Request for Additional Information Regarding Pressurizer Water Level Requirements (Tac No. MC7061)
ML052850213
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/14/2005
From: Boska J
NRC/NRR/DLPM/LPD1
To: Kansler M
Entergy Nuclear Operations
Boska J, NRR, 301-415-2901
References
TAC MC7061
Download: ML052850213 (6)


Text

October 14, 2005 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING PRESSURIZER WATER LEVEL REQUIREMENTS (TAC NO. MC7061)

Dear Mr. Kansler:

On May 25, 2005, Entergy Nuclear Operations, Inc. (Entergy), submitted a request for an amendment to the Technical Specifications for Indian Point Nuclear Generating Unit No. 2 which proposed a change to the existing pressurizer water level requirement for plant operation in hot standby (Mode 3).

The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). During a telephone call on October 5, 2005, the Entergy staff indicated that a response to the RAI would be provided within 45 days of receipt of this letter.

Please contact me at (301) 415-2901 if you have any questions on this issue.

Sincerely,

/RA/

John P. Boska, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-247

Enclosure:

RAI cc w/encl: See next page

ML052850213 OFFICE PDI-1/PM PDI-1/LA PDI-1/SC NAME JBoska SLittle RLaufer DATE 10/13/05 10/13/05 10/14/05

Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING PRESSURIZER WATER LEVEL REQUIREMENTS ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247 On May 25, 2005, Entergy Nuclear Operations, Inc. (Entergy or the licensee), submitted a request for an amendment to the Technical Specifications (TSs) for Indian Point Nuclear Generating Unit No. 2 (IP2) which proposed a change to the existing pressurizer water level requirement for plant operation in hot standby (Mode 3). The Nuclear Regulatory Commission (NRC) staff is reviewing the submittal and has the following questions:

1.

In its amendment request, Entergy proposed to add a new requirement to TS Limiting Condition for Operation (LCO) 3.4.9, "Pressurizer." The new requirement would establish a maximum actual level in the pressurizer of 90 percent during Mode 3 operation. The current TS LCO 3.4.9 maximum indicated pressurizer level for Modes 1 and 2 is 65.1 percent. Title 10 of the Code of Federal Regulations, Section 50.36, "Technical Specifications," defines a "Limiting Condition for Operation" as "the lowest functional capability or performance level of equipment required for safe operation of the facility." A TS LCO based on actual level as opposed to indicated level does not account for known uncertainties and establishes an allowable value for pressurizer water level that is inconsistent with the current (Modes 1 and 2) licensing basis for the pressurizer water level at IP2. The NRC staff requests that Entergy provide additional information to demonstrate that the proposed TS change satisfies NRC regulations regarding the allowable values for LCOs.

2.

Entergy provided a technical justification for the proposed change to TS LCO 3.4.9 in its amendment request. Specifically, the licensee stated that "In Mode 3, the rate of volumetric expansion of reactor coolant in the event of a loss of decay heat removal would be much less than that resulting from a loss-of-load or loss-of-normal feedwater, with the plant at full power." Since the purpose of TS LCO 3.4.9 is to preclude a water solid condition that results in water relief through the pressurizer safety valves, the NRC staff requests the licensee provide its analysis that demonstrates that a loss of decay heat removal will not result in a water solid condition in the pressurizer. Additionally, the staff requests that the licensee determine the peak pressure reached in the reactor coolant system for a loss of decay heat removal capability under the proposed TS LCO changes and verify that it meets the IP2 safety limit for peak reactor coolant system pressure.

3.

The licensee stated in its amendment request that the instrument channel indicators for the pressurizer level must be adjusted by plant operators using density compensation curves when the pressurizer is not at the temperature used for the instrument channel calibration. Since the temperature range for the Mode 3 operation is defined in the TSs, the licensee should be able to calculate the maximum uncertainty in the indicated pressurizer level under the most limiting Mode 3 conditions. The NRC staff requests that the licensee identify the maximum uncertainty, describe the methodology used to perform the calculation, and provide a technical justification for why this uncertainty is bounding.

4.

In its amendment request, Entergy stated that, as part of the proposed TS changes, administrative controls, implemented in plant procedures, will require that an operator be assigned for operating and controlling the chemical and volume control system, including monitoring pressurizer level, whenever the pressurizer level, in Mode 3, is above 65.1 percent. However, the licensee did not provide any description of the operator's responsibilities with regard to normal and accident conditions. The NRC staff is concerned that there may be undue reliance on operator actions to ensure the safe operation of IP2 under the proposed TS limits. The staff requests that the licensee provide a summary of operator responsibilities, training, and procedures that will be used to ensure the continued safe operation of IP2 under the proposed TS changes.

Indian Point Nuclear Generating Unit No. 2 cc:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Paul Rubin General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Columb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P. O. Box 249 Buchanan, NY 10511-0249 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 2 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511-0038

Indian Point Nuclear Generating Unit No. 2 cc:

Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Daniel C. Poole PWR SRC Consultant P.O. Box 579 Inglis, FL 34449 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001