ai Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating license No. DPR-72 Ref: 10 CFR 50.36 December 3, 2005 3F1205-03 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Special Report 05-01: Once-Through Steam Generator (OTSG) Notifications Required Prior to MODE 4
Reference:
FPC to NRC Letter 3F0601-07, dated June 28, 2001, " Crystal River Unit 3 -
Contingency Letter of Commitment Regarding License Amendment Request 252, Revision 0, Once Through Steam Generator Tube Surveillance Program, Tube Repair Roll (Re-Roll) Process" (TAC No. MB1519)
Dear Sir:
Pursuant to Improved Technical Specification (ITS) 5.7.2.c, Florida Power Corporation, doing business as Progress Energy Florida, Inc. (PEF) is hereby providing, prior to ascension into MODE 4, Special Report 05-01 to notify the NRC of information pertinent to the inservice inspection of steam generator tubes during Crystal River Unit 3 (CR3) Refueling Outage 14 (14R). The report contains the following:
- 1. Number of tubes plugged and repaired;
- 2. Crack-like indications and assessment of growth for indications in the first span;
- 3. Results of in-situ pressure testing; if performed; and
- 4. Number of tubes and axially oriented TEC (tube end crack-like) indications left in-service, the projected accident leakage, and an assessment of growth for TEC indications.
Additionally, Special Report 05-01 provides information to fulfill commitments made in the referenced letter to provide the best estimate leakage that would result from an analysis of the limiting Large Break Loss-of Coolant Accident (LBLOCA) based on as-found circumferential cracking in the original tube-to-tubesheet rolls, tube-to-tubesheet re-roll repairs and the zones adjacent to the seal welds.
During the OTSG tube inspection, a Condition Monitoring (CM) Assessment relative to structural and leakage integrity was performed. The CM evaluation concludes that structural and leakage requirements were met. As-found values for Main Steam Line Break calculated leakage were below the values projected by the previous inspection (Refueling Outage 13) operational assessment.
Progress Energy Florida, Inc.
74C3 t Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428
U.S. Nuclear Regulatory Commission 3F1205-03 Page 2 of 2 This letter establishes no new regulatory commitments.
If you have any questions regarding this submittal, please contact Mr. Paul Infanger, Supervisor, Licensing and Regulatory Programs at (352) 563-4796.
Sincerely, Mi ae J. Annacone Engineering Manager MJA
Attachment:
Special Report 05-01:
Prior to MODE 4 Once-Through Steam Generator Notifications Required xc:
NRR Project Manager Regional Administrator, Region II Senior Resident Inspector
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50 - 302 / LICENSE NUMBER DPR - 72 ATTACHMENT Special Report 05-01 Once-Through Steam Generator Notifications Required Prior to MODE 4
U.S. Nuclear Regulatory Commission 3F1205-03 Attachment Page 1 of 6 ITS 5.7.2.c REPORT Inservice inspections of the Crystal River Unit 3 (CR3) Once-Through Steam Generators (OTSGs) were performed during Refueling Outage 14 (14R).
In accordance with Improved Technical Specifications (ITS) Section 5.7, Reporting Requirements, Florida Power Corporation, doing business as Progress Energy Florida, Inc. (PEF) is submitting Special Report 05-01, for notifications required prior to ascension into MODE 4.
ITS 5.7.2.c states, Following each inservice inspection of the steam generator (OTSG) tubes, the NRC shall be notified of the following prior to ascension into MODE 4:
- 1.
Number of tubes plugged and repaired;
- 2.
Crack-like indications and assessment of growth for indications in the first span;
- 3.
Results of in-situ pressure testing, ifperformed; and
- 4.
Number of tubes and axially oriented TEC [tube end crack] indications left in-service, the projected accident leakage, and an assessment of growth for TEC indications.
The required information follows:
- 1.
Number of tubes plugged and repaired (ITS 5.7.2.c.1)
NUMBER OF NEW REPAIRS OTSG PLUGGED RE-ROLLED RE-ROLLED SLEEVED UPPER TUBE LOWER TUBE END (UTE)
END (LTE)
A 52 32 0
0 B
79 64 0
0 In addition to the above new tube repairs, several pre-existing plugs were replaced during the 14R outage as a result of plug maintenance.
PLUG REPLACEMENTS OTSG NUMBER ORIGINAL REPLACEMENT COMMENTS OF PLUGS PLUG PLUG A 1I-00RoledI-90Rolled Roll transition single 1-600 Rolled I-690 axial indication (SAI)
B 1
I-600 Welded I-690 Rolled Known weld defect B
2 I-600 Rolled 1-690 Rolled Roll transition SAI B
1 1-600 Rolled I-690 Rolled Add stabilizer at UTE B
1 I-600 Rolled I-690 Welded Roll transition SAI
U.S. Nuclear Regulatory Commission 3F1205-03 Attachment Page 2 of 6
- 2.
Crack-like indications and assessment of growth for indications in the first span of the "B" steam generator. (ITS 5.7.2.c.2)
The "first span" is defined as those lengths of tubing which span the region from the secondary face of the lower tubesheet to the first support plate. As required by technical specification 5.6.2.10.4.c, inservice tubes with pit-like intergranular attack (IGA) have been monitored for growth by using a test probe equivalent to the high frequency bobbin probe used in 1997.
The number of indications in the first span identified during this examination follows:
0 tubes had crack-like indications for the inservice tubes with pit-like IGA.
0 tubes were plugged for >40 % Through Wall Dimension (TWD).
2 tubes were plugged for >10 % growth and > 30% TWD.
CR3 SG-8 RFO-14 2005 Ist Span IGA Return to Service
%TW Growth Distribution 80 C0 2
- 25
- 20
-15
-10
-8
-6
-4
-2 0
2 Delta %TW 4
6 8
10 15 20 25
>25 Based on the distribution of freespan IGA, there is no significant change in the growth rate.
U.S. Nuclear Regulatory Commission Attachment 3F11205-03 Page 3 of 6
- 3.
Results of in-situ pressure testing (ITS 5.7.2.c.3)
The eddy current inspection identified two (2) indications that did not pass the initial In-Situ pressure test screening criteria based on flaw size and depth. In-Situ test pressures and axial loads were selected based on CR3 design parameters for normal operating differential pressure (NODP) and for accident induced differential pressure and axial loading as required.
No leakage was identified during the in-situ pressure tests.
The following table contains information regarding the tubes that were subjected to a full-length pressure test:
FLAW TEST DEPTH LENGTH.
ARC OTSG ROW TUBE TYPE PRESSURE
(%TW)
(inches)
(inches)
_ _ _ _ _ _(p s ig )
A 3
30 Axial 4300 39 4.1" NA B
73 55 Circumferential
- 5550 70 NA
- 0.37"
- includes the pressure for MSLB axial loading.
- conservatively combined the ARC length of two close circumferential indications.
- 4.
Number of tubes and axially oriented TEC indications left in-service, the projected accident leakage, and an assessment of growth for TEC indications (ITS 5. 7.2.c.4).
OTSG Tubes Indications Projected Accident Leakage UTE2/5LTE UTE1/ LTE 1282/5 1698/8 0.347 Tm B
- 806/148 1066/161 0.296 gpm
- There were 52 tubes that were duplicates between the upper and lower TEC tubes, resulting in 902 distinct tubes left in service.
Note: Projected Accident Leakage equals the Operational Assessment TEC Leakage. This includes the predicted TEC leakage based on the prediction method described in CR3 License Amendment No. 222.
The distance of the flaw tip location (FIL) relative to the carbon-clad interface (CCI) is recorded for each TEC indication. This distance is used to determine the TEC growth rates and to ensure that the indications have not grown into the CCI. For the TEC indications left in service during the previous outage, none had grown into the CCI as confirmed by comparing the previous 13R (2003) and the current 14R (2005) results. Furthermore, none of the new TEC indications had penetrated the CCI.
A distribution of growth rates for the 2003 - 2005 operating cycle is presented below, which provide histograms of the 2003 FTL values minus the 2005 FTL values. Thus, a positive number represents an apparent growth toward the CCI. Based on these figures, the growth distribution may indicate a small amount of positive growth, but nothing of significance. The
U.S. Nuclear Regulatory Commission 3F1205-03 Attachment Page 4 of 6 average growth rate for the upper TEC indications in both steam generators measures -0.002 inch.
The average growth rate for the lower TEC indications in both steam generators measures 0.001 inch.
A-OTSG Upper TEC FTL Growth Rate SG-A TEC Growth RFO13 - RFO14 (2003 - 2005) e 300 A 250
, 200 I-S 150 1 100 z
CO N _2
_ V 8
l 8
8 8
8 a
8 O _ _ f _ N N Delta Flaw Tip Length (FTL)
A-OTSG Lower TEC FTL Growth Rate SG-A Lower TEC Growth RFO13 - RFO14 (2003 - 2005 IC) a
- 1 2E z
4 q 8 _
f _
8 8
a 2
Pl
- S 8 8 f _R A
o o
ooo docoo oooooo oo o
o o o o
o I
F I
n I
Delta Flaw 1np Length (FTL)
U.S. Nuclear Regulatory Commission 3F1205-03 Attachment Page 5 of 6 B-OTSG Upper TEC FTL Growth Rate SG-B TEC Growth RFO13 - RFO14 (2003 - 2005)
A 200 I1100 z
j~~~~
~
~
~
j j
I I
.O
.O
.O 9e9a9l9w9l99 L9e0g0000 (cFcTo Delta Flaw Tip Length (FTL)
B-OTSG Lower TEC FTL Growth Rate SG-B Lower TEC Growth RFO13 - RFO14 (2003 - 2005) 50 45 40 9 35 2
30 5
25
-6 20 I
15 10 5
0 I
JL _____
-U-i-i j
j j
CO I qI CO gi gi gi 0
CO l
d w
C sdn o o
o o
d o
Delta Flaw Tip Length (FTL)
U.S. Nuclear Regulatory Commission Attachment 3F1205-03 Page 6 of 6 Regulatory Commitments Following each inservice inspection of steam generator tubes but prior to returning the CR3 steam generators to service, Progress Energy Florida Inc. will verbally notify the NRC of the following:
- a. Number of tubes with circumferential cracking indications inboard of the roll repair.
In the A OTSG, 0 tubes had circumferential cracking inboard of the re-roll.
In the B OTSG, 1 tube had circumferential cracking inboard of the re-roll.
- b. Number of tubes with circumferential cracking indications in the original roll region, including the zone adjacent to the tube-to-tubesheet seal weld if no re-roll is present.
A-OTSG had 34 tubes with circumferential cracking indications (3 tubes in the upper tube sheet [UTS] and 31 tubes in the lower tube sheet [LTS])
B-OTSG had 45 tubes with circumferential cracking indications (40 tubes in the UTS and 5 tubes in the LTS)
- c. Determination of the best estimate total leakage that would result from an analysis of the limiting Large Break Loss-of-Cooling Accident (LBLOCA) based on as-found circumferential cracking in the original tube-to-tubesheet rolls, tube-to-tubesheet re-roll repairs, and the zones adjacent to the welds.
A leakage analysis was performed based on LBLOCA axial tube loading and as-found circumferential cracking indications. The best estimate leak rate from degradation is 5.5 gpm in "A" OTSG, and 3.3 gpm in "B" OTSG.
- d. Demonstrate that the primary-to-secondary leakage following a LBLOCA, as described in Appendix A to Topical Report BAW-2374, Revision I is acceptable based on the as-found condition of the steam generators. This is required to demonstrate that adequate margin and defense-in-depth are maintained. For the purpose of this evaluation, "acceptable" means a best estimate of the leakage expected due to a LBLOCA where that leakage would not result in a significant increase of radionuclide release (e.g., in excess of 10 CFR Part 50.67 and Part 100 limits).
The estimated leak rate due to a LBLOCA would not have resulted in a significant increase in radionuclide releases from the plant. This is based on a review of the Steam Generator Tube Rupture (SGTR) accident assumptions from Chapter 14 (Safety Analysis) of the FSAR.
The LBLOCA best estimate leakage is less than the FSAR assumptions for SGTR which assumed a flow rate to the secondary side of the affected steam generator to be 435 gpm.
The conservative SGTR accident leak rate and assumptions for degraded fuel cladding only result in a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> integrated dose at the exclusion area boundary of 0.139 rem compared to a limit of 2.5 rem. Therefore the LBLOCA leakage of 5.5 gpm for the "A" OTSG and 3.3 gpm for the "B" OTSG is bounded by the FSAR evaluation.