September 15, 2005

Mr. William OConnor, Jr.

Vice President

Nuclear Generation

Detroit Edison Company

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: FERMI POWER PLANT, UNIT 2 - INFORMATION REQUEST FOR AN NRC

BIENNIAL SAFETY SYSTEM DESIGN AND PERFORMANCE CAPABILITY

(SSDPC) BASELINE INSPECTION 05000341/2005016(DRS)

Dear Mr. OConnor:

In our letter dated August 31, 2005, which announced our plans to begin a biennial Safety

System Design and Performance Capability (SSDPC) baseline inspection at the Fermi 2 Power

Plant, we stated that the reactor core isolation cooling and the emergency diesel generator

systems were selected for review. However, in the enclosure, we did not state the reactor core

isolation cooling system was selected. This was an error.

Enclosed is a revised request for documents needed for the inspection. As stated in our

August 31, 2005 letter, these documents have been divided into three groups. The first group

of information should be available to the NRC Region III office no later than October 27, 2005

and except as noted, should be provided electronically to Mr. Al Walker at (haw@nrc.gov). The

second group of requested documents should be made available on-site for the inspectors by

November 14, 2005. The third group lists information that will aid the inspection team in

tracking issues identified as a result of the inspection. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

W. OConnor -2-

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-341

License No. NPF-43

Enclosure: Safety System Design and Performance Capability

Inspection (SSDPC) Document Request

cc w/encl: N. Peterson, Manager, Nuclear Licensing

D. Pettinari, Legal Department

Compliance Supervisor

G. White, Michigan Public Service Commission

L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Monroe County, Emergency Management Division

Planning Manager, Emergency Management Division

MI Department of State Police

W. OConnor -2-

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-341

License No. NPF-43

Enclosure: Safety System Design and Performance Capability

Inspection (SSDPC) Document Request

cc w/encl: N. Peterson, Manager, Nuclear Licensing

D. Pettinari, Legal Department

Compliance Supervisor

G. White, Michigan Public Service Commission

L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Monroe County, Emergency Management Division

Planning Manager, Emergency Management Division

MI Department of State Police

DOCUMENT NAME:ML052590523.wpd

X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII

NAME HWalker:jb EDuncan AMStone

DATE 9/15/05 9/15/05 9/15/05

OFFICIAL RECORD COPY

W.OConnor -3-

ADAMS Distribution:

LXR1

NKR

RidsNrrDipmIipb

GEG

KGO

SJC4

DRPIII

DRSIII

PLB1

JRK1

SAFETY SYSTEM DESIGN AND PERFORMANCE CAPABILITY INSPECTION (SSDPC)

DOCUMENT REQUEST

Inspection Report: 05000341/2005016(DRS)

Inspection Dates: November 14 through December 2, 2005

Inspection Procedure: IP 71111.21, Safety System Design and Performance Capability

Lead Inspector: Hershell Walker, Team Leader

(630) 829-9728

I. Information Requested for In-Office Preparation Week

The following information is requested by October 27, 2005, or sooner, to facilitate the

selection of specific items that will be reviewed during the on-site inspection week. The

team will select specific items from the information requested below and submit a list to

your staff by November 8, 2005. We request that the specific items selected from the

lists be available and ready for review on the first day of inspection. If you have any

questions regarding this information, please call the team leader as soon as possible.

All information should be sent, electronically if at all possible, to (haw@nrc.gov).

The items requested below apply only to the selected systems:

Reactor Core Isolation Cooling (RCIC) system and

Emergency Diesel Generators (EDGs) and associated support systems

(e.g., EDG Air Start, EDG Lube Oil, EDG Fuel Oil, EDG Jacket Water Cooling,

and EDG Room Cooling, EDG Service Water);

(1) one copy of the systems description, design basis documents, related training

manuals and system health reports;

(2) one copy of the normal and abnormal operating procedures;

(3) five half-size (18" x 24") copies of the piping and instrument drawings (P&IDs)

[paper copies];

(4) two half-size (18" x 24") copies of the electrical schematics, single-line and key

diagrams [paper copies];

(5) name and phone numbers of the technical contact, a regulatory contact, and the

design and system engineer(s);

(6) current management and engineering organizational chart; and

(7) list of analyses that either support or take credit for operation of the systems.

For each analysis, besides the number and title, include the purpose of the

Enclosure

calculation, the date, a technical contact, and the current status (active,

superceded, historical). Clarify any abbreviations or acronyms and give word

titles for any numbers (e.g., residual heat removal inner containment isolation

valve, rather than RH-2301-45B).

In addition to the above, specifically identify (by number) the calculations that address

each of the following areas. If a calculation cannot be identified for a particular area,

please provide an explanation of why a calculation is not necessary:

  • breaker and fuse coordination calculations;
  • diesel loading calculations;
  • instrument uncertainty calculations;
  • room temperature environmental qualification calculations for major

equipment;

  • relay setting calculations;
  • setpoint calculations for all technical specification or emergency

operation procedure equipment;

  • time delay calculations (for any component incorporating time delay

features);

  • undervoltage and degraded voltage calculations;
  • voltage drop calculations for all major electrical components (motors,

MOVs);

  • design basis (flow rates, levels, pressures, temperatures)

confirmation calculations (including NSSS calculations);

  • heat exchanger calculations;
  • NPSH and total dynamic head calculations;
  • pressure transient/water hammer evaluations;
  • pump minimum recirculation flow calculations;
  • relief valve sizing calculations;
  • tank over-pressurization calculations; and
  • tank sizing calculations.

(8) List of all major modifications or set-point changes made to the selected systems

since pre-operational testing. Major changes are those that significantly affected

the way the system operated, for example, replacement of major components,

modification to electrical control logic, etc. Please include the number and title,

the modification purpose (description), the date, the status (whether the

calculation is active, canceled, superceded, or under revision) and a technical

contact. Spell out abbreviations, or acronyms and give word titles for any

numbers. Note if any of the modifications required prior NRC approval. One

way to provide this information is by providing the first sheet of the modification

(not the cover letter);

(9) list of open temporary modifications, if any;

(10) list of the selected systems electrical equipment/components that have been

removed from the licensees EQ Program, if any;

Enclosure

(11) list of condition reports (corrective action documents) involving the RCIC system

or EDG and its support systems that are in one of the following categories. For

each condition report, besides the number and title, clearly designate the status

(open/closed), the importance ranking, the date initiated, the date closed (if

applicable), the status of corrective actions, and a technical contact. (Note: it is

not necessary to provide a separate list for each category.)

  • any condition report initiated more than 2 years prior to the inspection

that is still open;

  • any condition report (open or closed) initiated in the last 2 years that

required an apparent or root cause analysis

(i.e., Category 1 or 2 condition reports);

  • any condition report (open or closed) initiated in the last 2 years that

required an operability determination (include determination); and

  • any condition report (open or closed) initiated in the last 2 years that

related to problems with the quality of engineering (not system

specific).

(12) the corrective maintenance history of major components for the last 2 years;

(13) list of operability evaluations as far back as retrievable. Include both those

currently relied upon and those that were previously relied upon for operability;

and

(14) list of Engineering Related Operator Workarounds.

II. Information Requested to be Available on First Day of Inspection (November 14,

2005)

We request that the following information be available to the team once they arrive

on-site. The team will select the specific documents that will be reviewed for items

(1) through (5) by November 8, 2005. Some documents, such as the Updated Final

Safety Analysis Report or the Technical Specification, do not need to be solely available

to the team (i.e., they can be located in a reference library) as long as the team has

ready access to them. However, they should be located prior to the inspection team

arriving on-site such that if the team requests any of these documents they are available

within a short time (i.e., less than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />):

(1) copies of the selected calculations indicated by subject area in Item I.7,

excluding data files. Please review the calculations and also provide copies of

referenced material (such as drawings, engineering requests, vendor letters);

(2) copies of the selected MAJOR design changes, modifications, and set-point

changes as indicated in Item I.8. For each modification, as a minimum provide

the purpose, the 10 CFR 50.59 evaluation or screening, and the completed

post-modification test;

(3) copies of the selected condition reports (corrective action documents) indicated

Enclosure

in Item I.11, including any associated root/apparent cause analyses and

operability determinations;

(4) copies of selected operability evaluations indicated in Item I.13 and plans for

restoring operability, if applicable;

(5) copies of selected work-around evaluations indicated in Item I.14 and plans for

resolution;

(6) copies of any open temporary modifications;

(7) an Index of the surveillances for ALL Technical Specification equipment

completed during the last 2 years;

(8) list of all maintenance, surveillance, and annunciator response procedures

related to the systems. Include name as well as number. For the surveillance

procedures, provide a cross-reference which shows how each technical

specification requirement is being met;

(9) one copy of each major equipment drawing (valves, pumps, tanks, strainers),

including pump head curves (1/2 size, 18" x 24");

(10) copies of isometric drawings for major flow paths (1/2 size);

(11) copies of elementary diagrams (1/2 size);

(12) index of wiring diagrams (1/2 size);

(13) copies of loop drawings (1/2 size);

(14) copies of instrumentation and control logic drawings (1/2 size);

(15) maintenance history of major components for the last 2 years;

(16) trend data on the EDG fuel oil transfer pumps and RCIC pump performance

(over last 3 years) including inservice testing, other vibration monitoring, oil

sample results, etc., as applicable;

(17) inservice testing valve tables for RCIC and EDG and support systems;

(18) inservice testing basis document for RCIC and EDG and support systems (if

available);

(19) a copy of any self-assessments and associated corrective action documents

generated in preparation for the inspection;

(20) one copy of the current plant organization charts; and

Enclosure

(21) reference materials (make available if needed):

  • equipment qualification binders;
  • general set of plant drawings;
  • IPE/PRA report;
  • pre-operational tests, including documents showing resolution of

deficiencies;

  • procurement documents for major components in each system (verify

retrievable);

  • relevant operating experience information (such as vendor letters or

utility experience);

  • standards used in system design (such as IEEE, ASME, TEMA);
  • system procedures;
  • Technical Specifications;
  • Technical Data Book (if applicable);
  • vendor manuals.

III. Information Requested to be provided throughout the inspection

(1) copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection; and

(2) copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

If you have questions regarding the information requested, please contact the team leader.