Mid-Cycle Performance Review and Inspection Plan - Brunswick Steam Electric Plant
ML052420275
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/30/2005
From: Fredrickson P
NRC/RGN-II/DRP/RPB4
To: Gannon C
Carolina Power & Light Co
Shared Package
ML052420264 List:
References
Download: ML052420275 (4)


Text

August 30, 2005 Carolina Power & Light Company ATTN: Mr. C. J. Gannon Vice President Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

BRUNSWICK STEAM ELECTRIC PLANT

Dear Mr. Gannon:

On August 3, 2005, the NRC staff completed its performance review of the Brunswick Steam Electric Plant for the first half of the calendar year 2005 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390" will include the physical protection review and a resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process baseline inspections at your facility through March 31, 2007.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2007. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

CP& L 2

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4530 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-325, 50-324 Licensee Nos. DPR-71, DPR-62

Enclosure:

Brunswick Inspection/Activity Plan cc w/encl: (See page 3)

CP& L 3

cc w/encl:

T. P. Cleary, Director Site Operations Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.

Electronic Mail Distribution Benjamin C. Waldrep Plant Manager Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution James W. Holt, Manager Performance Evaluation and Regulatory Affairs PEB 7 Carolina Power & Light Company Electronic Mail Distribution Edward T. O'Neil, Manager Support Services Carolina Power & Light Company Brunswick Steam Electric Plant Electronic Mail Distribution Garry D. Miller, Manager License Renewal Progress Energy Electronic Mail Distribution Lenny Beller, Supervisor Licensing/Regulatory Programs Carolina Power and Light Company Electronic Mail Distribution David T. Conley Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution James Ross Nuclear Energy Institute Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment and Natural Resources Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 David R. Sandifer Brunswick County Board of Commissioners P. O. Box 249 Bolivia, NC 28422 Warren Lee Emergency Management Director New Hanover County Department of Emergency Management P. O. Box 1525 Wilmington, NC 28402-1525 Distribution w/encl: (See page 4)

OFFICE DRP:RII SIGNATURE GTM NAME GMacdonald:as DATE 08/29/2005 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO