Dominion Energy Kewaunec, Inc.
N490 Highway 42, Kewaunee, WI 54216-9511 1ominio AUG 3 1 2005 U. S. Nuclear Regulatory Commission Serial No.05-585 Attention: Document Control Desk KPS/LIC/GR: R3 Washington, DC 20555 Docket No.
50-305 License No.
DPR-43 DOMINION ENERGY KEWAUNEE, INC.
KEWAUNEE POWER STATION INSERVICE INSPECTION PROGRAM FOR FOURTH INSPECTION INTERVAL RELIEF REQUEST WITHDRAWAL By letter dated December 16, 2003, (ML033580734 and ML035580735) the Kewaunee Power Station's Inservice Inspection Program for the fourth inspection interval was submitted to the Nuclear Regulatory Commission. In that letter, 13 relief requests were included for the fourth interval. The purpose of this letter is to withdraw one of the relief request, relief request RR-1-6.
The relief requests described in the December 16th letter were labeled RR-1 -1 through RR-1-10, RR-2-1, RR-G-1, and RR-G-2. Attachment 1 lists these relief requests and their status. As shown in Attachment 1, RR-1-6 and RR-G-1 are the relief requests still under NRC review.
Based on discussions with the NRC staff, Dominion Energy Kewaunee, Inc. has determined that RR-1-6 is not needed at this time and hereby withdraws this relief request.
If you have questions or require additional information, please feel free to contact Mr.
Gerald Riste at 920-388-8424.
Very truly yours, Leslie N. Hartz Vice President - Nuclear Engineering Commitments made by this letter: NONE 0 417
Serial No.05-585 Page 2 of 2 cc:
Mr. J. L. Caldwell Administrator, Region U. S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Mr. J. F. Stang Project Manager U.S. Nuclear Regulatory Commission Mail Stop O-8-H-4a Washington, D. C. 20555 Mr. S. C. Burton NRC Senior Resident Inspector Kewaunee Power Station Public Service Commission of Wisconsin Electric Division P.O. Box 7854 Madison, WI 53707
Serial No.05-585 Docket No. 50-305 ATTACHMENT 1 INSERVICE INSPECTION PROGRAM FOR FOURTH INSPECTION INTERVAL RELIEF REQUEST WITHDRAWAL DOMINION ENERGY KEWAUNEE, INC.
KEWAUNEE POWER STATION
KEWAUNEE POWER STATION FOURTH 10-YEAR ISI INTERVAL Summary of Relief Requests Relief Request Number Disposition Associated Letter Date RR-1-1 Authorized February 18, 2005 RR-1-2 Authorized February 18, 2005 RR-1-3 Granted February 18, 2005 RR-1-4 Authorized February 18, 2005 RR-1 -5 Granted February 18, 2005 RR-1 -6 RR-1 -7 Authorized February 18, 2005, and May 27, 2005 RR-1-8 Authorized February 18, 2005, and May 27, 2005 RR-1-9 Withdrawn September 17, 2004 RR-1-10 Not Required February 18, 2005 RR-2-1 Authorized February 18, 2005 RR-G-1 RR-G-2 Authorized February 18, 2005