Vogtle Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2005 13:03:44 Report 22 5
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 08/29/2005 09/02/2005 Safety System Design and Performance Capability IP 7111121 1, 2 4
PS1-RP
- RP PUBLIC BASELINE Safety Issues 09/12/2005 09/16/2005 Transportation of Reactor Control Rod Drives in Type A Packages IP 2515/161 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P IP 7112203 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Performance Indicator Verification IP 71151 1, 2 1
PS2 EP
- EP INSPECTION Baseline Inspections 09/12/2005 09/16/2005 Alert and Notification System Testing IP 7111402 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Emergency Response Organization Augmentation Testing IP 7111403 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2 Baseline Inspections 09/12/2005 09/16/2005 Performance Indicator Verification IP 71151 1, 2 2
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 09/26/2005 09/29/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 EB3TI160
- 2515/160 U-2: PZR PENETRATION NOZZLES Safety Issues 09/26/2005 09/30/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
1 EB3SGISI
- STEAM GENERATOR ISI Baseline Inspections 10/10/2005 10/14/2005 Inservice Inspection Activities - PWR IP 7111108P 2
- REQUAL INSPECTION Baseline Inspections 10/17/2005 10/21/2005 Licensed Operator Requalification Program IP 7111111B 1, 2 3
PS2-EP
- EP EXERCISE Baseline Inspections 03/20/2006 03/24/2006 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 03/20/2006 03/24/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 03/20/2006 03/24/2006 Performance Indicator Verification IP 71151 1, 2 1
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 04/03/2006 04/07/2006 Maintenance Effectiveness IP 7111112B 1, 2 2
EB3-HS
- HEAT SINK Baseline Inspections 07/17/2006 07/21/2006 Heat Sink Performance IP 7111107B 1, 2 1
PS1-RP
- RP PREINSPECTION VISIT OCCUPATIONAL Baseline Inspections 08/28/2006 08/30/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 3
PS1-RP
- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 09/18/2006 09/22/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Vogtle Inspection / Activity Plan 09/01/2005 - 03/31/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2005 13:03:44 Report 22 3
PS1-RP
- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 09/18/2006 09/22/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 09/18/2006 09/22/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 09/18/2006 09/22/2006 Performance Indicator Verification IP 71151 1, 2 1
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 09/25/2006 09/29/2006 Inservice Inspection Activities - PWR IP 7111108P 1
1 EB3TI150
- 2515/150 U-1: RPV & VHP NOZZLES Safety Issues 09/25/2006 09/29/2006 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA IP 2515/150 1
1 EB3SGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 10/02/2006 10/06/2006 Inservice Inspection Activities - PWR IP 7111108P 1
3 PS1-RP
- RP BASELINE OCCUPATIONAL WK2 Baseline Inspections 10/02/2006 10/06/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/02/2006 10/06/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/02/2006 10/06/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/02/2006 10/06/2006 Performance Indicator Verification IP 71151 1, 2 7
PB2-PI&R
- BIENNIAL PI&R Baseline Inspections 11/06/2006 11/10/2006 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 11/27/2006 12/01/2006 Identification and Resolution of Problems IP 71152B 1, 2 3
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 01/22/2007 01/26/2007 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 01/22/2007 01/26/2007 Permanent Plant Modifications IP 7111117B 1, 2 1
EB3TI150
- 2515/150 U-2: RPV & VHP NOZZLES Safety Issues 03/12/2007 03/16/2007 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA IP 2515/150 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.