ML052420457

From kanterella
Jump to navigation Jump to search
Mid-Cycle Performance Review and Inspection Plan - Vogtle Electric Generating Plant
ML052420457
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/30/2005
From: Widmann M
NRC/RGN-II/DRP/RPB2
To: Grissette D
Southern Nuclear Operating Co
Shared Package
ML052420473 List:
References
Download: ML052420457 (4)


Text

August 30, 2005 Southern Nuclear Operating Company, Inc.

ATTN: D. E. Grissette, Jr.

Vice President - Vogtle Project P. O. Box 1295 Birmingham, AL 35201-1295

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - VOGTLE ELECTRIC GENERATING PLANT

Dear Mr. Grissette:

On August 3, 2005, the NRC staff completed its performance review of the Vogtle Electric Generating Plant for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance With 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility through March 31, 2007. We also plan on conducting inspections of the reactor vessel head and head penetrations and pressurizer penetrations which are not part of the routine baseline inspection program.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2007. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

SNC 2 If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4550 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

\RA\

Malcolm T. Widmann, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81

Enclosure:

Vogtle Inspection/Activity Plan cc w/encl: (See page 3)

SNC 3 cc w/encl:

J. T. Gasser Arthur H. Domby, Esq.

Executive Vice President Troutman Sanders Southern Nuclear Operating Company, Inc. Electronic Mail Distributioin Electronic Mail Distribution Senior Engineer - Power Supply T. E. Tynan Municipal Electric Authority General Manager, Plant Vogtle of Georgia Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution Reece McAlister N. J. Stringfellow Executive Secretary Manager-Licensing Georgia Public Service Commission Southern Nuclear Operating Company, Inc. 244 Washington Street, SW Electronic Mail Distribution Atlanta, GA 30334 Director, Consumers' Utility Counsel Distribution w/encl: (See page 4)

Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Director, Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Manager, Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution Resident Manager Oglethorpe Power Corporation Alvin W. Vogtle Nuclear Plant Electronic Mail Distribution

OFFICE RII:DRP SIGNATURE CWR1 NAME CRapp:rcm DATE 8/ /2005 8/ /2005 8/ /2005 8/ /2005 8/ /2005 8/ /2005 8/ /2005 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO