior to an automatic scram signal, one hour ago.
15 min. into the event, TR-22 tripped on Sudden Pressure.
Coolant activity is 320 µCi/g I-131.
Drywell radiation monitors indicate 90 R/hr.
Drywell Pressure = 1.22 psig.
Reactor Building Area Temperatures:
AREA TEMPERATURE (°F)
HPCI Room 90 Shutdown Cooling Pump room 95 Shutdown Cooling Hx Room 105 Clean Up Demin Room 85 Clean Up Pump Hx Area 90 Isolation condenser Area 85 Reactor Building Area Radiation Levels:
AREA RADIATION (mr/hr)
HPCI Cubicle 80 East LPCI Pump Area 8
West LPCI Pump Area 6
East CRD Module Area 20 West CRD Module Area 30 Vessel Instrument Rack Area 20 Clean Up System Area 25 Isolation Condenser Area 6
Wind direction = 282 deg.
Wind speed = 10 mph Any parameters not listed are in a normal band.
Any equipment not listed is operating as expected.
Page 43 of 9 INITIATING CUE Review the event, determine notification requirements and perform ONE of the following:
- 1. IF an emergency condition exists:
Determine EAL(s) (Ignore discretionary EALs).
Complete a NARS Form. Give the completed NARS Form to the WEC Supervisor. He will make the state notification.
OR;
- 2. IF NO emergency condition exists:
Determine ENS notification requirement.
Fill out ENS form