MONTHYEARML0535602482005-12-20020 December 2005 BWR Owners Group Submittal of Structural Integrity Associates Fracture Mechanics Methodology Licensing Topical Report Project stage: Request ML0606800902006-04-10010 April 2006 Acceptance for Review of Boiling Water Reactors Owners Group (BWROG) SIR-05-044, Pressure Temperature Limits Report Methodology for Boiling Water Reactors, Revision 0 Project stage: Acceptance Review ML0612205532006-05-0303 May 2006 (Bwrog), (Rai), Topical Report (TR) SIR-05-044, Pressure Temperature Limits Report Methodology for Boiling Water Reactors, Revision 0 Project stage: RAI ML0624403872006-08-29029 August 2006 Responses to Request for Additional Information Dated 05/03/06, Regarding the BWROG Topical Report SIR-05-044, Pressure Temperature Limits Report Methodology for Boiling Water Reactors, Revision 0 Project stage: Response to RAI ML0629104172006-11-14014 November 2006 Draft Safety Evaluation for the Boiling Water Reactor Owners Group (BWROG) Fracture Mechanics Licensing Topical Report (TR) SIR-05-044, Pressure Temperature Report Methodology for Boiling Water Reactors Project stage: Draft Approval ML0636001232006-12-20020 December 2006 BWR, Draft Safety Evaluation for the Boiling Water Reactor Ownerss Group (BWROG) Structural Integrity Associates Licensing Topical Report (LTR) SIR-05-044, Pressure Temperature Report Methodology for Boiling Water Reactors Project stage: Draft Other ML0701804832007-02-0606 February 2007 Final Safety Evaluation for BWROG, Structural Integrity Associates Topical Report SIR-05-044, Pressure Temperature Report Methodology for Boiling Water Reactors Project stage: Approval ML0712302282007-04-30030 April 2007 Transmittal of Final Safety Evaluation for the Boiling Water Reactor Owners Group Structural Integrity Associates Topical Report SIR-05-044, Pressure Temperature Report Methodology for Boiling Water Reactors Project stage: Request 2006-04-10
[Table View] |