ML053460005

From kanterella
Jump to navigation Jump to search
Assessment Followup Letter - Crystal River Unit 3
ML053460005
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/09/2005
From: Payne D
NRC/RGN-II/DRS/EB2
To: Young D
Florida Power Corp, Progress Energy Florida
References
Download: ML053460005 (4)


Text

December 9, 2005 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

ASSESSMENT FOLLOWUP LETTER - CRYSTAL RIVER UNIT 3

Dear Mr. Young:

In a letter dated September 21, 2005, the NRC informed you of the final significance determination for a White inspection finding in the mitigating systems cornerstone for Crystal River Unit 3. This finding, which was identified during a fire protection inspection, involved unprotected post-fire safe shutdown cables and related non-feasible local operator actions.

Pursuant to Manual Chapter 2515, Appendix B, Supplemental Inspection Program, one White NRC identified finding dictates that the NRC perform the Supplemental Inspection described in Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. The NRC plans to conduct the 95001 Supplemental Inspection during the week of January 23 - 27, 2006. This schedule was discussed by Mr. D. Herrin, Lead Engineer in your Licensing and Regulatory Programs group and Mr. P. Fillion of our office on December 8, 2005. The onsite inspection will be performed by Mr. N. Merriweather, a Senior Reactor Inspector based at the Region II office. He may be accompanied by an inspector in our training program or a recently qualified inspector.

The inspection will consist of a review of your root cause determination and extent of condition evaluations, plus a review of proposed corrective actions. During the in-office preparation phase of the inspection, you will probably be requested to send documents directly related to the finding and your evaluations. As discussed with Mr. Herrin, it is possible, though not anticipated, that the inspection will require more than one week. In that event, Mr.

Merriweather will coordinate the additional inspection time with your staff.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

FPC 2

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact Mr. Fillion at (404) 562-4623 or Mr. Merriweather at (404) 562-4627.

Sincerely,

/RA/

D. Charles Payne, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-302 License No. DPR-72 cc: See page 3 Distribution: See page 4

FPC 3

cc Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Terry D. Hobbs Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Jim Mallay Framatome Technologies Electronic Mail Distribution

OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE

/RA/

/RA/

/RA/

NAME PFillion S. Ninh for J.Munday DPayne DATE 12/9/2005 12/9/2005 12/9/2005 12/ /2005 12/ /2005 12/ /2005 E-MAIL COPY?

NO NO YES YESNO YES NO YES NO YES NO