Meeting with Duke Energy to Discuss Proposed License Amendment Request for Dry Storage at Oconee
ML053130120
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/05/2005
From: Olshan L
Plant Licensing Branch III-2
To:
Duke Energy Corp
Olshan L N, NRR/DLPM, 415-1419
Shared Package
ML053250224 List:
References
Download: ML053130120 (5)


Text

December 5, 2005 LICENSEE:

DUKE ENERGY CORPORATION (DUKE)

FACILITY:

OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

SUBJECT:

SUMMARY

OF NOVEMBER 1, 2005, MEETING TO DISCUSS PROPOSED PART 50 LICENSE AMENDMENT REQUEST FOR DRY STORAGE OF SPENT FUEL On November 1, 2005, the Nuclear Regulatory Commission (NRC) met with Duke to discuss the need for a license amendment request (LAR) to incorporate technical specifications into the Oconee Part 50 license (of Title 10 of the Code of Federal Regulations (10 CFR)) to facilitate loading and handling of Part-72-licensed casks in the spent fuel pools. Enclosure 1 is a list of the attendees. Enclosure 2 is the handouts provided by Duke during the meeting.

In its presentation, Duke described the need for an LAR based on a review of RIS 2005-05 and the dry storage systems in use at Oconee. Duke determined that its cask systems relied on a soluble boron credit to maintain subcriticality during fuel loading and handling in the moderated spent fuel pool environment. Duke determined that its spent fuel licensing basis required it to maintain fuel in a subcritical condition without a soluble boron credit. Therefore, Duke determined that it needs a license amendment to credit fuel burnup and load fuel into the dry-cask storage systems.

Duke presented the approach it is currently taking to perform the necessary criticality calculations. Duke emphasized that the criticality analysis methodologies being used to perform the evaluation are very similar to those methodologies reviewed and approved by the NRC for licensing the McGuire and Oconee spent fuel pools. Duke committed to identifying any deviations from the previously approved methodologies and providing a technical basis in the LAR. In addition, Duke indicated that its criticality analyses will address all current and previously loaded spent fuel canisters and will conform to current NRC expectations for soluble boron credit under 10 CFR Part 50.

Duke is planning to provide the LAR by March 1, 2006, and is requesting NRC approval by June 1, 2006. The NRC staff was able to identify a number of minor issues that Duke plans to

Duke address up front in the LAR to minimize the need for additional staff review time and requests for additional information. The NRC indicated that if Duke follows the guidance provided during the meeting, the requested approval date could likely be achieved.

/RA/

Leonard N. Olshan, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosures:

1. List of Attendees
2. Licensees Handout cc w/encls: See next page

Duke for additional information. The NRC indicated that if Duke follows the guidance provided during the meeting, the requested approval date could likely be achieved.

/RA/

Leonard N. Olshan, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosures:

1. List of Attendees
2. Licensees Handout cc w/encls: See next page DISTRIBUTION:

PUBLIC LPL2-1 R/F RidsNrrPMLOlshan RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDorl (CHaney/EHackett)

RidsNrrDorlLlpc (EMarinos)

RidsNrrLAMOBrien RJasinski RTaylor CWithee MRahimi BWetzel, EDO RII RidsRgn2MailCenter(MErnstes)

TMensah Package: ML053250224 : ML053250237 Meeting Summary: ML053130120 Meeting Notice: ML052870132 NRC-001 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME LOlshan: BT MOBrien EMarinos DATE 12/2/05 12/2/05 12/5/05 OFFICIAL RECORD COPY LIST OF ATTENDEES MEETING WITH DUKE ENERGY CORPORATION (DUKE)

TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST FOR DRY STORAGE AT OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 NOVEMBER 1, 2005 NRC DUKE R. Taylor S. Newman C. Withee G. Walden M. Rahimi S. Nesbit L. Olshan J. Coletta W. Murphy

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Ms. Lisa F. Vaughn Duke Energy Corporation 526 South Church Street P. O. Box 1006 Mail Code = EC07H Charlotte, North Carolina 28201-1006 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Issues and Industry Affairs Duke Energy Corporation 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672 Ms. Karen E. Long Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602