(1)
Dominion Nuclear Connecticut, Inc., et al. (the licensees) consists of Dominion Nuclear Connecticut, Inc., Central Vermont Public Service Corporation and Massachusetts Municipal Wholesale Electric Company. Dominion Nuclear Connecticut, Inc. is authorized to act as the agent and representative for Central Vermont Public Service Corporation and Massachusetts Municipal Wholesale Electric Company and has exclusive responsibility and control over the physical operation and maintenance of the facility.
DOMINION NUCLEAR CONNECTICUT, INC., ET AL. (1)
DOCKET NO. 50-423 (MILLSTONE POWER STATION, UNIT NO. 3)
RENEWED FACILITY OPERATING LICENSE Renewed License No. NPF-49 1.
The U.S. Nuclear Regulatory Commission (the Commission) having previously made the findings set forth in License No. NPF-49 issued on January 31, 1986 has now found that:
A.
The application to renew License NPF-49 filed by Dominion Nuclear Connecticut, Inc. (DNC), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter 1, and all required notifications to other agencies or bodies have been duly made; B.
Construction of the Millstone Power Station, Unit No. 3 (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-113 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C.
Actions have been identified and have been or will be taken with respect to:
(1) managing the effects of aging during the period of extended operation on the functionality of structures and components that have been identified to require review under 10 CFR 54.21(a)(1), and (2) time-limited aging analyses that have been identified to require review under 10 CFR 54.21(c), such that there is reasonable assurance that the activities authorized by the renewed license will continue to be conducted in accordance with the current licensing basis, as defined in 10 CFR 54.3, for the facility, and that any changes made to the facilitys current licensing basis in order to comply with 10 CFR 54.29(a) are in accordance with the Act and the Commissions regulations; Renewed License No. NPF-49 D.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance, see Section 2.D below);
E.
There is reasonable assurance: (i) that the activities authorized by this renewed operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter 1, (except as exempted from compliance, see Section 2.D below);
F.
DNC is technically qualified to engage in the activities authorized by this renewed license in accordance with the Commission's regulations set forth in 10 CFR Chapter 1; G.
The licensees have satisfied the applicable provisions of 10 CFR Part 140 Financial Protection Requirements and Indemnity Agreements of the Commission's regulations; H.
The issuance of this renewed license will not be inimical to the common defense and security or to the health and safety of the public; I.
After weighing the environmental, economic, technical and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Renewed Facility Operating License No. NPF-49, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied; and J.
The receipt, possession, and use of source, byproduct and special nuclear material as authorized by this renewed license will be in accordance with the Commissions regulations in 10 CFR Parts 30, 40, and 70.
2.
On the basis of the foregoing findings regarding this facility, Facility Operating License No. NPF-49, issued on January 31, 1986, is superceded by Renewed Facility Operating License No. NPF-49, which is hereby issued to Dominion Nuclear Connecticut, Inc. to read as follows:
A.
This renewed operating license applies to the Millstone Power Station (MPS),
Unit No. 3, a pressurized water nuclear reactor and associated equipment (the facility), owned by the licensees. The facility is located in Waterford Township, New London County, Connecticut on the north shore of Long Island Sound, and is described in the licensees Final Safety Analysis Report, as supplemented and amended, and in the licensees Environmental Report, as supplemented and amended.
Renewed License No. NPF-49 B.
Subject to the conditions and requirements incorporated herein, the Commission hereby licenses; (1)
DNC, pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the designated location in New London County, Connecticut in accordance with the procedures and limitations set forth in this license; Central Vermont Public Service Corporation and Massachusetts Municipal Wholesale Electric Company, pursuant to the Act and 10 CFR Part 50, to possess the facility at the designated location in New London County, Connecticut in accordance with the procedures and limitations set forth in this renewed operating license; (2)
DNC, pursuant to the Act and 10 CFR Part 70, to receive, possess and use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (3)
DNC, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (4)
DNC, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5)
DNC, pursuant to the Act and 10 CFR Parts 30, 40, and 70 to possess, but not separate, such byproducts and special nuclear materials as may be produced by the operations of the facility.
C.
This renewed operating license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level DNC is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
Renewed License No. NPF-49 (2)
Technical Specifications The Technical Specifications contained in Appendix A, revised through Amendment No. 226 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated into the license. DNC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3)
DNC shall not take any action that would cause Dominion Resources, Inc. (DRI) or its parent companies to void, cancel, or diminish DNC's commitment to have sufficient funds available to fund an extended plant shutdown as represented in the application for approval of the transfer of the licenses for MPS Unit No. 3.
(4)
Immediately after the transfer of interests in MPS Unit No. 3 to DNC, the amount in the decommissioning trust fund for MPS Unit No. 3 must, with respect to the interest in MPS Unit No. 3, that DNC would then hold, be at a level no less than the formula amount under 10 CFR 50.75.
(5)
The decommissioning trust agreement for MPS Unit No. 3 at the time the transfer of the unit to DNC is effected and thereafter is subject to the following:
(a)
The decommissioning trust agreement must be in a form acceptable to the NRC.
(b)
With respect to the decommissioning trust fund, investments in the securities or other obligations of Dominion Resources, Inc. or its affiliates or subsidiaries, successors, or assigns are prohibited.
Except for investments tied to market indexes or other non-nuclear-sector mutual funds, investments in any entity owning one or more nuclear power plants are prohibited.
(c)
The decommissioning trust agreement for MPS Unit No. 3 must provide that no disbursements or payments from the trust, other than for ordinary administrative expenses, shall be made by the trustee until the trustee has first given the Director of the Office of Nuclear Reactor Regulation 30-days prior written notice of payment. The decommissioning trust agreement shall further contain a provision that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the NRC.
(d)
The decommissioning trust agreement must provide that the agreement can not be amended in any material respect without 30 days prior written notification to the Director of the Office of Nuclear Reactor Regulation.
Renewed License No. NPF-49 (e)
The appropriate section of the decommissioning trust agreement shall state that the trustee, investment advisor, or anyone else directing the investments made in the trusts shall adhere to a prudent investor standard, as specified in 18 CFR 35.32(a)(3) of the Federal Energy Regulatory Commission's regulations.
(6)
DNC shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application for approval of the transfer of the MPS Unit No. 3 license and the requirements of the Order approving the transfer, and consistent with the safety evaluation supporting the Order.
(7)
The Final Safety Analysis Report (FSAR) supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the FSAR required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, DNC may make changes to the programs and activities described in the supplement without prior Commission approval, provided that DNC evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
(8)
The FSAR supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. DNC shall complete these activities no later than November 25, 2025, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
(9)
All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
D.
Exemptions from certain requirements of Appendix J to 10 CFR Part 50 (Section 6.2.6, SSER 4) and from a portion of the requirements of General Design Criterion 4 (Section 3.9.3.1, SSER 4) of Appendix A to 10 CFR Part 50 have previously been granted. See Safety Evaluation Report Supplement 4, November 1985. With these exemptions the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training, and qualification, and safeguards contingency plans including amendments made pursuant to Renewed License No. NPF-49 provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: Millstone, North Anna and Surry Power Stations Security Plan, Training, and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 0 submitted by letter dated October 15, 2004.
F.
Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, DNC shall report any violations of the requirements contained in Section 2.C of this renewed operating license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written follow-up within thirty days in accordance with the procedures described in 10 CFR 50.73(b), (c) and (e).
G.
The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
H.
Fire Protection (Section 9.5.1, SER, SSER 2, SSER 4, SSER 5)
DNC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the SER (NUREG-1031) issued July 1984 and Supplements Nos. 2, 4, and 5 issued September 1985, November 1985, and January 1986, respectively, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
I.
This renewed operating license is effective as of its date of issuance and shall expire at midnight on November 25, 2045.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Attachments:
- 1. Appendix A - Technical Specifications
- 2. Appendix B - Environmental Protection Plan
Renewed License No. NPF-49 Date of Issuance: November 28, 2005