MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin 2024-09-26
[Table view] |
Text
December 20, 2005 Mr. Gary C. Park, Chairman ASME Subcommittee on Nuclear Inservice Inspection Monticello Nuclear Generating Facility Monticello, MN 55362
Dear Mr. Park,
Operating experience has demonstrated that Alloy 82/182/600 materials exposed to primary coolant water (or steam) at the normal operating conditions of pressurized water reactor (PWR) plants have cracked due to primary water stress corrosion cracking (PWSCC). A number of domestic and foreign experiences demonstrate that Alloy 82/182 materials used to make dissimilar metal (DM) butt weld connections in the reactor coolant pressure boundary (RCPB) of PWR plants are susceptible to PWSCC. These incidents of PWSCC have been identified through the discovery of boric acid deposits from through-wall leaks or by ultrasonic examination. Some of these events have involved circumferential cracking.
The current rules for inservice inspection of DM butt welds are contained in the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code.Section XI of the ASME Code requires that DM butt welds with nominal pipe size 4 inches and larger be ultrasonically examined once every 10-year interval.Section XI also requires that ultrasonic examination procedures, equipment, and personnel be qualified by performance demonstration in accordance with the requirements of Section XI, Appendix VIII. There is enough operating experience of leakage and cracks/flaws to support the position that current ASME Code inspection requirements need improvement for managing PWSCC. The Nuclear Regulatory Commission (NRC) considers this issue to be safety significant.
In recognition of this issue, the Materials Reliability Program (MRP) recently issued MRP-139, Rev. 0, Primary System Piping Butt Weld Inspection and Evaluation Guideline, as mandatory requirements under the Nuclear Energy Institute (NEI) initiative, NEI-03-08. The NRC staff provided comments on MRP-139 to NEI in an October 12, 2005 letter. Among other comments NRC staff recommended that the industry consider developing a plan for codification of inspection and evaluation guidelines including flaw evaluation methodologies, inspections, inspection schedules, and mitigation techniques.
The topic of codification of DM butt weld inspection and flaw evaluation rules was discussed at the November 2005 ASME Code,Section XI, meetings in Greensboro, NC. We understand that agreement was reached to codify rules for flaw evaluation and certain mitigation techniques and that the decision to codify inspection requirements is still pending further consideration.
We believe that codifying inspection requirements should not require significant resources or seriously impact MRP. A good deal of industry participation on MRP-139 took place in reaching agreement on the inspection rules.
G. Park Many stakeholders for nuclear power, including the NRC, rely on the ASME Code to set the standards for maintaining pressure boundary integrity. Given the operating experience with PWSCC and the serious challenges posed by potential failure of the RCPB, we believe that it is essential that an appropriate regulatory footprint be established for inspection of DM butt welds.
I am requesting that the ASME Section XI take the actions necessary to develop the needed improvements to the existing Code requirements. It is our preference that these inspection requirements be developed by the ASME Code. If the Code requirements are found acceptable by the NRC, they will be incorporated by reference into our regulations. NRC staff will fully support and participate in the effort I am requesting to ensure that differences are eliminated or at least minimized. If ASME cannot support development of improved requirements for DM butt welds, NRC may need to pursue other means to codify the needed requirements in its regulations.
Sincerely,
/RA/ R. W. Borchardt for J. E. Dyer, Director Office of Nuclear Reactor Regulation cc: K. R. Balkey, Chairman, BNCS J. Ling, Associate Executive Director, ASME Codes and Standards K. Ennis, Director, Nuclear Codes and Standards P. McCullough, V.P. Accreditation, Institute of Nuclear Power Operations G. L. Vine, Executive Director, Washington Representative, EPRI R. L. Dyle, Southern Company
References:
See next page
G. Park
REFERENCES:
- 1. NRC Information Notice 2000-017, Crack in Weld Area of Reactor Coolant System Hot Leg Piping at V. C. Summer, October 18, 2000
- 2. NRC Information Notice 2004-11, Cracking in Pressurizer Safety and Relief Nozzles and in Surge Line Nozzle, May 6, 2004
- 3. NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, May 28, 2004
- 4. Materials Reliability Program: Primary System Piping Butt Weld Inspection and Evaluation Guideline (MRP-139), July 2005
- 5. M.E. Mayfield, NRC, to A. Marion, NEI, letter on MRP-139, October 12, 2005 (ML052720290)
G. Park Document
Title:
Gary Park, ASME, Ltr Re: Primary Water Stress Corrosion Cracking in Reactor Coolant System Nickel-Based Alloy Butt Welds ADAMS Accession No: ML053480359 dated DISTRIBUTION:
PUBLIC RidsNrrDe DCI RF RidsNrrDpr RidsNrr Od RidsResOd RidsNrrAdes SCoffin RidsNrrDci WNorris JCollins EReichelt ESullivan
ML053480359 OFFICE NRR/DCI NRR/DCI NRR/OD NAME ESullivan BBateman JDyer (RWB for)
DATE 12/8/05 12/14/05 12/20/05