Supplemental Information for License Amendment Request: Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process
ML053110262
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/02/2005
From: Montgomery B
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML053110262 (4)


Text

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Constellation Generation Group, LLC Lusby, Maryland 20657 I> Constellation Energy November 2, 2005 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 Supplemental Information for License Amendment Request: Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process

REFERENCE:

(a) Letter from Mr. G. Vanderheyden (CCNPP) to Document Control Desk (NRC), dated January 27, 2005, License Amendment Request: Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process In Reference (a) we requested changes to the Technical Specifications to modify mode change limitations in Limiting Condition for Operation (LCO) 3.0.4 and Surveillance Requirement 3.0.4. One of the optional requested changes would allow a mode change with an inoperable diesel generator if a risk assessment would support it. Upon further consideration, we are withdrawing this portion of the original request. We recognize that this portion of the request is substantially beyond the scope of the Consolidated Line Item Improvement Process safety evaluation and do not wish to pursue it at this time.

Therefore, we wish to amend our previous submittal (Reference a) to remove our request to allow mode changes with an inoperable diesel generator using LCO 3.0.4.b. We now request the addition of a Note to LCO 3.8.1 prohibiting the use of LCO 3.0.4.b for diesel generators, as described in Technical Specification Task Force (TSTF)-359-A, Revision 9. Please replace marked-up pages 3.8.1-2, 3.8.1-3, and 3.8.1-6 in Reference (a) with the attached marked-up page (Attachment 1). The No Significant Hazards Consideration determination and Environmental Evaluation presented in the Nuclear Regulatory Commission Notice of Availability published on April 4, 2003 remains valid for the reduced scope of this request.

Document Control Desk November 2, 2005 Page 2 Should you have questions regarding this matter, please contact Mr. L. S. Larragoite at (410) 4954922.

Very truly yours, STATE OF MARYLAND

TO WIT:

COUNTY OF CALVERT 1, Bruce S. Montgomery, being duly sworn, state that I am Manager CCNPP Engineering Services -

Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.

the State of Maryland and County of S5ub thisj oy re, WITNESS my Hand and Notarial Seal:

Notary Public

vly (omrri1sion Expires

Date 7 BSDA/PSF/bjd

Attachment:

(1) Marked-up Technical Specification Page cc: P. D. Milano, NRC Resident Inspector, NRC S. J. Collins, NRC R. I. McLean, DNR

ATTA( ANT (1)

MARKED-UP TECHNI ECIFICATION PAGE I "l 1, .

Calvert Cliffs Nid Fir Power Plant, Inc.

Nove' '2, 2005 I,

/ -.-

(a h~ N o{-E - A AC Sources-Operating CTIcONS 5nA frilcbe 3.8.1 CONDITION REQUIRED ACTION COMPLETION TIME A. One required A.1 Perform SR 3.8.1.1 or 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> LCO 3.8.1.a offsite SR 3.8.1.2 for circuit inoperable. required OPERABLE AND offsite circuits.

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from feature(s) with no discovery of no offsite power offsite power to available inoperable one train when its redundant concurrent with required feature(s) inoperability of is inoperable. redundant required feature(s)

AND A.3 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> offsite circuit to OPERABLE status. AND 17 days from I discovery of failure to meet LCO 3.8.1.a or LCO 3.8.1.b


.-- CALVERT CLIFFS - UNIT-- -- --- 3.8.1-2 Amendment No. 265 CALVERT CLIFFS - UNIT 2 Amendment No. 242