Technical Specifications Pages Re Secondary Containment Bypass and Main Steam Isolation Valve Leakages
ML060260559
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/25/2006
From: Jaffe D
Plant Licensing Branch III-2
To:
jaffe D, NRR/DORL, 415-1439
Shared Package
ML053470007 List:
References
TAC MC7463
Download: ML060260559 (1)


Text

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.11 Verify the combined leakage rate for all In accordance secondary containment bypass leakage with the paths that are not provided with a seal Primary system is 9 0.10 L when pressurized to Containment 2 56.5 psig.

Leakage Rate Testing Program and Inservice Testing Program SR 3.6.1.3.12 Verify combined MSIV leakage rate for In accordance all four main steam lines is < 250 scfh with the and s 100 scfh for any one steam line Primary when tested at 2 25 psig.

Containment Leakage Rate Testing Program SR 3.6.1.3.13 NOTE-----------------

Only required to be met in MODES 1, 2.

and 3.

Verify combined leakage rate through In accordance hydrostatically tested lines that with the penetrate the primary containment is Primary within limits.

Containment Leakage Rate Testing Program I

FERMI - UNIT 2 3.6-17 Amendment No. Z e- /A. 169