ML060590258
| ML060590258 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/22/2006 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 3230 | |
| Download: ML060590258 (4) | |
Text
-FENOC FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, Ohio 43449 Mark S. Bezilla Vice President - Nuclear 419-321-7676 Fax: 419-321-7582 10 CFR 26.71(d)
Docket Number 50-346 License Number NPF-3 Serial Number 3230 February 22, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Semiannual Fitness-For-Duty Report, July - December 2005 for the Davis-Besse Nuclear Power Station Ladies and Gentlemen:
Pursuant to 10 CFR 26.71 (d), "Recordkeeping Requirements," FirstEnergy Nuclear Operating Company (FENOC) submits the semiannual Fitness-For-Duty (FFD) report for the period of July through December 2005 for the Davis-Besse Nuclear Power Station, Unit 1 (DBNP'S). provides FENOC's DBNPS FFD Program Performance Data. Attachment 2 provides a summary of management actions taken by FENOC based on positive FFD testing results, presumptive positives, and a list of FFD event reports submitted by FENOC.
Should you have any questions or require additional information, please contact Mr. Clark A. Price, Manager - Regulatory Compliance, at (419) 321-8585.
Very truly yours, GMW/s Attachments cc:
Regional Administrator, NRC Region m-DB-1 NRC/NRR Project Manager DB-1 Senior NRC Resident Inspector A-look, I
Docket Number 50-346 License Number NPF-3 Serial Number 3230 Page 1 of 1 Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 FirstEnergy Nuclear Operating Company Company Davis-Besse Nuclear Power Station December 31, 2005 6 Months Ending (419) 321-8585 Location Phone Clark A. Price. Manager - Regulatory Compliance Contact Name Cutoffs: Screen/Confirmation (na/ml)
ADpendix A to 10 CFR 26 Marijuana Cocaine Opiates 100/15 300/150 300/300 Amphetamines Phencyclidine Alcohol (%BAC) 1000/500 25/25 0.04 Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number of Individuals in Random 822 0
188 Population Categories Tested Positive Tested Positive Tested Positive Pre-Access 60 0
0 0
128 0
For Post Accident 5
0 0
0 1
0 Cause Observed Behavior 3
0 0
0 0
0 Random 201 0
0 0
36 0
Follow-up 14 0
0 0
3 0
Other 0
0 0
0 0
0 Total 283 0
0 0
168 0
Breakdown of Confirmed Positive Tests for Specific Substances Maijaa oaie pats Amphe-Phency-Acol Refusal Marijuana lCocaine)piates ltamines clidine Al ohol to test Licensee Employees 0
0 0
0 0
0 0
Long-Term Contractors 0
0 0
0 0
0 0
Short-Term Contractors 0
0 0
0 0
0 0
Total 0
0 0
0 0
0 0
Docket Number 50-346 License Number NPF-3 Serial Number 3230 Page 1 of 1 FENOC MANAGEMENT ACTIONS RELATING TO FITNESS-FOR-DUTY FENOC Personnel Contractor Personnel Referred to Employee Assistance Program (EAP)
Management Sanctions 0
0 0
0 For the year ending 2005, the average population was 1034. There were 547 random tests completed.
FENOC does not perform onsite initial drug screening tests; therefore, there are no unconfirmed positive results on which to base management actions.
FENOC FITNESS-FOR-DUTY EVENT REPORTS There were no Fitness-For-Duty event reports submitted during this reporting period (July - December 2005).
Docket Number 50-346 License Number NPF-3 Serial Number 3230 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance (419) 321-8585 at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None N/A