- UIR28 Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Friday, May 7, 2004 Start Time:
1800 NSB Cafeteria ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer / Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordinator (SSC)
Shutdown Safety Assessor (SSA)
Site Management (SSM)
General Supervisors First Line Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2.
Radiation Protection (RPM)
- 3.
Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5.
Maintenance Coordinator Turnover (MOC)
- 6.
Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8.
Schedule Review (SOM)
- 9. Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM)
BRIEFING NOTES Items Included in Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule ina Xras WM the Freedom of Inform'b A, eXemp~ #
'II 1
Site Yellow Communication On Friday, May 7, at 0018 Maintenance was utilizing a center punch inside the control board in support of the Manually Operated Breaker (MOB) Modification.
The work caused a nearby breaker to trip. This caused a loss of annunciator power for one of the control boards. The Shift Manager appropriately reviewed the Emergency Action Levels (EALs) for a potential entry into an Unusual Event.
The EAL in question surrounded the classification for an "Unplanned loss of most (approximately 75%) safety system annunciators or indications for >. 15 minutes....". The Shift Manager did correctly determine that the conditions did not meet the criteria for this classification. The number of annunciators lost did not meet the criteria.
Site personnel did an excellent job responding to the needs of Operations; however, this event was a significant near miss. It is important to remind all personnel that they need to be aware that their actions can have an impact on plant operations.
It is important to ensure that all site personnel understand what error likely situations are associated with work assignments and know what defenses are in place to prevent events.
2
Committed to Ntuclcar Excellenc OURFlEV v
YOMCELLMfl PGlT BRCH -* U1R21 Point Beach Nuclear Plant UlR28 Refueling Outage Safety Topics for week of May 2 - 8, 2004 Theme for the week This week's theme is Hand Protection. During the last week of April, there were a lot of minor hand injuries reported. Although we have come a long way in the last few years, we still have not eliminated hand injuries. It is time we hand protection to the next level.
Daily Safety Snippets Sunday
'It's difficult to grip when your finger gets snipped" Could you imagine doing your job without your hands? We tend to take it too much for granted that we have two hands at our command, immediately ready to do what we want them to. They not only perform amazing manual tasks, but they also make us money. Just ask anyone who has lost the use of his or her hands.
Monday "Concerning fingers. do not Ignore: Cut one off and you'll grow no more" Limmerk 1999, While lowering a 20001b. flow diffuser from the high pressure turbine, a worker lost a substantial portion of one finger when the cribbing and jack used to support the diffuser failed and pinned the worker's hand between the diffuser and an I-beam used as part of the cribbing.
Tuesday "Safety gloves worn Is a hand not torn" OE12632 Davis Besse, While performing a search, a security officer ran his hand between the front and back seat of a vehicle. A utility knife with the blade partially open cut the leather outer covering of the search glove, but the Kevlar liner gloves the officer had on protected his hand and prevented a serious injury.
Wednesday "Where danger lingers, watch your fingers' Workers need to know accidents can happen in the strangest ways. Some accidents are simply bizarre. Others happen when no hazard is apparent. Doors were the source of more than 10,000 hand injuries a year in the US. Vending machines caused more than 100 lost-day hand injuries.
And 52 workers Injured their hands while walking, according to the statistics.
Thursday "Practice safety until it fits like a glove" Do you consider gloves as much a part of your normal PPE as your hardhat, safety glasses, and hearing protection? If not, maybe you should be. Always carry a pair of gloves with you when in the plant and use them when operating the valve or picking up scrap metal.
Friday
'A finger tip - don't leave work without theml" On April 4, 2001, a contract employee at Braidwood Station suffered a fractured right hand when an electric hoist disengaged from a crane hook and fell on to the new fuel storage rack. The electric hoist was being used to drag test new spent fuel racks being installed at the station. Workers attached a load cell and the electric hoist to the auxiliary hoist of the fuel building overhead crane, and then connected the electric hoist to a test gage. As the crane operator lowered the auxiliary hook, the test gage hung up on the fuel rack and caused the rigging to move laterally. The electric hoist became disengaged because the safety latch on the auxiliary hook was not used.
Saturday "It's no hand live... Proper gloves protect all five" OSHA 1910.138(a): General requirements. Employers shall select and require employees to use appropriate hand protection when employees' hands are exposed to hazards such as those from skin absorption of harmful substances; severe cuts or lacerations; severe abrasions; punctures; chemical burns; thermal burns; and harmful temperature extremes.
3
Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 33 Path N -
Picture Meets Outage Radiation Performance 11nnen't "=get F=NH-esada
_0-.-
nA_
I IThis indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
53.52 Rem jDay 33 - May 6 1
Actual = 0.693 Cumulative = 53.520 Cumulative Forecast = 62.488 Daily dose and PCE goals reforecasted on 4/23.
PCE #8 on 5/5, Individual performing disassembly of valve 1 SC-953 was round to have 6,000 ncpm contamination on modesty bottom.
Meets: <= 18 Exceeds: <=1 2 Actual PCE's:
8 Os41 PIr
.0-I Stu Thomas I
Personnel Contamination Events Cummulative Dose Exposure w
C 0
02 z
z 20 18 16 14 12 10 8
6 4
2 0
0 0
80 I
60,
40 -
20 -
0 2 4 6 8 1012141618202224262830323436384042
+
Actual Goal 0 2 4 6 8 101214161820222426283032343638404244464850
Nit Conmindted to Nucdear Excotlane g
Outage Status Report Plant:
Point Beach Unit I Day:
Friday Today's Date / Time:
5/07/04 1600 OutageDuration: Day 34 Of Refueling Outage Number UIR28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage I
Summary:
Radiological Dose to date 53.520 Projected to date
- 62.488 Outage Goal 575 R Difference
-8.968
- Reforecast on 4/23 Number of PCEs 9
Summary: 5/704 - Individual was found to have particle inside shoe. Actions were taken to remove contamination.
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
0 Hot Standby (Mode 3) 0 Hot Shutdown (Mode 4) 0 Cold Shutdown (Mode 5) 0 Refueling Shutdown (Mode 6)
RCS:
Temperature:
81 Pressure:
Vented to Atmosphere RV Level:
Refueling Height Time to Boil:
35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> Shutdown Safety Assessment Protected Equipment:
Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)
- IB-42 MCC Horizontal Bracing & Bucket Replacement
- CVCS Restoration
- Under Head Equipment Setup
- Restoration of IB-42
- Radiography on T-26 Biowdown Tank
- Reactor Head Repair
- IP15B SI Pump Seal Repair
- SI System LRPM Testing Significant Outstanding Issues Date Issue Due Responsibility 4/28/04 IW-3B Shroud Fan Backdraft Damper FME 5/09/04 Terry Guay 5/03/04 Reactor Vessel Head Repair Penetration #26 5/16/04 Jim Schweitzer Upcoming Mtjor Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <200° 4/03/04 2100 4/03/04 2230 RCS Fill & Vent 4/23104 1500 Head Lift 4/09/04 ' 0900 4/21/04 1550 Heatup >2000 4125/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 On-Line 4/30/04 0100 5
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
May 7, 2004 TIME:
1400 YKEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
PROTECTED EQUIPMENT:
GREEN YELLOW GREEN
-GREEN GREEN NA COMMENTS:
RCS Time to Boil is 35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-1S62 Rcvision 2 10/30102 6
Page 5 of 9 Refrences: NP 10.3.6 NP 102.1
l__
_Defined Critical Path I
MAY U
ID DESCRIPTION OD RD Cal U SYS EQID TF 7
I a
6,
.1002.14,16,18.20,221 o 2.4 8,1002.14.16,18,20.221 2.4.6.8.1002,14,16,18,20, 1
MM0408036 lP-15B REPAIR/REPLACE 36 3
1 1 StI P-0158 4
15B, REPAIR/REPLACE SEAL EAL 0408036-07MAY04 14:5902MAY04 18:OOA I
SD-1600-34 P INCORPORATE 46 27 1 1 RC R-1 3
c4600-34P' 6-INCORPORATE COMMENTSREVIEW MOD PKG
_ COMMENTS/REVIEW MOD
_0213476-08MAYO4 14:5906MAY04 15:OOA I EM0202527C 1B-42RE-INSTALL BUCKETS 15l 5 1 1 1 480V B-42 a0 F
2
-42RE-INSTALL BUCKETS MR 01-128MIU1R28 MR 01-128'M/U1R28 0202527-07MAY04 16:5907MAY04 00:OOA 1
CE-1600-72 P-26 -INCORPORATE SPEED 2
2 1
1 RC R-1 0
CE4600-7 INCORPORATE SPEED INTO WORK PACKAGE INTO WORK PACKAGE 0213475 - 07MAY04 13:5907MAY04 12:00 1 CEI600RO15 P-26/32/33 - REMOVE 24 24 11 RC R-1 0
CEI6 0R15 2 M/2/33 - REMOVE THERMAL SLEEVES THERMAL SLEEVES 24
- 0 l1l1___07MAY4____
0213475- 08MAY04 15:59 I
EM0202527E 1B-42 PERFORM MEGGER 2
2 l1 1 480V B-42 0
EM 202527E 1842PERFORMMEGGERTESTING(MRO1-128'MfU1R28)
TESTING (MR I
07MA)p4 17:00*0202527- 07MAY04 18:59 1
T-7590-R 1 480V MR 01-128 IB-42 BUS 2
2 1 1 480V MR 01-128 0
T.7590.1pO48V MR 01-128 15-42 BUS BRACING EM REVO-1 BRACING EM REVO-1 07 AY4 19:0010017590- 07MAY04 20:59 1
2RESTOR RESTORE 1-42 PER IWP 3
3 l 1l 1480V B-42 0
B42RESTORETORE I B42 PER rWP O1-128*E-BR 01-128 E-BR 17MAY04 21:O 07MAY04 23:59 E; AF iEFI
! t
^'sIL J, 1-1vi lx~l WI I 1
B52423F BUS STAB PMT 1S1-856B 2
2 1 1 480V 842 0
B52-423FBUS STAB PMT= ISI-856B 08MAY04 00:00E0202527 - 08MAY04 01:59 1
T-7436-R I 480V MR 01-128 1B52-423F I 1 l1 1 480V MR 01-128 0
T.7436r41 480V MR 01-128 1B52-423F (Sl-8568) OPS REVO-1 (SI-856B) OPS REVO-1 08MAY04 02:00%0017436- 08MAY04 02:59 1
T-7439-R 1I480VMR01-1281052-423M 1
1 1
1 480V MR 01-128 0
T.7439.14I4 8V MR 01-128 1B52-423M (SI-871B) OPS REVO-1 (Sl-871B) OPS REVO-1 08MAY04 06:00E0017439- 08MAY04 06:59 1
T-7432-H I 480V MR 01-128 1852-422J 1
1 1
1 480V MR 01-128 0
T-7432-Hl 480V MR 01-128 1B52-422J (SI-878B) OPS REVO.1 (SI-8788) OPS REVO-1 08MAY04 07:0030017432 - 08MAY04 07:59 1
B52-422J BUS STAB PMT'1SI-878B8 1
1 1 1 480V B-42 0
1352.422JBUS STAB PMT 1'I-8788" 08MAY04 08:0010202527- 08MAY04 08:59 1
T-7432-R 1 480V MR 01-128 1B52422J I 1 I
1 480V MR 01-128 0
T-7432.R 480V MR 01-128 1B52-422J (Sl-8788) OPS REVO-1 (SI-878) OPS REVO-1 08MAY04 09:00E0017432- 08MAY04 09:59 1
T-7430-H 1 480VMR01-128tB52-422F 1
1 1
1 1480V MR 01-128 0
T-7430-Hi 480V MR 01-128 1B52-422F (Sf-878C) OPS REVO-1 (SI-878C) OPS REVO1 08MAY04 10:0010017430- 08MAY04 10:59 1
852-422F BUS STAB PMT'1SI-878Cl 1 1 1 1 480V B-42 0
B52.422FBUS STAB PMT '1SI-878C' 08MAY04 11:0010202527- 08MAY04 11:59 Run Date 07MAY04 13:34 LT-1 6 DEFINED CRITICAL PATH Sheet 1 of3 0 Primavera Systems. Inc.
FL-16 DEFINED CRITICAL PATH SET
I Defined Critical Path
__I_
M A Y U
ID DESCRIPTION OD RD Cal U SYS EQID TF MAY4I 6
8 g
I I
I I
I I
I 14 6.8 1,10112,14,16,18,20,2210 2
4.6.8,10I12,14,16,18,20.2 1 E=
- I *
=
u I
T-7430-R I 480V MR 01-128 1B52-422F (SI.878C) OPS REVO-1 1
I I
1 480V MR 01-128' 0
1 T-7440-H 1 480V MR 01-128 1B52-424C 1
1 1 1480V MR 01-128 0
(SI-8258) OPS REVO-1 1
B52-424C BUS BRACING PMT 1
1 1 1 480V 8-42 0
'1SI-825B' 1
T-7440-R 1 480V MR 01-128 1B52-424C 1
1 1 1 480V MR 01-128 0
t 5-1600-36 PORC - REACTOR HEAD 3
3 1
1 RC R-1 3
REPAIR MOD 1
T-7429-H i 480V MR 01-t28 1B52-422C 1
1 1 1 480V MR 01-128 0
(SI-896B) OPS REVO-1 1 CEI600R020 PERFORM ULTRASONIC 12 12 1 1
RC R-1 0
TESTS ON OPEN HOUSINGS 1
B52-422C BUS STAB PMTf1SI-896B' 1
1 1 1 480V B-42 0
T-7429-R 1 480V MR 01-1281B52422C 1
1 1 1 480V MR 01-128 0
(SI-8968) OPS REV0-1 1
CE-1600-70 INCORPORATE DESIGN 3
3 1
1 RC R-1 3
PAPER INTO REPAIR 1
T-7427-H I 480V MR 01-128 1B52-421J 1
1 1 1 480V MR 01-128 0
(SI-866B1 OPS REVO-1 1
B52-421J BUS STAB PMT 1SI-866B 1
1 1 1 480V 8-42 0
I T-7427-R I 480V MR 01-128 1B52-421J I
1 1 1 480V MR 01-128 a
1(SI-866B) OPS REVO-1 1
CE-1600-74 HEAD REPAIR PRE-JOB 4411 RC R-1 3
CE-I604 HEAD BRIEF T-74306R1 480V MR 01-128 1B52-422F (SIl878C) OPS REVO-1 08MAY04 12:00LI0017430- 08MAY04 12:59 T-7440-H1 480V MR 01-128 1B52-424C (S1-8258) OPS REVO-1 08MAY04 13:00140017440- 08MAY04 13:59 B52-424CBUS BRACING PMT "ISI-825B' 08MAY04 14:00[10202527- 08MAY04 14:59 T.7440.R1480V MR 01-128 1B52-424C (51-825B) OPS REVO-1 08MAY04 15:00Lq0017440-08MAY04 15:59 SD4600-36PORC - REACTOR HEAD REPAIR MOD PACKAGE/APPROVA 08MAY04 15:00-0213476- 08MAY04 17:59 T.7429-111480V MR 01-128 1B52-422C (Sl-8968) OPS REVO-1 08MAY04 16:00U0017429- 08MAY04 16:59 CE1600RO2OPERFORM ULTRASONIC TESTS ON OPEN HOUSING 08MAY04 16:00-_
0213476-09MAY04 03:59 B52.422CBUS STAB PMT "1SI-896B" 08MAY04 17:00110202527- 08MAY04 17:59 T.7429"1_480V MR 01-128 1B52-422C (SI-896B) OPS REVO 08MAY04 18:00110017429- 08MAY04 18:59 CE4600-7dNCORPORATE DESIGN PAPER INTO REPAIR PACKAG 08MAY04 18:00-0213476- 08MAY04 20:59 T-7427.H1 480V MR 01-128 1B52-421J (SI-866B) OPS REVO I 08MAY04 19:0010017427- 08MAY04 19:59 B52-421JBUS STAB PMT "1SI-866B' 08MAY04 20:0020202527- 08MAY04 20:59 T-7427-R1 480V MR 01-128 1B52-421J (SI-866B) OPS REVO 0 08MAY04 21:0010017427- 08MAY04 21:59 CE-1600-74HEAD REPAIR PRE-JOB BRIEF 08MAY04 21:00-0213476- 09MAY04 00:59 014 2 g.BFILL & VENT P-015B HHSI PP PER 01-I28 (PARTIAL 08MAY04 22:00M0408036- 09MAY04 01:59 1
01-128-B FILL & VENT P-015B HHSI PP I PER 01-128 (PARTIAL) 4 4
1 1
SI P-015B 0
I OP0408036 P-158 PMT PER IT-01A 4 _ 1 1
SI P-015B 0
I _P04080 36P-1B PT PER IT-0IA 09MAY04 02:00_0408036- 09MAY04 05:59 1 CE1600R025 PERFORM REPAIR OF HEAD 96 96 1 1
RC R-1 0
CE1600R02SPERFORM REPAIR OF HEAD PENETRATION 2(
PENETRATION 26 02134T6-13MAY04 03:5909MAY04 04:00 Run Date 07MAY04 13:34 LT-16 DEFINED CRITICAL PATH Sheet 2 of 3 C Pnmavera Systems, Inc.
FL-16 DEFINED CRITICAL PATH SET
Defined Critical Path I
II IMAY U
ID DESCRIPTION ODRD Cal U SYS EQID TF
__,_8_
Y _ ___
4.6.8.
14.16,18,20.2210.2.4.6.8,10112,14,16.18,2,i220.2.4.6.8
.i12.14,16.18,20,2 I
T-7451-R 1 480VMR01-128 1B52-425J 1 1 1 1 480V MR 01.128 0
T.7451.RI 480V MR 01-128 1B52-42J (S1-857B) OPS REVC (SI-857B) OPS REVO-1 0017451- 09MAY04 09:5909MAY04 09:0011 1
IT.530D LRPM & PIGGYBACK TEST 8
8 1 1 RH OIT-0530D 0
rr.530DLRPM & PIGGYBACK TEST OF TRAIN B S
_.OF TRAIN BSI 0215917 -09MAY04 17:5909MAY04 10:00000-W I
Run Date 07MAY04 13:34l LT-1 6 DEFINED CRITICAL PATH I
Sheet 3 of 3 O Primavera Systems, Inc.
T FL-16 DEFINED CRITICAL PATH SET
after 07MAY04 12:00 I
U1R28 WORKING SCHEDULE I
aWI' ulmp M. ts#I 4
t U
ID RESPl WO EQID DESCRIPTION lRD ES I
EF RISK MF FrA 7 ISat8 S
I
_ST >e10zZ4.la2Q221.2. 4.
- 6.
4.11812.0 2
46 1
1 AP0215127 APM 76 X-01-A INSPECTCALANO SET 16 08MAY04 09MAY04 DR-N ML-N 83 AP0215 27 SA5CTCALANDXSETX-01-A X-01-A 08:00 14:59 ORT3-N R-N 02151 2 MAIN
-k A:*
-~ g
!S
!1* -E 2
1 AP02151 19 APR 76 A-06 IA-06 CALIBRATE 5
07MAY04 07MAY04 DR-N ML-N 126 A CAUBRAT! NON-TECH SPE RELAYS NON-TECH SPEC 09:OOA 16:59 ORT3-N R-N
.16 KV BUS SW1TCHG AR (SAFEGUARDS) 3 1 AP0215131A APR 76 8wX-01 X-01 PROTECTIVE 2
09MAY04 09MAY04 DR.Y ML-Y 165 AP0215131AK-01 ROTECTIVE RELAY CALBRATION HECKS PART:
RELAY CALIBRATION 12:00 13:59 ORT3-Y R-N
_1X41 MAIN POWER FMR BACKUP LOCKOUT RELAY021 5131O 4
0 CE0306041 CE1 76 INTAKE CRI INSPECT CRIB.
65 05APRW4 14MAY04 DR-Y ML.Y 240 Q6041NSPECT CRIB. INSTALL BUOYS AND FISH INSTALL BUOYS AND 10:OOA 16:59 ORT3-Y R-N I
5 1
CE44CGATR CE3 77 IST-SISI REM INSUL FOR FAC 145 04APR04 20MAY04 DR-Y ML-Y 0 E l
IPROG - CTMT 44 FT 16:OOA 12:59 ORT3-YR-N R
_-N 6
1 CE08TOHTI CE3 77 IST-SISI REINSULATE -FACl 10 20APR04 07MAY04 DR-Y ML-Y 401 EINSJLATE-FAC PROG -TURB HALL8 PTOVERHD PROG -TURB HALL 8 15:OOA 21:59 ORT3-Y R-N SECONDARY INSERVICE INSPECION0303636 7
1 CE26TGATI CE3 77 IST-SISI REINSULATE - FAC 10 28APR04 07MAY04 DR-Y ML-Y 155 TG EINSULATE-FAC PRO
-TRB HALL26 FTGENAREA PROG - TRB HALL 26 FT 09:OOA 21:59 ORT3-Y R-N l SECONDARY IN ERVICE INSPECTION0303636 8
1 CE44TGATRX CE3 77 IST-SISI REM INSUL FOR FAC 10 01MAY04 07MAY04 DR-Y ML-Y 401 EUNSUL FOR FAC ROG -TRB HALU,444FT GEN AREA PROG - TRB HALL 44 10:OOA 21:59 ORT3-Y R-N SECONDARY IN ERVICE INSPEC7ION0303636 9
1 CE30000TI CE3 76 TG-01-T ENCAPSULATE 10 01MAY04 07MAY04 DR-Y ML-Y 241 z ENCAPSULATE INSULAT ON ON HP TURBIkE COVER INSULATION ON HP 12:OOA 21:59 ORT3-Y R-N lIGH PRESSURI TURBNE0302153 10 1
CE26TOHTI CE3 77 IST-SISI REINSULATE - FAC 90 04MAY04 14MAY04 DR-Y ML-Y 321 TE EINS LATE - FAC PRO TURB HALL 2q FT OVERHD PROG-TURB HALL 26 20:OOA 21:59 ORT3-Y R-N l 11 1
'CE0407963 CE3 10 CS-03109 1CS-3109 INSULATION 3
07MAY04 07MAY04 0 E 631Cs-31b9 INSULATION R MOVAL REMOVAL 11:00A 14:59 18BlB2SGBDHXRE
_EF0407963 1&
@ 03e v.¢ Ia 12 1
CE26TOHSR CE4 77 IST-SISI REMSCAFF-FAC 37 01MAY04 10MAY04 DR-Y ML-Y 382
=
- TURB HALL 26 FT OVERHO PROG - TURB HALL 26 l 09:OOA 08:59 ORT3-Y R-N l 13 1
CE937787SR CE4 l 82 FD-02543A REMOVE 3
05MAY04 07MAY04 DR-Y ML-Y 416 7SRREM9VE SCAFFOLDIN FOR iFD.2543A:
SCAFFOLDING FOR 10:OOA 14:59 ORT3-Y R-N HX.19B l!P FWH 38 DRAIN 0 HX17B CONTROL9937787 14 1
CE08TOHSR CE4 77 IST-SISI REMOVESCAFF-FAC 30 05MAY04 08MAY04 DR-Y ML-Y 389 S EV SCAFF-FAC ROG TURB HAIL 8 FT OVERHD PROG - TURB HALL 8 10:OOA 21:59 ORT3-Y R-N l SECONDARY IN ERCEINSP 15 1 CE216164SR CE4 76 ISOL PHASE REMOVE 20 06MAY04 10MAY04 DR-Y ML-Y 151 S M
EMOVESCAFFOLDIN FOR ISOL PHASE BUS DUCT SCAFFOLDING FOR 18:OOA 15:59 ORT3-Y R-N I_
16 1 CE202527SR CE4 76 B-42 REMOVE 20 07MAY04 08MAY04 DR-Y ML-Y 394 E2 2527SRREM6VE SCAFFOLDIN; FOR 1i42 SCAFFOLDING FOR 17:00 16:59 ORT3-Y R-N I 80VMOTOR ONTRO CENTER PAB Run Date 07MAY04 13:i0l LT-03 STANDARD PUBLICATION l
Sheet 1 of 24 O Prmavera Systems. Inc.
1 FL-03 Execution Publication Set
after 07MAY04 12:00 U1R28 WORKING SCHEDULE I
aner uUmA Yu) oz.wu U I ID RESP WO EQID DESC IPTION RD ES EF RISK MF F
MAY ST 1
4 17 1
CE-871A-SR CE4 St-00871A RE 5
07MAY04 07MAY04 DR-ML-Y 28EMOVE SCAFFOLDI TO REMOVE TA6 RH715A SCAFF IN1:00 22:59 ORT3-_ R-N Wm E*M El 3
18 1
CE0407589C CE5 76 T-026 T-026-BD TANK PIPING 11 07MAY04 10MAY04 DR-Y ML-Y 0 E 89CT-02V BD TANK PIPIN I INPINGMENT P.ATE REPAIR I INPINGMENT PLATE 07:OOA 14:59 ORT3-Y R-N 19 1
CE9929774 CE5 77 Z
INSTALUMOD 40 07MAY04 14MAY04 DR-Y ML-Y 43 E9 4 NSTALLJMOD PLATFOR S PLATFORMS 12:00-11:59 ORT3-Y R-N 77 20 0
CE0210988 CE6 77 SEC SEC SUPPORT MR 2'
05APR04 12MAY04 DR-N ML-N 176 EC SUPPORT MR 99-01 Il 99-011-B 07:OOA 14:59 ORT3-N R-N 21 0
CE0210989 CE6 76 SEC SEC, INSTALL NEW 27 05APR04 12MAY04 DR-N ML-N 176 B9SEC, IqSTALL NEW EQU P MR 99-011 E EQUIP MR 99-01 1E 08:OOA 14:59 ORT3-N R-N l 22 0
CE0210990 CE6 76 SEC SEC REM ABANDONED 52 03MAY04 18MAY04 DR-N ML-N 151 E gOSEC RiM ABANDONED QUIP MR 99-011 EQUIP MR 99-01 F 08:OOA 07:59 ORT3-N R-N E
.S.La 23 1
CEI600R0OI CE8 21 R-i MOBILIZE REPAIR 29 03MAY04 08MAY04 DR-V ML.Y 824 MO R
R CRE*
TRAINING ANDBADGING CREW, TRAINING AND 12:OOA 16:59 ORT3-Y R-M 1RE A
CTORVESSELAN ASSEMBLY 24 1
CEI600R005 CE8 21 R-1 OFF-LOAD REPAIR 4
05MAY04 07MAY04 DR-Y ML-Yl 849 o
5OFF-t4AD REPAIR EQ PMENT AND MOJE INTO CTMT EQUIPMENT AND MOV I 11:00A 15:59 ORT3Y R-M REACTOR VESSEL AND SSEMBLYO213476 25 1
CE-1600-72 CE8 75 R-1 P-26. INCORPORATE 2
07MAY041 07MAY04 0 E-l0 72P IhCORPORATE SP ED INTO WORK ACKAGE SPEED INTO WORK 12:00 13:59 REACTOR VESSEL AND AS EMBLY0213475 26 1
CEI600R014 CE8 75 R-1 P-26/32133 THERMAL 2
07MAY04 07MAY04 DR-Y ML-Y 01CEI ORN4P-262I33 THERMAL S EVE REMOVAL ?RE-JOB BRIEF SLEEVE REMOVAL 14:00 15:59 ORT3-Y R-M IREACTORVESSELAND SSEMBLY0213475 27 1
CEI600R015 CE8 75 R-1 P-26/32133 - REMOVE 24 07MAY04 08MAY04 DR-Y ML-Y 0 El 0IR1 26r3 -REMOVET RMAL SLEEVES' THERMALSLEEVES 16:00I 15:59 ORT3-Y R-M 0 347 REACTPR VESSEL AND oSSEMBLY 28 1
CEI600R020 CE8 21 R-1 PERFORM 12 08MAY04 09MAY04 DR-Y ML-Y 0
CE1600RO2P ERFORM ULTRASONIC TESTS ON 0 EN HOUSING!
ULTRASONIC TESTS 16:00 03:59 ORT3-Y R-M 021347 REACTR VESSEL A 29 1
CE-1600-70 CE8 21 R-1 INCORPORATE DESIGN 3 08MAY04 08MAY04 0
CE-1600.70NCRPORATE DESIG'N PAPER INTO RE AIR PACKAGI PAPER INTO REPAIR 18:00I 20:59 REACTOR VFSSEL AND ASSE BLY021347TI 30 1
CE-1600-74 CE8 21 R-1 HEAD REPAIR PRE-JOB 4 08MAY04 09MAY04 3
1 CE4600.7`A REPAIR P E-JOB BRIEF BRIEF 21:00' 00:59 REACT6R VESSEL AND A SEMBLY021347 31 1
CE1600R025 CE8 21 R-1 PERFORM REPAIR OF 96 09MAY04 13MAY04 DR-Y ML-Y 0
o CEI6O RO25PERFORM R;PAIR OF HEAD P NETRATION 21 I
HEAD PENETRATION 26 04:00 03:59 ORT3-Y R-M REACTOR VES EL AND ASSEM8.Y0213474 32 1
CEI600R018 I CE8 75 R-1 PERFORM WELD 10 09MAY04 09MAY04 DR-Y ML-Y o80 CEI600ROId'ERFORM WELD SAMPLES ON S EVE SAMPLE' SAMPLES ON SLEEVE 1000 19:59 ORT3-Y R-M REAC1jORVESSEL AND ASSEMBLY021341V_
I Run Date 07MAY04 13:201 LT-03 STANDARD PUBLICATION Sheet 2 of 24 0 Prmavera Systems. Inc.
I FL-03 Execution Publication Set I
after 07MAY04 12:00 U1R28 WORKING SCHEDULE I
anerulmJuso OIC.Vij Ul ID RESP WO EQID I
DESCRIPTION RD ES EF RISK MF MAY 1
_P_
.100121416,18211221 02.2 4.16 8,1012,14,1618.2022i 0. 2.2 4.16.18 10O114,16.1 ST
- 1 4
4.
33 1
CH0300360 CH 77 CHEM-SAMPI RCS CL TSR 3.4.5.2 11 03MAY04 08MAYo4 DR-N ML-N 379 06CLTSR3.4.5.2 3
_ 05:OOA 11:59 ORT3-N R-N C
-MISC CHEMIST RY SAMPLING0 00360 34 1
CH0300373 CH 77 IHEM-SAMPL RCS DO TSR 3.4.5.1 11 03MAY04 08MAY04 DR-N ML-N 379 C0 3 RCS Db TSR 3.4.5.1 I
05:OOA 11:59 ORT3-N R-N
_MISC CHEMITRY SAMPLING0 00373 35 1
CH0300403 CH 77 CHEM-SAMP RCS BORON SR 3.9.1.1 11103MAY04 08MAY04 DR-N ML-N 379 Q
RCS BORON SR 3.9.1.L 3 1 C
05:OOA 11:59 ORT3-N R-N R
!M ISC CHEMI4TRY SAMPLING0 00403 36 1 CHLORINATE CH 77 O-RF-070 CHLORINATION IN 8
07MAY04 07MAY04 DR-N ML.N 0 C.H HLORINATION IN SUP'PORT OF CTMT OOSE FLUSH SUPPORT OF CTMT 12:00-19:59 ORT3-N R-N F7RE HOSE AND FIRE STATION SURVEILLANCE TESTO 15935 37 1
CAMP-113AC CH CAMP-113 CAMP-113 N2SPARGE 3
09MAY04 09MAY04 DR.Y ML-Y 0
CAMP-113ACCAMP-1 3 N2 SPARGE AND SAMPLEA STE M GENERATO0 AND SAMPLE A STEAM 12:00-14:59 ORT3-N R-N NITROGEN MIXI G OF STEAM GE$ERATOR CHEMI' TRYM 38 1
CAMP-113BC CH CAMP-13 CAMP-1 13 N2 SPARGE 3
09MAY04 09MAY04 DR-N ML-N 0
CAMP-113BCCAMP-1 3 N2 SPARGE ANp SAMPLE B ST M GENERATOI AND SAMPLE B STEAM 12:00-14:59 ORT3-N R-N NITROGEN MIXI G OF STEAM GENERATOR CHEMI 9RY 39 1
EE0302137 EEP 76 P-058 P-058 - POST 1
09MAY04 09MAY04 DR-Y ML-Y 559 EE03021 7P-058 -POSTM4INTENANCEVIEB TON CHECK!
I MAINTENANCE 03:00 03:59 ORT3-Y R-N HYDROGEN SI E SEAL OIL PUMP, 03021 37 1b 1
EM0216638A EM 76 P-001B-M P-1B RE-ASSEMBLY OF 66 01MAY04 10MAY04 DR-N ML-N OMP EM0 E-ASSEMBLYO MOTOR IMOTOR 17:OOA 05:59 ORT3-N R-M 41 1
EM-8480G EM 76 R-1 CLEAN CONOSEAL 11 03MAY04 07MAY04 DR-N ML-N 287 M
LEAN CONOSEAL PART PARTS 08:OOA 22:59 ORT3-N R-N REACTOR VEE SEL AND ASSEMBLY0214134 42 1
EM-BMFP-15 EM 76 P-0288-M P28B REINSTALL OIL 5
04MAY04 07MAY04 DR-Y ML-Y 0 EM 28B REINSTALL OIL I ES AND MOTOR, COVERS LINES AND MOTOR 10:OOA 16:59 ORT3-N R-N STEAMGENERATOR F ED PUMP MOTOq 0312035 43 1
EM0306596 EM 76 MOB-121 IMOB-121 REPLACE 2
05MAY04 07MAY04 DR-N MI-N 0
M 596 1MOB421 REPLACE AN TEST BREAKER1 AND TEST BREAKER 04:00A 13:59 ORT3-N R-N PWRTO d-01 Ul TRAIN B S ATUS LIGHTS0306596 44 1
EM9929766 EM 76 MOB-121 IMOB.121 REPLACE 2
05MAY04 07MAY04 DR-N ML-N 0
IM
?61MOB-121 REPLACE MO NTING SCREWS, MOUNTING SCREWS 04:OOA 13:59 ORT3-N R-N UPWRTO001 U
TRAIN B STATUS LGHTS9929766 45 0
EM0306109A EM 04 D72-16-07 IWP-037-03 REPL MOBS I
06MAY04 07MAY04 DR-N ML-N 0
M 6109AWP-3703 REPL MOB IMOB-058 -064 I MOB-058 - 064 18:00A 12:59 ORT3-N R-N PWM TO lC.03 SAFEGUARDS BUS A (1MOB-58 THROUGH 103061 09 46 0
EM0306112A EM 76 D72.16-13 IWP-037-03 REPL I
06MAY04 07MAY04 DR-N ML-N 0
6112AWP-03703 REPL1 IMO -065-"68/084-089g I
1MOB-065-0681084-089 18:OOA 12:59 ORT3-N R-N PWRTO IC603STMITURBAU CTLBD(1MOB-65-68/1MO0306112 47 1
EM0215241 EM 76 4111E02 RMP 9308, DS-II 14 06MAY04 08MAY04 DR-N ML-N 173 MO 15241RMP 908, DS41 BREAK R MAINTENANCEI BREAKER 19:0A0 22:59 ORT3-N R-N 1TG-1TG EX ITER FIELD CI 48 1
EM0306576 EM 76 MOB-049 MOB -049 BREAKER 3
07MAY04 07MAY04 DR-N ML-N 2 M Q 6M0B -049 BREAKER M NTENANCE MAINTENANCE 00:OOA 14:59 ORT3-N R-N PWR TO:U1 CONTVENT IS LATION TRAIN B0306576 49 2
EM0305133 I EM l 76 lU2B-UVRELl TESTU2TRAINB I
07MAY04 07MAY04 DR-N ML-N 0 ErQ 5133TEST t2TRAIN1BUNDE VOLTAGEAND UNDERVOLTAGE AND 10:OOA 12:59 ORT3-N R-M pTRAIN B 4.1 KV AND 480 V SWTCHGEAR REL4Y TEST0305133 Run Date 07MAY04 13:20l LT-03 STANDARD PUBLICATION l
Sheet 3 of 24 O Pnmavera Systems. Inc.
I FL-03 Execution Publication Set I
after O7MAY04 12:00 U1R28 WORKING SCHEDULE I
anerulmA TuFq ie;uu N
RDPES E
RISK IMIIMAY ID RESP WO I EOID DESCRIPTION RD E
RISK MF Fri 7 Sa1 8 Suni---
1 I
I ST I
I I
I P.10l1214,16ja2Q210. 2, 4 6. 8,1012,14,1618,2(122 0,2, 4!6 -8 10,1214 18, ST 4 6_zljj.jj-=
50 1
EM0305450 EM 76 C-703 C-703 CLEAN AND INSPECT P-037D 5
07MAY04 07MAY04 DR-N ML-N 12:00' 16:59 ORT3-N R-M 0
5111 1 EM0216170 EM 176 FIRE-BARRI PERFORM RMP 58 FIRE 24 07MAY04 08MAY04 DR-N ML-Y 330
__.BARRIER 12:00 11:59 ORT3-N R-N EMO EMO EMO 10$
703,CLEAN AND INSP CT P-037D CONTROL PANEL
_P37D DC EMERGENCY LO PUMP START CONTROL PANEL jg M
IP 58FIRE ~ARRIER SURVEI LANCE IFIRE BARRIERS IN CONTAINMI qMP-025A BREAKER 0040 (A=2
_07)
)305450 NT0216170 52 1 0 EM0304872 EM 76 A52-DHVR-1 IP-025A BREAKER MAINTENANCE 1200-40 24 07MAY04 10MAY04 I DR-N ML-N 12:00' 08:59 ORT3-N R-N 0
S 187 I
I 53 2
EM0305128 EM 76 U2A-UV REL TEST U2 TRAIN A 3
07MAY04 07MAY04 DR-N ML-N 849 UNDERVOLTAGE AND 13:00' 15:59 ORT3-N R-M 54 0
EM0306109B EM 04 D72-16-07 IWP-037-03 EM PMT OF 2 07MAY04 07MAY04 DR-N ML-N 0
MOBS IMOB-058 - 064 14:00 15:59 ORT3-N R-N 55 0
EM0306112B EM 76 D72-16-13 IWP-037-03 EM PMT OF 2 07MAY04 07MAY04 DR-N ML-N 0
IMOB-065-0681084-089 14:00 15:59 ORT3-N R-N 56 1
EM0216164D EM 76 ISOL PHASE POST-MAINTENANCE 3
07MAY04 07MAY04 DR-Y ML-Y 0
MEGGER OF ISOPHASE 14:00 16:59 ORT3-N R-N 57 1
EM0306574 EM 76 MOB-004 MOB-004 BREAKER 4
07MAY04 07MAY04 DR-N ML-N 0
MAINTENANCE 14:00 17:59 ORT3-N R-N M8 I EM0306575 EM 76 MOB-008 MOB-008 BREAKER 4
07MAY04 07MAY04 DR-N ML-N 0
MAINTENANCE 14:00 17:59 ORT3-N R-N 59 1
EM0400344 EM 76 P-028A-M 1 P-28A-M PUMP END 10 07MAY04 08MAY04 DR-Y ML-Y 25 MOTOR BEARING 17:00' 02:59 ORT3-Y R-N 60 1
EM0312035A EM 76 P-028B-M I P-28B-M PERFORM 4
07MAY04 07MAY04 DR-Y ML-Y 0
POST MCE TEST 18:00' 21:59 ORT3-N R-N 61 1
EM0407727 EM 71 C-041 C-041 INSTALL LOCK 6
08MAY04 08MAY04 DR-N ML-Y 0
NUTS ON BUS BAR 08:00' 13:59 ORT3-N R-N 62 1
EM0400047 EM 76 B52-7D 1B52-7D PERFORM BKF I
09MAY04 09MAY04 DR-N ML-N 0
. SWAP IN U1R28 00:00 00:59 ORT3-N R-N 63 1
EM0215246 EM 76 62A01 CAL AND TEST 62/AO 6
09MAYO4 09MAY04 DR-N ML-N 0
RELAY PER 1RMP 06:00 11:59 ORT3-N R-N 64 1
EM0215228 EM 76 W-003B W-3B-M INSPECT AND 12 09MAY04 09MAY04 DR-N ML-N 0
MAINTAIN FAN AND 07:00 18:59 ORT3-N R-N 65 1
EM0212645 EM 76 W-003B-M 1W-3B-M REPLACE 24 09MAY04 10MAY04 DR-N ML-N 0
MOTOR 07:00' 06:59 ORT3-N R-N 66 0
EM0304871 EM 76 A52-DHVR-1 BREAKER 24 09MAY04 10MAY04 DR-N ML-N 0
MAINTENANCE 1200-42 11:00 10:59 ORT3-N R-N EMO EMO EMO EMC EMC EMO EM EM Q=8TEST 12 TRAIN A UNDEI TRAIN A4.16KVAND48C 061,9BlWP037 03 EM PMT OF PWR T6 IC-03 SAFEGUA
.6j12BWP-q37T03 EM PMT OF MPWR TO 1C-03 STM/TURE IqjpPiOSt-MAINTENANCE b
_ISOL PHASE DUCT0216 6
4MB-Op4 BREAKER MAII IPW R TO IMOB-8, lMC 6o soB-0b8 BREAKER MAIl
_PW%" TO 1 IR AEAICHA 400 3441P-28A-M PUMP END M 400 STEAM (
31203sA!!4!BM PERFORM F 031203{
STEAM GENERP EM0407727C 0407727if PWRTO 1B-41 UNIT I TURBI EM0215 IA-01 B EM02152Z El 4.16 K EMC 480 VOLT I WVOLTAGE AND l
VSWITCHGEAR fELAY TErT03051 MOBS IMOB-058.- 064 IDS BUS A (IMOI-58 THROUGH 10 1MOB-065-06810(34-089
- AUX CTL BD (IMOB.65-6811MO 030 IEGGER OF ISOPAASE BUS 164 4TENANCE B-49 AND 1 IR YLG (YELLOW) 030651 4TENANCE DMA/FPA INST RlCEPTACLE (YELL 3TOR BEARING LEAKING ENERATOR FEEd PUMP MOTOR OST MCE TEST TOR FEED PUMP MOTOR
.041 INSTALL LOCK NUTS ON BUS NROD CTL LIGIREACTOR TRI Em0400047iB52-7P PERFORM BKR JE BLDG MCC040DW47Dj 246CAL AND TEST 62/A01 RELAY PE JS TIME DELAY RtLAY021524 d 8W.3B-M INSPECi AND MAINTAIN F 021522d1 EMO2126451W-3B-M RE 0212645; 4030487lBREAKE6 MAINTENANCE' 11200 AMP VACUUM BREAKER0304 304 875BREAKER $AINTENANCE DE
)B-50 SWITCHGEAR BREAKER0304 28 306109 H112
'4 0306575 3AR
' BKR SWITCI-
- WAP IN UIR2 R 1RMP 9302-1 kN AND MOTOI PLACE MOTOF 200-42 (A52-02 171!_
50-001 (B52-4B 17^_
67 0
EM0304878 EM 76 B52-DB50.0 I BREAKER MAINTENANCE 24 09MAY04 10MAY04 DR-N ML-N 11:00 10:59 ORT3-N R-N 0
Run Date 07MAY04 13:20l LT-03 STANDARD PUBLICATION Sheet4of24 O Prmavera Systems, Inc.
I FL-03 Execution Publication Set I
after 07MA Y04 12:00 U1R28 WORKING SCHEDULE I
anleruIm/y4 TU4i;Luv ID RSP WOjI EQID I
DESCRIPTION RD ES EF RISK MF FMAYSt
~
I I
I
.1O01Z14, 1
16.1a2Q2210.2.4.6.8,1012,1416182G2(2210.2 4.6, 8jjjjjZ1j, 68 1 EM0202527C EMV 76 1342 1B-42 RE-INSTALL 5
07MAY04 07MAY04 DR-N ML-N 0 MO 1
42 RE-INSTALL BUC KETS MR 01.128*MfUlR28 BUCKETS MR 00:OOA 16:59 ORT3-N R-N 80V kI0TOR CONTROL CENTER PAB3 SAFEGUARDSO2025 7 69 1 EM0207539 EMV 76 B52-429DL 1952-429DL/DR REPL 5
07MAY04 07MAY04 DR-Y MI-Y 0
MO BS2-4~291UDR REP I U E-STARTER (XL4I o) 701LIN22EEV 6
84 ESGER TESTING (MR 17:00 18:59 ORT3-N R-N PWR MTO R MOLDOEG}ERGTESTNGC(MROU1-128MNGJ R
T8 3 LIE-TATE (I10 1:0 1:5 RT-YR-IW 1OX-0(01)MREC SUhLG-~N F
73 70 IIE020252E EM 6
1342 163-42 PERFORM 2
07MAY04 07MAY04 DR-N MI-N 0 MO 057B-42 PERFORMME TSIN(R0128Mi28 MEGER ESTNG MR 7:0 8:520252NR N86V MTRCONTL CENTER PAD bAFEGUARDS 71 0
EM04058968 EMV 76 W-021B IW-021B REMOVE 4
08MAY04 08MAY04 DR-N MI-N 0
EM0405896BW-021B REMOVE JUMPER iWP 01-128'E-FN JUMPER IWP 02:00 05:59 ORT3-N R-N
?405896
~PAB EXHAUST STACK, FAN 72 0
EM0405881D EMV 76 W-030A W-030A REMOVE 2
08MAY04 08MAY04 DR-N MI-N 0
IEMO4O5BB1DW-0 OA REMOVEzJUMPER PER IWPO01 28'EFN JUMPER PER IWP 06:00 07:59 ORT3-N R-N O 405881j4F 231F-29 PAB EXHA~UST FILTERFA 73 1
EP0301910 EPI 77 Ul-CONTAIN INSPECT CTMT AND 34 28APR04 11IMAY014 DR-Y MI-Y 101 P j~SPECT CTMT AND FEEbWATER PENET1RATIONS FEEDWATER 08 OOA 15:59 ORT3-Y R-N
- 74.
1 NG44CFClEV EPI 77 IST-SISI ENG EVAL FOR FAC I
29APR04 07MAY04 DR-Y MI-Y 110 CFC1 EVENq EVAL FOR FAC P:OG -CTMT 44Ft GEN AREA PROG - CTMT 44FT 08:OOA 12:59 ORT3-Y R-N SECONDAF~Y INSERVICE INSI ECT10N0301897:
75 1 NG44TFCIEV EPI 77 IST-SISI ENG EVAL FOR FAC 1I08MAY04 08MAY04 DR-Y ML-Y 0iG494TFCIEIJENG VAL FOR FAC PROG -TURB HALL.
FT GEN ARE)
PROG - TURB HALL 44 07:00 07:59 ORT3-Y R-N 0301 egijls ECONDARY INSEA~VICE INSPECTc-n k
VA-
-U iVi 76 1 FG02128116 FG1 76 CPP-36 ICPP-36 CLEAN RUST 49 04MAY04 11IMAY04 DR-Y ML-Y 0
j 6 CPP-36 CLEAN RUST AO0 PAINT AND PAINT 18:OOA 16:59 OR3Y-N__
77 0
FG-LIGHT FG1 MISC WALKDOWN OF 76 05MAY04 15MAY04 244 GGHALKDO)WN OF EMERGEC GHNG EMERGENCY LIGH11NG 07:OOA 15:59
__I 78 0 FG0302076 FGi 77 MANHOLE PUMP ELECTRICAL 3
07MAY04 07MAY04 DR-Y MI-Y 85 LIUMP ELECTRICAL MAN HOLE SUMPS PM MANHOLE SUMPS 07:OOA 14:59 ORT3-Y R-N
-PRTABLE ELECTRICAL IANHOLE SUMP PbMPSO302076 I
I
_______________________________I 79 0
FG0303130 FG1 77 MANHOLE PUMP ELECTRICAL 5
07MAY04 07MAY04 DR-V MI-Y 330 LIUMP
~LECTRICAL MAN HOLE SUMPS-MVtLY PM MANHOLE 07:OOA 16:59 ORT3-Y R-N
__PORTABLE ELECTRICA -MANHOLE SUMF~ PUMPS 0303130 80 1
FG212642P FG1 76 FD-00225A PAINT FD-225A VALVE 4
08MAY04 08MAY04 DR-Y ML-Y 9
FG21264PA D25 VALVE 06:00' 09:59 ORT3-Y R-N O 21284 HX-17A LP FWH-11A LC-2505 10 qR ISOLATION I g I Is "j w' v -I 81 1
HP7.51.6D HP IHP PURGE T PURGE VALVE TEST 2
09MAY04 09M1AY014 DR-V MI-HPT.51.6DPURGE VALVE TE IT (HPIP 7.51.61 (HPIP 7.51 6) 06:00' 07:59 RY 1ORT3-Y R-UNIT1ICO[IAINMENT PURdE TRIP TESTE 821 IC029 IC1 7
LC-02514 LC24REUBS 45 19APR04 11MAAY04 DR-VYML-Y 4
21 REFURBISH jj 103009976 C-254 RFURISH 1IOO0A 12:59 ORT3-Y R-N
~
j~
2 I
831 1C3505 IC 6
LS-02376 118S-2376 SMALL 45 19APR04 11MAY04 DR-Y ML-Y 0
o 5 !S316MAL5 A
rn ~
SW II1STEAM LEAK ON LVI 11:OOA 12:59 ORT3-Y R-N___
Run Date 07MA0 1321L-3 STANDARD PUBLICATIONShe5of2 C Primavera Systems, Inc.
I FL-03 Execution Publication Set 7
I
after 07MAY04 12:00 U1R28 WORKING SCHEDULE I
dm0 UMw I
U~lf 1, L.Vu I
MAY rEU ID lRESPl WO l EqD DESCRIPTION lRD ES I
EF I
RISK MF Fn 7 Sat 8 Sun 9 ST I1 p14,6,1g2(122 1 2, 618,2022i0,2.4.6. 8jj1011_1 84 1
IC5.47-1 IC1 76 ICP-05.047 SECONDARY LEVEL 45 19APR04 11 MAY04 DR-Y ML-Y 0
- SECONDARY LEVEL CONOILERS AND SWIT CONTROLLERS AND 1 1:00A 12:59 ORT3-Y R-N 5
85 1
IC5.53 IC1 76 ICP-05.053 ICP 5.53 SECONDARY 30 02MAY04 10MAY04 DR-Y ML-Y 17 C !
CP 5.53 SEONARY H IGH SSURE HIGH PRESSURE 08:OOA 08:59 ORT3-Y R-N 86 1
IC5.75 IC1 76 ICP-05.075 NI AUXILIARY 5
06MAY04 07MAY04 DR-Y ML-Y 0
NI AUXIUARY CHANNELS - Il SPECT CHANNELS - INSPECT 07:OOA 16:59 ORT3-Y R-N NIS A[IXILIARY CHANNI CALIBRATION0300880 87 1
IC10309955A IC1 76 G-06 PMT 1G-06 ROD DRIVE 1 07MAY04 07MAY04 DR-N ML-N 2
1G-06 ROD IRIVE MG SET IAV Ol 31 MG SET IAW 01 31 09:00A 12:59 ORT3-N R-N ROD CONTROL MG SET 88 1
IC0309956A IC1 76 G-06 PMT 1G-07 ROD DRIVE I 07MAY04 07MAY04 DR-N ML-N 2 M 1G-07 ROD DRIVE MG SET IAY 01 31 MG SET lAW 01 31 09:OOA 12:59 ORT3-N R-N ROD CONTAOL MG SET 89 1
ICFIT4049 IC1 FIT-04049 FIT-4049 FILL & VENT 1
07MAY04 07MAY04 DR-Y ML-Y 434 T 049 FILL & VENT AND VALVE I INEUP AND VALVE LINEUP 09:OOA 12:59 ORT3-Y R-N 90 1
IC0408040 IC1 76 RT-12B RT-12B REPLACE 4
08MAY04 08MAY04 DR-Y ML-Y 0
IC040804ORT-1 2B REPLACE RELAY RELAY 06:00 09:59 ORT3-Y R-N 040804dI1TRAIN B REACTtR TRIP RELAY 91 0
IC0300710 IC1 77 HP-07736 CLEAN 4 08MAY04 08MAY04 DR-Y ML-Y 828 IC030071 CN CONTAMIATION MONITOR CONTAMINATION 09:00 12:59 ORT3-Y R-N 030071 PERSONNEL CONTAMINATIO I MONITOR IB M9 0 IC0300711 IC1 77 HP-07739 CLEAN 4
08MAY04 08MAY04 DR-Y ML-Y 828 IC030071' CLEAN CONTAMINATION MONITOF (D
CONTAMINATION 09:00' 12:59 ORT3-Y R-N 0300711 ^
PERSONNEL CONTAMINATIO MONITOR lB 93 0
IC0300713 IC1 77 HP-09306 CLEAN 4
08MAY04 08MAY04 DR-Y ML-Y 828 IC030071 CLEAN CONTAMINATION MONITOR CONTAMINATON 09:00 12:59 ORT3-Y R-N 1
030071 PERSONNEL CONTAMINATIO qMONITOR 1B 94.1 IC0408039 IC1 76 RT-10B RT-10B REPLACE 4 08MAY04 08MAY04 DR-Y ML-Y 0
IC04080 9RT.10B REPLACJE RELAY RELAY 10:00 13:59 ORT3-Y R-N 04080 9lITRAIN B REACTOR TRIP RE V
95 1 IC2.15A IC1 76 ICP-02.015 lCP 2.15 RP 3
08MAY04 08MAY04 DR-Y ML-Y 12 IC2.15 1CP 2.15 RP PERMISStVEINI LOGI PRE-CRIT TE PERMISSfVEINI LOGIC 14:00 16:59 ORT3-N R-N 300807WJREACTOR PROTECTOI SYSTEM LOG
@!E 1!s;-
_~ U
_U 96 1
IC0306002 IC2 76 S-06050A 1S-6050A IOPS CH-1 11I 29APR04 08MAY04 DR-Y ML-Y 0 C03 160021S6050A IOPS CH-I OVE tSPEED LIGHT OVERSPEED LIGHT 08:OOA 04:59 ORT3-Y R-N I RB INDEPENDENT OVERSPEED PROT CTION CHAN 97 0
IC0300625 IC2 76 ICP-06.049 BATTERYIINVERTER 22 05MAY04 I0MAY04 DR-N MLY-308 Co3 )625BATTEIYIINVERTER RO M TEMP SWITCHtS ROOM TEMP 19:00A 04:59 ORT3-N R-N I 98 1
IC0306250 IC2 20 C-075 C-75 REPLACE IOPS 3
07MAY04 07MAY04 DR-Y ML-Y 13 CO3 tfQC-75 REPLACE lOPS SU ER ASSEMBUES SLIDER ASSEMBLIES 13:00*
I15:59 ORT3-Y R-N I 1
030625b 99 1
IC9950759 IC2 76 N-00041 N41 ECAD CABLE 3 07MAY04 07MAY04 DR-Y MLYV 0
1 9950759
'ECADICABLEE NG TESTING 1800 I
20:59 ORT3-Y R-N 995075T9NI POWER RANG CHANNEL 100 1 IC9950760 IC2 76 N-00042 N-42 ECAD CABLE 3
07MAY04 07MAY04 DR-N MLYV 0
IC9950760N42 ECAD CABL TESTING TESTING 21:00 23:59 ORT3-N R-N 9950760=NI POWER PNGE CHANNEL 101 1
IC9950761 IC2 76 N-00043 N-43 ECAD CABLE 3 08MAY04 08MAY04 DR-N MLIY 0
I C99W0 76lN43 ECAD C BLE TESTING TESTING 00:00 02:59 ORT3-N R-N 9950761=-N1 PO RANGE CHANNEL Run Date 07MAY04 13:201 LT-03 STANDARD PUBLICATION Sheet 6 of 24 C Primavera Systems, Inc.
I FL-03 Execution Publication Set I
afterO7MAY04 12:00 l
U1R28 WORKING SCHEDULE I
arrer uMM 1ru4 i;euu
- lU i
RESP WO I EQID I
DESCRIPTION RD ES I
EF I
RISK MF.
_MAYSn9 ST
.I I
.101214.16%120,2210
. 2, 4, 6, 8,1012,14,1618,2(122i 0 24, 6 i 6 8,1011 102 1
IC9950762 IC2 76 N-00044 N-44 ECAD CABLE 3
08MAY04 08MAY041 DR-N ML.Y 186
=
TESTING 03:00 18 59 ORT3-N R-N 99 N
I POWER RANGE C ANNEL 103 1
(C5.50 (C5 76 lCP-05.050 ICP 550 SECONDARY 30128APRO4 1 1MAY04 DR-Y ML-Y?
17 CI.0SEPONDARY MIDRA GE PRESSURE MIDRANGE PRESSURE 09:O0A 08 59 ORT3-Y R-N 104 1 IC4.395TK IC5 76 1ICP-04.03 ICP 4.39-1 GOVERNOR 22 06MAY04 09MAY04 DR-Y ML-Y 0
4 CIP 4.39.1 GOVERNOR V1LVE STROKE VALVE STROKE 06:OOA 11:59 ORT3-N R-M T
_RBINE 105 2 IC0310221 IC5 76 VBI-06100 2VBI-6100 CHANNEL #7 5 06MAY04 07MAY04 DR-Y ML-Y 330 2 2V14100 CHANNEL #7 BRATION VIBRATION 09:OOA 16:59 ORT3-Y R-N G-01 TG VIBRATION I DICATOR0310221, 106 1
ICTE.3111 IC5 77 TE-03111 TE-3111 LEFM FW 2
08MAY04 08MAY04 DR-Y ML-Y 51 I
ICTE-3111TEI 11 LEFM FW TEPP - REPLACE EL MENT TEMP. REPLACE 06:00 07:59 ORT3-Y R-N 0300956UL FM FEED TEMPERATURE ELEME 107 1 IC0309328E IC5 76 FM-03110 1 FM-31 10 INSTALL 5
08MAY04 08MAY04 DR-Y ML-Y 0
IC0309328E FN 0 INSTALL TRANSDUCERS - 2 TRANSDUCERS - 2nd 06:00 10:59 ORT3-Y R-N 030932 FM ELECTRONICS 108 1 IC2.20RED IC5 76 ICP-02.020 ICP 2.20 RP RED 8
08MAY04 08MAY04 DR-N ML-Y 0
IC2.20RESCP ;
RP RED CHA*NEL ANALOG ST CHANNEL ANALOG 06:00 13:59 ORT3-N R-N 030081 PPOST-REP UELING, PRESTA :TUP ANALOG 109 1 IC2.20WHT IC5 76 ICP-02.020 ICP 2.20 RP WHITE 8
08MAY04 09MAY04 DR-N ML-Y 0
IC2 k0WHTICP 2.20 RP WHITE CHANNEL ANALOG TESI CHANNEL ANALOG 14:00 10:59 ORT3-N R-N 30081 1 POST-REFL 110 1 IC2.20BLU IC5 76 ICP-02.020 ICP 2.20 RP BLUE 8
09MAY04 10MAY04 DR-N ML-Y 0
IC.2BLUICP 2.20 Rp BLUE CHANNEL ANALOG TESI CHANNEL ANALOG 11:00 07:59 ORT3-N R-N POST-REFUELING, PRESTA TUP ANALOG CHANNEL TEST0300 14]1_
111 I 1C4.39TEST IC5 76 1ICP-04.03 ICP 4.39-1 6
09MAY04 10MAY04 DR-N ML-Y 0
IC4.39TES CIP 4.39-1 GOVERNORISTOP VALV STROKE TESI GOVERNOR/STOP 12:00 06:59 ORT3-N R-M TURBINE VALVE CALIBRA ION/FUNCTIONAL TEST OF TRI031 0976t I
=:I
-xt Eu I_
1121 1 IC0406275 ICV 76 MS-02706 1MS-2706. POST 3
04MAY04 07MAY04 DR-Y ML-Y 19 C0 1627 51MS-2706. POSTREPAC DIAGNOSTIC REPACK DIAGNOSTIC 03:OOA 20:59 ORT3-Y R-N
_HP TURBINE DRA N EXTRACTION OUTLET CONTROL 406275 113 1 IC0214109 ICV 76 MS-02017-O MS-2017 POST 7
07MAY04 07MAY04 DR-Y ML-Y 0 CO MS201TPOSTINSPECTI NDIAGNOSTIC I
INSPECTION 13:00I 19:59 ORT3-N R-N L3,X-1B SG HEADER MAIN STEAM STOP CTL OPER0214 09 114 1 1IC0407659 ICV 75 CC-00761B-1CC-761B-S CONDUIT 3 07MAY04 07MAY04 DR-Y ML-Y 134 C040765 91CC-761B-CONDUI DISCONNECTEDi DISCONNECTED 19:00I 21:59 ORT3-Y R-N 0407659_1P-1B RCP THE MAL BARRIER CdOLING RETURN OLENOI 115 1
ICMS2017 ICV 76 MS-02017-O MS-2017 MSIV 7
07MAY04 08MAY04 DR-Y ML-Y 28 ICMS2017MS2017 MSIV DIAG? OSTIC DIAGNOSTIC 19:00I 01:59 ORT3-N R-N 030090 HX-1B SG EADER MAIN STEAM STOP CTL 0 ER 116 1 IC0216627P ICV 76 CV-01296 I1CV-1296 POST MTN 4
07MAY04 08MAY04 DR-Y ML-Y 0
IC0216627P1CV.1296 POST TN DIAGNOSTC1I DIAGNOSTIC 22:00 01:59 ORT3-N R-N 0216607 AUXILIAR CHARGING LINE'ISOLATION
[117 1
IC0216334 ICV 76 SI-00844A ISI-844A SEAT 4
08MAY04 08MAY04 DR-N ML-Y 0
IC021 33415 -844A SEAT LEAKAGE POS DIAGNOSTIC LEAKAGE POST 12:00I 15:59 ORT3-Y R-N 021 334_T-34A Sl ACCUMULATOR DRAIN TO T-IE 118 1
IC0300948 ICV 76 Sl-00844A-SI-844A DIAGNOSTIC 4
108MAY04 O8MAY04 DR-N ML-Y 0
t IC030 949SI-844A DIAGiIOSTIC CHECK CHECK 12:00 15:59 ORT3-Y R-N J
03094BT-34A 4I ACCUMULATORDRAIN TOT-IE Run Date 07 MA 413:20 LT-03 STANDARD PUBLICATION Shoot 7 of 24 O Primavera Systems, Inc.
l FL-03 Execution Publication Set
after 07MAY04 12:00 I
U1R28 WORKING SCHEDULE I
after O7MAYU4 7Z:UUD U U ID RESPt WO I EQID DESCRIPTION RD ES EF RISK MF MiA 7
SunY I
ST I I
0Q 121416,1 202210. 2 4. 6. 8 101.14.1618,2 022 0. 2, 4.,68,101Z1,161 119 I IC03DW949 ICV 78 SI-00844B-SI-844B DIAGNOSTIC 4 08MAY04 08MAY04 DR-N ML-N 0
IC030 D94951-s4B DIAG COSIC CHECK CHECK 12:00 15:59 ORT3-Y R-N 030 944 T-34B SI ACCUMULATOR DRAIN TO T-1 120 1
IC0300922 ICV 76 MS-05958-O MS-5958 DIAGNOSTIC 4
08MAY04 08MAY04 DR.Y ML-Y 0
IC0300922MS-4958 DIAGNOSTIC CHECK CHECK 18 00 21 59 ORT3-N R-N 030092ZHX-1A SG BLOU DOWN ISOLA1 121 1
IC0408038 ICV 28 MS-05959-0 MS-5959-0 AIR LEAK 4
08MAY04 08MAY04 DR-Y ML-Y 78 IC0408038MS-5959-0 AIR LEAK 18:00 21:59 ORT3-Y R-N 040803E]-HX-1B SG BLOU DOWN ISOLA1 122 1 1IC0214110 ICV 76 MS-02018 MS-2018 POST 7
08MAY04 09MAY04 DR-Y ML-Y 0
IC02141 OMS-2010 POST INSPECTK N DIAGNOSTI INSPECTION 23:00 05:59 ORT3-N R-N 02141 (HX-A SG HEADER 123 1
ICMS2018 ICV 76 MS-02018-0 MS-2018 MSIV 7
08MAY04 09MAY04 DR-Y ML-Y 0
ICMS2P18MS.2018 MSIV IAGNOSTIC DIAGNOSTIC 23:00 05:59 ORT3-N R-N 0300:01 1HX-A SG HEADER 124 1
IC0406193 ICV 76 MS-02084 iMS-2084, POST 4
09MAY04 09MAY04 DR-YML-Y 0
IC04061931MS-084, POSTREPA KDIAGNOSTI REPACK DIAGNOSTIC 06:00 09:59 ORT3-Y R-N HX-10 SG SAMPL ISOLATION CONTROL0406193M 125 1 MM9924975A MMI 76 HS-IHS-1. REBUILD& TEST 76 26APR04 14MAY04 DR-Y ML-Y S-1, REBUILD & TES SNUBBER (SHOP)
SNUBBER(SHOP) 06:OOA 10:59 ORT3-N R-N 126 1 MM9934376A MMI 76 HS-15 HS-15. REBUILD &
15 02MAY04 08MAYO4 DR-Y ML-Y 7 M 34376AH-15. REBUILD & TE$T SNUBBER (SHOP)
I I
I TEST SNUBBER (SHOP) 10:OOA 21:59 ORT3-N R-N I CONTAINMENT 3PRAY HEADE 127 1
MM0408036 MM1 76 P-015B I1P-15B.
3 02MAY04 07MAY04 DR-N ML-N 3
0 3 6 1P-15,.REPAIRIREPLA.E SEAL REPAIR/REPLACE SEAL 18:OOA 14:59 ORT3-N R-N 0408036' 128 1R MM9933444 MMI 76 W-001C2-A W-1C2-A REPLACE 70 03MAY04 13MAY04 DR-Y ML-Y 0
REPLACE SAC DRAFT DAMPEFI BACKDRAFT DAMPER 06:00A 21:59 ORT3-N R-N I 129 0
MM0407886 MM1 76 PIPING IA-1298 BROKEN PIPE 4
06MAY04 07MAY04 DR-Y MLI-389 MAM 61A-129P BROKEN PIPE SUPPORT SUPPORT 07:00A 15:59 ORT3-N R-N I PIPING'MULT ANDIOR NN-NUMBERED EQUIPMENT040788 130 2
MM0408109 MM1 75 P-015B 2P-15B REPLACE SET 2
07MAY04 07MAY04 60 MD04081 092P-15B REPLACE SEM SCREWS SCREWS 18:00I 19:59 040810l$AFETY INJECTIOt PUMP 131 1
MM0407701 MM1 75 CV-01296 CV-1296. REMOVE 4
07MAY04 07MAY04 DR-Y MLY-175 M 040 77O1CV-1296, REMOVE C THFROM PIPE' CLOTH FROM PIPE 18:00-21:59 ORT3-N R-N I0407701AUXILIARY CHA GING LINE ISOLATION 132 1
MM0407989 MM1l 71 CPP-14B 1CPP-14B, ROTATE 10 08MAY04 C8MAY04 DR-Y ML-Y 385 MM040T9891CPP-1 B. ROTATE PIPE ENDS DOWN FOR ME CONCER PIPE ENDS DOWN FOR 06:00 I
15:59 ORT3-N R-N 04079 U1C PIPE PENETRATION-CONTAINME 133 1
MMI600R017 MMI 75 R-1 MACHINE WELDABILI`Y 10 08MAY04 09MAY04 DR-Y ML-Y 0
MMI600RO1 ACHINE WELDABIUTY SAMPLES ROM SLEEVE SAMPLES FROM 20:00 I
05:59 ORT3-Y R-M REACTOk VESSEL AND AS EMBLY021347 134 1 MM9934376B MMi 76 HS-15 HS-15. REINSTALL 2
09MAY04 09MAY04 DR-Y ML-Y 58 I
MM99 76EPS-15. REIII STALL SNUBBEJ AS-LEFT VT3 SNUBBER. AS-LEFT 06:00 07:59 ORT3-N R-N CPNTAINMENT SP V HEADER SNUpB3ER9934371U 135j MM0304995MM2 76
-0288 8 OVERHAUL 65
- 30APR04 13MAY4 DR-Y MI-V 0
OVERHAUL M"N FEED PUMP I
I I
I I
I MAIN FEED PUMP 15:OOA 10:59 ORT3-NR-N I Run Date 07MAY04 13:20J LT.03 STANDARD PUBLICATION Sheet 8 of 24 O Primavera Systems, Inc..
i FL-03 Execution Publication Set I
after 07MAY04 12:00 U1R28 WORKING SCHEDULE aflulr Uf"A4 IV.# fs.wv
I_
'1001214.16,1a2 221 0.2,4 6.8 1101214,16182(1221 0 2,4,6 8j10jj14j16jj TITMMM, tgjfl-U161Xw
~~:4^6:,,
UulltPi W4 I -
l 136 1
MM0407390 MM2 76 P-028B IP-28B INSPECT SPEED INCREASER 91 01MAY04 15MAY04 DR-Y ML-Y 09:OOA 14:59 ORT3-N R-N a MMko¶73qo1P.28B INSPECT SPEEDIINCREASER I~m~
_I 1371 0 MM0407967 IMM21 781 K-026 I K-26. AIR LINE LEAK 4
02MAY04 07MAY04 0
13:00A 115:59 1 MM6 mm!
I.
IiZ 7K.26, AIR UNE LEAK
_SCBA/gBA CHARGING C(
Ua1, P-28B STOP OIL LEAK/
MPRESSOR0407;67 NSTALL BAFFLE' 138 I
MM9919654 MM2 77 P4028B 1P-28B STOP OIL 125 06MAY04 09MAY04 DR-Y ML-Y LEAK/INSTALL BAFFLE I I05:00A 1 14:59 J ORT3-N R-N 40 _
mm i
139 0 MM0202007 MM2 76 W-036A INSPECT FAN AND 3
07MAY04 07MAY04 0
LUBE BEARINGS 07:OOA 14:59 140 0 MM0202012 MM2 76 W.036B INSPECT FAN AND 3
07MAY04 07MAY04 0
LUBE BEARINGS 07:OOA 14:59 141 1 MM0213111 MM2 76 LO-03617B 1L0-3617B LUBE OIL 6
07MAY04 08MAY04 DR-Y ML Y 85 REGULATOR LEAKS 12:00' 06:59 ORT3-N R-N MM(
MM(
W_0 71NSPEOT FAN AND LUBI
!SPENT FUEL POOL EXHAL M2 j 2 lNSPECT FAN AND LUBI ONSPENT F~UEL POOL EXHAL
=111-o3v17B LUBE OIL RE P
-;WT RL ISW-43 W473 TEST REL VAi 1421 1 MM0405874 MM2 7
SW-04373 1SW-4373 TEST REL VALVE BY 5113/04 -
8 07MAY04 I 08MAY04 12:00-08:59 382
- a 143 0
MM0201410 MM2 76 P-032A-F-M SAMPLE OIL 2
07MAY04 07MAY04 390 18:00' 19:59 14 0
MM0301084 MM2 76 HX-240 INSPECT AND 8
07MAY04 08MAY04 0
MAINTAIN AC UNIT 18:00' 01:59 145 0 MM0201682 MM2 76 HX-281C INSPECT AND CLEAN 4
08MAY04 08MAY04 0
BATTERY ROOM 06:00 09:59 146 0
MM0201992 MM2 76 W-013A2 INSPECT FAN AND 8
08MAY04 08MAY04 0
LUBE BEARINGS 06:00 13:59 147 0 MM0301085 MM2 77 HX-234 CLEAN. INSPECT AND 4
08MAY04 08MAY04 DR-Y ML-Y 830 MAINTAIN AC UNIT 07:00' 10:59 ORT3-N R-N 148 1 MM0301 16 MM2 77 P-028A DRAW OIL SAMPLE 2
08MAY04 08MAY04 DR-Y ML-Y 0
FOR ANALYSIS 16:00' 17:59 ORT3-N R-N 149 1
MM0301117' MM2 77 P-0288 DRAW OIL SAMPLE 2
08MAY04 08MAY04 DR-Y ML-Y 821 FOR ANALYSIS 18:00-19:59 ORT3-N R-N Ml 10201410SAMPLE OIL 020141dUP-32A-F SERVICE V I03OO84INSOECT AND MAINT/
0301084_SOUTH SE MM02016821NS 0201682w MM020199NF 020199;9 MM0301085CL 0301080 SFP PLATFOI
.BEARINGS ST FAN0202007
'BEARINGS ST FAN0202012 GULATOR LEAK 8B SGFP LO PRESSURE REGULATI
.VE BY 5113104 - S:PARE HX-70 U1 EE RM ¢OOLING COIL OL
'ATER PUMP MOTORS (FOR CALLU IN AC UNIT RVICE BLDG AIR,ONDlTIONING U1 ECT AND CLEAN 8ATTERY ROOM ID-305/11/2D-205 SWINGlSTN BATT ECT FAN AND LUOE BEARINGS ICABLE SPF7EADING ROOM I
!AN, INSPECT AND MAINTAIN AC U WNSB WATER CNILLER IM030111 5DRAW pIL SAMPLE FORl 030111 STEAM GENERATOR I MM0301117DRA-W OIL SAMPLE F(
0301117UWTEAM GENERATC MMO201212qEMIANNUAL CRAI
!M BRIDGE/HOISTYRAILS0201212 qG RELIEF TLET RELIEF 3s 0 1IT IM CONDENSI
!ECIRC FAN INIT kNALYSIS EED PUMP
)R ANALYSIS R FEED PUMP IE INSPECT1OP I
1501 0 MM0201212 MM2 76 Z-017 SEMIANNUAL CRANE INSPECTION 3
09MAY04 09MAY04 07:00' 09:59 370 151 1 I MM0213109 MMV 76 CS-00038C ICS-00038CBODYTO 28 119APR04 11MAY041 DR-YML-Y 0
CS.00038C BODY TO BINNET LEAK BONNETLEAK 09:OOA 12:59.
ORT3-N R-N 152 1 MM0214023 MMV 76 AF.00104 AF-104-INSP/
13 01MAY04 08MAY04 DR-ML-Y 0
F-104 - INSP I MAINTAI CHECK VALVE PER RMP9S58 MAINTAIN CHECK I 11:00A 15:59 ORT3-N R-N I8B
-AFP DISCHARGEIO1HX-IB SGC 153 1 MM0214110 MMV 76 MS02018 MS-2018-OPEN &
28 03MAY04 108MAY04 DR-Y ML.Y I 0M 141 1 0MS-2018-OPEN&INSP CTVALVE-RMP;309.1 INSPECT VALVE-22:00A 15:59 ORT3-N R-N l XF-1A SG HEADER MAIN STEAM STOP Run Date 07MAY04 13:20 LT-03 STANDARD PUBLICATION Sheet 9 of 24 0 Pnmavera Systems. Inc.
FL-03 Execution Publication Set
after 07MA Y04 12:00 U1R28 WORKING SCHEDULE I
atcal W gol^.w I
I I
U ID IRESP wo ST EOID DESCRIPTION RD ES EF RISK MF MAY Fri 7 Sat R Suin 9
§ 3.1Ai11.1A-4AA5Lirv3-)I In. -3.A. rz. 0 AfIlill-11A Ir,12 n ,7 - A R.
I--..
MMMOMMMM Jimmy I I J
15411 MM0216334 MMV 76 SI-00844A 1SI-844A SEAT LEAKAGE 9
04MAY04 08MAY04 DR-Y ML-Y I
__ j09:00A 11:59 ORT3-Y R-N 0
Mj~l~w1SI-84A SEAT LEAKAGI E
=m_
l
_1---,
4
.551 1 l MM0303382 MMV 76 SC-00953 SC-953 - LEAKS BY.
REPLACE VALVE 10 04MAY04 08MAY04 DR-Y ML-Y I 09:OOA 12:59 ORT3-N R-N 3
=2SC-9S. LEAKS BY, RE Amm(
g_imn 156 1 MM0303681B MMV 76 MS-02010 IMS-2010-RE-INSTALL 4
05MAY04 07MAY04 DR-Y ML-Y 42 VALVE AFTER MOD 18:OOA 15:59 ORT3-N R-M 157 1 MM0406193 MMV 76 MS-02084 1MS-2084. REPACK 2
06MAY04 07MAY04 DR-Y ML-Y 0
VALVE 01:OOA 13:59 ORT3-N R-N 158 1 MM0303680B MMV 76 MS-02005 IMS-2005-REINSTALL 3
06MAY04 07MAY04 DR-Y ML-Y 44 VALVE AND MACHINE 19:OOA 14:59 ORT3-N R-M 1591 1 MM0216627A MMV 76 l CV-01296 CV-1296, FAILED ORT.
10 06MAY04 07MAY04 0
VALVE LEAKS BY 23:00A 21:59 WM(
U
_W1 B1MS2010 - RE4NSTALl HX-1A BG HEADER SAFE 1p1931MS-2PI84, REPACK VAY qHX-1B SGSAMPLE ISOLATn(
~80B1MS2005 - REINSTALL RHX-1B Sb HEADER SAFET a
296, FAILED ORT, AU AUXILIARY CHAI
-W-34A Si ACCUMULATOR DRAII
'LACE VALVE WPZR LIQUID':SPACE SAMPLE I L VALVE AFTER MOD rY0303681 VE PN CONTROL0406'93 VALVE AND MAOHINE FLANGE
'0303680 VALVE LEAKS BI tGING LINE ISOLATION0216627 I CLEANIINSPECd NASH FLOAT VA I TO T-16 RCD'
- ONTAINMENT 1601 1 MM0214035 I MMV 1 76 Cw FLUSH CW SYSTEM 28 07MAY04 11MAY041 DR-Y ML-Y AND CLEAN/INSPECT 12
- 00' 12:59 ORT3-N R-N 0
^s 1
M 161 1
MM0214137F MW 76 RC-00434 RC-434, REPLACE 3 6
07MAY04 08MAY04 84 BOLTS ON DISC.
19:00 00:59 rU2 I
MM0407661 MW 75 VNPSE-0324 VNPSE-3245, REPLACE 6
07MAY04 08MAY04 DR-Y ML-Y 0
j-MILLER SLIDE VALVE 19:00 00:59 ORT3-N R-N 10214137FRC-434, REPLACE 3
- 021413t, T-1 PZR SAI M0407661V4PSE-3245, REPU 0407661_W-2A/B U1C M04075971jS228 REPACK V.
BOLTS ON DISC. FLANGE.
ETY TO T-2 PRT.
CE MILLER SUDEi VALVE PURGE SUPPLY FAN DISCHARGE LVE RX HX-1A SG HEAI 1631 1 MM0407597 MMV 76 MS-00228 1MS-228 REPACK VALVE 12 07MAY04 08MAY04 DR-Y ML-Y 19:00 21:59 ORT3-N R-N a
040T59P I
-R DRAIN AND I
I I
0 IL I 11
t 1641 1 NG44CFCIND I NDE l 77 IST-SISI NDE FOR FAC PROG-24 26APR04 10MAY04 DR-Y ML-Y CONTAINMENT 44 FT _
08:OOA 15:59 ORT3-Y R-N
- 1 I
87 NG4CFCINIDDEZ FOR FAC PROG 4 CONTAINMENT 44 FT GEN AREA Iabm m
1a I4NMUA 1651.
EP0301909 INDE l
77 U1-CONTAIN VISUAL INSPECTION I OF CTMT LINER PLATE 76 30APR04 17MAY04 DR-Y ML-Y 08:OOA 07:59 ORT3-Y R-N
_--1su I
N P
EP0 INPCIO_0 TM I PLAtE i mu
- u I -
166 1 NG44TFC1ND NDE 77 IST-SISI NDE FOR FAC PROG -
5 03MAY04 07MAY04 DR-Y ML-Y 0
TRB HALL 44 FT GEN 09:OOA 16:59 ORT3-Y R-N 167 1
EP0408045 NDE
.77 AF-001 14 IAF-14 PERF RT OF 2
07MAY04 07MAY04 CHECK VALVE-U1R28 19:00 20:59 168 1
EP0408046 NDE 77 AF-00108 1AF-108 PERF RT OF 2
07MAY04 07MAY04 CHECK VALVE-U1R28 21:00 22:59 169 1
EP0408043 I NDE 77 SI-00891A iSI-891A PERF RT 2
08MAY04 0
CHECK VALVE-U1R28 00:00' 01:59 ierDNDEFOR FAC PROG.
SECONDARY INSERVIC LP04O80451AF-114 PERF RT 01 0408045q1P-29 AFP MINI R EP0408046AF-10 8 PERF RT 040804401P-29AFP DIS EP04d80431SI-891A PEF 0408043OP-15A Si F EPO4080441SI-91B I 6408044UP-15B '
TRB HALL 44 FT GEN AREA INSPECTION0301897 CHECK VALVE-J,1R28
-CIRC CHECK 3F CHECK VALVE-U1R28
-HARGE CHECK, F RT CHECK VALPEUUIR2B UMP DISCH RECIR C TO SI TEST Li ERF RT CHECK VALVE -U1R28 I PUMP DISCH RdCIRC TO SI TEST l
E CHECK LINE CHECK 1701 1 EP0408044 NDE 77 SI-00891B I 1SI-891B PERF RT CHECK VALVE -U1R28 2
08MAY04 08MAY04 02:00 03:59 352 I_
_I Run Date 07MAY04 13:20l LT-03 STANDARD PUBLICATION Sheet 10 of 24 O Pnmavera Systems, Inc.
I FL-03 Execution Publication Set
afterO7MAY04 12:00 U1R28 WORKING SCHEDULE I
after Uff"Arv-p 1,&.vw U
ID RESPl WO EQID DESCRIPTION RD ES EF RISK MF MAY I
I I
I
~STIII_ C S];"T 1024112(21 t 2 8112,14,1618020 2,. 6_810Z4 171 0
OP0301254 OPO 77 O-PC-075.1 PERFORM 32 07MAY04 08MAY04 DR-N ML-N 821 p0 g2s4PERFORM hMAINTENANCF ON THE SCBA MAINTENANCE ON THE 12:00' 19 59 ORT3-N R-N
_PERIODIC MAINTE IANCE OF THE 172 1
OP0309956 OPO 78 G-07 PMT IG-07 ROD DRIVE 2
07MAY04 07MAY04 DR-N ML-N 0
P0 09 95PMT 14.07 ROD DRIVE G SET IAW 01 31, MG SET IAW 01 31 13:00 14 59 ORT3-N R-N wROD COOTROL MG SET03 9956 173 0 OP0211062 OPO 77 O-IT-0007D IT-07D. P-32D SERVICE 2
08MAY04 08MAY04 DR-N ML-N 0
OP021 062!-07D. P-32D SERVICE WATE PUMP WATER PUMP 12:00 13:59 ORT3-N R-M 021 062RP-32D SEIRVICE WATER PU P TEST 174 0
0P0211070 OPO 77 O-IT-0007E IT-07E. P-32E SERVICE 2
08MAY04 08MAY04 DR-N ML-N 0
,OP 110T@T-07E, P142E SERVICE WATER PUMP 14:00 15:59 ORT3-N R-M 21107dUP-32E JERVICE WATER RUMP TEST 175 0
OP0301061 OPO 77 0-IT-0007F IT-07F. P-32F SERVICE 2
08MAY04 08MAY04 DR-N ML-N 0
P P03 0j 061 T-07F. P-32F SERVICE Y ATER PUMP WATER PUMP 16:00 17:59 ORT3-N R-M 03010611NJP-32* SERVICE WATE I PUMP TEST 176 0 OP0301281 OPO 77 0-IT-0007G IT-07G. SERVICE 4
08MAY04 08MAY04 DR-N ML-N 0
0
,0P301 2 81IT 07 SERVICE WATEF MO TESTING WATER MOV TESTING 18:00 21:59 ORT3-N R-M SERVICE WATER MOV TE NG 0301281w I -I--
U 177 0 OP0301292 OPt 76 O-PC-MIDS OPERATIONS MID 42 07MAY04 13MAY04 DR-N ML-N 204 0P0 O129 2OPER4TIONS MID SHI WEEKLY ROUTINE SHIFT WEEKLY 00:00A 06:59 ORT3-N R-N 178 2 OP0301589 OP1 77 TS-RE-004 AXIAL FLUX 2
08MAY04 08MAY04 DR-N ML-N 244 OP030 15 89 MAL FLUX IFFERENCE AND QUAD POWER DIFFERENCE AND 00:00 01:59 ORT3-N R-N 036158d^AXIAL FL DIFFERENCE AfD QUAD POWER TLT RATIO
_I I
179 2
OP0301606 OP1 77 TS-PAM-001 MISCELLANEOUS 2
08MAY04 08MAY04 DR-N ML-N 244 OP03di606MISCELLANE OUS EQUIPMENT CHECKS EQUIPMENT CHECKS 00:00 01:59 ORT3-N R-N 0301606lMISCEL YEOUS EQUIPMENT CHECKS 180 2 OP0301580 OPI 77 O-PC-023.5 CHARGING PUMP 3
08MAY04 08MAY04 DR-N ML-N 243 Op0 301580CHARGING P MP ROTATION AND ROTATION AND 00:00 02:59 ORT3-N R-N 03d1580MCHARGII G PUMP ROTATI6NIPREVENTiVE INTENANCE 181 0
OP0301331 OP2 77 O-PC-DAYS OPERATIONS DAY 10 03MAY04 08MAY04 DR-N ML-N 238 P 1OPERATIONS DAY SHIF WEEKLY ROUTINE SHIFT WEEKLY 08:OOA 14:59 ORT3-N R-N l I
OPERATIONS DAY SHIFT VEEKLY ROUT 182 OP0301616 OP2 77 O-PC-023.4 OPERATE LUBE OIL 2
08MAY04 08MAY04 DR-N ML-N 243 OP0 3016 1 ERATE LUBE OI1 PUMPS PUMPS 08:00-09:59 ORT3-N R-N 030161 MONTHLY RUN OF TURBINE LUBE OIL PUMPS 183 0
OP0215479 OP2 76 O-IT-0011 IT-1, P-12A/B SPENT 2
08MAY04 08MAY04 DR-N ML-N 239 OP021 T-1t P12A4 SPENT FUEL PO0L FUEL POOL 12:00-13:59 ORT3-N R-N l 021 79P-12AB SOENT FUEL POOLlCOOLING PU 184 0
OP0215624 OP3 77 O-PC-043.3 CLEAN SERVICE 7
22APR04 07MAY04 DR-N ML-N 846 P LAN SERVICE WATE STRAINERS WATER STRAINERS 16:OOA 18:59 ORT3-N R-N l SERVICE WATER STIAINERS021 5624:
185 0 OP0301387 OP3 77 O-PC-001.4 PAB VENTILATION 14 04MAY04 08MAY04 DR-N ML-N 238 P0 013 8f?
NTILATION CHE KS CHECKS 16:OOA 22:59 ORT3-N R-N l PAD MONTHLI HEATNGNEW 186 0 OP0301393 OP3 77 0-PC-SWING OPS SWING SHIFT 38 05MAYO4 12MAY04 DR-N ML-N 214 PO 0139gPSSWNGSHIFT WEE LYROUTINE WEEKLY ROUTINE 16:OOA 1 18:59 ORT3-NRN N
Run Date 07MAY04 13:20 LT-03 STANDARD PUBLICATION Sheet 11 of24 O Primavera Systems. Inc.
FL-03 Execution Publication Set
after 07MAY04 12:00 U1R28 WORKING SCHEDULE I
aneruimmmvu
_ST S2.141l6,1a2Q221 0, 2, 4, 6, 8,110t2,1416,18,2(1220.12,14, 6, 8,1011211.
187 0
OP0301389 OP3 77 O-PC-009.7 OPERATE WASTE GAS 1 07MAY04 07MAY04 DR-N ML-N 251 P0 0138QOPERAJTE WASTE GAS OMPRESSOR TO' COMPRESSOR TO 16 00 16:59 ORT3-N R-N 0 1389,EWASTE GAS COMPRES OR PERIODIC RWN 188 0 OP0301391 OP3 77 O-PC-075.2 INVENTORY FIRE 1
07MAY04 07MAY04 DR-N ML-N 251 OP0 0139INVENtORY FIRE BRIGA E TURNOUT GEAR BRIGADE TURNOUT 16:00' 16:59 ORT3-N R-N 0
1391,AFIRE PRIGADE TURNO T GEAR INVENTqRY 189 2 U2GNDR012 OP3 O-PC-021.3 DRAIN U2 MAIN 1
07MAY04 07MAY04 DR-Y ML.Y 0 U2G DR012DRAIN U2 MAINELECT CALGENERATOR PER PC 21.3 ELECTRICAL 16:00.
16:59 ORT3.Y R-N
[I 190 0 OP0301402 OP3 77 O-PC-072.2 MONTHLY CLEAN SIDE 6
08MAY04 08MAY04 DR-N ML-N 239 OP 3 0 1402MOtI-LYLEAN SIDE FIRE NGUISHEF FIRE EXTINGUISHER 16:00' 21:59 ORT3-N R-N 030140Z
_PS OF CLEAN-S DE FIRE EXTIl 191 2
U2GNDR013 OP3 O-PC-021.3 DRAIN U2 MAIN I
09MAY04 09MAY04 DR-Y ML-Y 0
U2GNDR013D IN U2 MAIN ELECTRICAL GENERAT R PER PC 21.
ELECTRICAL 16:00 16:59 ORT3-Y R-N E~ i-E:1@u1 -
-I _ _'
192 1
OP0309955 OPS 76 G-06 PMT OF 1G-06 ROD 1
07MAY04 07MAY04 DR-N ML-N 0
F IG-06 ROD DRIVE MG SET AW Of 31 DRIVE MG SET IAW 01 09:OOA 12:59 ORT3-N R-N ROD CONTROL MG SET I
193 1
OP0300957 OPS 76 WG-01788-0 WG-1788 PMT STROKE 1
07MAY04 07MAY04 DR-Y ML-Y 0 P0 Q957WG-1708 PMT STROKE tIER IT 60 PER IT 60 12:00' 12:59 ORT3-N R-N T-16 RCDT,AMPLE TO Z-46 GA ISOLATION OPFRATOR0300957 194 1
OP0300958 OPS 76 WG-01789-0 WG-1789 PMT STROKE 1
07MAY04 07MAY04 DR-Y ML-Y 0 OPO 0 95 8,G-1789 PMT STROKE FER IT 60 I
PER IT 60 12:00' 12:59 ORT3.N R-N T-16 RCDT FAMPLE TO Z-46 GA ISOLATION OPtRATOR0300958 195 1 0157-010 OPS 01-57 FILL & VENT RCDT 2
07MAY04 07MAY04 DR-N ML-N 81 01 IFILL & VgNT RCDT PUMPS IAW 01 57 PUMPS IAW O 57 12:00.
13:59 ORT3-N R-N 196 1
OP7A-100 OPS RESTORE TRAIN A OF 2
07MAY04 07MAY04 0 OP7 10(RESTOfE TRAIN A OF RHIR RHR 12:00 13:59 197 1 EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4
07MAY04 07MAY04 DR-Y ML-Y 307 EP AOPE"ATING SUPPORT OF INmAL RCS WALKDOWN OF INITIAL RCS 12:00' 15:59 ORT3-N R-N REACTOR COOLANT SY TEM (RCS) PRESSURE TEST - IN/
03494 198 1 SOP-CV-018 OPS CL-05A PERFORM SOP-CV-003 7
07MAY04 07MAY04 DR-N ML-N 0 0 V-015PERFdRM SOP-CV-003 erTACHMENTS 1 & 2 ATTACHMENTS 1 & 2 12:00 18:59 ORT3-N R-N FIgL & VENT CVCS VLVE LINEUPS 199 1 CL14B010 OPS CL-14B TURBINE LUBE OIL 8
07MAY04 07MAY04 DR-Y ML-Y 0 CLI BOITURBINE LUBE OIL VALV-UNEUPS VALVE LINEUPS 12:00 19:59 ORT3-N R-N RBINE LUBE OIL VALVE LINEUPS 200 1
RF-070 OPS 77 O-RF-070 RF-70, CTMT FIRE 8
07MAY04 07MAY04 DR-N ML-N 17 F
RF-70. CTMT FIRE HOSE SU VEILLANCE HOSE SURVEILLANCE 12:00 19:59 ORT3-N R-N F)RE HOSE AND FIE STATION SURYEILLANCE TEST0 15935 201 1
O-RT-053B OPS 77 O-RT-053 LLRT RCDT TO GAS 4
07MAY04 07MAY04 DR-N ML-N 340 O-R vLRT RCDT TO GAS AN A ER - POST ORT ANALYZER - POST ORT 13:00 16:59 ORT3-N R-N RCOD TO GAS ANALY R (P-34D)021598I 202 1 O-RT-055A OPS 77 O-RT-055 PRE LLRT HX-1A 4
07MAY04 07MAY04 DR-N ML-N 0 -R-.ssRE U>T HX.IA BLOWDOWN BLOWDOWN 14:00 17:59 ORT3-N R-N L
A STEAM GENERATOt BLOWDOWN (P-1)0215990 203 1
O-RT-067B OPS 77 O-RT-067 POST LLRT EX LTDN HY 8
07MAY04 07MAY04 DR-N ML-N 284 O-R.OfgOST LLRT EX LTDN HX CW UNES CONTINGENCY CCW LINES 14:00 21:59 ORT3-N R-N IICCWTO AND F OM EXCESS LET6OWN HX (P.191' 20)0216000 204 0 OPS-037-03 OPS 76 D72-16-13 IWP-037-03 OPS PMT a I
07MAY04 07MAY04 DR-N ML-N 49 PS 03 7-0CNP-017.03 OPS PMT & AUGNMENT POST MOD ALIGNMENT POST MOD 16:00 16:59 ORT3-N R-N 0
6112MPWR TO 1C-03 STMTrUI1B AUX CTL BD (IMOB-55-68/1M0 Run Date 07MAY04 13:201 LT-03 STANDARD PUBLICATION Sheet 12 of 24 O Puimavera Systems, Inc.
I FL-03 Execution Publication Set I
after 07MAY04 12:00 U1R28 WORKING SCHEDULE I
a#4Iv47#
EF I
RISK M
MF I AY II I
EF I
I 101121416.1R(2210.2.4.6.8,1012.14161820221012.4 6,8110(11141B1 Le 1 IM1 3
I; to W
.~~~~_
I_
~
2051 1 sOP-CV-019 IOps I CL-05A PERFORM SOP-CV-0031 3 ATTACHMENT 3 07MAY04 07MAY04 I DR-N ML-N 19:00 21:59 1 ORT3-N R-N 0
Y Y0&
206 1 Y04RECOVER OPS Y-04 FINAL RECOVERY 6
07MAY04 08MAY04 DR-N ML-N 0
FROM IY-04 OUTAGE 19:00 00:59 ORT3-N R-M 207 1 0148-035 OPS T-036 FILL LUBE OIL 12 07MAY04 08MAY04 DR-N ML-N 0
RESERVIOR 20:00 07:59 ORT3-N R-N 208 1 B42RESTORE OPS B-42 RESTORE 1B-42 PER 3
07MAY04 07MAY04 DR-N ML-N 0
IWP 01-128'E-BR 21:00 23:59 ORT3-N R-M 209 1 SOP-CV-021 OPS CL-05A PERFORM SOP-CV-003 6
07MAY04 08MAY04 DR-N ML-N 0
ATTACHMENTS 4 & 5 22:00 03:59 ORT3-N R-N 210 0 0I-39J OPS SECURE PA8 i
08MAY04 08MAY04 0
VENTILATION FOR 00:00 00:59 211 1
B52-423F OPS 76 B-42 BUS STAB PMT 2
08MAY04 08MAY04 DR-N ML-N 0
'1SI-856B' 00:00 01:59 ORT3-N R-N 212 1 B52-424J OPS 76 B-42 BUS STAB PMT 2
08MAY04 08MAY04 DR-N ML-N 0
'1CC-738B 00:00 01:59 ORT3-N R-N r203 1
B52-428H OPS 76 B-42 BUS STAB PMT D 2
08MAY04 08MAY04 DR-N ML-N 69 0z 00:00 01:59 ORT3-N R-N 214 1 B52-421B OPS 76 B-42 BUS STAB PMT 2
08MAY04 08MAY04 DR-N ML-N 0
_1SI-850B 01:00 02:59 ORT3-N R.N 215 1 OP0407661 OPS 71 VNPSE-0324 VNPSE-3245, PMT 2
08MAY04 08MAY04 0
STROKE PER IT 360 01:00 02:59 216 1 O-RT-066C OPS 77 O-RT-066C LLRT CONT PRESSURE 3
08MAY04 08MAY04 DR-N ML-N 347 TRANSMITTER LINE 01:00' 03:59 ORT3-N R-N 217 1
B42-PMT OPS 42 PERFORM PMT OF.
10 08MAY04 08MAY04 0
11-42 BUCKETS FOR 02:00 11:59 1218 1 CLIOC010 OPS CL-10C TURBINE HALL SW 6
08MAY04 08MAY04 DR-N ML-N 46 F
VALVE LINEUPS 03:00 08:59 ORT3-N R-N 219 1 SOP-CV-022 OPS CL-05A PERFORM SOP-CV-003 1
08MAY04 08MAY04 DR-N ML-N 0
ATTACHMENT 6 04:00 04:59 ORT3-N R-N F220 1
O-RT-046B OPS 77 O-RT-046 POST LLRT FOR AUX 4
08MAY04 08MAY04 DR-N ML-N 63 CHARGING 04:00 07:59 ORT3-N R-N 221 1
852-423M OPS 76 8-42 BUS BRACING PMT 1
08MAY04 08MAY04 DR-N ML-N 0
'1SI-871B 0500 05:59 ORT3-N R-N
)P-CV-019PERFORM SOP.CV-0
=FILL & VENT CV RECOVERFII4AL RECOVERY F1 0148-035FILL LUBE OIL RES I42RESTORERESTORE 1B-42 F SOP-CV-021PERFORM SOP, I
FILL O1.39JSECURE PAD Bs52.23FBUS STAB Pt 02d2527U480V MOT B52-424JSUS STAB Pt 0202527480V MOT, B52.428HBUS STAB PI 02P527!iL480V MOT, 8eS.421BBUS STAB 02025270U480V MO Opo4o 7 6 6 1VNPSE-324!
0407661DW-2AIB O.RT-066CLLRT CONT 0o15999MCONTA B42-PMTPERFORM CLAOCOlOTURBIN S1OP-CV.022PERFO
, FILL O.RT.O46BPOST 0215981_X B52 423 MUS 02025273480(
- B52.423CBUS 0202527M4 13 ATTACHMENT 3
'S VALVE LINEUPSl IOM 1Y-04 OUTAME ERVIOR
) SYSTEM MULTI ANDIOR NON-NUI ER IWP 01-1281E-tR V 003 ATTACHMENTS 4 & 5 FENT CVCS VALVM LINEUPS VENTILATION FOR JUMPER REMO IT *1SI-856B
)R CONTROL CEIiITER PAB SAFEGI IT 1 CC-738B'
)R CONTROL CENTER PAB SAFEGI
[TD-24' SAE
)R CONTROL CEI`ITER PAB SAFEG MT 'ISI850B 3 rOR CONTROL CENTER PAB SAFE(
PMT STROKE PER IT 360 IC PURGE SUPP¢Y FAN DISCHARe PRESSURE TRANSMITTER UNE NMENT PRESSULIE (P-32A)
_0 I
HALLSWVALVEUNEUPS TURBINE HALL StRVICE WATER V tM SOP-CV-003 ATTACHMENT 6l VENT CVCS VALVE LINEUPS LRT FOR AUX CHARGING
)XILIARY CHARGING LINE (P-32C)
RACING PMT 1S 1-871B-"
MOTOR CONTROL CENTER PAB S TAB PMT 1SI-85$B-V MOTOR CONTMOL CENTER PAB L
EQ AL rARDS ARDS UARDS AUARDS E
DNOWN LVE LINEUPS kFEGUARDS SAFEGUARDS 2221 B52-423C OpS 76 8-42 BUS STAB PMT
- 1SI-851B-2 08MAY04 05:00 08MAY04 06:59 DR-N ML-N ORT3-N R-N 0
Run Date 07MAY04 13:201 LT-03 STANDARD PUBLICATION l
Shoat 13 of 24 O Prlmavera Systems. Inc.
I FL-03 Execution Publication Set F
afterO7MAY04 12:00 U1R28 WORKING SCHEDULE M gar tot,,.~
U toID RESF WO EQID DESCRIPTION RD ES EF I
RISK MF MAY l
TFi7Sat 8
Sun 9 I
TII--
I P,1011214.161 2
la 2 46.8 1012 14,16.18,2(122f24681024,&
Ni~~
_g
.Le j
2231 1 SOP-CV-040 OPS T-004 FILL VCT & INERT WITH N2 6
08MAY04 08MAY04 DR-N ML-N 05:00 10:59 ORT3-N R-N 44 224 1
B52-422J OPS 76 B-42 BUS STAB PMT 1
08MAY04 08MAY04 DR-N ML-N 0
'1SI-878B 08:00 08:59 ORT3-N R-N 225 1
0148-050 OPS T-036 FILL MFP P-28A & B 8
08MAY04 08MAY04 DR-N ML-N 0
LUBE OIL RESERVIORS 08:00 15:59 ORT3-N R-N 226 0 01-39E OPS 01-39 RESTORE PAB 2
08MAY04 08MAY04 576 VENTILATION 09:00 10:59 227 1 OP13AO60 OPS LO & SO SY RESTORE LUBE & SEAL 18 08MAY04 09MAY04 DR-N ML-N 0
OIL SYSTEMS 09:00 02:59 ORT3-N R-N 228 1 B52-422F OPS 76 B-42 BUS STAB PMT I
08MAY04 08MAY04 DR-N ML-N 0
'1SI-878C' 11:00 11:59 ORT3-N R-N 229 1
B52-4210C OPS 76 0-42 BUS STAB PMT I
08MAY04 08MAY04 DR-N ML-N 0
_1SW-2908r 12:00 12:59 ORT3-N R-N 230 1 B52-424F OPS 76 B-42 BUS STAB PMT 1
08MAY04 08MAY04 DR-N ML-N 291
- 1SI-841B' 12:00 12:59 ORT3-N R-N 231 1 0135AG02-B OPS G-01 IWP-037-01 ALIGN G01 1
08MAY04 08MAY04 DR-N ML-N 43 TO 1A05 PER 01-35A 12:00 12:59 ORT3-N R-N 232 1 O-RT-060 OPS 77 O-RT-060 LLRT TRAIN B CONT 8
08MAY04 08MAY04 DR-N ML-N 0
SPRAY CIV 12:00-19:59 ORT3-N R-N 233 1 CI10J0010 OPS CL-10J CONTAINMENT SW 10 08MAY04 08MAY04 DR-N ML-N 32 VALVE 13:00 22:59 ORT3-N R-N 234 1 B52-421M OPS 76 B-42 BUS BRACING PMT I
08MAY04 08MAY04 DR-N ML-N 0
'1SI-860B 14:00 14:59 ORT3-N R-N 235 1 B52-424C OPS 76 B-42 BUS BRACING PMT I
08MAY04 08MAY04 DR-N ML-N 0
_1SI-825B' 14:00 14:59 ORT3-N R-N 236 1 SOP-B41A OPS B-41 PREPS FOR 8
08MAY04 08MAY04 DR-Y ML-Y 0
DE-ENERGIZING IB-41 14:00 21:59 ORT3-N R-N 237 1 852-422C OPS 76 B-42 BUS STAB PMT 1
08MAY04 08MAY04 DR-N ML-N 0
_1SI-896B' 17:00 17:59 ORT3-N R-N 238 0 01-73A OPS SECURE WATER 2
08MAY04 08MAY04 0
TREATMENT &
17:00 18:59 239 1 B52-422M OPS 76 8-42 BUS BRACING PMT I
08MAY04 08MAY04 DR-N ML-N 0
'1SI-860D-18:00 18:59 ORT3-N R-N SOP-CV-40FILL VCT & INERT WITH N2
- S2-422J8 JS STAB PMT "1I1-878B-020252 480V MOTOR CONTROL CENTER P 0148450F IL MFP P28A & B LUBE OIL RESE L SYSTEM MULTI AND/
01-39E RESTORE PAB VONTILATION OP13A06 ESTORE LUBE 8 SEAL OIL SYST MNMAI L
B52-4 2FBUS STAB PMT -1 S1878C' 0202 27480V MOTOR CONTROL CENTI 852-4 1 CBUS STAB PMT I1SW-2908 020 527E480V MOTOh CONTROL CEN B52.24FBUS STAB PMT "1SI-841B-020 52I480V MOTOR CONTROL CEN 0135AG 02-BWP-037-01 ALGN G01 TO 1AO 001 591911 125V IWP p0-037-01 EM RE 041.060 LLRT TRAIN B CONT SPRAY C 021 i99 14B PUMP/SI-86 CL1 DJ010CONTAINMtNT SW VALVE SERVICE WATER IN CONTAIN AENTW B 2.42IMBUS BRACING PMT "ISI-861 20252 j480V MOTOR CONTROL C B 2.424CBUS BRA(ING PMT "1SI-82' 2025271480V MOCTOR CONTROL C SOP-B4tAPR PS FOR DE-ENERGIZING 1-B41 PE I
L l
B52-422CBUS ITAB PMT 'I SI-89 02025271480V MOTOR CONTR(
01 ASECURE WATEk TREATMENT & F l
B52.422MBUS BRACING PMT "1 02025271480V MOTOR CONTI ftl B52.421JE<US STAB PMT I1 ft
~0202527I480V MOTOR CO]
B SAFEGUARI VIORS R NON-NUMBI MS.
E OIL AND SE R PAB SAFEGI R PAB SAFE R PAB SAFE(
PER 0135A 0-1 BDISCH CHKt~
B" NTER PAB SA LNTER PAS SA F1 I-SOP-480-BI L CENTER PAI ETREATMENI SI-860D OL CENTER P, 1-866B8 JTROL CENTEF 2401 1 B52-421J OPS 76 B-42 BUS STAB PMT I1SI-866B5 I
08MAY04 I 08MAY04 DR-N ML-N 20:00 20:59 ORT3-N R-N I 0
Run Date 07MAY04 13:20l LT-03 STANDARD PUBLICATION Sheet 140f24 O Pnmavera Systems. Inc.
I FL-03 Execution Publication Set I
after 07MAY04 12:00 I
U1R28 WORKING SCHEDULE I
0#1=6 t~v U
ID RS w0o EI I
RS I MI:
MAY SECTTON D
~
2 r7S tfR Sun 9 241 11 O-RT-059 OPS I 77 O-RT-059 LLRT TRAIN A CONT SPRAY CIV 8 I 08MAY04 09MAY04 I DR-N ML-N 20:00 03:59 ORT3-N R-N 0
242 2 AC-381E-5A OPS G-01 ENTER TSAC 3.8.1.E 0
08MAY04 DR-N ML-N 0
FOR A TRAIN DIG 0OS 21:00 ORT3-N R-M 243 1 134 1PTE OPS 841 IPTE BRIEF TO 1 08MAY04 08MAY04 DR-N ML-N 0
DE-ENERGIZE 1B-41 21:00 21:59 ORT3-N R-N 244 1 SOP-B41B OPS 8-41 DE-ENERGIZE 18-41 2
08MAY04 08MAY04 DR-N ML-N 0
PER 1-SOP-480-B02 22:00 23:59 ORT3-N R-M 245 1 01-128-B OPS 76 P-015B FILL & VENT P-015B 4
08MAY04 09MAY04 DR-N ML-N 0
HHSI PP PER 01-128 22:00 01:59 ORT3-N R-M 246 1 SOP-BOiC OPS B-O1 IPTE BRIEF FOR 1B-01 2
08MAY04 O9MAY04 DR-N ML-N 0
TRANSFER 23:00 00:59 ORT3-N R-N 247 1 O-RT-0558 OPS 77 O-RT-055 POST LLRT HX-1A 4
09MAY04 09MAY04 DR-N ML-N 0
BLOWDOWN 00:00 03:59 ORT3-N R-N 24 8 1 SOP-B41C OPS B-41 RE-ENERGIZE 18-41 2
09MAY04 09MAY04 DR-N ML-N 0
PER 1-SOP-480-B02 01:00 02:59 ORT3-N R-M a50 I OP0408036 OPS 76 P-015B P-15B PMT PER IT-01A 4
09MAY04 09MAY04 DR-N ML-N 0
Co 02:00 05:59 ORT3-N R-M 249 2 AC-38AE-5Z OPS G-01 EXIT TSAC 3.8.1.E FOR 0
09MAY04 358 A TRAIN D/G COS 02:59 251 1
09MAY04 09MAY04 DR-N ML-N 117 CONTAINMENT PURGE 03:00 03:59 ORT3-N R-N 252 0 01-73B OPS RESTORE WATER 2
09MAY04 09MAY04 558 TREATMENT &
03:00 04:59 253 1
OP-9CC OPS RESTORE 2
09MAY04 09MAY04 266 CONTAINMENT PURGE 03:00 04:59 254 1
SOP-BOiA OPS B-01 SUPPLY 18-01 FROM 8
09MAY04 O9MAY04 DR-N ML-N 0
1B-03 IAW 03:00 10:59 ORT3-N R-N 255 1
IT-740 OPS 77 O-IT-0740 IT-740, MAIN STEAM 1
09MAY04 09MAY04 DR-N ML-N 356 BLOWDOWN 04:00 04:59 ORT3-N R-N 256 1
IT-280A OPS 77 O-IT-0280A MSIV STROKE TEST.
4 09MAY04 09MAY04 0
IT-280A 06:00 09:59 257 1
852425J OPS 76 B-42 BUS STAB PMT 2
09MAY04 09MAY04 DR-N ML-N 0
'11-857B 07:00 08:59 ORT3-N R-N a
AC 01-128-SAFETY INJEC O-RT-0 A STEAM (ENERATOR BLOV SAFETY OP9C.075RESTC 01-73 I
SOP-J1 MS STOP V4ALVES STROKE 480V MOTOR CONTROL CEI B ST8AM GENERATOF O.RT059ULLRT TRAIN A COF T SPRAY CIV 0215992 P-14A FUMPISI-862A I 381 E-5ENTER TAC 3.8.1.E FOR A rRAIN DG OO B411PTEIPTE BRIEF TO DE NERGIZE 1B4 SOP-B41BOE-ENORGIZE 1B-41 PE 1 -SOP-480-BC
.LL & VENT P401SB HHSI PP PER C 1-128 (PARTIAL ION PUMP04080i SOP-B01IPTE BRIEF FOR 1 -01 TRANSFEF 5SPOST LLRT HX.1A SLOWDOWN ( ONTINGENCY tDOWN (P-51)021 99CL SOP-B41CRE-EN6RGIZE 1B 41 PE 1 -SOP-480-BC OP4O8O36P-1 58 PN PER IT-01A NJECTION PUMP 0408036 C-38AE-52EXIT TSAC 3.8.1.E FOR A rRAIN D/G OO!
RE CONTAINMENt PURGE POST IW ' 00-037-02&-0 3RESTORE WATER TREATMENT &
ETREATMEN OP-9CCRESTORt CONTAINMENT URGE SYSTEN 301ASUPPLY 1-B01 FROM 18-03 IA 1-SOP-480401 IT.74CIT-740. MAIN S M BLOWDOWI I 0215924IUNrr MAIN STEAM ITIIOAIMSIV STROK TEST, IT 280A rEST (CSD) <200 OEGF021589 B$2.425JBUS STAB PMT"ISI-857B' ITER PAR SAFEGUARDS0202527 O.RT.0S2bPOST LLRT HX-1 I SAMPLE UNE SAMPLE ISOLAT(ON (P-34C)0215947F 2581 1 O-RT-052B OPS 77 O-RT-052 POST LLRT HX-1B SAMPLE LINE 4
09MAY04 09MAY04 10:00 I
13:59 17 J
J*..***
I I
I__
_ _ _ _ _ _.L...
Run Date 07MAY04 13:201 LT-03 STANDARD PUBLICATION Sheet 15 of 24 0 Pnmavera Systems. Inc.
I FL-03 Execution Publication Set
afterO7MAY04 12:00 U1R28 WORKING SCHEDULE I.
alter uIM/y4 7Ui:vuu MAY U
ID RESPl WO EqlD DESCRIPTION lRD ES EF RISK MF MAY Isr 10 Z1416,11221024,6 Sa01,18 2022: 0. 2,4.6 8,10121441i E 1 eir1 4
1 4-259 1 IT-530D OPS 77 O-IT-0530D LRPM & PIGGYBACK 8 09MAY04 09MAY04 DR-N ML-N 0
IT.S3ODLRPM 6 PIG YBACK TES OF TRAIN B S I
TEST OF TRAIN B SI 10:00 17:59 ORT3-N R-M RPM PROGRAMTRAIN B HHS AND RHR PIGGYBACK TEST021 5 W3-
_II
-!1
_~
260 1 SWT01Z PPG MILESTONE CLOSE TURBINE 0 08MAY04 08MAY04 DR-N ML-N 0 _
SWTOIZCLOSE RBINE SERVICE WATERWORK W NDOW SERVICE WATER 03:00 02:59 ORT3-N R-N ITURBINE BUILDING SERVICE WATER 261 1
VNCCB52Z PPG MILESTONE END CONTAINMENT 0
08MAY04 08MAY04 DR-N ML-N 0
VNC B52ZEND CONTAINMENT FAN CO LERS D WOR FAN COOLERS D WOR_
13:00 12:59 ORT3-N R-N IEND CONTAINMENT FAN COOLERS D WOR 262 1 SIB02Z PPG MILESTONE CLOSE CTMT SPRAY B 0 08MAY04 08MAY04 DR-N ML-N 52 EIB02ZCLOSE CTMT SPRAY B TRAIN P-14B WINDO TRAIN P-14B WINDOW 21:00 20:59 ORT3-N R-N END WORK CTMT SPR kY B TRAIN P-14B3 263 1 480VXO1A PPG 8-01 START 480V BUS 0 09MAY04 09MAY04 DR-N ML-N 0
480V (01ASTART 480V tus RELATED EN RGIZED WOR RELATED ENERGIZED 03:00 02:59 ORT3-N R-N BEGINNING OF A T RAIN BUS WORK YV NDOWI 264 1
SIA02Z PPG MILESTONE CLOSE CTMT SPRAY A 0 09MAY04 09MAY04 DR-N ML-N 45 SIA02ZCLOSE CTMAT SPRAY A TRAIN P-14A WINDO TRAIN P-14A WINDOW 04:00 03:59 ORT3-N R-N END WORK ITMT SPRAY A TFAIN P-14AI 265 1 MSA25Z PPG MILESTONE END SIG A CL-1E 0 09MAY04 09MAY04 DR-N ML-N 301 MSA2ZSZEND SIG A CL-1E WORK OUTSIDE CONTAINMEN
_WORK OUTSIDE 11 00 10:59 ORT3-N R-N S/G B SECONDAR 1 & FEED/STEAMISLOWDOWN IN CT a 56 CTMTPHONEI RP I MISC INSTALL PHONE LINE I1 07MAY04 07MAY04 DR-Y ML-Y 83 C HONE1INSJALL PHONE UN THROUGH 66 HATCH THROUGH 66 HATCH 1200 1259 ORT3-Y R-N 267 1 RPSH004-R RPI PACKAGE4 REMOVE SHIELDING 3
09MAY04 09MAY04 DR-Y ML-Y 0
RPSH_04 EMOVE SHIELDION REGEN H T HAE ON REGEN HEAT 06 00I 08 59 ORT3-Y R-N 268 1 RPSH011-R RP1 PACKAGE 11 REMOVESHIELDING.
5 09MAY04 09MAY04 DR-Y MLY-0 PSH011-RREMOV SHIELDING -RE ORGAP REGEN DOOR GAP 09:00 13:59 ORT3-Y R-N 269 1 RPSH013-R RP1I PACKAGE 131 REMOVE SHIELDING -
4 09MAY04 09MAY04 DR-Y ML-Y 269 RPSH0134RREMOVE SHIELDING -. EGEN RACK REGEN RACKS 1400 11759 ORT3-Y R-N 270 1
SD-1600-34 SDM 21 R-1 P INCORPORATE 27 06MAY04 08MAY04 INCORPORATE C1MENTSIREVIEW MOD PKG I
COMMENTS/REVIEW 15:OOA 14:59 1_
R EACTO)VESSEL AND A SEMBLY 271 1 SD-1600-36 SDM 21 R-1 PORC - REACTOR 3 08MAY04 08MAY04 0
dD460 36'ORC -
EACTORHEADRfPAIRMODPAC GEIAPPROVAI HEAD REPAIR MOD 15:00I 17:59
[2 REACTOR VESSEL A
_ASSEMBLY 272l SD GSI-191 SDS CO NT ENGINEERING 35 08APR04 13MAY04 DR-V MI-V 4
0 SI-91EIONISSUES WALKDOWN - SUMP 08:OOA 14:59 ORT3-Y R-N L; ~ ~~~-1 MMB2eKI;Iqs~a1W 273 ~ ~ ~
~
~
~
~
~
~
~
~
~
~
~
~~
~~G 1 GUPR G GI-RVDCAE 4
3PO A0 RYM-9~SPPOR'rPROODE CRANE RIGIER, AND TOLR6)M SUPPC)RT(P9 G
TGI IT PRIGGER AND 09:OOA 18:59 ORT3-Y R-N Run Date 07MAY04 13:20 LT-03 STANDARD PUBLICATION Sheet 16 of 24 C Prmavera Systems. Inc.
FL-03 Execution Publication Set S
afterO7MAY04 12:00 U1R28 WORKING SCHEDULE I
arrer ui tmr u* t. uU
,Sat8
,Sun9 STrnl u
l~Z4161Sg2Q2210,2,4,6.81012,14,1B18.(20210,2.4 t6t8.ljjjjjjjj 274 1 TG0302130 TGG 76 L0-00258 L0-258 - OVERHAUL 8
27APR04 08MAY04 DR-V ML-Y 2 G 01213CLOL2 58 - OVERHAULS L OIL REUEF VAtVE SEAL OIL RELIEF 07:OA 00:59 ORT3-Y R-N P-5A/B Al SIDE SO PUMP RECIRC PRESSURE RELIEF 275 1
TG-30880 TGG 76 TG-01-T TIGHTEN HP CYLINDER 6
05MAY04 07MAY04 DR-Y ML-Y 0 o THTE?4 HP CYUNDER C )VER BOLTING COVER BOLTING 14:00A 17:59 ORT3-Y R-N HIGO PRESSURE TUR INE0302153 276 1 TG-30940 TGG 76 TG-Ot-T RECONNECT MS INLET 11 07MAY04 07MAY04 DR-Y ML-Y 304 ECONNECT MS INLET Pl ING TO HP TURBINE PIPING TO HP TURBINE 08:OOA 22:59 ORT3-Y R-N HIGH PRESSU E TURBINE0302153 277 1
TG-8223A TGG 76 MSR DUO-CH INSTALL MSR DUO-3 07MAY04 07MAY04 DR-Y ML-Y 47 N LI MSR DUO-CHECKS CHECKS 09:OOA 14:59 ORT3-Y R-N FD-9A-D SHELL SIDE OUT ET CHECKS 278 1
TG0213967A TGG 76 PIPING CRO REPLACE 7
07MAY04 10MAY04 DR-Y ML-Y 11 E
CE CROSS-UNDER MANWA S CROSS-UNDER 09:OOA 10:59 ORT3-Y R-N 279 1 TG-XUND2VI TGG 76 PIPING CRO CROSSUNDER PIPING 2
07MAY04 07MAY04 DR-Y ML-Y 120 T ND2VICROqSUNDER PIPING LOSEOUT INSPECTION CLOSEOUT 10:OOA 13:59 ORT3-Y R-N HP TURBINE EXHAUST TO SR'S0302140 280 1
RF-190-E TGG 76 O-RF-190 CLOSE HOTWELL 3
07MAY04 07MAY04 DR-Y ML-Y 26 R LOSE 14OTWELL MANWA rS MANWAYS 10:OOA 14:59 ORT3-Y R-N CONDENSER HOTWELL IN PECTIONo21587) 281 1
TG-30840 TGG 76 TG-01-T INSTALL UPPER HALF 10 07MAY04 09MAY04 DR-Y ML-Y 9
0- 3084 qNSTA1L UPPER HA OUTER STEAM LD CASINGS OUTER STEAM GLD 18:00 17:59 ORT3-Y R-N 030215
= -n w-s p 28I CL-28.WCC CL 28 MODE 6 TO MODE 5 9225APR04 19MAY04 DR N MI-N 0
-MODE 6 TO:MODE5C E
5CKLCK tST I
CHECKLIST 08:00A 15:59 ORT3-N R-N 283 1
C wCC W
CL2E MODE 3 TO MODE 2 61 02MAY04 26MAY04 DR-N M MODE 2 CHECKIT CHECKLIST 19:00A 16:59 ORT3-N R-N 284 1 CL-2F WCC CL 2F MODE 2 TO MODE 1 8t 02MAY04 27MAY04 DR-N ML-N 0 C-ODE 2 TOMODE 1 CHECKLI T CHECKLIST 19:OOA 12:59 ORT3-N R-N 285 1 T-0514-R WCC WG-1788 I WG WG-1788 IC 1
07MAY04 07MAY04 DR-Y ML-Y V
0 454Rl WG Wd-1788 IC REVO-1 REV0-1 12:00 12:59 ORT3-N R-N 1 WG WG-17'88 IC REVO-1 001 514 286 1
T-0515-R WCC WG-1789 1 WG WG-1789 IC I
07MAY04 07MAY04 DR-Y ML-Y 0 43-0w1 WG WG-4789 IC REVO-1 REVO-1 12:00 12:59 ORT3-N R-N I WG WG-1789 IC REVO-1 001 515 287 1
T-1643-H WCC l RMP-9133 1 AF RMP-9133 EM 1
07MAY04 07MAY04 278 41 i1 AF RMO,-9133 EM REVO-1 REVO-1 12:00 12:59 1AF RMP-9,33 EM REVO-100 1643 288 1 T-2078-R wCc CW SYSTEM I CW CW SYSTEM EPT 1
07MAY04 07MAY04 100 r-20 1 CW CWSYSTEM EPT RE O-1 REV0-1 12:00 12:59 1 CW CW SYSTEM EPT REV0110012078 289 1 T-7109-H wC l TG-01-G I TU TG-01-G EM 1
07MAY04 07MAY04 DR-Y ML-Y 0 H TU TG-01-G EM REV4-1 REV4-1 12:00 12:59 ORT3-Y R.N i TU TG-01$,3 EM REV4-10017 09 290 1
T-7149-H WCC 1F52-122 1 345KV 1F52-122 APS I
07MAY04 07MAY04 DR-N ML-N 1 r-71i1 345KV 1F52-122 APS REV -1 REV3-1 12:00 12:59 ORT3-Y R-N 1345KV 1F42-122 APS REV3- 0017149 291 1
T-7441-H wCc MR 01-128 1 480VMR 01-128 1
07MAY04 07MAY04 11 -T
-H1 480VMR 01-1281B52-42 (CC-738B) OPS FEV0-1 1B52424J (CC-738B) 12:00 12:59 1480VMR01-1281B52-424J(
C-738B)OPSREVG-10017441 Run Date 07MAY04 13:20 LT-03 STANDARD PUBLICATION Sheet 17 of 24 O Pnmavera Systems, Inc.
FL-03 Execution Publication Set l_I_
after O7MA Y04 12:00 U1R28 WORKING SCHEDULE I
diter UlVIUMA
- u. ILw.U
Fri 7 Sat 8 Sun 9 1I I
ST I
I PA1O214A I12221 0.2.4.6.8,1012.141618,202210.2.4. 6.8101121 61m e3l.kl
=
29211 T-8598-R wCC I WG-1788-0 I WG WG-1788-O MM REVO-1 I
07MAY04 07MAY04 DRY ML-Y 12:00 12:59 ORT3-N R.N 0
293 1 T-8599-R WCC WG-1789-0 1 WG WG-1789-O MM 1
07MAY04 07MAY04 DR-Y ML-Y 0
REV0-1 12:00 12:59 ORT3-N R-N 294 1 T-8839-R WCC CRDM/RPI I RC CRDMIRPI EM I
07MAY04 07MAY04 70 REVO-2 12:00 12:59 295 1 T-8378-R WCC P-2A I CV P-2A MM REVO-1 2
07MAY04 07MAY04 DR-N ML-N 78 12:00 13:59 ORT3-N R-N 296 1 T-1831-R WCC HX-15A 1 VNCC HX-15A MM 4
07MAY04 07MAY04 110 REV1-1 12:00 15:59 297 1 T-6930-R WCC D72-16-07 1 125V IWP 00-037-03 1 07MAY04 07MAY04 0
EM REVO-1 13:00 13:59 298 1 T-7108-R WCC TG-01-G I TU TG-01-G EM 1
07MAY04 07MAY04 DR-Y ML-Y 0
REV3-1 13:00 13:59 ORT3-Y R-N 299 1 T-7436-H WCC MR 01-128 1 480V MR 01-128 1 07MAY04 07MAY04 9
1B52-423F (SI-856B) 14:00 14:59 I80 1
T-7941-R WCC MS-2084 I MS MS-2084 REVO-1 2
07MAY04 07MAY04 42 14:00 15:59 301 0
T202007R WCC W-036A REMOVE TAG (O 1 07MAY04 07MAY04 849 VNDRM W-36AI36B MM 15:00 15:59 302 0 T301084H WCC HX-240 HANG TAG (O VNSSB I
07MAY04 07MAY04 2
HX-240 MM REV0-1) 15:00 15:59 303 1 T-2086-R WCC EM REVI-1 I RDC EM REV1-1 2
07MAY04 07MAY04 66 15:00 16:59 304 0 T-8731-R WCC K-26 0 EBA K-26 MM REVO-I I
07MAY04 07MAY04 594 16:00 16:59 305 1 T-7048-H WCC P-288 I CS P-28B EM REV2-1 1 07MAY04 07MAY04 DR-Y ML-Y 0
17:00 17:59 ORT3-N R-N 306 1 T-7109-R WCC TG-01-G I TU TG-01-G EM 1 07MAY04 07MAY04 DR-Y ML-Y 107 REV4-1 17:00 17:59 ORT3-Y R-N 307 1 T-7150-H WCC 1F52-122 1 345KV 1F52-122 APS I
07MAY04 07MAY04 0
REV2-1 17:00 17:59 308 1 T-7783-H WCC TG-01-G 1 TU TG01-G EM 1 07MAY04 07MAY04 107 REV4.1-1 17:00 17:59
-RI WG WG-1788-0 MM REVq Ii WG WG-1786-O MM REVO-1 9-RI WG Wd-1789-0 MM REVq II WG WG-1789-0 MM REVO-1 E9RI RC CRDMIRPI EM REVO-2 l RC CRDM/RPI EM REVO-200 RI CV P-24 MM REVO-1I 1 CV P-2A'MM REVO- 00183-I VNCC HX.15A MM REVI-1 Ali VNCd HX-15A MM REV1 O.R1 125V IYTP 00-037-03 EM R 1 125V IWP 00.037-03 EM RE
-RI TU TG-41.G EM REV3-1 1 TUTG-0)-G EM REV3-1001 61,1 480V MfR 01-1281552423 II 480V MR 01-128 1552-42:
I1 1MS MSQ2084 REVO-1I
- 1 MS ME-2084 REVO-1 001
)07RREMOVE TAG (0 VNDRM V
)84HANG T^G (O VNSSB HX-.
1641 RDC EM REV1.1-w08a1 RD6 EM REV1-1 7W31
.REBA ;-26 MM REVO-1I 18731E0 EBA K-26 MM REVO-1I 7048541 CS P-28B EM REV2-1 0170441 Cd P-28B EM REV2-1 7109RITU TG-01G EM REV4-01710w 1 TU TG-01-G EM REV.
7150-HI 345kV1F52-122APS I 01715(11 34SKV 1F52-122APS 7783441 T TG4-1G EM REV4.
017783(1 TI) TG-01-G EM REV 8001-RI 480i/ B52-429DIIDR El 01 8001S1 48pV 052429DUDR I
)018598
.1
)018599 I8839
'8
-10011831 EVa-i jVD-10016930 7108 F (Sl-856B) OPS REVO-1 F (SI-856B) OPS REVD-10017436 7941 f-36AI36B MM REV701) 40 MM REVO-1)
'V24 REV2-1 1.1-1 A REVO01
.M REV0-1 309 1
T-8001-R wcC B52-429DI 1 480V B52-429DLMDR EM REVO-1 I
07MAY04 07MAY04 17:00 t
17:59 494 Run Date 07MAY04 13:20l LT-03 STANDARD PUBLICATION Sheet 18 of24 O Pdimavera Systems, Inc.
I FL-03 Execution Publication Set I
after O7MAY04 12:00 U1R28 WORKING SCHEDULE I
arter UIMP4 FU*# IdC.V I1
- U ID l
EQID DESCRIPTION RD ES EF RISK MF MAY I FrI 7 ISat 8
I Sun 9 I _I. I,
I I
.1 D101Zl4,116.1lB20,2210 2. 4. 6.81012.141618,2Q2210,.2,4..6.8, Iil2,164 310 1
T-8116-R wCC MR01-128 11480V MR 01-128 1B-42 BUS BRACING EM 1
07MAY04 07MAY04 17:00 17:59 0
.1 311 1
T-8808-R WCC P-28B 1 CS P-28B EM 1
07MAY04 07MAY04 DR-Y ML-Y 193 REVO.3-1 17:00 17:59 ORT3-N R-N 312 1 T-2724-R WCC C-703 I TU C-703 EM REVO-1 2
07MAY04 07MAY04 239 17:00 18:59 313 1 T-7147-R WCC 1F52-122 1 345KV 1F52-122 APS 1
07MAY04 07MAY04 120 REV1-1 18:00 18:59 314 1 T-8918-R WCC Y.4 I Y Y-4 EM REVI-1 1
07MAY04 07MAY04 DR-N ML-N 0
18:00 18:59 ORT3-N R-N 315 1 T-0460-H WCC MS-5958 I MS MS-5958 IC 2
07MAY04 07MAY04 22 REVO-1 18:00 19:59 316 1 T-7590-R WCC MR 01-128 1 480V MR 01-128 18-42 2 07MAY04 07MAY04 0
BUS BRACING EM 19:00 20:59 317 1 T-8865-R WCC P-15B 1 SI P-15B MM REV1 t 2
07MAY04 07MAY04 0
19:00 20:59 a8" I T-3767-R WCC MS-02017 1 MS MS-2017 MMV 1
07MAY04 07MAY04 33 REVO-1 20:00 20:59 319 1 T-7048-R WCC P-28B 1 CS P-28B EM REV2-1 3
07MAY04 08MAY04 DR-Y ML-Y 186 22:00 00:59 ORT3-N R-N 320 1 T-7433-H WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 0
1B52-421B (SI-850B) 00:00 00:59 321 1
T-7491-H WCC RC 1 RC SG PRIMARY 1
08MAY04 08MAY04 DR-Y ML-Y 1
MANWAYS EPT REV2-1 00:00 00:59 ORT3-Y R-N 322 1 T-7499-H WCC T-001 1 RC PZR MANWAY MM 1
08MAY04 08MAY04 DR-Y ML-Y I
REV2-1 00:00 00:59 ORT3-Y R-N 323 1 T-7510-H WCC P-001B-M I RC P-1B-M RMP 1
08MAY04 08MAY04 DR-Y ML-Y 0
9002-1 MM REV2-1 00:00 00:59 ORT3-Y R-N 324 1 T-8616-H WCC PRIMARY 1 RC PRIMARY 1
08MAY04 08MAY04 DR-Y ML-Y 0
MANWAYS EPI REV2-1 00:00 00:59 ORT3-Y R-N 325 1 T-8887-H WCC Sl-844A I SI SI-844A MMV 1
08MAY04 08MAY04 0
REV2-1 00:00 00:59 326 1 T-8889-H WCC AF-104 1 AF AF-104 MMV 1
08MAY04 08MAY04 0
REV3-1 00:00 00:59 8116-R1 480V MR 01-128 1B-42 BUS BRACING EM REVI-1 0181111 480V MR 01-128 lB' 2 BUS BRACING EM REV-11 t
I
.8808R ICS -28B EM REV0.3-01880*1 C4 P-28B EM REV0 -1
.2724 R1 TU C-703 EM REVO-1 01272l1 T!U C-703 EM REVOI Tr7147.Rq34"KV 1F52-122 APS REV 1 001714711 3,45KV 1F52-122 APS REV1-1 T.8918 Y Y-4 EM REV 001891E1 'Y4 EM REVI-1 r-0460-41 M$ MS-5958 IC REV -1 001046f1'MS MS-5958 IC R 0-1 T-7590- I 480V MR 01-128 1B 2 BUS BRACINd EM REV0 1 001759C 1 480V MR 01-128 IB-42 BUS BRACI)rG EM REVO-1 T-8865.R1 SI P.15B MM REVI -I 001886j01 SI P-158MM RE 1l-1 T.3767.RIlMS MS-2017 MV REVO-1 001376171 MS MS-2017 MI REVO-1 T.7048o~tI P-28B EM FEV2.1 001704E_1 CS P-28B M REV2-1 T.7433-HI 480V MR 01 128 1t52421B ($1-850B) OPS REV(
001.7433111 480V MR 41.128 1B52-421B (SI-850B) OPS RD T.74914H1 RC SG PRI ARY MANWAYS EPT REV2-1 001749111 RC SG P MARY MANWAYS EPT REV2-1 T.74 9941 RC PZR MA WAY MM REV2-j 001749941 RC PZR MNWAY MM REV2L1 T.7910-H RC P-1B-M IMP 9002-1 MM REV2-1 001*5111 RC P-18-t RMP 9002.1 MM kEV2-1 T.8q164l RC PRIMAS MANWAYS EPI,EV241 001861 ;J1 RC PRIM RY MANWAYS EPI REV2-1 T-88874 11 St SI-844A MV REV2-11 001>8871 SII-844 MMV REV2-1 T.8189.qHAF AF-104 MV REV3-1 00168841 AF AF-1 MMV REV3-1 T-80'2"H1 aV IWP 0 -128E-FN (01.39)!EM REVO-2 001802401 480V I 01-128E-FN (OI-39) EM REVO-2
-1
'0-1 327 1
T-8024-H wcC lWP 1 480VIWPO1-128 E-FNI 2 108MAY04 08MAY04 (01-39) EM REVO-2 00:00 01:59 0
Run Date 07MAY04 13:20 LT-03 STANDARD PUBLICATION Sheet 19 of 24
© Prmavera Systems, Inc.
I FL.03 Execution Publication Set I
after 07MAY04 12:00 U1R28 WORKING SCHEDULE I
alsg a,..,._.,-
I L I ID lRESP WOI EQD DESCRIPTION RD ES EF RISK MF MAY ST D
ECRPTOIR Fri 7 Sat 8 IStin 9
I pi I
ST I
101214t6, a2o,22.2.4.6.8 1012,14,161820,2(12j
. 2. 4. 618j10j12141 Ni :
39 3kN I 4 II I
_1
- t..,
328 1
T-8606-R lWCC TURBINE I SW TURBINE OPS REV1-1 3
08MAY04 08MAY04
_ 00:00 02:59 a
329 1 T-7509-R WCC P-001B-M I RC P-1B-M RMP I
08MAY04 08MAY04 DR-Y ML-Y 280 9002-1 MM REV1.1 01:00 01:59 ORT3-Y R-N 330 1 T-8615-R WCC PRIMARY 1 RC PRIMARY 1
08MAY04 08MAY04 DR-N ML-N 66 MANWAYS EPI REV1-1 01:00 01:59 ORT3-N R-N 331 1
T-8616-R WCC PRIMARY 1 RC PRIMARY 1
08MAY04 08MAY04 DR-Y ML-Y 66 MANWAYS EPI REV2-1 01:00 01:59 ORT3-Y R-N 332 1 T-8886-R WCC SI-844A 1 SI SI-844A MMV 1
08MAY04 08MAY04 286 REV1-1 01:00 01:59 333 1 T-8888-R WCC AF-104 I AF AF-104 MMV 1
08MAY04 08MAY04 281 REV2-1 01:00 01:59 334 1 T-7436-R WCC MR 01-128 1 480V MR 01128 1
08MAY04 08MAY04 0
1B52-423F (SI-856B) 02:00 02:59 335 1
T-7441 -R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 68 1 B52-424J (CC-738B) 02:00 02:59 I36 1
T-8927-R WCC CV-1296 I CV CV-1296 MIN 1
08MAY04 08MAY04 0
C3 REV4-1 02:00 02:59 337 0 T301084R WCC HX.240 REMOVETAG (0VNSSO I 08MAY04 08MAY04 838 HX-240 MM REVO-1) 02:00 02:59 338 1
OP0216627P WCC 76 CV-01296 1CV-1296 PMT STROKE 1
08MAY04 08MAY04 DR-Y ML-Y 0
PER IT 320 03:00 03:59 ORT3-N R-N 339 1
T-7433-R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 0
1B52-421B (Sl-8508) 03:00 03:59 340 1 T-9667-R WCC C-1 1 CONT C-1 MM REVI-1 I
08MAY04 08MAY04 23 03:00 03:59 341 0 T201992H WCC W-013A2 HANG TAG (0 VNCSR I
08MAY04 08MAY04 2
W.13A2 MM REVO-1) 03:00' 03:59 342 1 T-7439-H WCC MR 01-128 1 480V MR 01-128 2
08MAY04 08MAY04 0
1052-423M (SI-871B) 03:00 04:59 343 1 T-7435-H WCC MR 01-128 1 480V MR 01.128 1
08MAY04 08MAY04 0
1852-423C (SI-851B) 04:00 04:59 344 1 T-8926-R WCC S-6050A 1 lOPS S-6050A IC I
08MAY04 08MAY04 30 REV3-1 05:00 05:59 T-8406.R-SW TURBIh 0018601 SWTU T-7509%4 RC P-1 B-h 0q175011 RC P-AB T 615-R1 RC PRIMA 01186141 RC PRIN T-i61 6I RC PRIMA 0q1861 U41 RC PRIN T4886-iSI SI14844A 0i188811 SI SI-844 T.J888.RAF AF-104 001888041 AF AF-1i T'I7436-R1 480V MR 001743U1 480V M Tr,7441.R1 480V MR 001744111 480V N T-8927. I CV CV.1:
0018924'1 CV CV-T301084RREMOVE 1 OP02 16627plCV-1291 0216627!IAUXILI, T-7433-R 480V M 0017433j1 480V T-9667cONTt 00096611 CONI T2019921HANG V T-7439-H1 480V M 00174301 480i T-7435-HI 480V 00174341 480' T.8926-1Ri'P' 001892t 110 T201682HHANG I
I EOPSREV1 1l BINE OPS REV1-1 RMP 9002-1 MM $EV11 l
M RMP 9002-1 ML REV1-1 RY MANWAYS EPI REVI-1 ARY MANWAYS EPI REV1-1 RY MANWAYS EPf REV2-1 ARY MANWAYS EPI REV21 l
MMV REVII-1 A MMV REV1-1 MMV REV2-1 4 MMV REV2-1 01-128 1B52-423IJ (Sf-8561) OPS RI R 01-1 28 1B52-42iF (Sf-856B) OPS F 01 1 28 1B52-424J (CC-738B) OPS R R 01-128 1852-424J (CC-738B) OPS 96 MMV REV4-1 1296 MMV REV4-1:
AG (0 VNSSB HX240 MM REVO-1)
PMT STROKE PtR IT 320 tRY CHARGING LINE ISOLATION R 01 -128 1B52424B (SI-8SOB) OPS I VR 01-128 1B52-4i1B (SI-850B) OP'
.1 MM REV1-1 C-I MM REV1-1 G (0 VNCSR W-13,A2 MM REVO-1)
R 01 -1 28 1B52-42jM (SI-871B) OPS I
'MR 01-128 1B52-423M (SI-871B) O0 AR 01-1 28 1B52-4h3C (SI-851B) OP,
' MR 01-128 1B52423C (Sl-851B) OF S-6050A IC REV3p1 IS S6050A IC REV3-1 TAG (O VNBI HX-481C MM REVO-2) v0-1 EVO-1 EVO-1 REV0-1 tEVO-1 REVO-1 ZEVO-1
'S REVO-1 REVO-1 S REVO-1 3451 0 T201682H Wcc HX-281C HANG TAG (O VNBI HX-281C MM REVO-2)
I 08MAY04 08MAY04 05:00 05:59 0
J
.I..I I_____
I I.........
Run Date 07MAY04 13:20 LT-03 STANDARD PUBLICATION Sheet 20 of 24
© Prmavera Systems, Inc.
FL-03 Execution Publication Set I
after 07MAY04 12:00 U1R28 WORKING SCHEDULE I
afleruiffmmusp
,i*~jj I
- 1 Ui I
RESEID I
DESCRIPTION IR1 ES I
E I
RSK M
MAY-
~
F RS P
Fri 7 IaI-Sun 9--
3461 1 T-7439-R wCC MR 01-128 I 480V MR 01-128 1B52-423M (Sl-871B) 1 08MAY04 08MAY04 06:00 06:59 0
347 1 T-7432-H WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1B52-422J (SI-8788) 07:00 07:59 ORT3-Y R-N 348 1 T-7435-R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 60 1B52-423C (Sl-851B) 07:00 07:59 349 1 T-8747-H WCC C-41 1 RDC C-41 EM REVO-1 1
08MAY04 08MAY04 DR-Y ML-Y 0
07:00 07:59 ORT3-Y R-N 350 1 T-7437-H WCC MR 01-128 1 480V MR 01-128 2
08MAY04 08MAY04 0
1 B52-423J (SI-870B) 07:00 08:59 351 1
T-0694-R WCC 0I-48A 1 LO 01-48A OPS 1
08MAY04 08MAY04 0
REVO01 08:00 08:59 352 1 T-8024-R WCC IWP 1 480V IWP 01-128-E-FN 1
08MAY04 08MAY04 0
(01-39) EM REVO-2 08:00 08:59 353 1 T-8188-H WCC TG-01-T 1 TL TG-01-T REV10-1 I
08MAY04 08MAY04 224 08:00 08:59 54 1 T-8694-R WCC WP I 480V IWP 01-128-E-FN I
08MAY04 08MAY04 832 (W-21A) CAUT REV1-1 08:00 08:59 355 1
T-7432-R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1t52-422J (SI-878B) 09:00 09:59 ORT3-Y R-N 356 1
T-7430-H WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1B52-422F (SI-878C) 10:00 10:59 ORT3-Y R-N 357 0 T201682R WCC HX-281C REMOVE TAG (0 VNBI 1
08MAY04 08MAY04 830 HX-281C MM REVO-2) 10:00 10:59 358 1 T-0479-H WCC Sl-844A I SI SI-844A IC REVO-1 2
08MAY04 08MAY04 DR-Y ML-Y 0
10:00 11:59 ORT3-N R-N 359 1 T-7437-R WCC MR 01-128 1 480V MR 01-128 2
OBMAY04 08MAY04 0
1952-423J (SI-870B) 10:00 11:59 360 1 T-7144-R WCC FM-03110 1 FW FM-3110 IC 1
08MAY04 08MAY04 287 REVO-1 11:00 11:59 361 1
T-7430-R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1B52-422F (SI-878C) 12:00 12:59 ORT3-Y R-N 362 1
T-7428-H WCC MR 01-128 1 480V MR 01-128 2
08MAY04 08MAY04 DR-Y ML-Y 0
1852-421M (SI-8608) 12:00 13:59 ORT3-Y R-N I
I I
II II II II II II II II II I
II I0 T-7439-R1 48 001743911 4 T-74324Hi 4 00174321 T-7435-Rl 4 00174351 T-8747-H j 001874711 T-7437-Hj 0017437w T-0694.-
0010694^
T-8024-RI 0018024 T-8188-1I 001818U T-8694-Rl 0018694 T-7432-4 0017432 T-7430.
00174 T201682 V MR 01-128 1B52-423M (SI-871B) C 0V MR 01-128 1B62.423M (SI-8718) 0V MR 01-128 1B32-422J (51-8789) 480V MR 01-128 1P52422J (SI-878B 10V MR 01 -128 1B52-423C (51-851 B)'
480V MR 01-128 1B152-423C (SI-851E DC C-41 EM REV-1 l
RDC C-41 EM REY0-1l I0V MR 01-128 1B52-423J (Sl-870B)
I 480V MR 01-128 1B52-423J (SI-87(
LO 01-48A OPS RV0-1l 1 LO 01-48A OPS REVO-1 480V IWP 01-128 E-FN (01-39) EM R' 1 480V IWP 01-124-E-FN (01-39) EM TU TG-01-T REV1I-1 1 TU TG-01-T REVIO-1 80V I 01-128*N (-21A)
CA I 480V IWP 01-128-E-FN (W-2tA) CAL 1 480V MR 01-128F1B52N422J (1-871 Ii 480V MR 01-128 1B52-422J (SI-8 11 480V MR 01-128 1B52-422F (Sl-S ti1 480V MR 01-128 1052-422F (SI-RREMOVE TAG (0 VNBI HX-281 C MI lDI I St SI-844A IC qEV0-1 J1 SI SI-844A IC REVO-1 RI 480V MR 01.128 1B52-423J (Sl-81
'7AI 480V MR 01-128 1B52-423J (S R1 FWFM-3110 1C REVO-1 14411 FW FM-3110 IC REVO-1 R1 480V MR 01-128 1B52-422F (SI-W, T43U1l 480V MR f1-128 1B52-422F i ji 480V MR 01-128 1B52-421M (51-8 T4201 480V MR 01-128 1852-421I ji 480V MR 01-12k 1B52-424C (SI-82 1744(11 480V Mq 01-128 1B52-424(
PS REVO-1 OPS REVO-1
)PS REVO-1 i OPS REV0-1 OPS REVO-1
) OPS REVO-1
)PS REVO-1 B) OPS REV0-'
-V0-2 pEV0-2 T REV1-1 UT REV1-1 B) OPS REVO-
- 88) OPS REV(
8C) OPS REVC 178C) OPS REI I REVO-2)
T-0479 00104 T-7437.
00174:
T.714 0017 T-7430.
001 T-7428-1 001 T-7440-0o 0B) OPS REVO
-8708) OPS RE 8C) OPS REVO SI-878C) OPS F
, (SI-825B) OPS 3631 1 T-7440-H wCC MR 01-128 1 480V MR 01-128 1B52-424C (S-8256) II 08MAY04 08MAY04 DR-Y ML-Y 13:00 13:59 ORT3-Y R-N 0
Run Date 07MAY04 13:20 LT.03 STANDARD PUBLICATION Sheet 21 of 24 a Pfmavera Systems, Inc.
I FL-03 Execution Publication Set I
after 07MAY04 12:00 I
U1R28 WORKING SCHEDULE arner uim/4?us#1.vIUu i iI MAY lUl ID lRESPl WO lIEQID DESCRIPTION lRD ES I
EF I
RISK MF Fri 7 I
Sat 8 I
Sun 9 SI I
I j
_I I
- I~~~~~~
~
~
~
~
2110 ltg>DZ I1I!
3641 1 T-8747-R wCC C-41 1 RDCC-41 EMREV0-1 1
08MAY04 08MAY04 DR-Y ML-Y 14:00 14:59 ORT3-Y R-N 441 365 0 T201992R WCC W-013A2 REMOVE TAG (0 1
08MAY04 08MAY04 826 VNCSR W-13A2 MM 14:00 14:59 366 1 T-7428-R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1B52-421M (SI-860B) 15:00 15:59 ORT3-Y R-N 367 1 T-7440-R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1B52-424C (SI-825S) 15:00 15:59 ORT3-Y R-N 368 1 T-0479-R WCC SI-844A 1 SI SI-844A IC REVO-1 1
08MAY04 08MAY04 DR-Y ML-Y 271 16:00 16:59 ORT3-Y R-N 369 1 T-0480-R WCC SI-844B 1 SI SI-844B IC REVO-1 1
08MAY04 08MAY04 287 16:00 16:59 370 1 T-2709-R WCC MS-2018 I MS MS-2018 MMV I
08MAY04 08MAY04 18 REVO-1 16:00 16:59 371 1
T-7429-H WCC MR 01-128 1 480V MR 01-128 1 08MAY04 08MAY04 DR-Y ML-Y 0
1852-422C (SI-8968) 16:00 16:59 ORT3-Y R-N W2 I T-8889-R WCC AF-104 I AF AF-104 MMV I
08MAY04 08MAY04 266 v"
REV3-1 16:00 16:59 373 1 T-7434-H WCC MR 01-128 1 480V MR 01-128 2
08MAY04 08MAY04 DR-Y ML-Y 0
1B52-422M (SI-860D) 16:00 17:59 ORT3-Y R-N 374 1
T-8887-R WCC SI-844A 1 SI SI-844A MMV 2
08MAY04 08MAY04 270 REV2-1 16:00 17:59 375 1 T-7429-R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1B52-422C (SI-8968) 18:00 18:59 ORT3-Y R-N 376 1 T-7427-H WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1852-421J (SI-866B) 19:00 19:59 ORT3-Y R-N 377 1 T-7434-R WCC MR 01-128 1 480V MR 01-128 2
08MAY04 08MAY04 DR-Y ML-Y 0
I B52-422M (SI-860D) 19:00 20:59 ORT3-Y R-N 378 1 T-7427-R WCC MR 01-128 1 480V MR 01-128 1
08MAY04 08MAY04 DR-Y ML-Y 0
1852-421J (SI-8668) 21:00 21:59 ORT3-Y R-N 379 1 T-0460-R WCC MS-5958 1 MS MS-5958 IC 2
08MAY04 08MAY04 0
REVO-1 22:00 23:59 380 1 T-7043-R WCC P-028A-M 1 CS P-28A-M EM I
09MAY04 09MAY04 DR-Y ML-Y 0
REVO-1 04:00 04:59 ORT3-Y R-N T2 T-7428-l T-7440-T-7429.
8747.RRDC C-41 EM REVO-1 i018747J1 RDC C.41 EM REVO-1 I
D1ss2RREMOVE TXG (O VNCSR W-t:
x1 480V MR 01-128`1B52-421M (SI-81 00174241 480V MR 01-128 1B52-4
~1 480V MR 01-12B 1B52-424C (SI-8 001744r11 480VMR01-128 1B52-4 T-0479-R1 SI S'-844A IC REV0.1 001047iE1 SI SI-844A IC REVO-1 T-0480-I St SI-"44B IC REVO-1 001048 Sl 51-844B IC REVO-1 T-2709-IRMS MhS2018 MMV REVC 001270q 1 MS 4S-2018 MMV RE' 1 480V MR 01-12, 1B52-422C (SI-81 001742911 480V MR 01-128 1B52 T-8889 1AF Ai-104 MMV REV3-1 001888l1 AF 4F-104 MMV REV3 1 480V MR 01-128 1852-422M (SI-81 001743451 480V MR 01-128 1B5 T-8887-I Si SIA444A MMV REV2.1 001888t%1 SI PI-844A MMV RE\\,
480V MR 01-128 1 B52-422C (Si-B!
00174291 480V MR 01-128 1E 480V MR 01-12P 1B52-421J (SI-81 001742711;480V MR 01-128 480V MR 014128 1B52-422M (SI-81 0017434N1 480V MR 01-12E 1 480V MR 01-12P 1 B52-421J (SI-81 0017427pi 480V MR 01-1 T.0460 RS MS-5958 1C 001044U1 MS MS-595 Tr-704-R 1 CS P-2F P-28A-M EM REVO-1 001704I Y-704741 CS P-2e P-28A-M EM REVI-1 00170471 T-7434-0 A2 MM REVO-1]
OB) OPS REVO 1M (SI-860B) C 5B) OPS REVO 24C (SI-825B) C 0-1 F0.1 6B) OPS REVO 422C (Sl-896B)
-422M (SI-8601 2-1
'68) OPS REVO 52-422C (SI-89(
- 68) OPS REVO 852-421J (SI4Y OD) OPS REVO 1B52-422M (Si 6B) OPS REVO 8 1B52-421J (S REVO-1 IIC REVO-1 A-M EM REVO-1 A-M EM REV1-1
.I T-7429-T-7427' T-7434-T-7427.
T-7047-H wCC P-028A-M I CS P-28A-M EM REV1-1 1
09MAY04 I 09MAY04 TDR-Y MI-04:00 04:59 ORT3-Y R-N a
Run Date 07MAY04 13:20 LT-03 STANDARD PUBLICATION Sheet 22 of 24 O Pnmavera Systems. Inc.
l FL-03 Execution Publication Set I
afterO7MAY04 12:00 U1R28 WORKING SCHEDULE I
arrer u/mA 7u4 ie:uu
- U ID lRESPl WO I EQID I
DESCRIPTION RDl ES EF FrRISK 7
SMtA8 Sun 9 ST_
P.1011214,16,18,21221 0. 2,*4.6.8.1012.14I1618,21122i 0.24.4 6.*8.10M1214,169 woT-94H60 1 R610 MA 1
3821 1 T-0964-H wcC 621AO1 I MRR 621A01 RMP 9302.1 EM REV0-I I
09MAY04 09MAY04 05:00 05:59 0
383 1 T-7451-H WCC MR 01.128 1 480V MR 01-128 1
09MAY04 09MAY04 0
1B52-425J (SI-857B) 06:00 06:59 384 1 T-7047-R WCC P-028A-M 1 CS P-28A-M EM 1
09MAY04 09MAY04 DR-Y ML-Y 77 REVI-1 09:00 09:59 ORT3-Y R-N 385 1 T-7451-R WCC MR 01-128 1 480V MR 01-128 1
09MAY04 09MAY04 1B52-425J (Sl-857B) 09:00 09:59 386 1 T-0677-H WCC ICP-10.24 1 ESF ICP-10.24 IC I
09MAY04 09MAY04 7g REVO-1 10:00 10:59 387 1 T-5946-R WCC MAIN 1 MS MAIN STEAM MMV 1 09MAY04 09MAY04 1
REVI-1 10:00 10:59 388 1 T-6820-H WCC LS-02376 1 MS LS-2376 IC REV2-1 1 09MAY04 09MAY04 50 10:00 10:59 389 1 T-7421-R WCC HX-001A 1 MS HX-IA WLU MMV 1 09MAY04 09MAY04 0
REV2-1 10:00 10:59 a90 I T-8170-H WCC TG-01-T 1 TLI TG-01-T REV9-1 1 09MAY04 09MAY04 DR-Y ML-Y 0
OwC 10:00 10:59 ORT3-Y R-N 391 1 T-8376-H WCC FD-196A 1 MS FD-196A CE I
09MAY04 09MAY04 DR-Y ML-Y 0
REV2-1 10:00 10:59 ORT3-Y R-N 392 1 T-8377-R WCC FD-196A 1 MS FD-196A CE 1 09MAY04 09MAY04 DR-Y ML.-Y 0
REV1-1 10:00 10:59 ORT3-Y R-N 393 1 T-8752-H WCC CS-38C I CS CS-38C MM 1 09MAY04 09MAY04 DR-Y ML-Y 0
REV2-1 10:00 10:59 ORT3-Y R-N 394 1 T-8753-R WCC CS-38C I CS CS-38C MM I
09MAY04 09MAY04 DR-Y ML-Y 50 REV1-1 10:00 10:59 ORT3-Y R-N 395 1 T-8867-H WCC HX-1B 1 MS HX-IB WLU MMV 1 09MAY04 09MAY04 REV3-1 10:00 10:59 396 1 T-8868-H WCC HX.1A I MS HX-1A WLU MMV 1 09MAY04 09MAY04 REV3-1 10:00 10:59 397 1 T-8893-R WCC TG-01.T I TU TG01-T REV8.2-1 I
09MAY04 09MAY04 805 10:00 10:59 398 1 T-5947-H WCC MAIN 1 MS MAIN STEAM MMV 2 09MAY04 09MAY04 DR-N ML.-N REV2-1 10:00 11:59 ORT3-N R-N 1MRR 62AO1 RI I
T-7451-I 480V MF 01-128 1B52-425 I
T-7451-1 48qV MR 01-128 1852 I
i T.0964-H1l MRR 621A01 RMP 93 AP 9302.1 EM REV0-1 00109641 1I 480V MR 01-12B 1B52-425J (SI-8!
(SI-857M) OPS RV0.1 00174511 T-7047-RI CS P-21 1 CS P-28A-M EM REV1-1 001704, R1 480V MR 01-120 1B52-425J (51-8 425J (Si-857B) OPS REV0-10017451 TL06774H1 ESF ICP 1 ESF ICP-10.24 IC REVG-1 001 06 T.5946.R1 MS MAIN STEJ S MAIN STEAM MMV REV11 00159 IT-68204H1 MS LS I MS LS-2374 IC REV2.100168:
T-7481-R 1 MS HX-IA W MS HX-1A WLU MMV REV2-100174:
T-8170-H TU I TU TG41-T REV9-1 00181' T-837640 MS FD-.
1 MS FD.196ACE REV2-100183 T.8377.Rl MS FD.
'T-8752411 CS CS.
I CS CS-38C kM REV2.1 0018T
- T-8753-R1 CS CS 1 CS CS-38C MM REVi1 001 87 T.8867.I MS HX-.B WV MS HX-1B WLU MviV REV3-1 001588 T-888.-14 MS HX.-A W MS HX-IA WLU MM'V REV3-1 001881 T-8893-R1 TU T 1 TU TG-011T REV8.2-100188' T.5947'rH1 MS MAIN STEi S MAIN STEAM MMV REV2-1 00159.
- T-5949-HI1 D T 1 FD T-23 N4MV REV2.1 00159, L
12-1 EM REVO-1 7B) OPS REVO AM EM REV1.1 1B) OPS REVO 10.24 IC REVO-71 M MMV REVI-1 2376 IC REV2-U MMV REV2-I ii rG-01-T REV9-D6A CE REV2-1 96A CE REVI.1 18C MM REV2-IBC MM REVI-
.U MMV REV3-71 U MMV REV3.1
- -01-T REV8.2-M MMV REV2.1 7E Z3 MMV REV2-go 3991 1 T-5949-H wCC T-23 1 FD T-23 MMV REV2-11 2 09MAY04 09MAY04 10
- 00 11:59 a
Run Date 07MAY04 13:20l LT-03 STANDARD PUBLICATION Sheet 23 of 24 O Primavera Systems, Inc.
i FL-03 Execution Publication Set I
after 07MAY04 12:00 I U1R28 WORKING SCHEDULE I
after uIMAYU4 7Z:UU
- iUl ID lRESPl WO EOID l
DESCRIPTION RDl ES EF I
RISK MF MAY ST II 7
1 1 S
400 I
T-7422-R WCC HX-001B I MS HX-1B WLU MMV 1 09MAY04 09MAY04 0
TT4 W
MV REV2 REV2-1 11 00 11:59 1 MS HX.1B WU MMV REV2-10017122!
401 1
T-8293-H WCC HX-1B 1 MS HX 18 SMP OPS I
09MAY04 09MAY04 DR-Y ML-Y 0
T-8293-H1 MS HX-1B S MP OPS REVI-REVI1-1100 1159 ORT3-Y R-N 1MS HX-1B SMPOPS REV-1.0018 293 402 1
T-8376-R WCC FD-196A 1 MS FD-196A CE 1
09MAY04 09MAY04 DR-Y ML-Y 50 so8376R1 MS FD. sA CE REV2.1 REV2.1 11:00 11:59 ORT3-Y R-N 1 MS FD-196A CE REV2-1001817 403 1
T-8867-R WCC HX-1B I MS HX-1 B WLU MMV I
09MAY04 09MAY04 0
T4867.Rl MS HX-1 B w LU MMV REV3-REV3-1 11:00 11:59 1 MSHX-1BWLUMWMVREV3.10018 3671 404 1
T-8868-R WCC HX-1A I MS HX-1A WLU MMV 1
09MAY04 09MAY04 0_
T-8888-R1 MS HX-1A % U MMV REV3-1 REV3-1 11:00 11:59 1 MS HX-1A WwL IMV REV3-1 0018 564 405 1
T-8930-H WCCI HX-1A 1 MS HX-1A SMP OPS 1
09MAY04 09MAY04 0
T.8910-1H1 MS HX-1A S P OPS REVi.1 REV1-1 11:00 11:59 1 MS HX.1A SMPOPS REV-1.0018 301 406 1
T-0964-R WCC 621A01 1 MRR 62A01 RMP 1
09MAY04 09MAY04 DR.Y ML-Y 64 T-0964.R1 MhR 6VA01 RMP 93 2-1 EM REV0-1 9302.1 EM REVO-1 12:00 12:59 ORT3-Y R-N 1 MRR 621A01 RMP 930t-1 EM REV0-1 001 964 407 1
T-5947-R WCC MAIN I MS MAIN STEAM MMV I 09MAY04 09MAY04 49 T-594fRl MS MAIN STEiM MMV REV2.
REV2-1 12:00 12:59 1 MS MAIN STEAM MMV REV2-1 001 9471 898 1 T-5948-R WCC T-23 1 FD T-23 MMV REV1-1 1
09MAY04 09MAY04 49 T-5948.R 1 FD T23 MMV REV1-12:00 12:59 I FD T-23 MMV REV1-1 001594U 409 1
T-5949-R WCC T-23 1 FD T-23 MMV REV2-1 4
09MAY04 09MAY04 311 1 T-5949-R1 FD TZ3 MMV REV2.
12:00 15:59 1 FDT-23MMVREV2-1001 949 410 1
T.8293-R WCC HX-1B 1 MS HX-1B SMP OPS 1
09MAY04 09MAY04 DR-Y ML-Y 243 T828A3.R1 MS HX-lB SIP OPS REV1-REVI-1 15:00 15:59 ORT3-Y R-N 1 MS HX-1q SMP OPS REV1L0018293 411 1
T-8930-R WCC HX-1A 1 MS HX-1A SMP OPS 1
09MAY04 09MAY04 139 T4970-Rl MS HX-A P O REV1 REV1-1 15:00 15:59 1 MS HX-lA SMP OPS REV1- 001 893d!
Run Date 07MAY04 13:20 LT-03 STANDARD PUBLICATION Sheet 24 of 24 O Pdrmavera Systems, Inc.
FL-03 Execution Publication Set
Run Date 07MAY04 13:361 Work Activity Risk Assignment I
Sheet lot 2 U
ACT ID WO GRPI MA'(
HPE RISK EQUIPMENT Activity Descriptlon Cal I DUR START I FINISH 66,Fri 7, Sat 8 Sun9-1 Mon-10,TuejjL.Wed-12 -thuAj1LftL14jSe
- a1 ID Id4 n-f 24)40 nl C.4.)4i n4f.
4__-jt~r.)4 jd
- n. o 4-
-flC
- 4. 4 nK C.r wjiJ f. G tioiO n. it I -
I I
I I
I",
I I 1-ww w ll_lXA V.
w I
CE1600ROOI 21 1 CE8 I DR-Y ML-Y ORT3-Y R-M R-1 MOBILIZE REPAIR CREW.
TRAINING AND BADGING II 29 03MAY04 j 08MAY04 12:00A 16:59 0213476 I
CE1600R005 21 1 CE8 I DR-Y ML-Y ORT3-Y R-M R-1 OFF-LOAD REPAIR EQUIPMENT AND MOVE 1 1 4 05MAY04 07MAY04 1:OOA 15:59 p213476 1
CEI600R014 75 CE8 DR-Y ML-Y R-1 P-26/32/33 THERMAL 1
2 07MAY04 07MAY04 ORT3-Y R-M SLEEVE REMOVAL PRE-JOB 14:00 15:59 1
CEI600RO15 75 CE8 DR-Y ML-Y R-1 P-26/3233 -REMOVE 1
24 07MAY04 08MAY04 ORT3-Y R-M THERMAL SLEEVES 16:00' 15:59 1
CE1600R020 21 CE8 DR-Y ML-Y R-1 PERFORM ULTRASONIC 1
12 08MAY04 09MAY04 ORT3-Y R-M TESTS ON OPEN HOUSINGS 16:00' 03:59 1
CE1600R025 21 CE8 DR-Y ML-Y R-1 PERFORM REPAIR OF HEAD l 1 96 09MAY04 13MAY04 ORT3-Y R-M PENETRATION 26 04:00 03:59 REACTOR VESSEL AND ASSEMBLY 128CE REACTOR VESSEL AND ASSEMBLY lREACTOR VESSEL AND ASSEMBLY 0213475 - 128CE REACTOR VESSEL AND ASSEMBLY 02134750- 128CE 1MREACTOR VESSEL AND ASSEMBLY 0213476 - 128CE
-_R A
REACTOR VESSE 0213476 - 128CE OREACTOR VESSEL AND ASSEMBLY 0213475 - 128CE LAN I
CE1600R018 75 CE8 DR-Y ML-Y ORT3-Y R-M R-1 PERFORM WELD SAMPLES ON SLEEVE SAMPLES 1
10 09MAY04 09MAY04 10:00' 19:59 I
XE
- l. Iw ^:
3~
I EM0216638A 76 EM DR-N ML-N P-001B-M PlB RE-ASSEMBLY OF I1 66 01MAY04 10MAY04 REACTOR COOLANT PUMP MOTOR I
ORT3-N R-M MOTOR 17:OOA 05:59 0301756 12BEM 2
EM0305133 76 EM DR-N ML-N U2B-UV TEST U2 TRAINB 1
1 07MAY04 07MAY04 RAIN B 4.16 KV AND 480 VSWITCHGEAR RELAY TEST ORT3-N R-M RELAYS UNDERVOLTAGE AND 10:OOA 12:59 305133 - B07A2 I
EM0305450 76 EM DR-N ML-N C-703.
C-703 CLEAN AND INSPECT 1
5 07MAY04 07MAY04
_IP.37D DC EMERGENCY LO PUMP START CONTROL PANEL ORT3-N R-M P-037D CONTROL PANEL 12:00-16:59 305450 - 128EM 2
EM0305128 76 EM DR-N ML-N U2A-UV TEST U2 TRAIN A 1
3 07MAY04 07MAY04
]TRAIN A 4.16 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS UNDERVOLTAGE AND 13:00' 15:59 0305128 - B07A2 z-
22 106MAY04 09MAY04 BINE VALVE CAULBRATIONIFUNCTIONAL TEST OF TR I ORT3-N R-M lVALVE STROKE 06:OOA 11:59 0300976 1281C I
IC4.39TEST 76 IC5 DR-NML-Y 1ICP-04.039-1 1CP 4.39-1 GOVERNORISTOP 5
6 09MAY04 10MAY04 C=TURBINE VALVE CAUBRATIONIFUNCTIONAL TES l
lORT3-N R-M lVALVE STROKE TEST 12:00 06:59 0300976 - 1281C lltifXlf:wtlllet^[ilL~I Ma ltl Uli~~ 1 -1.1 j M..
Im
~
1 MMI600RO17 75 MMI. DR-YML-Y R-1 MACHINE WELDABILITY 1
0 08MAY04 09MAY04
[CREACTORVESSELANDASSEMBLY ORT3-Y R-M SAMPLES FROM SLEEVES I. l 2000' 0559 0213475 - 128MM
!-f~~iu
!J
!- i!.*-
- &tj 1
MM0303681B 76 MMV DR-YML-Y MS-02010 IMS-2010-RE-INSTALL 1
4 05MAY04 407MAY04 HX-1A SG HEADER SAFETY I
ORT3-N R-M VALVE AFTER MOD 18:OOA 1559 303681 128MM 1
MM0303680B 76 MMV DR-YML-Y MS-02005 IlMS-2005 - REINSTALL 1
3 06MAY04 07MAY04 HX-IBSGHEADERSAFETY ORT3-N R-M VALVE AND MACHINE 19:00A 14:59 03036f
- 128MM o l OP0211062 177 1OPO DR-N ML-N O-IT-0007D IT-07D. P-32D SERVICE 1
2 08MAY04 08MAY041 OP-32D SERVICE WATER PUMP TEST ORT3-NR-M l lWATER PUMP l 12:00*
13:59 0211062 - B07A2 NMCI/WVfE ILT-81 HUMAN ERROR RISK BARCHART Ss I
FL-81 HUMAN ERROR POTENTIAL i
l PBNP U1 Refueling 28 Outage.I O Primavera Systems. Inc.
I
Run Date 07MAY04 13:361 Work Activity Risk Assignment I
Sheet 2 of,2 Run ate 7MAY4 13361 heet2MAY U
ACT IWO GRP HPE EQUIPMENT Activity Cal DUR START FiNISH 13 4
oID ST RISK Description ID
___________ ___n____________
0 OP0211070 77 OP DR-N ML-N O-IT-0007E IT-07E. P-32E SERVICE 1
2 08MAY04 08MAY04 0P-32E SERVICE WATER PUMP TEST I _
ORT3-N R-M WATER PUMP 14:00-15:59 0211070 - 807A2 0
OP0301061 77 OPO DR-N ML-N O-IT-0007F IT-07F. P-32F SERVICE 1
2 08MAY04 08MAY04
[P-32F SERVICE WATER PUMP TEST ORT3-N R-M WATER PUMP 16:00 17:59 0301061 - 1307A2 0
OP0301281 77 OPO DR-N ML-N 0-IT-0007G IT-07G, SERVICE WATER 1
4 08MAY04 08MAY04 OSERVICE WATER MOV TESTING ORT3-N R-M MOV TESTING 18:00 21:59 0301281 EA- _ ___
1 Y04RECOVER OPS DR-N ML-N Y04 FINAL RECOVERY FROM 1
6 07MAY04 08MAY04 O
ORT3-N R-M 1Y-04 OUTAGE 19:00 00:59 1280P I
B42RESTORE OPS DR-N ML-N B-42 RESTORE 1B-42 PER IWP 1
3 07MAY04 07MAY04 I
I ORT3-N R-M 01-128 E-BR 21:00 23:59 1280P 2
AC-381E-5A OPS DR-N ML-N G-01 ENTER TSAC 3.8.1.E FOR A 1
0 08MAY04 ORT3-N R-M TRAIN D/G OOS 21:00 1280P 1
01-128-B 76 OPS DR-N ML-N P-015B FILL & VENT P-015B HHSI PP 1
4 08MAY04 09MAY04 ISAFETY INJECTION PUMP ORT3-N R-M PER 01-128 (PARTIAL) 22:00 01:59 0408036 - 1280P 1
SOP.B41B OPS DR-N ML-N B-41 DE-ENERGIZE 1B-41 PER 6
2 08MAY04 08MAY04 a
ORT3-N R-M 1-SOP-480-B02 22:00 23:59 1280P I
SOP-B41C OPS DR-N ML-N B-41 RE-ENERGIZE lB41 PER 6
2 09MAY04 09MAY04 0
ORT3-N R-M 1-SOP-480-B02 01:00 02:59 1280P 1
OP0408036 76 OPS DR-N ML-N P-015B P-15B PMT PER IT-01A 1
4 09MAY04 09MAY04 ESAFETY INJECTION PUMP ORT3-N R-M 02:00 05:59 0408036 - 1280P 1
IT-530D 77 OPS DR-N ML-N O-IT-0530D LRPM & PIGGYBACK TEST 1
8 09MAY04 09MAY04 IRLRPM PROGRAM TRAIN B HHSI AND RHR PIGGYBACK ORT3-N R-M OF TRAIN B Si 10:00 17:59 0215917 - 1280P
.N__ _MC I WE LT-81 HUMAN ERROR RISK BARCHART r
PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL Cl Prlmavera Systems, Inc.