|
---|
Category:Letter
MONTHYEARIR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML22192A0862022-07-12012 July 2022 RQ Inspection Notification Letter ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21239A0652021-09-0808 September 2021 Request for Additional Information Regarding Proposed Alternative to ASME Section XI Requirements for Repair - Replacement of Buried Service Water Piping (EPID L-021-LLR-0014) - Public ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283C5532019-10-18018 October 2019 Redacted - Brunswick Steam Electric Plant, Units 1 and 2 - Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19081A0722019-03-21021 March 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19067A2712019-03-0707 March 2019 NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19056A2212019-02-25025 February 2019 NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19015A0302019-01-14014 January 2019 NRR E-mail Capture - Brunswick 2nd Round RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19010A3872019-01-10010 January 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML18360A0352018-12-21021 December 2018 NRR E-mail Capture - Brunswick Draft 2nd Round RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18360A0362018-12-21021 December 2018 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML18282A1492018-10-0909 October 2018 NRR E-mail Capture - Brunswick RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18263A3042018-09-20020 September 2018 NRR E-mail Capture - Brunswick Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18250A3082018-08-31031 August 2018 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS to Relocate the Pressure-Temperature Limits to the Pressure and Temperature Limits Report ML18225A0122018-08-10010 August 2018 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS to Relocate the Pressure-Temperature Limits to the Pressure and Temperature Limits Report RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18130A8262018-05-15015 May 2018 Supplemental Information Needed for Acceptance. Amendment Request to Revise the Technical Specifications to Relocate the Pressure Temperature Limit Curves to a Pressure and Temperature Limits Report ML18088A0072018-03-27027 March 2018 NRR E-mail Capture - Brunswick Units 1 & 2 Request for Additional Information - Relief Request for RPV Shell Circumferential Weld Examination (L-2018-LLR-0001) ML18071A3732018-03-12012 March 2018 NRR E-mail Capture - Correction: Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) ML18067A1032018-03-0808 March 2018 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) ML18010A0502018-01-0505 January 2018 E-mail Re. Brunswick Units 1 and Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) ML18010A0512018-01-0505 January 2018 Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) (Nonproprietary) ML17339A9132017-12-0505 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - Human Factors (EPID: L- 2017- LLA- 0398) ML17339A0702017-12-0404 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - Electrical Engineering (EPID: L- 2017- LLA- 0398) ML17317B0022017-12-0404 December 2017 Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) ML17339A0732017-12-0404 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - PRA (EPID: L- 2017- LLA- 0398) ML17328A4872017-11-24024 November 2017 Unit 2 - Request for Additional Information Related the Emergency Amendment Request for One-Time Extension of EDG Completions Time ML17275A2772017-10-0202 October 2017 E-mail, Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CAC Nos. MF8864 and MF8865) (Non-Proprietary) ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17082A3042017-03-0909 March 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CACs MF8864 and MF8865) ML17037A0022017-02-0303 February 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related to LAR to Modify the TS Requirements for End States Associated with the Implementation of the Approved TSTF Traveler TSTF-423-A (MF8466 and MF8467) ML16020A2632016-01-20020 January 2016 Brunswick Steam Electric Plant - Notification Of Inspection And Request For Information 2023-07-19
[Table view] |
Text
January 20, 2006 Carolina Power and Light Company ATTN: Mr. J. Scarola Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Scarola:
On March 6, 2006, the NRC will begin the baseline inservice inspection (NRC Inspection Procedure 71111.08) at Brunswick Steam Electric Plant Unit 1.
Experience has shown that this inspection will be resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection for both sides, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Group A) identifies information necessary to ensure that the inspector is adequately prepared. The second group (Group B) identifies information the inspector will need upon arrival at the site. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portion of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be William Murray, of your licensing organization. If there are any questions about this inspection or the material requested, please contact the assigned inspector Tomy Nazario at (404) 562-4710.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark S. Lesser, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-325 License No. DPR-71
Enclosure:
See next page
CP&L 2
Enclosure:
INSERVICE INSPECTION DOCUMENT REQUEST cc w/encl:
T. P. Cleary, Director Site Operations David T. Conley Brunswick Steam Electric Plant Associate General Counsel - Legal Dept.
Progress Energy Carolinas, Inc. Progress Energy Service Company, LLC Electronic Mail Distribution Electronic Mail Distribution Benjamin C. Waldrep James Ross Plant Manager Nuclear Energy Institute Brunswick Steam Electric Plant Electronic Mail Distribution Carolina Power & Light Company Electronic Mail Distribution John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge James W. Holt, Manager 2300 N. Street, NW Performance Evaluation and Washington, DC 20037-1128 Regulatory Affairs PEB 7 Carolina Power & Light Company Beverly Hall, Acting Director Electronic Mail Distribution Division of Radiation Protection N. C. Department of Environment Edward T. O'Neil, Manager and Natural Resources Support Services Electronic Mail Distribution Carolina Power & Light Company Brunswick Steam Electric Plant Peggy Force Electronic Mail Distribution Assistant Attorney General State of North Carolina Garry D. Miller, Manager Electronic Mail Distribution License Renewal Progress Energy (cc w/encl: See next page)
Electronic Mail Distribution Lenny Beller, Supervisor Licensing/Regulatory Programs Carolina Power and Light Company Electronic Mail Distribution
CP&L 3 cc w/encl cont'd:
Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 David R. Sandifer Brunswick County Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Warren Lee Emergency Management Director New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402-1525
OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/
NAME TNazario MLesser PFredrickson DATE 1/19/06 1/19/06 1/20/06 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates: March 6, 2006 through March 10, 2006 Inspection Procedures: IP 7111108 Inservice Inspection Activities Inspector: Tomy Nazario (404) 562-4710 A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy (or electronic format CD - preferred), in care of Mr. Nazario by February 20, 2006, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and request a list from your staff of additional documents needed on-site. We request that the specific items selected from the lists be available and ready for review on the first day of inspection. All information requests relate to Unit 1 unless otherwise stated. If you have any questions regarding this information, please call the inspector as soon as possible.
- 1) A detailed schedule of nondestructive examinations (NDE) planned for Class 1 & 2 systems and containment, performed as part of your ASME Code ISI Program during the upcoming outage. Please include FAC exams.
- 2) A copy of the NDE procedures used to perform the examinations identified in A.1 (including calibration and flaw characterization/sizing procedures). A copy of your NDE written practice and welding program. For ultrasonic examination procedures qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also, include documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers). If these documents are not available in electronic format, then please provide during the inspection week.
- 3) A copy of ASME Section XI, Code Relief Requests applicable to the examinations identified in A.1
- 4) A list identifying NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, visual (VT-1, VT-2, VT-3)) which have identified recordable indications on Code Class 1
& 2 systems since the beginning of the last refueling outage.
- 5) List with short description of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage or that are planned for the current outage, and identify the system, weld number and reference applicable documentation.
- 6) A detailed description of the welds to be examined and the extent of the planned examination, if reactor vessel weld examinations required by the ASME Code are
2 scheduled to occur during the inspection period. Also a list of any BWRVIP exams that are to be performed this outage.
- 7) List with description of ISI related issues (e.g. list based upon data base searches using key words related to piping, ASME Code, cracks, wear, thinning, leakage, rust, corrosion, BWRVIP, welding, etc.) entered into your corrective action system since the beginning of the last refueling outage (both Units).
- 8) Copies of any 10 CFR Part 21 reports applicable to your structures systems or components within the scope of Section XI of the ASME Code, that have been identified since the beginning of the last refueling outage.
- 9) A copy of your most current revision of the ISI Program Manual and Plan for this Interval. If these documents are not available in electronic format, then please provide during the inspection week.
- 10) List of any temporary non-code repairs in service.
- 11) List of known locations that have pin-hole leaks, ASME Class 1, 2, 3.
- 12) Documentation that demonstrates how you are meeting all BWRVIP guidance documents or documentation that supports deviation from guidelines.
- 13) Names and numbers for the following program leads:
ISI contacts (Examination, planning)
Containment Exams Snubbers and Supports Repair and Replacement program manager Site Welding Engineer Licensing contacts BWRVIP B. Information to be provided on-site to the inspector at the entrance meeting (March 6, 2006):
- 1) For welds selected by the inspector from A.5 above, copies of the following documents:
a) Document of the weld number and location (e.g., system, train, branch);
b) Document with a detail of the weld construction; c) Applicable Code Edition and Addenda for weldment; d) Applicable Code Edition and Addenda for welding procedures; e) Applicable weld procedures (WPS) used to fabricate the welds; f) Copies of procedure qualification records (PQRs) supporting the WPS on selected welds; g) Copies of mechanical test reports identified in the PQRs above; h) Copies of the nonconformance reports for the selected welds;
3 i) Radiographs of the selected welds and access to equipment to allow viewing radiographs; and j) Copies of the preservice examination records for the selected welds.
- 2) A copy of the corrective actions and supporting documentation for the ISI related corrective action issues selected by the inspector from A.7 above.
- 3) A copy of the examination records and associated corrective action documents for the nondestructive examination reports with relevant indications on Code Class 1 & 2 systems selected by the inspector from A.4 above.
- 4) Updated schedules for item A.1 (including schedule showing contingency repair plans if available).
- 5) Ready access to the Editions of the ASME Code (Sections III, V, IX and XI) applicable to the inservice inspection program and the repair/replacement program. (e.g. copies provided to the inspector to use for the duration of the inspection at the on-site inspection location).
Inspector Contact Information:
Tomy A. Nazario Reactor Inspector (404) 562-4710 E-mail: txn1@nrc.gov Mailing Address U.S. Nuclear Regulatory Commission-Region II Sam Nunn Atlanta Federal Center, 23 T85 Attn: Tomy Nazario Atlanta, GA 30303-8931