|
---|
Category:Letter
MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses ML23073A0712023-03-30030 March 2023 Enclosure 1 - Order - Susquehanna Steam Electric Station, Units 1 and 2 and Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments ML23073A0682023-03-30030 March 2023 Letter - Susquehanna Steam Electric Station, Units 1 and 2 and Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments ML23073A0822023-03-30030 March 2023 Enclosure 2 - Draft Conforming Amendments - Susquehanna Steam Electric Station, Units 1 & 2 & Associated Independent Spent Fuel Storage Installation- Order Approving Indirect Transfer of Licenses & Draft Conforming License Amendments EPID L ML23073A1072023-03-30030 March 2023 Enclosure 4 - Safety Evaluation Nonproprietary Susquehanna Steam Electric Station,Units 1,2 & Associated Independent Spent Fuel Storage Installation-Order Approving Indirect Transfer of Licenses & Draft Conforming License Amendments EPID L- ML23010A1082023-01-15015 January 2023 Issuance of Amendment No. 268 Change to Control Rod Technical Specifications ML22294A1502022-11-17017 November 2022 Issuance of Amendment Nos. 284 and 267 Relocating Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program ML22299A1122022-11-0303 November 2022 Notice of Consideration of Approval of Indirect Transfer of Licenses & Conforming Amendments & Opportunity to Request Hearing - Susquehanna Steam Station, Units 1 & 2 & Associated Independent Spent Fuel Storage Installation (EPID L-2022-LLM ML22256A0542022-10-28028 October 2022 Issuance of Amendment Nos. 283 and 266 Change to Reactor Steam Dome Pressure--Low Instrument Function Allowable Value in Technical Specifications ML22200A0622022-08-30030 August 2022 Issuance of Amendment Nos. 282 and 265 Regarding Risk-Informed Completion Times in Technical Specifications ML22146A2072022-07-15015 July 2022 Issuance of Amendment Nos. 281 and 264 Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR - NON-PROPRIETARY - ML21229A1572021-11-0404 November 2021 Issuance of Amendment No. 263 Temporary Change to Unit 2 Technical Specification 3.8.7 to Allow Replacement of Unit 1 480 Volt Load Center Transformers ML20317A3142021-03-10010 March 2021 Issuance of Amendment Nos. 280 and 262 Revise Technical Specification 3.8.1, AC Sources-Operating, to Create a New Condition for an Inoperable Manual Synchronization Circuit ML20342A2372021-02-18018 February 2021 Issuance of Amendment Nos. 279 and 261 Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements ML20168B0042021-01-21021 January 2021 Issuance of Amendment Nos. 278 and 260 to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2019-LLA-0153) (Redacted) ML20297A5642020-12-22022 December 2020 Issuance of Amendment Nos. 277 and 259 Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML20199G7492020-10-0808 October 2020 Issuance of Amendment Nos. 276 and 258 Revise Technical Specification 5.5.2 to Modify the Design-Basis Loss-of-Coolant Accident Analysis ML19248A8442020-01-17017 January 2020 Issuance of Amendment Nos. 275 and 257 Temporary Changes to Allow Replacement of Emergency Service Water System Piping ML19336D0642020-01-13013 January 2020 Issuance of Amendment Nos. 274 and 256 to Revise Shutdown Margin Definition to Address Advanced Fuel (TSTF-535, Revision 0) ML19155A2642019-07-16016 July 2019 Issuance of Amendment Nos. 273 and 255 Adoption of TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19154A0602019-06-24024 June 2019 Issuance of Amendment Nos. 272 and 254 Technical Specifications to Adopt TSTF-501, Revision 1, Relocated Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18284A4552018-11-0707 November 2018 Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML18222A2032018-09-26026 September 2018 Issuance of Amendment Nos. 271 and 253 Revising Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MG0269 and MG0270; EPID L-2017-LLA-0306) ML17187A2972017-07-28028 July 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Issuance of Amendments Revising Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF9154 and MF9155) ML17067A4442017-03-27027 March 2017 Issuance of Amendments Secondary Containment Access Openings ML17004A2502017-01-26026 January 2017 Susquehanna Steam Electric Station, Unit 2 - Issuance of Amendment Re: Temporary Change of Technical Specifications to Allow Replacement of Engineered Safeguard System Load Center Transformers. (CAC No. MF7298) ML16005A2342016-05-20020 May 2016 Issuance of Amendments Adoption of TSTF-425 ML16062A2162016-03-28028 March 2016 Issuance of Amendments Emergency Action Level Scheme Change ML15267A3812015-11-0202 November 2015 Issuance of Amendments Approval of Cyber Security Plan Milestone 8 ML15243A1402015-09-30030 September 2015 Issuance of Amendments Revisions to Technical Specification 3.4.10, Reactor Coolant System Pressure and Temperature (P/T) Limits ML15054A0582015-04-10010 April 2015 Letter Forwarding Order Approving Transfer of Licenses and Conforming Amendments Related to Susquehanna Steam Electric Station, Units 1 and 2 (TAC MF4426 and MF4427) ML14111A0522014-05-14014 May 2014 Issuance of Amendments Regarding Change to Technical Specification Surveillance Requirement 3.5.1.12 ML14036A2572014-02-26026 February 2014 Issuance of Amendment Change to Allow Only One Manual Trip System to Be Operable for the Residual Heat Removal Shutdown Cooling System in Modes 4 and 5 ML12265A2982012-10-17017 October 2012 Issuance of Amendment Approval of Cyber Security Plan Milestones 3 and 6 ML1211701292012-04-27027 April 2012 Correction to Issuance of Amendment ML12096A1582012-04-19019 April 2012 Issuance of Amendment Temporary Change to Unit 2 Technical Specifications 3.8.7 and 3.7.1 to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1, 4160 V Buses PLA-4817, Amendment Request to Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES, Unit 1 4160 V Buses, Unit 2 Technical Specifications2012-03-0808 March 2012 Amendment Request to Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES, Unit 1 4160 V Buses, Unit 2 Technical Specifications ML11292A1372011-11-17017 November 2011 ME5050 & ME5051-Issuance of Amendments to Renewed FOLs Changes to TS SR 3.4.3.1, Safety Relief Valve Tolerances from -3% to -5% ML11221A2712011-09-0808 September 2011 License Amendment, Issuance of Amendment Adoption of TSTF-514, Revision 3 PLA-6642, Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances2010-11-10010 November 2010 Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances ML0931602762009-11-24024 November 2009 Renewed Operating License No. NPF-22 for Susquehanna Steam Electric Station, Unit 2 ML0931602402009-11-24024 November 2009 Renewed Operating License No. NPF-14 for Susquehanna Electric Steam Station, Unit 1 ML0929501102009-11-0909 November 2009 License Amendment, Changed Technical Specification Table 3.3.5.1-1 for ECCS Instrumentation for CST and Editorial Changes to TS 3.10.8.f ML0917305982009-07-13013 July 2009 License Amendment, Deleted Technical Specification (TS) Section 5.2.2.e, Which Is Superseded by Title 10 of the Code of Federal Regulations (10 CFR) Part 26, Fitness for Duty Programs, Subpart I, Managing... ML0912703662009-07-0606 July 2009 ME0693 & ME0694, Issuance of Amendment to Incorporate TSTF-448 Using CLIIP ML0905002332009-03-18018 March 2009 Issuance of Amendment Technical Specification Change to Technical Specification 3.6.1.3 to Increase the Maximum Allowable Secondary Containment Bypass Leakage Limit ML0903303912009-02-26026 February 2009 Issuance of Amendment Changes in MCPR Safety Limits ML0835004782009-01-0202 January 2009 Issuance of Amendments 249 & 228 Adoption of TSTF-460-A, Revision 0, Control Rod Scram Time Test Frequency Using Consolidated Line Item Improvement Process (TAC Nos. MD9301 and MD9302) ML0835203952009-01-0202 January 2009 Issuance of Amendment Adoption of TSTF-475, Revision 1, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action Using Consolidated Line Item Improvement Process ML0829702642008-12-11011 December 2008 Issuance of Amendment Revision of Technical Specifications (Tss) 3.8.4, DC Sources-Operating, 2023-05-17
[Table view] Category:Safety Evaluation
MONTHYEARML23257A1222023-09-19019 September 2023 Authorization and Safety Evaluation for Alternative Request for Valve 251130 ML23207A1762023-08-0101 August 2023 Authorization and Safety Evaluation for Relief Request 4RR-10 ML23073A0822023-03-30030 March 2023 Enclosure 2 - Draft Conforming Amendments - Susquehanna Steam Electric Station, Units 1 & 2 & Associated Independent Spent Fuel Storage Installation- Order Approving Indirect Transfer of Licenses & Draft Conforming License Amendments EPID L ML23073A1072023-03-30030 March 2023 Enclosure 4 - Safety Evaluation Nonproprietary Susquehanna Steam Electric Station,Units 1,2 & Associated Independent Spent Fuel Storage Installation-Order Approving Indirect Transfer of Licenses & Draft Conforming License Amendments EPID L- ML23010A1082023-01-15015 January 2023 Issuance of Amendment No. 268 Change to Control Rod Technical Specifications ML22294A1502022-11-17017 November 2022 Issuance of Amendment Nos. 284 and 267 Relocating Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program ML22256A0542022-10-28028 October 2022 Issuance of Amendment Nos. 283 and 266 Change to Reactor Steam Dome Pressure--Low Instrument Function Allowable Value in Technical Specifications ML22200A0622022-08-30030 August 2022 Issuance of Amendment Nos. 282 and 265 Regarding Risk-Informed Completion Times in Technical Specifications ML22146A2072022-07-15015 July 2022 Issuance of Amendment Nos. 281 and 264 Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR - NON-PROPRIETARY - ML21229A1572021-11-0404 November 2021 Issuance of Amendment No. 263 Temporary Change to Unit 2 Technical Specification 3.8.7 to Allow Replacement of Unit 1 480 Volt Load Center Transformers ML21095A3042021-04-19019 April 2021 Relief Request 4RR-02 Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML20317A3142021-03-10010 March 2021 Issuance of Amendment Nos. 280 and 262 Revise Technical Specification 3.8.1, AC Sources-Operating, to Create a New Condition for an Inoperable Manual Synchronization Circuit ML20342A2372021-02-18018 February 2021 Issuance of Amendment Nos. 279 and 261 Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements ML20168B0042021-01-21021 January 2021 Issuance of Amendment Nos. 278 and 260 to Allow Application of Advanced Framatome Atrium 11 Fuel Methodologies (EPID L-2019-LLA-0153) (Redacted) ML20297A5642020-12-22022 December 2020 Issuance of Amendment Nos. 277 and 259 Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules ML20199G7492020-10-0808 October 2020 Issuance of Amendment Nos. 276 and 258 Revise Technical Specification 5.5.2 to Modify the Design-Basis Loss-of-Coolant Accident Analysis ML20028E8842020-02-10010 February 2020 Correction to Amendment Nos. 275 and 257 Temporary Changes to Allow Replacement of the Emergency Service Water System Piping ML19248A8442020-01-17017 January 2020 Issuance of Amendment Nos. 275 and 257 Temporary Changes to Allow Replacement of Emergency Service Water System Piping ML19336D0642020-01-13013 January 2020 Issuance of Amendment Nos. 274 and 256 to Revise Shutdown Margin Definition to Address Advanced Fuel (TSTF-535, Revision 0) ML19155A2642019-07-16016 July 2019 Issuance of Amendment Nos. 273 and 255 Adoption of TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19154A0602019-06-24024 June 2019 Issuance of Amendment Nos. 272 and 254 Technical Specifications to Adopt TSTF-501, Revision 1, Relocated Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML18302A3032019-01-0303 January 2019 SE Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order Ea-13-109 (CAC Nos. MF4364 and MF4365; EPID No. L-2014-JLD-0055 ML18284A4552018-11-0707 November 2018 Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML18222A2032018-09-26026 September 2018 Issuance of Amendment Nos. 271 and 253 Revising Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MG0269 and MG0270; EPID L-2017-LLA-0306) ML17187A2972017-07-28028 July 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Issuance of Amendments Revising Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF9154 and MF9155) ML17067A4442017-03-27027 March 2017 Issuance of Amendments Secondary Containment Access Openings ML16320A0802016-11-30030 November 2016 NON-PROPRIETARY - Safety Evaluation by NRR Related to Indirect Transfer of Renewed Operating Licenses from Talen Energy Corporation to Riverstone Holdings, LLC for the Susquehanna Steam Electric Station, Units 1 and 2 ML16005A2342016-05-20020 May 2016 Issuance of Amendments Adoption of TSTF-425 ML16069A1992016-05-10010 May 2016 Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 Through MF6307) ML16062A2162016-03-28028 March 2016 Issuance of Amendments Emergency Action Level Scheme Change ML15267A3812015-11-0202 November 2015 Issuance of Amendments Approval of Cyber Security Plan Milestone 8 ML15243A1402015-09-30030 September 2015 Issuance of Amendments Revisions to Technical Specification 3.4.10, Reactor Coolant System Pressure and Temperature (P/T) Limits ML15098A4782015-04-28028 April 2015 Relief Requests 4RR-01: Use of a Risk-Informed Inservice Inspection Alternative for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF5097 and MF5098) ML15054A0582015-04-10010 April 2015 Letter Forwarding Order Approving Transfer of Licenses and Conforming Amendments Related to Susquehanna Steam Electric Station, Units 1 and 2 (TAC MF4426 and MF4427) ML14141A0732014-06-0909 June 2014 Relief Requests for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF2705 Through MF2714) ML14122A1972014-05-22022 May 2014 Relief Requests for the Fourth 10-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2912 and MF2915) ML14111A0522014-05-14014 May 2014 Issuance of Amendments Regarding Change to Technical Specification Surveillance Requirement 3.5.1.12 ML14028A3952014-03-12012 March 2014 Request for Relief 3RR-20 from the Requirements of the American Society of Mechanical Engineers Section XI ML14036A2572014-02-26026 February 2014 Issuance of Amendment Change to Allow Only One Manual Trip System to Be Operable for the Residual Heat Removal Shutdown Cooling System in Modes 4 and 5 ML12160A1942012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to the Fukushima Daiichi Nuclear Power Plant Accident ML1211701292012-04-27027 April 2012 Correction to Issuance of Amendment ML12096A1582012-04-19019 April 2012 Issuance of Amendment Temporary Change to Unit 2 Technical Specifications 3.8.7 and 3.7.1 to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1, 4160 V Buses ML12062A1332012-03-0606 March 2012 ME7902 & ME7903-Approval of RR-2012-001 Use of Later Edition of the ASME OM Code for Check Valve Condition Monitoring Program ML12046A0462012-02-23023 February 2012 Relief Request No. 3RR-18, Regarding Relief from the Requirements of the ASME Code for Successive Inspections ML11292A1372011-11-17017 November 2011 ME5050 & ME5051-Issuance of Amendments to Renewed FOLs Changes to TS SR 3.4.3.1, Safety Relief Valve Tolerances from -3% to -5% ML11221A2712011-09-0808 September 2011 License Amendment, Issuance of Amendment Adoption of TSTF-514, Revision 3 ML11152A0092011-07-21021 July 2011 Issuance of Amendment Approval of the PPL Susquehanna, LLC Cyber Security Plan ML1035600052011-01-0404 January 2011 Approval of Relief Request RR-02, Revision 1, to Allow 6 Month Extension for SRV IST ML1015204312010-06-16016 June 2010 Request for Alternative No. RR-07 Main Steam Safety Relief Valve Test Interval Extension ML0935201522010-01-0707 January 2010 Relief Requests RR-07 and RR-08 from the Requirements of the OM Code Inservice Testing of Safety Relief Valves 2023-09-19
[Table view] |
Text
March 20, 2006 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 - ISSUANCE OF AMENDMENT REGARDING MINIMUM CRITICAL POWER RATIO SAFETY LIMIT AND REFERENCE CHANGES (TAC NO. MC9187)
Dear Mr. McKinney:
The Commission has issued the enclosed Amendment No. 231 to Facility Operating License No. NPF-14 for the Susquehanna Steam Electric Station, Unit 1 (SSES 1). This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated December 1, 2005, as supplemented by letter dated February 17, 2006.
This amendment changes the SSES 1 TSs by revising the SSES 1 Cycle 15 Minimum Critical Power Ratio Safety Limit in Section 2.1.1.2. for single-loop operation and the references listed in Section 5.6.5.b.
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's Biweekly Federal Register Notice.
Sincerely,
/RA/
Richard V. Guzman, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-387
Enclosures:
- 1. Amendment No. 231 to License No. NPF-14
- 2. Safety Evaluation cc w/encls: See next page
ML060730355 OFFICE NRR/LPLI-1/PM NRR/LPLI-1/LA NRR/DSS/SBWB OGC NRR/LPLI-1/C NAME RGuzman SLittle GCranston
- SHamrick RLaufer DATE 3/15/06 3/15/06 3/6/06 SE DTD 3/20/06 3/20/06 Susquehanna Steam Electric Station, Units 1 and 2 cc:
Robert A. Saccone Community Relations Manager, General Manager - Nuclear Operations Susquehanna PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 634 Salem Blvd., SSO Berwick, PA 18603-0467 Berwick, PA 18603-0467 Aloysius J. Wrape, III Bryan A. Snapp, Esq General Manager - Performance Assoc. General Counsel Improvement and Oversight PPL Services Corporation PPL Susquehanna, LLC Two North Ninth Street, GENTW3 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Allentown, PA 18101-1179 Supervisor - Document Control Services Terry L. Harpster PPL Susquehanna, LLC General Manager - Plant Support Two North Ninth Street, GENPL4 PPL Susquehanna, LLC Allentown, PA 18101-1179 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Richard W. Osborne Allegheny Electric Cooperative, Inc.
Rocco R. Sgarro 212 Locust Street Manager - Nuclear Regulatory Affairs P.O. Box 1266 PPL Susquehanna, LLC Harrisburg, PA 17108-1266 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Director - Bureau of Radiation Protection Pennsylvania Department of Walter E. Morrissey Environmental Protection Supervising Engineer Rachel Carson State Office Building Nuclear Regulatory Affairs P.O. Box 8469 PPL Susquehanna, LLC Harrisburg, PA 17105-8469 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Senior Resident Inspector U.S. Nuclear Regulatory Commission Michael H. Crowthers P.O. Box 35, NUCSA4 Supervising Engineer Berwick, PA 18603-0035 Nuclear Regulatory Affairs PPL Susquehanna, LLC Regional Administrator, Region 1 Two North Ninth Street, GENPL4 U.S. Nuclear Regulatory Commission Allentown, PA 18101-1179 475 Allendale Road King of Prussia, PA 19406 Steven M. Cook Manager - Quality Assurance Board of Supervisors PPL Susquehanna, LLC Salem Township 769 Salem Blvd., NUCSB2 P.O. Box 405 Berwick, PA 18603-0467 Berwick, PA 18603-0035 Dr. Judith Johnsrud Luis A. Ramos National Energy Committee
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Sierra Club 443 Orlando Avenue State College, PA 16803
PPL SUSQUEHANNA, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-387 SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 231 License No. NPF-14
- 1. The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A. The application for the amendment filed by PPL Susquehanna, LLC, dated December 1, 2005, as supplemented on February 17, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-14 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 231 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 20, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 231 FACILITY OPERATING LICENSE NO. NPF-14 DOCKET NO. 50-387 Replace the following pages of the Appendix A Technical Specification with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT TS/2.0-1 TS/2.0-1 TS/5.0-22 TS/5.0-22 TS/5.0-23 TS/5.0-23
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 231 TO FACILITY OPERATING LICENSE NO. NPF-14 PPL SUSQUEHANNA, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 DOCKET NO. 50-387
1.0 INTRODUCTION
By application dated December 1, 2005, Agencywide Documents Access and Management System Accession No. ML053470314, as supplemented by letter dated February 17, 2006 (ML060530614), PPL Susquehanna, LLC, (PPL, the licensee), requested changes to the Technical Specifications (TSs) for Susquehanna Steam Electric Station, Unit 1 (SSES 1). The supplement dated February 17, 2006, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination.
The proposed amendment revises the SSES 1 Cycle 15 (U1C15) Minimum Critical Power Ratio (MCPR) Safety Limit in Section 2.1.1.2 for single-loop operation and the references listed in Section 5.6.5.b.
2.0 REGULATORY EVALUATION
2.1 Regulatory Requirements The regulatory requirements and guidance which the Nuclear Regulatory Commission (NRC) staff considered in its review of the application are as follows:
- 1. Title 10 of the Code of Federal Regulations (10 CFR) establishes the fundamental regulatory requirements with respect to the reactivity control systems. Specifically, General Design Criterion 10 (GDC-10), Reactor design, in Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50 states, in part, that the reactor core and associated coolant, control, and protection systems shall be designed with appropriate margin to assure that specified acceptable fuel design limits are not exceeded.
- 2. NRC Generic Letter 88-16 (GL 88-16), Removal of Cycle-Specific Parameter Limits from Technical Specifications, provides guidance on modifying cycle-specific parameter limits in the TSs.
- 3. NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants, provides guidance on the acceptability of the reactivity control systems, the reactor core, and fuel-system design. Specifically, Section 4.2, Fuel System Design, specifies the criteria for evaluation of fuel-design limits such that there be at least 95% probability at a 95% confidence level that the hot fuel rod in the core does not experience a departure from nucleate boiling or a transition condition during normal operation or anticipated operational occurrences. Section 4.4, Thermal Hydraulic Design, provides guidance on the review of thermal-hydraulic design in meeting the requirement of GDC-10 and the fuel-design criteria established in Section 4.2.
3.0 TECHNICAL EVALUATION
3.1 Proposed Changes to MCPR Safety Limit and Reference Changes PPL proposed to change the MCPR safety limit value in TS 2.1.1.2 for U1C15 operation from 1.10 to 1.12 for single-loop operation to reflect the cycle specific MCPR Safety Limit analysis for U1C15 with the reactor steam dome pressure $785 pounds-per-square inch (psig) and core flow $ 10 million pound-mass-per hour (lbm/hr).
PPL described the approved methodologies used to calculate the MCPR safety limit value for the proposed TS change in its submittal dated December 1, 2005. The U1C15 MCPR safety limit analysis was performed by Framatone Advanced Nuclear Power (FANP) using SSES 1, plant-and cycle-specific fuel and core parameters including power profiles provided by PPL, and the NRC-approved methods including (1) ANF-524(P)(A), Revision 2, Critical Power Methodology for Boiling Water Reactors, Supplement 1, Revision 2 and Supplement 2, (2) EMF-1997(P)(A), Revision 0 and Supplement 1, Revision 0, (3) EMF-2158(P)(A),
Revision 0, Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2.
In its submittal, PPL stated that the current two-loop MCPR safety limit value (1.09) did not change as a result of the U1C15 analysis. However, the single-loop MCPR safety limit value increased by 0.02 (1.10 to 1.12). PPL stated that the 0.02 increase is due to (1) cycle-to-cycle variation and (2) the change from the ANFB-10 to the SPCB Critical Power Correlation.
As PPL previously described in its letter dated December 22, 2003 (ML040020346), changes in both the two-loop and single-loop MCPR safety limits are due solely to cycle-to-cycle variation and estimated to range from -0.01 to +0.01. PPL clarified with further justification in its supplemental letter dated February 17, 2006, that (1) the U1C15 preliminary core loading provided in its submittal was revised to mitigate the potential for excessive friction in peripheral control cells, (2) no changes were made to the loading of the interior control cells, (3) the changes to the U1C15 core loading do not change the proposed two-loop and single-loop MCPR safety limits, and (4) the core composition provided in its submittal remains unchanged.
In its submittal, PPL stated that beginning with U1C15, FANPs NRC-approved EMF-2209(P)(A), SPCB Critical Power Correlation, is applied for MCPR safety limit calculation, reload licensing analyses, and MCPR monitoring.
PPL provided the following justification for the increase in MCPR safety limit for single-loop operation in terms of the SPCB Critical Power Correlation:
Single-loop safety analyses including the MCPR Safety Limit are performed at the highest rod-line that is within the analyzed operating domain for single-loop operation; 76% of rated thermal power and 52 Mlbm/hr core flow. The core flow value of 52 Mlbm/hr is the maximum that can be achieved due to recirculation pump speed limitations in single-loop operation specified in TS 3.4.1. Due to a flow discontinuity in the ANFB-10 Critical Power Correlation near 52 Mlbm/hr core flow, the previous Unit 1 MCPR Safety Limit calculation was performed at a core flow of 55 Mlbm/hr. [...]The SPCB Critical Power Correlation does not have a flow discontinuity at 52 Mlbm/hr.
Therefore, FANP performed the U1C15 single-loop MCPR Safety Limit at 52 Mlbm/hr core flow and also at 55 Mlbm/hr core flow. The results of the analyses are provided in the following table:
Percentage of Pins in Boiling Transition at Single-Loop Conditions for SPCB
% of Pins in Boiling % of Pins in Boiling Transition Transition 52 Mlbm/hr Core Flow 55 Mlbm/hr Core Flow 1.10 MCPR SL 0.198 Calculation Not Performed 1.11 MCPR SL 0.131 0.095 1.12 MCPR SL 0.087 Calculation Not Performed The preceding table shows that changing the core flow from 55 to 52 Mlbm/hr increases the MCPR Safety Limit by 0.01 for the SPCB Critical Power Correlation.
PPL stated that the channel bow assumptions used in the U1C15 MCPR safety limit calculation did not contribute to the increase in the single-loop MCPR safety limit. PPL provided the following justification for this statement and follow-up actions for continued validation of its safety analyses assumptions:
The impact of the channel bow on the MCPR Safety Limit is included due to recent fuel channel/control rod interference observed during previous Unit 1 operating cycles. The channel bow assumptions used for Unit 1 Cycle 15 are consistent with the current Unit 1 assumptions. Therefore, the change in the single-loop MCPR Safety Limit is not the result of a change in channel bow assumptions...
[...]Based on fuel channel/control rod interference observed during previous Unit operating cycles which may indicate that fuel channel bow is larger than the FANP nominal database, PPL requested FANP to increase the amount of channel bow assumed in the Unit 1 Cycle 15 MCPR Safety Limit calculation. PPL requested that FANP use a mean channel bow for the highly exposed Unit 1 Cycle 15 fuel assemblies of 122.6 mils (from an initial value of 61.3 mils) which is consistent with mean channel bow assumed for the current Unit 1 operating cycle following the recently completed
Unit 1 maintenance outage. As part of the continuous validation of safety analyses assumptions, PPL will confirm that the actual Unit 1 Cycle 15 mean channel bow is less than or equal to the mean channel bow assumed. The confirmation will rely on performance data from previously measured fuel channels that were operated in a manner consistent with projected Unit 1 Cycle 15 operation and a potential channel measurement and re-channeling campaign during the refueling and inspection outage preceding Unit 1 Cycle 15 operation. PPL will continue to monitor fuel channel performance in conformance with PPLs fuel channel monitoring program.
PPL also proposed to delete four PPL analytical methods and to add 7 NRC-approved, FANP analytical methods that were not previously contained in TS 5.6.5.b.
3.2 NRC Staff Evaluation The NRC staff has reviewed the justification contained in the application and the supplemental letter for the proposed MCPR safety limit value of 1.12 for single-loop recirculation loop operation using NRC-approved methodologies. Based on the review of the proposed changes, the NRC staff concludes that PPL has provided adequate justification for the 0.02 increase of the MCPR safety limit value for the U1C15 single-loop operation in terms of cycle-specific core loading and the change from the ANFB-10 to the SPCB Critical Power Correlation methodology. Therefore, the proposed MCPR safety limit and its analysis for U1C15 operation using the plant- and cycle-specific calculation in conjunction with the approved methods is acceptable. The U1C15 MCPR safety limit will ensure that 99.9 percent of the fuel rods in the core will not experience boiling transition, which satisfies the requirements of GDC-10.
The NRC staff has reviewed the justification for the proposed reference changes in TS 5.6.5.b and finds the changes acceptable since the references that are removed pertain to PPL analytical methods which are no longer in use for the application of the U1C15 MCPR safety limit calculation. Furthermore, the addition of the references to TS 5.6.5.b which contain FANP analysis methodologies is acceptable since it has already been approved by the NRC for the applications requested by PPL (namely, to support calculations of the cycle-specific parameters specified in TS 5.6.5 beginning with U1C15). The NRC staff finds the proposed changes are in compliance with the guidance specified in GL 88-16.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Pennsylvania State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (71 FR 2595). The amendment also relates to changes in recordkeeping, reporting, or
administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusions set forth in 10 CFR 51.22(c)(9) and (c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: T. Huang R. Guzman Date: March 20, 2006