Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 I>
Constellation Energy November 2, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 Supplemental Information for License Amendment Request: Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process
REFERENCE:
(a)
Letter from Mr. G. Vanderheyden (CCNPP) to Document Control Desk (NRC), dated January 27, 2005, License Amendment Request: Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process In Reference (a) we requested changes to the Technical Specifications to modify mode change limitations in Limiting Condition for Operation (LCO) 3.0.4 and Surveillance Requirement 3.0.4.
One of the optional requested changes would allow a mode change with an inoperable diesel generator if a risk assessment would support it. Upon further consideration, we are withdrawing this portion of the original request.
We recognize that this portion of the request is substantially beyond the scope of the Consolidated Line Item Improvement Process safety evaluation and do not wish to pursue it at this time.
Therefore, we wish to amend our previous submittal (Reference a) to remove our request to allow mode changes with an inoperable diesel generator using LCO 3.0.4.b. We now request the addition of a Note to LCO 3.8.1 prohibiting the use of LCO 3.0.4.b for diesel generators, as described in Technical Specification Task Force (TSTF)-359-A, Revision 9. Please replace marked-up pages 3.8.1-2, 3.8.1-3, and 3.8.1-6 in Reference (a) with the attached marked-up page (Attachment 1). The No Significant Hazards Consideration determination and Environmental Evaluation presented in the Nuclear Regulatory Commission Notice of Availability published on April 4, 2003 remains valid for the reduced scope of this request.
Document Control Desk November 2, 2005 Page 2 Should you have questions regarding this matter, please contact Mr. L. S. Larragoite at (410) 4954922.
Very truly yours, STATE OF MARYLAND COUNTY OF CALVERT
- TO WIT:
1, Bruce S. Montgomery, being duly sworn, state that I am Manager CCNPP Engineering Services -
Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
S5ub oy re, thisj the State of Maryland and County of WITNESS my Hand and Notarial Seal:
- vl y (omrri1sion Expires
BSDA/PSF/bjd Notary Public Date 7
Attachment:
(1)
Marked-up Technical Specification Page cc:
P. D. Milano, NRC S. J. Collins, NRC Resident Inspector, NRC R. I. McLean, DNR
ATTA(
ANT (1)
MARKED-UP TECHNI ECIFICATION PAGE I "l 1, Calvert Cliffs Nid Fir Power Plant, Inc.
Nove'
'2, 2005 I,
/
(a N o{-E h~
A CTIcONS 5nA frilcbe AC Sources-Operating 3.8.1 CONDITION REQUIRED ACTION COMPLETION TIME A. One required LCO 3.8.1.a offsite circuit inoperable.
A. 1 Perform SR 3.8.1.1 or SR 3.8.1.2 for required OPERABLE offsite circuits.
AND A.2 Declare required feature(s) with no offsite power available inoperable when its redundant required feature(s) is inoperable.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND 17 days from discovery of failure to meet LCO 3.8.1.a or LCO 3.8.1.b AND A.3 Restore required offsite circuit to OPERABLE status.
I CALVERT CLIFFS - UNIT--
3.8.1-2 CALVERT CLIFFS - UNIT 2 Amendment No. 265 Amendment No. 242