ML052270342
| ML052270342 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/12/2005 |
| From: | Colburn T NRC/NRR/DLPM/LPD1 |
| To: | Spina J Nine Mile Point |
| References | |
| TAC MC8061 | |
| Download: ML052270342 (1) | |
Text
LIMITING CONDITION FOR OPERATION SURVEILLANCr= REQUIREMENT LIMITIN CONDITION FOR OPERATION SURVEILLANCE flFOUIRFMFNT t
I
- f.
The containment spray system shall be considered operable by verifying that lake water temperature does not exceed 830F.
- g.
If specification Tf" cannot be met commence shutdown within one hour and be in hot shutdown within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and cold shutdown within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- f.
Lake Water Temperature Record at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> when latest recorded water temperature is greater than or equal to 75TF and at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when the latest recorded water temperature Is greater than or equal to 790F.
AMENDMENT NO. 442, 190 161