ML060680090

From kanterella
Jump to navigation Jump to search

Acceptance for Review of Boiling Water Reactors Owners Group (BWROG) SIR-05-044, Pressure Temperature Limits Report Methodology for Boiling Water Reactors, Revision 0
ML060680090
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 04/10/2006
From: Ho Nieh
NRC/NRR/ADRA/DPR
To: Conen J
BWR Owners Group, DTE Energy
Honcharik M, NRR/DPR/PSPBPM, 415-1774
References
SIR-05-044, TAC MC9694
Download: ML060680090 (3)


Text

April 10, 2006 Mr. Joseph E. Conen BWR Owners Group DTE Energy - Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166

SUBJECT:

ACCEPTANCE FOR REVIEW OF BOILING WATER REACTORS OWNERS GROUP (BWROG) SIR-05-044, PRESSURE TEMPERATURE LIMITS REPORT METHODOLOGY FOR BOILING WATER REACTORS, REVISION 0 (TAC NO. MC9694)

Dear Mr. Conen:

By letter dated December 20, 2005, the BWROG submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report SIR-05-044, Pressure Temperature Limits Report Methodology for Boiling Water Reactors, Revision 0. The NRC staff has performed an acceptance review of SIR-05-044. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by June 19, 2006, and issue its draft safety evaluation by November 13, 2006, and estimates that the review will require approximately 330 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on March 2, 2006.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that TRs are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours will be billed accordingly.

Sincerely,

/RA/

Ho K. Nieh, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 691 cc: See next page

April 10, 2006 Mr. Joseph E. Conen BWR Owners Group DTE Energy - Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166

SUBJECT:

ACCEPTANCE FOR REVIEW OF BOILING WATER REACTORS OWNERS GROUP (BWROG) SIR-05-044, PRESSURE TEMPERATURE LIMITS REPORT METHODOLOGY FOR BOILING WATER REACTORS, REVISION 0 (TAC NO. MC9694)

Dear Mr. Conen:

By letter dated December 20, 2005, the BWROG submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Topical Report SIR-05-044, Pressure Temperature Limits Report Methodology for Boiling Water Reactors, Revision 0. The NRC staff has performed an acceptance review of SIR-05-044. We have found that the material presented is sufficient to begin our comprehensive review. The NRC staff expects to issue its request for additional information by June 19, 2006, and issue its draft safety evaluation by November 13, 2006, and estimates that the review will require approximately 330 staff hours including project management time. The review schedule milestones and estimated review costs were discussed and agreed upon in a telephone conference between you and the NRC staff on March 2, 2006.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that TRs are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours will be billed accordingly.

Sincerely,

/RA/

Ho K. Nieh, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 691 cc: See next page DISTRIBUTION:

PUBLIC PSPB Reading File RidsNrrDpr RidsNrrDprPspb RidsNrrLADBaxley RidsAcrsAcnwMailCenter RidsNrrPMMHoncharik RidsOgcMailCenter RidsNrrDciCvib ADAMS ACCESSION NO.: ML060680090 NRR-106 OFFICE PSPB/PM PSPB/LA CVIB/BC PSPB/BC DPR/DD NAME MHoncharik DBaxley MMitchell RGramm HNieh DATE 4/3/06 4/3/06 4/4/06 4/7/06 4/10/06 OFFICIAL RECORD COPY

BWR Owners Group Project No. 691 cc:

Mr. Randy C. Bunt Vice Chairman, BWROG Southern Nuclear Operating Company Bin B057 P.O. Box 1295 Birmingham, AL 35201 Mr. J. A. Gray, Jr.

Regulatory Response Group Vice Chairman BWR Owners Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 Mr. H. Lewis Sumner Executive Chairman, BWROG Southern Nuclear Company 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35242 Mr. Thomas G. Hurst GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 Mr. Amir Shahkarami Executive Vice Chairman, BWROG Exelon Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 Mr. William A. Eaton Entergy P.O. Box 31995 Jackson, MS 39286 Mr. Al Wrape PPL Mail Code GENPL4 Two North Ninth Street Allentown, PA 18101 Mr. Richard Libra DTE Energy - Fermi 2 M/C 280 OBA 6400 North Dixie Highway Newport, MI 48166 Mr. James F. Klapproth GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 Mr. Kenneth Putnam Regulatory Response Group Chairman BWR Owners Group Nuclear Management Company Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 Mr. Tim E. Abney GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 12/21/05