ML053220335

From kanterella
Jump to navigation Jump to search
Baffle Plate Bolting Failures
ML053220335
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/18/2005
From: Lesser M
NRC/RGN-II
To:
Lesser M 404-562-4667
References
MR-II-05-0014
Download: ML053220335 (1)


Text

Morning Report Date: NOV 18, 2005 PRIORITY ATTENTION REQUIRED MORNING REPORT - REGION II Licensee/Facility:

Notification:

2-2005-0014 11/14/2005 MR Number:

FLORIDA POWER CORP.

[3] B&W-L-LP Date:

Crystal River Crystal River, Florida 050-00302 Dockets:

CRYSTAL RIVER UNIT 3 - BAFFLE PLATE BOLTING FAILURES

Subject:

On November 13, 2005, while in a refueling outage, Crystal River Unit 3 identified two broken reactor internal baffle plate bolts while investigating fuel grid strap wear concerns. The failed bolts are 7/16" stainless steel baffle-to-baffle bolts used to join individual baffle plates, vice baffle-to-former plate bolts which hold the baffle plates to the horizontal former plates within the core barrel. While the baffle-to-baffle bolts play a role in maintaining the integrity of the baffle assembly, the baffle-to-former bolts are the critical components essentials to support the vendor's structural analysis of the baffle assembly.

The licensee is currently defueling the reactor to facilitate follow on actions. Framatome ANP is assisting the licensee in their determination of follow on actions which will include an analysis of the required bolting for continued operation, and ultrasonic testing of selected baffle-to-former plate bolts.

Discussion:

Contact:

Email:

Phone No:

Org:

LESSER, MARK S MSL1@nrc.gov (404) 562-4667 R2