\\Am A subsidiary of Pinnacle West Capital Corporation Craig K. Seaman Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 PO Box 52034 Tel (623) 393-5421 Phoenix, Arizona 85072-2034 Fax (623) 393-5442 E-mail: CSEAMAN@apsc.com 1 O2-05291 -CKS/RAS June 14, 2005 Mr. Arthur T. Howell, Ill Director, Division of Reactor Projects Region IV, U.S. Nuclear Regulatory Commission 61 1 Ryan Plaza Dr., Suite 400 Arlington, Texas 7601 1-4005
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3.
Docket Nos. STN 50-528/529/530 Request for Supplemental Inspection Scheduling Change
Dear Mr. Howell,
Arizona Public Service Company (APS) is requesting that the PVNGS degraded cornerstone supplemental inspection (IP 95002), originally scheduled for August 2005, instead be conducted in September 2005. Specifically, APS is requesting that the first onsite inspection activities would be conducted during the week of September 12, 2005.
APS is requesting this inspection scheduling change to ensure that the root and contributing causes for the failure to maintain portions of the emergency core cooling system (ECCS) filled with water are fully developed and that the extent of conditionkause and corrective actions are sufficient to prevent recurrence.
In conversation with your staff, we understand that this request should be acceptable.
No commitments are being made to the NRC in this letter. Should you have questions regarding this matter, please call me at (623) 393-5421.
CKSIRASlrs A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway Comanche Peak D i a b l o Canyon Palo Verde South Texas Project Wolf Creek
Mr. Arthur T. Howell, Ill Director, Division of Reactor Projects Region IV, US. Nuclear Regulatory Commission Request for Supplemental Inspection Scheduling Change Page 2 GC:
B. S. Mallett NRC Administrator, Region IV M. B. Fields G. G. Warnick NRC NRR Project Manager NRC Senior Resident Inspector, PVNGS