ML051940636

From kanterella
Jump to navigation Jump to search
U1R28 OCC Interactive Turnover
ML051940636
Person / Time
Site: Point Beach 
Issue date: 05/03/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051940636 (39)


Text

Connaitted to Nuclear E V OF

?C~lif emuC

  • UIR28 Point Beach Nuclear Plant U1R28.

OCC Interactive Turnover Meeting Agenda Monday, May 3,2004 Start Time:

1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer/ Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Line Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)
5. Maintenance Coordinator Turnover (MOC)
6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule Iw wtmabon in tNs record was deleted in a rdanc Ith th Fivedom of Iknormabonw Ac~~e FmA4iA-SO' 1

Communication is the key...

Ineffective communications have played a major part during this outage. Consequently, we have made numerous errors, had poor coordination and cooperation, low productivity, and unclear direction.

As a result, site management has decided to take a graded approach to communications.

A communication color code has and will continue to be implemented throughout the remainder of the outage. The color code will indicate the importance and timeliness of communicating to all employees and personnel onsite.

A RED level communication would represent an urgent, prompt dissemination of the information. The leadership team has two options from RED level communications:

1. Calling all employees out of the field to discuss the issue.
2. Managers/Supervisors going out to employee's job-site to communicate the issue.

A Y E LLONN' level communication would represent important information that must be communicated to all onsite personnel prior to the end of the shift.

A GREEN level communication would contain information that can be communicated at the next turnover meeting or at a daily briefing.

Only the Site Vice-President, Site Director, Plant Manager, or their designee can determine if an issue needs to be communicated at the RED level.

It is important to note that all RED level communications need to have all personnel sign the briefing sheet, QF-1 060-02 Rev.l. A completed briefing sheet needs to be returned to the OCC.

Also, if a RED level communication is issued site-wide, ALL departments are required to brief employees on the issue, no exceptions. Managers/Supervisors are required to brief personnel absent as soon as they return to work on the issue. Employees assigned to outage jobs will attend the RED level communication briefings with the group they are working with.

2

IPTE Briefings (May 3, 2004)

NP 1.2.6, Infrequently Performed Tests or Evolutions, states that the Senior Line Manager performs pre-evolution and pre-shift briefings for IPTEs for procedures designated as requiring Senior Line Management briefings. It further defines Senior Line Manager as "Plant Manager, group head or designee, as appropriate."

For upcoming IPTEs, the line manager with responsibility for the guiding procedure, test, etc. will be accountable for conducting, or designating the appropriate person, for the associated pre-evolution and pre-shift briefings.

3

Cornnsitted to Nuclear Excenc O

JfU11EY OF P0lm BEIIC

  • 111111 Point Beach Nuclear Plant U1R28 Refueling Outage Safety Topics for week of May 2-8,2004 Theme for the week This week's theme Is Hand Protection. During the last week of April, there were a lot of minor hand injuries reported. Although we have come a long way in the last few years, we still have not eliminated hand injuries. It is time we hand protection to the next level.

Daily Safety Snippets Sunday

'It's difficult to grip when your finger gets snipped" Could you imagine doing your job without your hands? We tend to take it too much for granted that we have two hands at our command, immediately ready to do what we want them to. They not only perform amazing manual tasks, but they also make us money. Just ask anyone who has lost the use of his or her hands.

Monday 1Concerninl fingersa do not Ifnore: Cut one off and pou'll rrow no anore" Limmerk 1999, While lowering a 20001b. flow diffuser from the high pressure turbine, a worker lost a substantial portion of one finger when the cribbing and jack used to support the diffuser failed and pinned the worker's hand between the diffuser and an I-beam used as part of the cribbing.

Tuesday "Safety gloves worn is a hand not torn" OE12632 Davis Besse, While performing a search, a security officer ran his hand between the front and back seat of a vehicle. A utility knife with the blade partially open cut the leather outer covering of the search glove, but the Kevlar liner gloves the officer had on protected his hand and prevented a serious injury.

Wednesday "Where danger lingers, watch Your fingers" Workers need to know accidents can happen in the strangest ways. Some accidents are simply bizarre. Others happen when no hazard is apparent. Doors were the source of more than 10,000 hand injuries a year in the US. Vending machines caused more than 100 lost-day hand injuries.

And 52 workers Injured their hands while walking, according to the statistics.

Thursday "Practice safety until It fits like a glove" Do you consider gloves as much a part of your normal PPE as your hardhat, safety glasses, and hearing protection? If not, maybe you should be. Always carry a pair of gloves with you when in the plant and use them when operating the valve or picking up scrap metal.

Fridav "A finger tip - don't leave work without theml" On April 4, 2001, a contract employee at Braidwood Station suffered a fractured right hand when an electric hoist disengaged from a crane hook and fell on to the new fuel storage rack. The electric hoist was being used to drag test new spent fuel racks being Installed at the station. Workers attached a load cell and the electric hoist to the auxiliary hoist of the fuel building overhead crane, and then connected the electric hoist to a test gage. As the crane operator lowered the auxiliary hook, the test gage hung up on the fuel rack and caused the rigging to move laterally. The electric hoist became disengaged because the safety latch on the auxiliary hook was not used.

Saturday "It's no hand live... Proper gloves protect all five" OSHA 1910.138(a): General requirements. Employers shall select and require employees to use appropriate hand protection when employees' hands are exposed to hazards such as those from skin absorption of harmful substances; severe cuts or lacerations; severe abrasions; punctures; chemical burns; thermal bums; and harmful temperature extremes.

4

Point Beach Nuclear Plant Outage 1R28 DAY Supporting Operational Excellence 29

  • Path

_ S-Picture Meets A

Outacie Radiation Performance nnaen'* MKAg EXVrAAAQ I

I I

l 0

- La.

1!*L_

j.;@^.t.

This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Meets:

<=75 Rem Actual Cum.

Exceeds:

<=71 Rem Dose:

49.604 Rem Day z2 - May 2 Actual = 1.478 Cumulative = 49.604 Cumulative Forecast = 55.988 Daily dose and PCE goals reforecasted on 4/23.

Meets: <= 18 Exceeds: <= 12 Actual PCE's:

6 7-

=

0e 0

Stu Thomas I

Personnel Contamination Events Cummulative Dose Exposure 20 18 3 16 lu 14 0

x 12 E

l10 0i'8 0

0 6 EE 4

2 0

E it 0

0 0) to 0

~~~~~..

_. I.. ___ _

i 40 C

I 20 2

z1 0 2 4 6 8 1012141618202224262830323436384042

--- *Actual

~GGoal 0 2 4 6 8101214161820222426283032343638404244464850

n NMuEce comwmitted to Nuclear Excellec Outage Status Report Plant:

Point Beach Unit 1 Day:

Monday Today's Date / Time:

5/03/04 1500 Outage Duration: Day 30 OfRefueling OutageNumber UIR28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Significant near misses 0

Total for this outage I

Summary:

Radiological Dose to date 49.604 Projected to date

  • 55.988 Outage Goal s75 R Difference

-6.384 Number of PCEs 6

Summary:

  • Reforecast on 4/23 Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary:

Plant Status Mode:

Cl Hot Standby (Mode 3)

Q Hot Shutdown (Mode 4) a Cold Shutdown (Mode5) 3 Refueling Shutdown (Mode 6)

RCS:

Temperature:

83 Pressure:

Vented to Atmosphere RV Level:

Refueling Height Time to Boil:

32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> Shutdown Safety Assessment Protected Equipment:

Major Activities Completed in Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)

  • Fuel Motion and Insert Shuffle
  • Close RHR B Loop Work Window
  • Core Map and Baffle Inspection
  • Start RHR A Loop Work Window
  • B Train RHR Testing
  • MOB Packages IWP-037-02 & IWP-037-07
  • IB RCP Motor Work
  • IP-15B SI Pump Seal Repair Significant Outstanding Issues Date Issue Due Responsibility 4/25/04 lB RCP Motor Oil 5/10/04 Rick Repshas 4/28/04 1 W-3B Shroud Fan Backdrafl Damper FME 5/09/04 Terry Guay 5/2/04 IP-15B SI Pump Seal Leak 5/03/04 Mike Pajewski Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Date Time Date Time Date Time Date Time Cooldown <2000 4/03/04 _2100 4/03/04 2230 RCS Fill & Vent 4/23/04 1500 Head Lift 4/09/04 0900 4/21/04 1550 Heatup >2000 4/25/04 0900 Refueled 4/14/04 0300 5/02/04 1848 Reactor Critical 4/28/04 0800 RV Headset 4/18/04 1900 1On-Line 4/30/04 0100 6

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

May 3, 2004 TIME:

Q I wOO

>5Igfl q

KEY SAFETY FUNCTIONS REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN YELLOW GREEN N/A PROTECTED EQUIPMENT:

COMMENTS:

RCS Time to Boil is 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> Fire Protection Condition IV: Credit is taken for fire rounds as fire prevention contingency PBF-I 562 Revision 2 10/30/02 7

Page 5 of 9

References:

NP 10.3.6 NP 10.2.1

__Defined Critical Path IIMAY--

U ID DESCRIPTION OD RD Cal U SYS EOID TF 3

4 I

1 I

I_

4.6.8.l01l2.14,6,18,2O02210.2.4.6.8.1O,12.14.16,18.2O.2210.2.4.6.8.1012,14.16.18.2O2 E [ I_**

fi _ial-K ! ! ! !-

1I CEI600ROO MOBILIZE REPAIR CREW.

91 91 1 1 RC R-1 0

CEI600R00 UOBILIZE REPAIR CREW. TRAINING AND BADGING

]

TRAINING AND BADGING I MAY04 12:0 I

CEI600R010 SETUP EQUIPMENT FOR 24 24 1 1

RC R-1 CEI600Ra1 OSETUP EQUIPMENT FOR CUTTING THERMAL SLEEVE I _

CUTTING THERMAL SLEEVE

_ J_

0213476- 06MAY04 06:5905MAY04 07:00-Run Date 03MAY04 13:561 LT-16 DEFINED CRmCAL PATH l

Sheet 1 of 1 0 Prlmavera Systems Inc

~

FL-16 DEFINED CRITICAL PATH SET I

after 03MA Y04 12:00 7

U1R28 WORKING SCHEDULE J

after O3MA Y04 12:00 Z

ul MAY to AP0215132 RESP APM WO ST 71 EQID C-039 1

DESCRIPTION CALIBRATE THE MW TRANSDUCER TO EH CONTROL PANEL CAL lA-Oi NON-TECH SPEC RCP RELAYS RD 4

ES 04MAY04 08:00 EF RISK MF Ttie 4 0n* 2. A. S.* R.10121.1 b.11 04MAY04 DR-N ML-N 1 164 11:59 ORT3-NR-N Wed 5

.2. 4. 6. R.10i12.14.16.1 1IA-14.16 KV BUS 1512018-03CJ WW480V !

AP0215132S'LIBRATETHE MWTRANSDUCER TO 4H CONTROL PA 0215132l_TURBINE ELEqTRO-IYDRAULIC IONTROL PANEL 2

1 I AP02I151 1 A

76 A-01 1

30APR04 03MAY04 DR-N MIL-N

_ 08:00A 1 12:59 1 ORT3-N R-N 13 3

1 AP0215120 APR 76 8-03 18-03 CALIBRATE TECH 5

03MAY04 03MAY04 DR-N ML-N 9

SPEC RELAYS 1O00A 16:59 ORT3-N R-N 4

0 TRIPIll APR F52-111 F52-111 PERFORM 5

04MAY04 04MAY04 DR-N ML-N 0

CONT. CKT. AND TRIP 1200' 16:59 ORT3-N R-N TESTING 5

1 AP021511 8 APR 76 A-02 1A-02CALIBRATETECH 30 05MAY04 OBMAY04 DR-N ML-N 0

SPEC RELAYS 08:00-1k159 ORT3-N R-N S

  • 1 110t 6

0 L11100S APS F52-111 LINE 111 OUTOF 34-03MAY04 04MAY04 DR-N ML-N 0

SERVICE

0700A, 21:59 ORT3-N R-N 7

0 l F52111 APS F52-111 F52-111 PERFORM 6

03MAY04 04MAY04 DR-N ML-N 3

BREAKER 1000A 08:59 ORT3-N R-N l

l__

l

__A MAINTENANCE APO:

APO:I pI NON-TECH SPEC

`WITCHGEAR 021 5 JJBRATE TECH SP AFEGUARDS LOAE TRI RCP RELAYS 1 5 kC RELAYS CENTER0215120 p111F52-111 PERFt INl LillbOSUNE 111 6UT OF SERVICE

  • ~l iilm RM CONT. CKT. Al AP02151181 02151189 HING UNE I1I IN -

I ULATED BY PPCS D TRIP TESTIN(

Ik02 CALIBRATI I

F521 I1F52-111 PEqFORMBREAKERM r_

I q

I _;-

17 UJNTEN4ANCE LIIIISISWITC 8

A 0

  • 111SI APS F52-111 SWITCHING UNE 11 IN PBNP YARD VERIFY RTO AS CALCULATED BY PPCS 4

04MAY04 I 04MAY04 I DR-N ML-N 17:00-21:59 I ORT3N R-N 557 IBNP YARD' 9

2 BM0300121 BMS 77 RE-PC 46.1 1

04MAY04 I 04MAY04 I DR-N ML-N 08:00-08:59 ORT3-N R-N 158 BM0300121 VPRIFY RTO AS CAL' 0300121 [CALORIMETRIC 10 I 0 Siuvjou.4 I CEI 76 INTAKE CRI INSPECT CRIB. INSTALL I 30 05APR04 06MAY04 DR-Y M6-Y 213 BUOYS AND FISH t0:OOA 11:59 ORT3-Y R-N ZE0106041 INSPECt CRIB, INSTALL BUIlYS AND FISH 11 I

CEDIVINSP CEI 76 CW UNDERWATER 21APRO4 104MAY04 DR-YML-Y I

0 INSPECTION OF CIRC 09.OCIA M.59 ORT3-N R-N I

WATER 11 w-AW001IM0 NXII #ZW1 12 1

CE44CGATR CE3 1 17 IST-SISI lp REM INSUL FOR FAC 145 04APR04 IIMAY04 DR-Y ML-Y 0

ROG-CTMT44FTGEN 16.OOA 16:59 ORT3-Y R-N I

AREA T3--

E08TOHTI IST-SISI REINSULATE - FAC 10 20APRO4 03MAY04 DR-Y ML-Y

-15 PROG - TURB HALL 8 FT 15-OM 21:59 ORT3--Y R-N OVERHD NSpUNDE ATER INSPECTIo OF CIRC WATER CE w

SYSTEM MUl n AND/OR NON-NU BERED EUIF CE4 GATR REM ISU FOR FAC PRO -CTr 44 FT GEq AREA I

_ l I-t I

%C" I 't¶I I

%iEai I I IQ I -0Ia1 ru1INbULI I r E r PROG - TRB HALL 26 FT GEN AREA 1U 1W0rMU4 I WMMILIY4 Ur-i MLvT 09:OOA 21:59 ORT3-Y R-N 4t.

E0 0 rREINSU TE -FAC PROG-SECONDARY INSI CE2 GAlREINSU TE-FAC PROG -

SECONDARY INSI

'12 NDEIISI -

PLACE INSUL -Pi AFW FROM CC P124 NDElISI -

LACE INSUL. SU FFED'.W TURB HALL 6 FT o0 RVICE INSPECTIOI MB HALL 26 FT GE RVICE INSPECTICO

'ING NEAR FW-476 NT ISOLATION VAL

'PORTS NEAR FW-

,TER CONT ISOLVi ERHD' 0303636 4 AREA 0303636

'B ESTO FW HEADEF T6BB LVES TO STEAM GI

  • s nqqsA T

onq 7n 15 110I 1

rLZ14-II 91=

II PIPING EB-NDEnSI - REPLACE 11 30APR04 03MAY04 DR-Y ML-Y INSUL-PIPING NEAR 111:OOA 23:59 ORT3-Y R-N FW-476BB jq:..

435~

16 1VT P1246-TI CE3 77 1 PIPING EB-NDEAiSI - REPLACE 15 1 30APR04 I 04MAY04 I DR-Y ML-Y I

a I

NSU._ SUPPORTS NEAR 11:00A 03:59 ORT3-Y R-N FW -476B B

_ I _ _ _

0303877 7NERATORS030 I

Run Date 03MAY04 13:481 LT-03 STANDARD PUBLICATION l

Sheet 1 of 29 I Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after O3MAY04 12.00 l

U1R28 WORKING SCHEDULE j

after O3MA Y04 12:00

  1. t U

ID RESP Wo ST MAY EQID DESCRIPnION RD ES EF RISK MF U

473

_Mon 3 R.10 12,14.16 17 1 l CE44TGATRX I CE3 77 IST.SISI REM INSUL FOR FAC 1o o 01 MAY04 03MAY04 DR-Y ML-Y PROG-TRB HALL 44FT I 10:OOA 21:59 ORT3-Y R-N GEN AREA I

CE4*rGATRXREM K -

18 1 CE30000TI P1:<

1 7t TP

^4 T

CE3 7b IU-u01-ENCAPSULATE INSULATION ON HP TURBINE COVER 10 01MAY04 03MAY04 DR-Y ML-Y 12:00A 21:59 ORT3-Y R-N 36 CE3-;

19 1

CE214113TI CE3 76 MS-02719 INSTAL LINSULATION 6

03MAY04 03MAY04 DR-Y ML-Y 29 FOR MS-2719 12:00 17:59 ORT3-Y R-N 20 1

CE214523T1 CE3 87 HX-020B FW HEATER 4B -

6 03MAY04 03MAY04 DR-Y ML-Y 289 REINSTALL SHELL 12:00 17:59 ORT3-Y R-N INSULATION 21 1

CE310576T1 CE3 82 RD-05975 INSTALL INSULATION 8

03MAY04 03MAY04 DR-Y ML-Y 0

FOR 1RD-5975 12:00 19:59 ORT3-N R-N 22 1

CE44TOHTI CE3 77 IST-SISI REINSULATE-FAC 8

03MAY04 03MAY04 DR-Y ML-Y o

PROG - TURB HALL 44 12:00 19:59 ORT3-Y R-N FT OVERHD 23 1

CE214522TI CE3 77 HX-020A FW HEATER 4A-I1 03MAY04 03MAY04 DR-Y ML-Y 285 REINSTALL SHELL 12:00 21:59 ORT3-Y R-N INSULATION 24 1

CE216332TI CE3 76 FD-00204B INSTALL INSULATION 1 0 03MAY04 03MAY04 DR-Y ML-Y 345 FOR 1FD-204B 1Z:00 21:59 ORT3-Y R-N 25 1

CE937804TR CE3 76 PIT-02745A REMOVE INSULATION 4

03MAY04 03MAY04 DR-Y ML-Y 6

A 1PIT-2745A8B 17.00 20:59 ORT3-Y R-N 26 1

CE309512T1 CE3 76 SW-02861 INSTALL INSULATION 8

03MAY04 04MAY04 DR-Y ML.Y 470 1SW-2861 17:00 00:59 ORT3-Y R-N 27 1

CE44POHTI CE3 77 IST-SISI REINSULATE - FAC 12 03MAY04 04MAY04 DR-Y ML-Y 0

PROG - PAB 44 FT 17o00 05:59 ORT3-Y R-N OVERHEAD 28 1

P1133-TI CE3 77 PIPE RC25 NDEflSI - REPLACE 16 03MAY04 04MAY04 DR-Y ML-Y 0

INSULATION-PZR 17:00 10:59 ORT3-Y R-N SPRAY LINE 29 1

CE406275TI CE3 76 MS-02706 INSTALL INSULATION 8

03MAY04 04MAY04 DR-Y ML-Y 336 FOR 1MS-2706 23:00 10.59 ORT3-N R-N 30 1

CE303847T1 CE3 76 MS-00006 INSTALL INSULATION 6

04MAY04 04MAY04 DR-Y ML-Y 153 FOR MS-6 07:00 12:59 ORT3-Y R-N 31 1

CE407600TI CE3 76 MS-00282 INSTALL INSULATION 6

04MAY04 04MAY04 DR-Y ML-Y 90 FOR 1 MS-282 07:00 12.59 ORT3-N R-N 32 1

CE304280TI CE3 76 SW-00015A INSTALL INSULATION 10 04MAY04 04MAY04 DR-Y ML-Y 0

FOR 1SW-1sA 07:00 16:59 ORT3-Y R-N 33 1

CE213064TI CE3 7*6 MS-0001OA INSTALL INSULATION 6

04MAY04 05MAY04 DR-Y ML-Y 320 FOR 1MS-10A 21:00 02.59 ORT3-Y R-N 34 1

CE26TOHTI CE3 77 IST-SISI REINSULATE - FAC 100 05MAY04 1 1MAY04 DR-Y ML-Y 348 PROG -TURB HALL 27 07:00 02.59 ORT3-Y R-N FT OVERHD IC 1

tC')4CCC77*

f'2 R Cm FnivioRt.

,&uerA, I IFCIe. 11

n.

aiIK Q

.AsnAv nr~.%ne nc. v,.

v CE21 CE21 CE31 CE44 CE2 CE2~

CE9 C

CE 411mINSTAL E___GLAI 4523TI FW HEV

=LP F

0sT6nINSTAL rOIRTREINSU 4522T FW HdJ 3m 632TINSTAI 7 8 0 4TRtMO 1937804 0951 2TII 13095121 POHn REINS' s

In Ine 4 ISUL FORF FOPR

-2TRBHALLUF ISECONOARY INS RME INSPECTIO!,

)LAnE lNsuLAnoN ON HP TURBINE Cl IHIGH PRESSURE URINE0302153 L

INSULAnIoN FOR MUS2719s ID STEAM HEADER SAFETY RELEF021 TER 4- - REINSTAIL SHELL INSULATE

EDWATER HEATEI 480214523 A INSULATION FOR RD-5975 28 BLOWDOWN TA4K VENT RUPTURE

.ATE - FAC PROG - TURB HALL 44 FT C MCONDARY INSE ICE INSPECTION 03 TER 4A - REINSTAL SHELL INSULATE ILP FEEDWATER 1EATER 4AO214522 L

INSULATION FOR IFD-204B EHX-21B HP FWH5 3 LS-2639 UPPER IS 1E INSULATION 1PI -2745A&B HP TURB CYL HTG P EXHAUST GOVE L INSULATION 1-2861 HX-53B H2 S E SEAL OIL COOL LATE - FAC PROG-PAR 44 FT OVERH SEC NDARY INSERVICE I - REPLACE INSUL TION - PZR SPRA)

SPRPAY LINE FRI mINSTALL INSU TON FOR 1 MS-270 t GEN AREA n0.2. 4. 6. 8.10012.14.16,1

ER 4113 IN DISC0310576 VERHO p3636 IN OLATION 0216332 FNOR END CTL PIT i1 OUTLET RELIEF EAD INSPECTION LUNE

)M LOOP TO PRES 3WJb3b 1133.TI1D, 30388710n _

URIZER CE40627 j"ei7cl



'

un nnl-Ie ralS s

l en

^

A-s rE

_r sn rWmczlWwl-U; 04tl62 IDr IURBINE DR CE303847TIN ALL INSULATION I 0303847 HP TURB CY CE4076o00l1N ALL INSuLAnoNj 0407600 HX-1B SG BL CE30428ufTINiALL INSULATION 0304280 HX-15 CE213064TI 0213064 SECONDA Y INSERVICE INSP RIAIN FXAITlnN m m FT CnNTRI

'OR MS-6

- HTG STEAM SUPI

OR lMS-282 WDOWN TO HX-1
OR 1SW-i5A

' CONT RECIRC HY INSTALL INSULATI HP TURD CE26TOITRE

-CTION0303636M CE216557TI 0216557 ILY YS-2744 BLC M1/2 SGBD HX INtET CHECK

)N FOR 1MS-101 STEAM SUPPLY NSULATE -FAC INSTALL INSUL l_=HY I

-* I

_CZ IDJJ I I

-C.

IV I-VV4ULL, F; O INR ULM I F

I,2 FOR tFD-282C 0

U;)rV1PUI U;Nvt.TUq I UjrT ML.T 09:00 16:59 ORT3-Y R-N U

I I

I I

I I

Run Date 03MAY04 13:48_

LT03 STANDARD PUBLICATION Sheet2of29 O Primavera Systems, Inc.

I FL.03 Execution Publication Set

after 03MAY04 12:00 l

U1R28 WORKING SCHEDULE after 03MA Y04 12:00 l U ID lRESPj WO EGID DESCRIPTION RD ES EF RISK MF Mon3 MAY I

I S_

.10 12,14,16.18.20.2210. 2.4.6.8.19l2.14.16.18,20.2210.2.4.6. 8.10112.14.16l 36 1

CE304279TI CE3 82 MS-02037 INSTALL INSULATION 8

05MAY04 06MAY04 DR-Y ML-Y 430 CE304279TIlN

_ ___FOR I MS-2037 17 00 00-59 ORT3-Y R-N 0304m29 37 1

CE301715TI CE3 76 MS-00111 INSTALL INSULATION 10 05MAY04 06MAY04 DR-Y ML-Y 428 CE3017ISnTIN!

FOR IMS-I1 VALVE 17:00 0Z59 ORT3-Y R-N 03017159!

M-. To km j1[

=

E*_-

3811 1 CE28TOHSR ICE4 77 IST-SISI REM SCAFF FAC PROG 37 01MAY04 05MAY04 DR-YML-Y

-flURB HALL 26 FT I

I 09 OQA 1 08:59 J ORT3-Y R-N 35CF2JrOHSR REM SFAFF - FAC PROG - EURB HALL 26 FT C VERHD I in I I

FmONrARY ip t

39 1

CE214048SR CE4 76 HS-CS-01 REMOVE SCAFFOLDING 5

03MAY04 03MAY04 DR-Y ML-Y 55 FOR HS-C01 07:00A 16:59 ORT3-Y R-N 40 1

CE309424SR CE4 76 CW-00138A REMOVE SCAFFOLDING 4

03MAY04 03MAY04 DR-Y ML-Y 361 FOR 1CW-138A 12:00 15:59 ORT3-Y R-N 41 1

CE934380SR CE4 76 HS-601R-37 REMOVE SCAFFOLDING 4

03MAY04 03MAY04 DR-Y ML-Y 348 FOR HS-601R-37A 12:00 15:59 ORT3-Y R-N 42 1

CE212843SR CE4 76 P-028B-M REMOVE SCAFFOLDING 10 03MAY04 03MAY04 DR-Y ML-Y 0 E FOR IP-28B-M 12:00 21:59 ORT3-Y R-N 43 1

CE301979SI CE4 77 SC-1A BUILD SCAFFOLDING 10 03MAY04 03MAY04 0 CE FOR lATUBE PLUGGING 12:00 21:59 1

CE407589SI CE4 76 T-026 BUILD SCAFFOLDING 10 03MAY04 03MAY04 DR-Y ML-Y 35 REPAIR LEAK ON 12:00 21:59 ORT3-YR-N 45 1

CE933444S1 CE4 76 W-001C2-A BUILD SCAFFOLDING 8

03MAY04 04MAY04 DR-Y ML-Y 41 E FOR W-lC2-A 1Z-00 08:59 ORT3-Y R-N 46 1 CE311887SR CE4 82 HX-021B REMOVE SCAFFOLDING 6

03MAY04 03MAY04 DR-Y ML-Y 474 E FOR HX-021B 15:00 20:59 ORT3-Y R-N 47 1

CESH96-SR CE4 PACKAGE 96 REMOVE SCAFFOLDING 5

03MAY04 04MAY04 DR-Y ML-Y 390 FOR SHIELDING -21 NE 21:00 01:59 ORT3-Y R-N 48 1

CE301980SI CE4 77 SC-1A BUILD SCAFFOLD FOR 10 03MAY04 04MAY04 21 lB TUBE PLUGGING 22:00 11:59 49 1

CE212694S1 CE4 76 PIPING HB-BUILD SCAFFOLDING 8

03MAY04 04MAY04 DR-Y ML-Y 0

FOR IPIPING HB-19 23:00 07:59 ORT3-Y R-N 50 1

CESH94-SR CE4 PACKAGE 82 REMOVE SCAFFOLDING 4

04MAY04 04MAY04 DR-Y ML-Y 299 FOR SHIELDING - A RHR 00:00 03:59 ORT3-Y R-N 51 1

CESH95-SR CE4 PACKAGE 95 REMOVE SCAFFOLDING 5

04MAY04 04MAY04 DR-Y ML-Y 387 FOR SHIELDING -A HOT 00:00 04:59 ORT3-Y R-N 52 1 CE214041SR CE4 82 FD-02401 REMOVESCAFFOLDING 5

04MAY04 04MAY04 DR-YVML-Y 466 FOR FD-2401 00:00 08:59 ORT3-Y RN E39 ES:

4048SRREMO 3NCONE 9424SRREMC P-30A C 438OSRREMC PZR PC PE SCAFFOLDING F MNSATE LINE GB-4 fE SCAFFOLDING VP DISCHARGE HE ME SCAFFOLDING F ZV HEADER SNUBB DR HS-CS-01 3NUBBER0214048 OR ICW-138A IkDER VENT030942 OR HS-OIR-37A

=R9934380 E21 E3(

E4(

ES' E-31 M31 2W435REMO =SCAFFOLDING FOR 1P-28BM STEAM GENERATPR FEED PUMP MC i979SIBUILD

M 7582SIBLMD mfti

3444SIBUILD CAFFOLDING FOR ECONDENSER (DEJ CAFFOLDING REPE 1BLOWDOWN TAN CAFFOLDING FOR IATUBE PLUGGINI kERATING)0301979 hR LEAK ON BLOWA (0407589 W-1C2-A rOR0212843 DOWN TANK lI J__

_1~ft~~r(

1887 SRREMo 1887_

CESH96-SR CE301980 03019)

CE2126S 0212 CESHI CESH9 CE2140

.02.

CE2140 FE SCAFFOLDING F HP FEEDiWATER HI ZEMOVE SCAFFOL Bow S iIBUILD SCAFFOLE_

zVI-* All ^1v1u1l l WV}

l _ _.. _....

OR HX-021 B ATER 5B

)ING FOR SHIELDII FOR 1B TUBE PLUI r

1U9

__CONDENSER d

4SI BUILD SCAFFOt 94_pS I-SRREMOVE SCAI

-R R iSR REMOVE SCAI ISRREMOVE SCXl 4041_

OSRREMOVE SCAl DING FOR IPIPING ZRVICE WATER TO

'FOLDING FOR SHi FOLDING FOR SHII FOLDING FOR FD-;

HX-17B LP FWH 1BS iO6LDING FOR FD-MHX-19B P FW XLING FAN DISCHA IG -2t'NE

GING DEAERATING) hB-19 PAINTING ENGINEERED SAFI
LDING - A RHR PIP LDING -A HOT LEG 401 2B CHANNELHEAD 400

-1 38 CHANNELHEA GE DAMPER99 UARDS

PIPE RELIEF REUEF 53 1 1 1 CE214040SR I CE4 82 FD-02400 REMOVE SCAFFOLDING FOR FD-2400 8

04MAY04 I 04MAY04 DR-Y ML-Y 00:00-11:59 ORT3-Y R-N 463 02 I4 040_1 1

_1 Run Date 03MAY04 13:481 LT-03 STANDARD PUBLICATION l

Sheet 3 of 29 O Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after 03MAY04 12:00 l

U1R28 WORKING SCHEDULE I

after O3MA Y04 12:00 U

ID RESP WO I EalD DESCRIPTION ES EF I

RISK MF on 3 I

Te 4 Wed5

_I._sr.

112.14.161,20,2210* 2.4. 6. 8.10112.14.16,18.20,221 o. 2*E4. 6* 8R 10E2.141 lo] RI I i1[ L1S a

_ -m la, El 154 1

CE310576SR ICE4 82 RD-05975 REMOVE SCAFFOLDING1 4 04MAY04 04MAY04 FOR 1RD-5975 01:00 08:59 DR-Y ML-Y ORT3-N R-N 94 CE31C C40:

CE441 76SRREMOVE S_!

10576Iflm OHSRREM SCAFF-FFOLDING FOR IS T-28 BLOWDOWNI FAC PROG -TURB D-5975 ANK VENT RUPTUI HALL 44 FT OVERF 55 1

CE44TOHSR CE4 77 IST-SISI REM SCAFF - FAC PROG 12 04MAY04 04MAY04 DR-Y ML-Y 595

-TURB HALL 44FT 01:00 13:59 ORT3-YR-N 56 1

CE44POHSR CE4 77 IST-SISI REMOVE SCAFF FOR 4

04MAY04 04MAY04 DR-Y ML-Y 336 FAC PROG - PAB 44 FT 07:00 10.59 ORT3-Y R-N 57 1

CEO8TOHSR CE4 77 IST-SISI REMOVE SCAFF - FAC 32 04MAY04 05MAY04 DR-Y ML-Y 436 PROG - TURB HALL 8 FT 07:00 18:59 ORT3-Y R-N 58 1

CESHs2-SR CE4 PACKAGE 52 REMOVE SCAFFOLDING 4

04MAY04 04MAY04 DR-Y ML-Y 0

FOR SHIELDING - 21 09:00 12:59 ORT3-Y R-N 59 1

P1133-SR CE4 77 PIPE RC 25 NDEIISI - REMOVE 6

04MAY04 04MAY04 DR-Y ML-Y 388 SCAFFOLD - PZR SPRAY 11:00 16:59 ORT3-Y R-N 60 1

P1248-SR CE4 77 PIPING EB-NDEJISI - REMOVE 6

04MAY04 04MAY04 DR-Y ML-Y 372 SCAFFOLD.SUPPORTS 15:00 21:59 ORT3-Y R-N 6 1 1

CE937787SR CE4 82 FD-02543A REMOVE SCAFFOLDING 5

04MAY04 04MAY04 DR-Y ML-Y 453 FOR IFD-2543A 17:00' 21:59 ORT3-Y R-N 62 1

CE304280sR CE4 76 SW-00015A REMOVE SCAFFOLDING 5

04MAY04 OSMAY04 DR-Y ML-Y 320 FOR 1SW1SA.

22:00 02:59 ORT3-Y R-N 63 1

CESH78-SR CE4 PACKAGE 78 REMOVE SCAFFOLDING 2

05MAY04 05MAY04 DR-Y ML-Y 95 FOR SHIELDING - CV-296 05:00 07:59 ORT3-Y R-N 64 1

CE214113SR CE4 76 MS-02719 REMOVE SCAFFOLDING 5

OSMAY04 OSMAY04 DR-Y ML-Y 443 FOR MS-2719 07:00 11:59 ORT3-Y R-N 65 1

CE301693SR CE4 82 FD-02608 REMOVE SCAFFOLDING 5

05MAY04 05MAY04 DR-Y ML-Y 443 FOR FD-2608 07:00 11:59 ORT3-Y R-N 66 1

CE2161645R CE4 76 ISOL PHASE REMOVE SCAFFOLDING 30 05MAY04 06MAY04 DR-Y ML-Y 290 FOR ISOL PHASE BUS 07:00 16:59 ORT3-Y R-N 67 1

CE212642SR CE4 76 FD-00225A REMOVE SCAFFOLDING 8

05MAY04 05MAY04 DR-Y ML-Y 438 FOR FD-225A 09:00 16:59 ORT3-Y R-N 68 1

CE214034SR CE4 82 CV-00370 REMOVE SCAFFOLDING 6

05MAY04 05MAY04 DR-Y ML-Y 354 FOR CV-370 11:00 16:59 ORT3-Y R-N E DISC I.

_u jb3bI_

IT _E tLAJONDA I

CE44POHSR RE 0303636[

CrnosToHsR REI AOVE SCAFF FOR I iSECONDARY IN AOVE SCAFF - FAC IT NSERVIrt INSP AC PROG - PAB 44 3ERVICE INSPECT PROG TURB HAL it C.T.IUN T OVERHEAD N

8 FT OVERHD 03036361 ' -

CESHs2-SR P1133-03031

=

1 REMOVE SCAFFOL SRNDEIISI - REMOI 87 SPRA'

'124G SRNDE111-I 0303876M" E937787SRREMO 9937787Iq CE304280S 03042e 3ING FOR SHIELDII

!E SCAFFOLD - PZF

  • UNE FROM LOOP IEMOVE SCAFFOU IFEEDWATER COI

/E SCAFFOLDING I llHX-198 LPW 3V R REMOVE SCAFFC DMHX-15A C CESH78-SRREMC CE214113SRRE 021411311 CE301693SRRE 0301693w CE216164SRRE 021616411 CE212642SR 0212642 l.

CE21403-0214 21'RHR Ut SPRAY UNE l0 PRESSURIZE SUPPORTS NE 0ISOLVALVES OR IFD-2543A l DRAIN TO HX-WING FOR 1SV ONT RECIRC HY t/E SCAFFOLDI WOVE SCAFFOL WGLANDS11 JIiOVE SCAFFOL MHX-22B MS iUOVE SCAFFOL REMOVE SCAFI H)

SRREMOVE SC

)34!_1H CE2165575RRE 0216557E 69 1

CE2165575R I CE4 76 FD-00282C REMOVE SCAFFOLDING FOR 1FD-282C 5

05MAY04 I 05MAY04. DR-Y MLtY 17.00 21:59 ORT3-Y R-N 433 70 0O CE0212330A CE5 76 WT REROUTE MEMCOR 11 29APR04 04MAY04 152 E0 2330ARERo MEMCOR PIPE 07:OOA 14:59 0212330 71 1

CE0407589 CE5 76 T-026 T-026-REPAIRLEAKON 25 30APR04 05MAY04 DR-Y ML-Y 0 E 7 8gT-026.

LPAIRLEAK ON B TANK BLOWDOWN TANK 08:OOA 16:59 ORT3-Y R-N El.

Run Date 03MAY0413:48l LT-03 STANDARD PUBLICATION Sheet4of29 O Pnmavera Systems, Inc.

l FL-03 Execution Publication Set

after 03MAY04 12:00 l

U1R28 WORKING SCHEDULE

]

after O3MAY04 12:00 RAAV

  1. Iu 72 1 1 m

CE0407724 CE0210986 CE5 CE6 RESPI WO ST Er 76 E

77 EQID RC-00526B SEC DESCRIPTION 1RC-526B, REPAIR SWAGLOC FITTING SEC SUPPORT MR 99-011-B RD I ES EF RISK 6

03MAY04 04MAY04 I DR-N ML-N 19:00-00:59 ORT3-N R-N MF 1

0 117 Mon 3 ITue 4

IWed 5;

3101121416,1820.21..4. 6 1

810214,16,1820,210.24 6 8.1 1214.1 1 E040TT241Rl 5268. REPAIR AGLOC TTING 040T724 H-kX-1B SG NELHEAD ORAI CE 0g8 6SECSU PORTMR99-01V 731I0-461 05APR04 11MAY04 I DR-N ML-N 07-00A 09.59 ORT3-N R-N I

741 0 CE0210989 CE6 76 SEC SEC. INSTALL NEW EQUIP MR 99-011-E 381 05APR04 I 10MAY04 DR-NML-N

_ 0800A 09 59 ORT3-N R-N 125 CE010989SEC. INTALLNEWEQUIP I IR99-011 E 11 m

  • m U 

h 

I 4--4.

4 1

l 751 0 CE021Q990 CE1600ROO0 CE6 C

CE8 76 76 SEC R-1 SEC REM ABANDONED EQUIP MR99-011'F 76 03MAY04 I 17MAY04 I DR-N ML-N 08 0A 07:59 ORT3-N R-N 87 OSECREt ABANDONED EQIP MR 99-011 F

_-E0~

I 00-M 76 1 MOBIZE REPAIR I 91 03MAY04 1 07MAY4I DR-YML-Y CREW.TRAININGAND l 12:00 06:59 lORT3-YR-M C

e-i.-

mcmn fOIItE REPA1R CRE-W tlWNINGU Amn nArshim l

[

I 7711 CE1600R005 I

I I

CE8 76 R-1 OFF-LOAD REPAIt 10 I04MAY04 I 04MAY04 DR-Y ML-Y EQUIPMENT AND MOVE 14:00' 23:59 ORT3-Y R-M I

I 78 1

CE1600R010 CH0300360 CE8 CH 76 U

77 R-1 HEM-SAMPL SETUP EQUIPMENT FORI 24 1 05MAY04 I 06MAY04 DR-Y ML-Y CUTTING THERMAL I

07:00-06:59 1 ORT3-Y R-M 2

25 RCS CL TSR 34.52 1 53 03MAY04 08MAY04 DR-N ML-N 05:00A 09:59 ORT3-N R-N I

80 1

CH0300373 CH 77 HEM-SAMPL RCS DO TSR 3.4.5.1 1 53 1 03MAY04 I 08MAY04 DR-N ML-N 05:OOA 09:59 ORT3-N R-N 25 7

CEI O0ROO5OFF-LOAO EPAR EQUIPME AND MOVE IN1 213476 REACTOR SEL AND ASSEB

0.

CEI60ORO0OS EQUIPMEN1 021347-a H 0360RCS CLS 3.4.52 a

HO 00373 RCS C TSR 3A.5.1 CH 00403 RCS B N R 391.

H 001 9 7BAST RON TSR 3.5.12_

B E

8 387 SBDF AMMA SCAN E CHo 00442RE-229 OPIC l

81"1 CH0300403 CH 77

-HEM-SAMPL RCS BORON SR 3.9.1.11 53 1 03MAY04 0500A 08MAY04 IDR-N ML-N 09:59 ORT3-N R-N 25 82 0

CH0300197 CH 77 CHEM-SAMPI BAST BORON TSR 35 03MAY04 07MAY04 DR-N ML-N 3.5.12 0700A 14:59 ORT3-N R-N 12 1

83 t

CH0300387 CH 77

_HEM-SAMPI SGBDFO GAMMA SCAN I 35 I 03MAY04 I 07MAY04 DR-N ML-N 0700A 14:59 ORT3-N R-N 12 84 1 CH0300442 CH 77

'HEM-SAMPL RE.229 ISOTOPIC 1 35 03MAY04 07MAY04 DR-N ML-N 07.O0A 14:59 ORT3-N R-N 12 I

815 12 CH0300483 CH 77 CHEM-SAMPL RCS 8ORON SR 3.9.1.1 35 03MAY04 07MAY04 DR-N ML-N 0700A 14:59 ORT3-N R-N 128 g, J 83 RCS B4CON SR 3.9.1.1 IEl 

 I 

I 

86 1 21 CH0300500 ICH 77 ICHEM-SAMPt RCS CL TSR 3.4.52 1351 03MAY04 07MAY04 DR-N ML-N 1 128 07:O0A 14:59 ORT3-N R-N 1oo5 RCS CLlSR 3A.52 I _l 87 1 2 CH0300513 CH 77 __CHEM-SAMPL RCS DO TSR 3.4.5.1 135 03MAY04 07MAY04 DR-N ML-N 07.O0A 14:59 ORT3-N R-N 128

}O 3RCSD TSR 3A.5.1

?

m m

q 88 1 2 CH0300526 CH 77 CHEM-SAMPL SGBDFO GAMMA SCAN 1 35 03MAY04 07MAY04 I DR-N ML-N 07:00A 14:59 ORT3-N R-N 128 CHO:

U 00526 SGBDF GAMMA SCAN I_

.1.

Run Date 03MAY04 13:48 LT-03 STANDARD PUBLICATION Sheet 5 of 29 0 Primavera Systems, Inc.

FL-03 Execution Publication Set I

after O3MAY04 12:00 l

U1R28 WORKING SCHEDULE I

after O3MA Y04 12:00 ID RESF WO ST EOID DESCRIPTION RD ES MAAV RISK MF 891 2 CH0300552 CH 77 HEM-SAMPL RE-229 ISOTOPIC 35 03MAY04 07MAY04 I DR-N Mk-N 07:00A 14:59 ORT3-N R-N 128 i

90 2

CH0300566 CH 77 CHEM-SAMPL RCS GROSS ACT VITY 6

05MAY04 05MAY04 DRN ML-N 146 SR 3.04.16.01 07:00c 12:59 ORT3-N R-N 91 0

EE0302308l EEP 60 PAB VIBRATION ROUTE DATI 3 03MAY04 03MAY04 DR-N ML-N 160

-PAB-CA 11.SOA 14:59 ORT3-N R-N 92 1

EM0407740X EM 76 P401B-M P-18PERFORMLOCAL 26 29APR04 04MAY04 DR-N ML-N 25 OIL FLUSWS AS 1900A 15:59 ORT3-N R-N 93 1

EM0216164 EM 76 ISOLPHASE ISOLPHASESEBUSDUCT 11 29APR04 03MAY04 DR-YML-Y 0

INSPECTION AND 21IO0A 23:59 ORT3-N R-N 94 1

EM0216638A EM 76 P-011B-M P-lBRE-ASSEMBLYOF 56 01MAY04 05MAY04 DR-N MI-N 0

MOTOR 18:OOA 19:59 ORT3-N R-M 95 0

EM0306110A EM 76 D72-16-05 IWP-037-02 REPL MOBS 4

02MAY04 03MAY04 DR-N ML-Y 0

1MOB-009-019 22.00A 15:59 ORT3-NR-N 96 1

EM-8480G EM 76 R-1 CLEAN CONOSEAL.

11 03MAY04 03MAY04 DR-N ML-N 344 PARTS 08.00A 23:59 ORT3-N R-N 97 0

EM0305274 EM 76 D-305 QUARTERLY SWING 1

03MAY04 03MAY04 DR-N ML-Y 0

STATION BATTERY 09:OOA 12:59 ORT3-N R-N 98 0

EM9925005 EM 76 A52-DHVR-3 3D00-1 1X02-1A01 CELL I

03MAY04 03MAY04 DR-N MI-N 103 SWITCH INSPECTION 12:00 l1Z59 ORT3-N R-N 99 1

EM0216165B8 EM 77 HX-001A REMOVE ECTPOWER 2

03MAY04 03MAY04 DR-N ML-N 418 INSIDE CONTAINMENT 1200' 13:59 ORT3-N R-N 100 2 EM0305121 EM 77 TG-01 TG4-1 GROUNDING 2

03MAY04 03MAY04 DR-N ML-N 253 STRAPS 12:00' 13:59 ORT3-N R-N 101 1

EM0302132B EM 76 L0-0291 P-059B-RETERM 4

03MAY04 03MAY04 DR-YML-Y 251 AIRSIDE SEAL OIL B/U 12:00W 15:59 ORT3-Y R-N 102 1

EM0212805 EM 76 TE-00125 1TE-125REPLACE 6

03MAY04 03MAY04 DR-N ML-N 356 FLEXIBLE CONDUIT 12:00 l

17:59 ORT3-N R-N 103 1

EM0306911 EM 76 TG4-1-VARM 1TG-1-VARM READS 8

03MAY04 03MAY04 DR-N MI-N 0

HIGH REPLACE 12:00 l

20.59 ORT3-N R-N 104 0

EM0305376 EM 77 GLOVES REPLACE RUBBER 10 03MAY04 04MAY04 DR-N MI-N 245 GLOVES AND BLANKETS 1200' 12:59 ORT3-N R-N 105 0 EM0304872 EM 76 A52-DHVR-1 1P-025ABREAKER 24 03MAY04 06MAY04 DR-N MI-N 0

MAINTENANCE 1200-40 12.00' 08:59 ORT3-N R-N

%J 6 MIOPF I

ASE BUS DUCT INS jRISOL PHASE D E-ASSEMBLY OF M PECTION AND L1CT0216164

)TOR

m]6&AP1IB

_r

...i.-..

06110AIW-0 1PWR TC 22~a~`Lc 7-02 REPL MOBS I1 1C-04 SAFEGUARI 3NOSEAL PARTS AOB-009 - 019

'SBUS A (1MOB-19)

SEL AND ASSEMBLl p306110 (0214134 Mnan 3 I

Tue w ted S I 10012.14f16 1 20,221 0. 24 6 18 1002.1406,1820,221 0. 2 4* 6. 801 02,14116 1

'HO 05 Rr=229 TwOPIC CH0300566R GROSS AtTV 0300566 MISC CHI

-E0 2308VIRATI N ROUTE DATA -A-C PRIMARIAUXILLARY BUILDI STRUCTUREO3038
MJ07L40XP-IB PtRFORM LOCAL 01 FLUSISAS NECE SARY

=

REACT' COOLANTPUM MOTOR040774 11 _

IPFMVFR IUA

M91

-_MO:

2MO:

2MO:

_MO:

IMO:

rTERLY SWmN(

pSWING STAI 250053000-1 1 14.16 KV/3000 16 1 6 58 REMO FSTEAM GE 05121TG-01 G ITUR1BINE C 0 213 2BP-059E MTURBIN 128051TE-125

-a1P-1 06911 1TG-1-V 0 53 7 6 REPLAC Ezvs tst STATION BATTER ON BATTERY (O2-1A01 CELL SW TCH INSPECTION pMP VACUUM BRE 9925005 FE ECT POWER INS DE CONTAINMENT IERATOR0216165 IOUNDING STRAPS ENERATOR (GENE IC: SEE COMPONE RETERM AIRSIDE SEAL OIL B/U PUN OIL PRESSURE R 0UCNG0302132 REPLACE FLEXIBLE CONDUIT 3 RCP SEALWATEF INJECTION TEMPE kRM READS HIGH "REPLACE METER' ITG-01 TURBINE G NERATOR OUTPU E RUBBER GLOVE AND BLANKETS ITS)0305121 I MOTOR MATURE RTD 02121 VARMETER03069 VES AND BLANKE

!-CT)

°5 I

S0305376

,.R UBBER OIL2 BREAKER MAINQ4ANCE 1200-40 (A5 048721P-025A I!

1061 2 EM0305106 EM l 76 D-205 MONTHLYNON-SAFETYl 4 103MAY04 03MAY04 1 DR-NML-N 125V DCSTATION l

13:00' l

16:59 l ORT3-N R-M 0Moi 05106MONTHIY NON-SAFETY 12V DC STATION l

125V IC STATION BATTEiY0305106 Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATION l

Sheet 6 of 29 0 Pnmavera Systems, nc.

I FL-03 Execution Publication Set I

afterO3MAY0412:00 l

U1R28 WORKING SCHEDULE l

afterO3MAY0412:00 ID lRESPl WO EOID DESCRFnON RD ES EF RISK u

ID REP WO VIAV EQtD DESCRIPTION QUARTERLY NON-SAFETY 125V DC STATION RD ES EF RISK MF 1 ~

Mn3Tue 4

Wed S 1071 2 EM0305117 EM 76 0-205 4

03MAY04 03MAY04 DR-N ML-N 13:00 16:59 ORT3-N R-M 614 108 0 EM0306110B EM 76 D72-16-08 IWP-037-02 EM PMT FOR I 03MAY04 03MAY04 DR-N ML-Y 0

MOBS 1MOB-009 -019 17:00 17:59 ORT3-N R-N 109 I EM0215241 EM 76 4111E02 RMP9308. DS-II 24 03MAY04 05MAY04 DR-N ML-N 0

BREAKER 18:00 23:59 ORT3-N R-N MAINTENANCE 110 0 EM0306117A EM 76 D72-21-08 IWP-037-07 REPL 16 03MAY04 04MAY04 DR-N 0

1MOB-020 10301051 19:00 tlO.S9 ML-YORT3-N R-N 111 j1 EM0306574 EM 76 MOB-004 MOB-004 BREAKER 8

03MAY04 04MAY04 DR-N ML-N 2

MAINTENANCE 20:00 03:59 ORT3-N R-N 112 1 EM0306575 EM 76 MOB-008 MOB-008 BREAKER 8

03MAY04 04MAY04 DR-N ML-N 2

MAINTENANCE 20:00 03:59 ORT3-N R-N 113 1 EM0306576 EM 76 MOB-049 MOB -049 BREAKER 8

03MAY04 04MAY04 DR-N ML-N 2

MAINTENANCE 20:00 03:59 ORT3-N R-N 114 1 EM0306596 EM 76 MOB-121 1MOB-121 REPLACE 8

03MAY04 04MAY04 DR-N ML-N 0

AND TEST BREAKER 20-00 03:59 ORT3-N R-N 115 1 EM9929766 EM 76 MOB-121 1MOB-121 REPLACE 8

03MAY04 04MAY04 DR-N ML-N 0

MOUNTING SCREWS 20:00 03:59 ORT3-N R-N 116 1 EM0306577 EM 76 Y-04-04 Y-04-04 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00 05:59 ORT3-N R-N 117 T EM0306578 EM 76 Y-04-01 Y-04-01 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00 05:59 ORT3-N R-N 118 1 EM0306579 EM 76 Y-04-12 Y-04-12 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00 05:59 ORT3-N R-N 119 1 EM0405920 EM 76 Y-04-13 Y-04-13 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00 05:59 ORT3-N R-N 120 1 EM9908111 EM 76 Y-04-M1 Y-04-M1 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00 05:59 ORT3-N R-N 121 1

EM9908112 EM 76 Y-04-05 Y-04-05 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00' 05:59 ORT3-N R-N 122 1 EM9908113 EM 76 Y.04-06 Y-04-06 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00 05:59 ORT3-N R-N 123 1 EM9908114 EM 76 Y-04-07 Y04.07 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00' 05:59 ORT3-N R-N 124 1

EM9908115 EM 76 Y-04-08 Y-04-08 BREAKER 10 03MAY04 04MAY04 DR-N ML-N 0

REPLACEMENT 20:00 05:59 ORT3-N R-N I 19 1 I 1s l

7 DAC

^n^A A

DK E

K EM EM 0112,114.16.11120,2 0 2. 4.6 8.01.4,6 03065117ou LYNON-SAFETY 125V DC STATI 1M0l25v 1 STA-2RONATCEATY0305ET7 10 06110113~ 74 EM PMTFOR IOBS 1MOB 4

030611051TO RC-04 SAFEGUMDS

-1US A (Il EMA021524 1

0 B-121 REAKECR MAINTENAN 10215241 E 00306117A M.307REPLI1MO02 /10301051 920306 117 P

0R TOAIC EM03065747 BREAKER ACNTEENCE 10306574 PWRTWIMOB-18MOI EM0306575 1 BREAKER ANCENTANCE 10306575PWRTO 11RAEA202A EM03065769 12 BREAKERR ACTENANCT 1030656 PWRIT U1 CONTVEN EM03065920Y 13 REPLACE MND TEST BRE 0306596l 1

PWR TE C-01 Ul TRAt EM9929766 21 REEPLACE MOUNTINGSC 9929T661_

PWRTO C-01 U1 TRAII EM03065 BREAKER RE PLACEMENT 1 36577 PWF1TO C-18U1ll821 lEMO90fi8114Y BREAKER R PLACEMENT 00581 PWF1 TO 2C-20 BUS EM0306579Y 6 BREAKER REPLACEMENT l03065791 PWF TO 1C-75 TUR lEM0405920 13O BEKR RE PLACEMENT 040592 PWF TO PPCS-1051 EM9908111 BAKE R 3PLACEMENT 9908111 PWF TO 1Y-04 YEIJ EM9908112Y 5 BEKR RI PLACEMENT l9908112 PWF TO 1C-1 17111E[

lEM9908113

-6BRAER R PAEMENT 99081131 PWI`TO 1C-128 RC IEM9908114Y40BRAE REtPLACEMENT 9908114-PWF TO 1C-125 CV IEM990 115Y8 BREAKER RE PLACEMENT l908115 _

P tTO 1IC-130 NUX lEM9908116Y 9 BREAE REPAEMENT 990811[6 PITO 1C-130NIS

.18.20,221 0, 2,,6

-01,41 nON BMOB INCE C-49 DMA Nr Is(

EAKE INB' CREVY

,INB' LGS S VOL RBINE jPPC 18COI CS 131 VCS C UCLE)

'S RAI 9

19) jAFEGUARDS BUS I bND 1IR YLG (YELL JFPA INST RECEPTP TLAITON TRAIN B rATUS LIGHTS TATUS LIGHTS

'RYO CONTROL P)

TMETER (YELLOW)

IOPS MAIN TRIP PI CONTROL RM DIS 12OVVITAL INST PI ITROL CHANNEL V l4EL (YELLOW)

JNTROL PANEL (YI

.R INSTRUMENT RP K VIA IEY.08 (YEL I (1MOB-30)

CLE (YELL NEL (YELLOW)

IL (YELLOW)

"LAY CYELLOW)

NEL FROM I (YELLOW) 7LLOW)

CK (YELLOW)

W) l4tI I I F1Vuvollu C-M

'ID I TtNPU4 I.-kP#

t:

DrV-,S,\\Mrr REPLACEMENT 1U UV

%I LqMPTU 20:00 05:59 UK-N ML-N ORT3-N R-N U

.IL J

_LI I

I_

I.I Run Date 03MAY04 13:48 LT.03 STANDARD PUBLICATION Sheet 7 of 29 C Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after O3MAY04 12:00 l

U1R28 WORKING SCHEDULE I

after 03MAY04 12:00 MAY

  1. U ID P WO EQID DESCRIPTION RD ES EF RISK MF Mon 3 Tue 4 Wed 5

_ _I IST I

910012.14.16.1120,221 0.2.4. 6. 8,1O12,14.16,18,20,221 0. 2.4. 6. 8 1011214.16,'

0410BEAE l10 03A0 04MAY04 DR-ML-10410 BREAKER Rl_________

126 1 EM99D8117 IEM 76 YV04-10 RE0410 BREAKER REPLACEMENT 10 03MAY04 I 04MAY04 DR-N MI-N 1 20:00 05:59 fORT3-N R-N 0

127 1

EM9908118 EM 76 Y-04-11 YV04-11 BREAKER 10 03MAY04 04MAY04 DR-N MIL-N 0

REPLACEMENT 20:00 05:59 ORT3-N R-N 128 1

EM0216539 EM 76 TG-01-VARM REMOVETEMPORARY 2

03MAY04 03MAY04 DR-N ML-N 96 METERING T-MOD 21:00 22:59 ORT3-N R-N 129 1 EM-BMFP-15 EM 76 P-026B-M P286 REINSTALL OIL 6

03MAY04 04MAY04 DR-Y ML-Y 0

_UNES AND MOTOR 22:00 03:59 ORT3-N R-N 130 0 EM03061 14B EM 76 072-17-03 IMP-037-01 SUPPLY 3

04MAY04 04MAY04 DR-N MIL-N 0

TEMP POWER TO 02Z00 04:59 ORT3-N R-N 131 1

EM0216164D EM 76 ISOL PHASE POST-MAINTENANCE 3

04MAY04 04MAY04 DR-Y ML-Y 0

MEGGER OF ISOPHASE 03:00 05:59 ORT3-N R-N 132 1 EM0312035A EM 76 P-028B-M 1P-288-M PERFORM 4

04MAY04 04MAY04 DR-Y ML-Y 0

POST MCE TEST 05:00 09:59 ORT3-N R-N 133 0 EM0305204 EM 76 125V STATION TECH SPEC 6

04MAY04 04MAY04 DR-N ML-N 596 BATTERIES WEEKLY 0700 12:59 ORT3-N R-N 134 1 EM0215217 EM 76 T-001 TEST HEATER 10 04MAY04 04MAY04 DR-Y ML-Y 0

INSULATION 07:00 16:59 ORT3-N R-N 135 1 EM0400344 EM 76 P-028A-M 1P-28AM PUMP END 10 04MAY04 04MAY04 DR-Y ML-Y 10 MOTOR BEARING 07:00 16:59 ORT3-Y R-N 136 0 EM03061178 EM 76 D72-21-08 IWP-037-7 EM PMT FOR 2 04MAY04 04MAY04 DR-N ML-N 0

MOBS IMOB-02010301 12:00 13:59 ORT3-N R-N 137 2 EM0305128 EM 76 U2A-UV REL TEST U2 TRAIN A 3

04MAY04 04MAY04 DR-N ML-N 0

UNDERVOLTAGE AND 12.00 14:59 ORT3-N R-M 138 2

EM0305133 EM 76 U2B-UV REL TEST U2 TRAIN B 3

04MAY04 04MAY04 DR-N ML-N 33 UNDERVOLTAGE AND 15:00 17.59 ORT3-N R-M 139 0

EM0306114A EM 76 D72-17-03 MtP-037-01 REPLACE 16 04MAY04 05MAY04 DR-N ML-N 0

MOBS 100-109 15:00 06:59 ORT3-N R-N 140 0

EM0306109A EM 04 D72-16-07 IWP-037-03 REPL MOBS 16 04MAY04 05MAY04 DR-N ML-N 0

1MOB-058 -064 18:00 09.59 ORT3-N R-N 141 0

EM03061t2A EM 76 072-16-13 IWP-037-03 REPL 16 04MAY04 05MAY04 DR-N ML-N 0

1MOB-065-068/084-089 18:00 09:59 ORT3-N R-N 142 1 EM0400047 EM 76 B52-7D 1552-7M PERFORM BKR 1

04MAY04 04MAY04 DR-N MIL-N 0

SWAP IN U1R28 21:00 21:59 ORT3-N R-N 143 1 EM0215246 EM 76 62/A01 CAL.ANDTEST 62/A01 6

05MAY04 05MAY04 DR-N ML-N 0

RELAY PER IRMP 07:00 12:59 ORT3-N R-N EM9908117Y 9908117!

EM9908118Y 9908118!

EM0216539 0216539 EM-BMFP-031203 EMO:

EM 04-10 BREAKER RI

~PWF 04-11 BREAKER RI P-r REMOVE TEMPORJ

  • 1TG-01 TURBINI ISP28B REINSTALL 5lSTEAM

,06114BFWP-0 3 7 l0 1306114PWR-

)21616 4DPOSTM 0216164M1ISa

=MO312035A1P-2 8 1 0312035w EM0305204ST 0305204E EM0215217TE 0215217w EM0400344 1P 04003441 EM0306 030 EM03C 030 E

EN

'LACEMENT TO tMOB4 AND 11

'LACEMENT TO IC-166SAFEGI RYMETERING T-M GENERATOR OUT

)IL LINES AND MO ENERATOR FEED SUPPLY TEMP POI 2 C-01 SAFEGUAR NTENANCE MEGGI PHASE DUCT MA PERFORM POS ISTEAM GENERAI fTION TECH SPEC I 125VSYSTE T HEATER INSULA jP PRES 28A-M PUMP END I

__STEAI 17BI'WP-0 37-07 EN

117?[PWRTO 1E 5128TEST U2 TRAUl 5128OTRAIN A' 10305133TEST U2 03051331TRA 1306114AIWP-0374 0B-121 (YELOW)

ARDS TRN B RLY F

)D 02-052

'UTVARMETER DR COVERS lUMP MOTOR

'ER TO 1-VL-1723 G BUS A (IMOB-10 R OF ISOPHASE B8 lMCE TEST pR FEED PUMP MC ATIERIES WEEKL1 I MULTI ANDIOR NC 1ON RESISTANCE URIZER TANK ACK (YELLOW) 1-IMOB-10 S

TOR iN-NUMBERED I

.6 0306114w EM03061109AIP 0306109j I EM03061112AIWP.

03061121 OTOR BEARING U AKING I GENERATOR FEE PUMP MOTOR PMT FOR MOBS 1 oB42010301 0!

-04 SAFEGUARDS 3US B (IMOB-30 A UNDERVOLTAG AND

,I.6 KVAND 480V S WTCHGEAR RE RAIN B UNDERVO TAGE AND

' B 4.16 KV AND 48) V SWITCHGEA I REPLACE MOBS 100-109 PV SR TO C-01 SAF 137.03 REPL MOBS lMOB-058 - 064

__PWRTO IC-0 137-03 REPL 1MOB 0654681-08s IPWR TO IC-a IB52-7D PERFORMIBKR SWAP IN L IPWRTO 1B-41 UI 1T TURBINEB EMO215246C4 ANO TEST 62/

02152465 IA-01 BU EMO21 5 134 O

TES1 02151134 w

EM040041 0400041 1441 0 EM0215134 EM 77 COM GAI-TRONICS TEST I15 05MAY04 05MAY04 DR-N ML-N 07:00 22:59 ORT3-N R-N 565 Run Date 03MAY04 13:48 LT-03 STANDARD PUBLICATION l

Sheet 8 of 29 O PnmaveraS ems Inc.

FL-03 Execution Publication Set

after 03MAY04 12:00 U1R28 WORKING SCHEDULE after O3MAY04 12:00 U

ID RESP WO EQID DESCRIPflON RD ES I

EF RISK MF MAY ST Mon 3

.IT 4

WedS j 1 12,14,16,18.20.221 0.2, 4. 6, O,1 12,14,16,16.20.2210. 2, 4, 6. 8,10012,14.16.1 145 0 EM0306114C EM 76 D72-17-03 IWP-037-01 PERFORM 1

05MAY04 05MAY04 DR-N ML-N EM0306114C003701 PERF_

PMT FOR MOBS 100-109 08:00 08:59 ORT3-N R-N 0306114 PWRTO C-01 S 146 0 EM0305218 EM 78 D-48 MONTHLY 4

05MAY04 05MAY04 DR-N ML-N 0

EM0305218 OHLY COMM COMMUNICATION 08 00' 11 59 ORT3-N R-N 03052118 TELEPHOIO 147 0 EM0306109B EM 04 D72.16-07 IWP-037-03 EM PMTOF 2

05MAY04 05MAY04 DR-N ML-N 0

EM03061 BIWP-037.03 MOBS 1 MOB-058 -064 11:00 12:59 ORT3-N R-N 0306 09[UPWRTO 148 0 EM03061128 EM 76 D72-16-13 IWP-037-03 EM PMT OF 2

05MAY04 05MAY04 DR-N ML-N 0

EM03061 2BnNP 037-03 1MOB4065068489 11:00 12:59 ORT3-NR-N 0306 12OPWRTO 149 0

EM0308114D EM 76 D72-17.03 IWP-037-01 RESTORE 4

05MAY04 05MAY04 DR-N ML-N 98 EM03061 4DW 037-01 1-WL-1723TOPERM 11:00 14:59 ORT3-N R-N 0306 14_PWR 150 0

EM0309072 EM 76 D-105 STATION BATTERY INSP 3 05MAY04 05MAY04 DR-N ML-N 0

EM03 9072 STATION B PER RMP 9046-1 12-00' 14:59 ORT3-N R-N 03 072125V 151 0

EM0309136 EM 76 D-106 STATION BATTERY INSP 3 05MAY04 06MAY04 DRN ML-N 231 E 03091'36STATI PER RMP 9046-1 15:00' 08:59 ORT3

-N I I

03093136 152 1

B42TRN-1 EMV B42 EM JIT TRAINING FOR 3

03MAY04 03MAY04 4

N-IEM JITT ING FOR IB-42 OLTEDFAULTS (DNYS) 1B-42 BOLTED FAULTS I

I1WA 14:59 53 1 EM0215186 EMV 76 S-00871A-SW871A-OACTUATOR 30 03MAY04 04MAY04 DR-N ML-N 0 EM0 j 8 6SI871A ACTUATORREB; ID(SWAP)

REBUILD (SWAP) 1200' 1759 ORT3-N R-N P.14 CONTSPRAY PU P SUCTION FR 154 1

B42TRN-2 EMV B-42 EM JIT TRAINING FOR 4

03MAY04 03MAY04 9

B42TRN-2EM JIT TRAINING FOR 6-42 BOLTED FAU TS (NIGHTS) 1B-42 BOLTED FAULTS 19-00 I

2259 155 1 EM0202527B EMV 76 B-42 16B42REMOVE 20 04MAY04 05MAY04 DR-N ML-N 0

EM02025275 1 2REMOVE BUC SMR01-128 1R28 BUCKETS MR 08:00 03:59 ORT3-N R-N 0202527 4__

4 80V M'TOR CONTR80 156 1 EM0202527A EMV 76 B-42 1B42VENDORTO 12 05MAY04 05MAY04 DR-N ML-N 40 E 0202527A1B-2 N42 OORTO REPLACE BUCKET 04:00 15:59 ORT3-N R-N 0202527 480%

157 1 EM0202527 EMV 76 6-42 1-B42 ADD BRACES MR 35 05MAY04 06MAY04 DR-N ML-N 0

EM02025271842 BRACESMR 01-128M/U1R28 04:00 14:59 ORT3-NR-N 0202527 158 EPRAD10_2 EP EPMP21G QUARTERLYEP RADIO 3

04MAY04 4MAY04 DR-N ML-N 1551 EP-RADIO20ARTERLYEP R 0I CHECK CHECK 09.00 11:59 ORT3-N R-N N

159 1 EP0301910 EPI 77 U1-CONTAINl INSPECTCTMTAND 19 28APR04 05MAY04 DR-YML-Y 153 CTMTAND FEELAIERPENETRA NS FEEDWATER 08-OOA 1059 ORT3-Y R-N UNIT 1 NCO 160 1 EP0301901 EPI 76 RH VT-2ASMEXIPERIODIC 4

02MAY04 03MAY04 DR-NML-N 0

lp1 VT-2AS1 'EXIPERIODICPR£55URETEST -RH PRESSURETEST-RH 19:00A 15:59 ORT3-Y R-N RH SYS EM MULTI ANDIO NON-NUMBERED UIPMENT0301901 161 1 NG44TFClEV EPI 77 IST-SISI ENG EVAL FOR FAC I1 04MAY04 04MAY04 DR-Y ML-Y 0

NG44TFCIEVE GEVALFORFAC ROG-TURBHALL44FTGENAREX PROG -TURB HALL 44 08:00 08:59 ORT3-Y R-N 0301897 SECONDARYINS VCE INSPECTION Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATiON Sheet 9 of 29

© Primavera Sylems, Inc.

I FL-03 Execution Publication Set

after O3MAY04 12:00 U1R28 WORKING SCHEDULE after 03MAY04 12:00

  1. ILu ID EPVNCC RESPI WO MAY EQID DESCRIPTION RD ES EF RISK Mon 3 Tue 4 ST 1.1 12.14.16.1 METEDATA Q) FROM CFCS IPMENT REPAIR/SE RVICE 0400553 162 1

EPP 76 SERVICE OBTAIN NAMEPLATE DATA (EC) FROM CFC'S 2

27APR04 03MAY04 1600A 14:59 DR-Y ML-Y ORT3-Y R-N 0

P MNCCOBTAIN I

MISC EGl 16311 EP0302115A I EPT 76 SC-1B SC-lB -INSTALL COND I 3 05MAY04 05MAY04 TUBE SHIELDS (1B) 07:00 09:59 DR-Y ML-Y ORT3-Y R.N 0

EP0302115ASCl 6 -INSTALLC 0302115 CONDENSER NG-SC1A.

MAIN COND.1 03019 9ICONDEN NG-S 1B.p MAIN CO 01981mCOt 164 1 NG-SC1A-TP IEPT n77 SC-1A MAIN COND TUBE 3

05MAY04 [05MAY04 I DR-Y ML-Y 0

PLUGGING (1A) 10.00-12Z59 ORTY RN 165 I

NG-SC1B-TP FG0300155 EPT FG1 77 SC-1B MAIN COND TUBE PLUGGING (1B) 3 05MAY04 05MAY04 13:00-15:59 DR-Y ML-Y ORT3-Y R-N 0

166 0 77 MISC REMOVE VEGETATION l 35 1 03MAY04 I 07MAY04 IN ISOLATION ZONES I I 07:00A l 14:59 DR-Y ML-Y ORT3-Y R-N 128 GOi0155 REM-VEGETATION IN ISLATION ZONES I111119 11-II 167 0 FG0408042 FG1 DOOR-062 REPLACE WEATHER 2

03MAY04 03MAY04 672 STRIP ON DOOR-62 13:00 14:59 168 1 FG213064P FG1 76 MS-0001OA PAINT VALVE 1MS-10A 4

03MAY04 03MAY04 DR-Y ML-Y 0

18:00 21:59 ORT3-Y R-N J69 1 FG216557P FG1 76 FD-00282C PAINT 1 FD-282C 8

03MAY04 04MAY04 DR-Y ML-Y 0

22000 05:59 ORT3-Y R-N 170 1

FG214082P FG1 76 HX-021A PAINT FD-2410 24 03MAY04 04MAY04 DR-Y ML-Y 510 22:00 23:59 ORT3-N R-N 171 1

FG212642P FG1 76 FD-00225A PAINT FD-225A VALVE 4

04MAY04 04MAY04 DR-Y ML-Y 0

06:00 09:59 ORT3-Y R-N 172 1 FG0212B03 FG1 76 CPP-51 ICPP-51 REMOVE PAINT 12 04MAY04 04MAY04 DR-Y ML-Y 0

06:00' 17:59 ORT3-Y R-N 173 1 FG302663P FG1 76 FS-02852 PAINT PIPING FOR 22 04MAY04 05MAY04 DR-Y ML-Y 32 IFS-2852 06:00-16:59 ORT3-Y R-N 174 1 FG0212694 FG1 76 PIPING HB-1PIPING HB819 REPAINT 72 04MAY04 07MAY04 DR-Y ML-Y 0

08:00-07:59 ORT3-Y R-N 175 1 FG0212804 FG1 76 CPP-50 ICPP-50 REMOVE PAINT 12 04MAY04 05MAY04 DR-Y MLY 0

18:00' 05:59 ORT3-Y R-N G0 D804 2REPLAC f"0408042

21 3 064pPAI`

0213064Ow FG216551 02165!

FG21408r E WEATHER STRIP VALVE iMS-10A IHPTURB STEAM iPAINT IFD-282C rlHX-PAINT FD-2410 ON DOOR-62

UPPLY INLET PX-2 X MSR LS-2530/LC 25 ROOT 2515 UPPER ROO0 ISOLATION 02140d 1114P FFFWAT1t7R HEATERl 5A FG212642PPAIiFDe225A VALVE 0212642 HX-17A U' FWH I FG0212803 I REMOVE PARN 02128030_U1C FG302663P l PING FOR 1FS-

% LC-2505 LOWER I:$OLATION

^ PIPE PENETRATIC d - lnA-I I Ul D

4852 I

03026631

P FG0212694 1 IPING HB-19 REPA NT 02126941 I

m FG02128041CPI 0212804W 1-50 REMOVE PAIN 1HI'

_U

, r PIPE PENETRAl

'-36 CLEAN RUS 1761 1 FG0212816 HP0301846 FG1 76 CPP-36 ICPP-36 CLEAN RUST AND PAINT MONTHLY RMS OPERATIONAL TEST 33 05MAY04 07MAY04 06:00 16:59 DR-Y ML-Y 0

ORT3-Y RN FG02128161CP1 177 0 HP 77 HP RMS

22. 01MAY04 I 05MAY04 07.OOA 16:59 DR-Y ML-Y ORT3-Y R-N 242 qp0j 1 846 MONTH Y RMS OPERATIO ALTEST IIIinHI 1-1--4 4

-4 1781 0 RE-234-B07 HP HP RMS RE-234r235 AIR SAMPLE CHANGE OUT 1

05MAY04 05MAY04 08:00W 08:59 DR-Y ML-Y ORT3-Y R-N 204 RE.234-B07F II E-2341235 AIR Si I

.I

_I I

Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATION Sheet 10 of 29 C Pnmavera Systems, Inc.

I FL-03 Execution Publication Set I

after 03MAY04 12:00 l

U1R28 WORKING SCHEDULE afterO3MAY0412:00 a

.u ID RESPJ MAY wo ST EQID DESCRIPTION RD ES EF RISK MF Mon 3 Tne 4 WIed 5 1791 1 IC0407662 IC 76 VNPSE-0001 I VNPSE-13REPAIR AIR 1

03MAY04 03MAY041 DR-Y ML-Y I

EA I

08OOA 1 259 ORT3-N R-N 30 3,10 m

lC04 IC02 CRI 180 1 IC0212595 I Ic 76 1 VNPSE-0321 1IVNPSE-3213 MINOR AIR 7 !03MAY04 03MAY04 DR-N ML-N I 0

LEAKS 08OOA 19.59 ORT3-Y R-N 7 6 6 2VNPSE-1 IVNPSE-3245 2595IVNPSE.

IC-250RETRII U

0. 2. 4. 6. 9.10i12.1 REPAIR AIR LEAK SUP FAN DISCHAR(

213 MINOR AIR LE

-6A.B U1C PURGE I

/E Z.16 CONSTANT E AIR UNE LUBRIC WKS XHAUST FAN SUCI SIREPLC BATT VTOR 0407662 ON0212595

0. 2.4.6. 8,10112,14.16.,

1811 2 ICRPIC-250 ICLS3579 IC O-RP-001C LS-03579 RETRIEVE Z-16 CONSTANTSIREPLC 2

03MAY04 I 03MAY04 12:00 13:59 DR-Y ML-Y ORT3-Y R-N 396 18121 1 ICI [ 76 DISASSEMBLE.CLEAN [15 19APR04 04MAY04 DR-YML-Y AND INSPECT LEVEL I l 1100A 15:59 ORT3-Y R-N 67 ICLSP !DIASSEtBIB. CLEAN AND IOSPECT LEVEL INStRU 1831' ICLS3580

'Cl 76 1L-03580 DISASSEMBLE, CLEAN I 15 I 19APR4 I 04MAY04 I DR-Y ML-Y AND INSPECT LEVEL I 1 1:00A 15:59 l ORT3Y R-N 67 I

=

b b

1 A

IP U

4VbtK WAI r_

ICLSE80 D17SASSE4BE LA AND IkSPECTLEVEL. INS TU A.Lis, MlJA ft I LUWVY L

_L_ __ - --- - ____ -

S C

1 H

ONDENSER WATE RB OX N. L OW Ll l

l l

18141 1 ICLS3581 IC' 76 18-03581 DISASSEMBLE. CLEAN 1 15 1 19APRO4 I04MAY04 DR-Y ML-Y AND INSPECT LEVEL I 11:OOA 15:59 ORT3-Y R-N 67 I:QS151DISASSE43BLE, CLEAN A CTtVEL INSRU

_ts

_^

NSv-A nnOFNDNFR WATEI nX In I oW II 1851 ICLS3582 ICl 76 LS-03582 DISASSEMBLE. CLEAN 1 15 1 19APRO4 04MAY04 DR-Y ML-Y AND INSPECT LEVEL I

1 1:00A 15:59 ORT3-Y R-N 67 ICL 158 2DtSASSE BBLE, CLEAN AND I SPECT LEVEL IN 1861 IC5A7-1 I ICI1 7 6 1 ICP-05.047 SECONDARY LEVEL 1651 19APRO4 09MAY04 DR-Y MI-V 0

I CONTROLLERS AND I 1o00A 10:59 ORT3-r R-N 1

8 7 1 1IC0302099 ICl 76 LC-02514 LC-2514 REFURBISH 65 1 APRO4 10MAY04 DR-Y ML-Y 11 :00A 10:59 ORT3-Y R-N 17 SC-IA ODENSER WATEI ZBOX #4 Low csr.k 1 SECONDA YLEVELCONTR Cot 2099 LC-2514 IEFURBISH IC03 508511.8-237 SMALL STEAM ON LVL SW cs.

ICP 5.53 SEC PREUR 11881 1 IC030585I IC 1 76 LS-02376 1LS-2376 SMALL STEAMj 651 19APRO4 10MAY041 DR-Y ML-Y Io LEAK ON LVL sw II 1OOA 10:59 ORT3-YR-N CC2 I

A 1

189 1

IC5.53 Ici 76 ICP-05.053 ICP 5.53 SECONDARY I 50 I 02MAY04 09MAY04 I DR-Y ML-Y HIGH PRESSURE 08:OOA 06:59 1ORT3-Y R-N 32 190 1

IC0307192 ICI 76 Z-016 Z-16 CONTINGENCY 5

03MAY04 03MAY04 DR-Y ML-Y 0

TROUBLESHOOTER 06:00A 16:59 ORT3-Y R-M 191 1

ICD400553E ICI 76 SERVICE SERVICE MAINT 2

03MAY04 03MAY04 DR-Y ML-Y 1

SUPPORT EQ VERIF -

09:OOA 13:59 ORT3-Y R-N 192 1 IC0400553C ICI 76 SERVICE SERVICE MAINT 9

03MAY04 04MAY04 DR-Y ML-Y 106 SUPPORT EQ VERIF -

11:OOA 12:59 ORT3-Y R-N 193 0

IC0300680 ICI 77 Z-107G REPLACE MEMBRANE 1

04MAY04 04MAY04 DR-Y ML-Y 304 07:00 07:59 ORT3-Y R-N 194 0

IC0300687 IC1 77 Z-107D EXPLOSIVE DETECTOR 6

04MAY04 04MAY04 DR-Y ML-Y 0

CLEANING 07:00 12:59 ORT3-Y R-N 195 1 IC5.75 ICI 76 ICP-05.075 NI AUXILIARY CHANNE 20 04MAY04 05MAY04 DR-Y ML-Y 36

- INSPECT 07:00 15:59 ORT3-Y R-N 1C031 SERC IC0 7 1 9 2 Z16 COI RREAC ICE MAINT St

  • MISC EQUI 0553CSEFM'(

TINGENCY TROUBI

'OR CAVITY MANIPI

'PORT EQ VERIF - I

'MENT REPAIR/SEF MAINT SUPPORT ESHOOTER ILATOR 0307192

ONT FAN VICE EQ VERIF - LOOP A1EA

§ l

I I

I ICtPt CM IWP D DDDlAlt

.l-cfM n,

-r -

IC0300680RE 03006800F 1C0300687 EX 03006870 1C5.75N1,

'LACE MEMBRANE ORTABLE EXPLOSr

'LOSIVE DETECTOI MGATEHOUSE UaLtARY CHANNI

'I (ES DETECTOR t CLEANING EXPLOSIVES DETE LS - INSPECT

,F"wjjj ITOR S

03008801 NIS l

1961 0 IC0300684 ICi 76 C-025 MONTHLY PM ON DMIMJ 2

05MAY04 I 05MAY04 I DR-Y ML-Y SYSTEM 07:00' 08:59 ORT3-Y R-N 150 IC0300684 MNTHLY PM ON 0300684 UNWt 12 LOOSE Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATION Sheet 11 of 29 C Prmavera Systems, Inc.

I FL-03 Execution Publication Set I

after 03MAY04 12:00 l

U1R28 WORKING SCHEDULE afterO3MAY0412:00 ID RESPI WO EQID DESCRIPTION RD ES EF RISK MF Mn MAY TUe 4 Wed 5 0, 2, 4 R.

61,I12.14.16.1 ST 4.1Q12.14AR11

.2.4.S.

.1Ai12.14.1 191 1 IC0306002 IC2 76 S5-6050A 1S-6050A 10PS CH-1 OVERSPEED LIGHT 30 1 29APR04 07MAY04 08:OOA 01:59 DR-Y ML-Y ORT3-Y R-N C0366002 IS460501 IOPS CH-1 OVERS EED UGHT II t t

+

4-4-

1981 1 IC0303647 IC2 76 MMS ICP-6.037 CAL STEAM 2 02MAY04 Y

05MAY04 PLT INDICATORS 19.00A 04:59 DR-Y ML.Y ORT3-Y R-N 61 C03 I3647 1CP O.1ICAL STEAM PILT I DICATORS At_

r-S Wr n ~ MMS YSTEM MULTI j 199 1 IC1032A IC2 76 ICP-10.032 ICP 10.32 CONT H2 4

03MAY04 03MAY04 DR-Y ML-Y 0

RTD'S & PRESS SW 18:00 21:59 ORT3-Y R-N 200 1 IC4.34 IC2 76 ICP.04.034 CONTAINMENT 9

03MAY04 04MAY04 DR-N ML-Y 0

HYDROGEN ANALYZERS 22:00 19:59 ORT3-N R-N 201 1

ICS.31 IC2 76 ICP-05.031 GENERATOR 15 04MAY04 05MAY04 DR-Y ML-Y 84

_HYDROGEN GAS 19:00 22 59 ORT3-Y R-N 202 0 IC0300625 IC2 76 ICP-06.049 BATTERYANVERTER 40 04MAY04 09MAY04 DR-N ML-Y 212 ROOM TEMP SWITCHES 19 004 01359 ORT3-N R-N 203 1 IC1 32SDN IC2 76 ICP-13.002 CONTAINMENT 3 04MAY04 04MAY04 DR-N ML-N 479

__HYDROGEN 20:00' 22:59 ORT3-N R-N 204 1 IC0300795 1IC5-76 1I&C MISC I VISUAL INSPECTION OF 5 l25APR04 l03MAY04 1DR-Y ML-Y l49 t

-I RELAYRACKS I

I09:O0A I1659 1ORT3-YR-NI IC10.32AICP1 0300891f=

IC43 03008 07 9 5 VISUAL I MMISC IICP 5.50 SEC 0.32 CONT H2 RTD ICONTAINMENT H 4CONTAINMENT K

& PRESS SW CAL DROGEN MONITOF DROGEN ANALYZE

-

BRATION S

RS

-~

-(.CONT HYDROGEN ANALY7E11R ELEC TX

^

ICS.3 i GE O

HYDROGEN GAS SYSTDf 0300863" IC0300625BA 0300625[0 IC13.2SDNC 03007401 kY RACKS 0300795

PRESSURE I7EY~NERTR4~M TMPSWfl

)NTAINMENT HYDF ECONTAINMENT tOGEN iYDROGEN MOI C031 m

C5.5!

4SPECTION OF REI CWORKACTMTE.

)NDARY MIDRANG

~05 1 IC5.50 ICs 76 ICP-05.050 ICP 5.50 SECONDARY 40 1 28APR04 07MAY04 MIDRANGE PRESSURE 09
00A 12:59 OR-Y ML-y ORT3-Y R-N 47

-4'-l-

_I r:

206l1 IC0302917 IC5 76 C-108 1C-108 CORRECT WIRINGtABELING 4 1 01MAY04 04MAY04 09:OOA 09:59 DR-Y ML-Y ORT3-Y R-N 205 C0329 171C4108 CRRECTWIRINCUENG

,_- --, - - - - - -.. A^

-S I

U ERFl fN.SERTWWNI BIT PAELFJn-lnfl2I 207 t

IC9950758 IC5 76 N-00040 N-40 ECAD CABLE 5

03MAY04 03MAY04 DR-Y ML-Y 1

TESTING 09.00A 16:59 ORT3-Y R-N 2 08 1

IC04u8039 IC5 76 RT-10B RT-10u REPLACE RELAY 9

04MAY04 04MAY04 DR-Y ML-Y 0

06:00-14:59 ORT3-Y R-N 209 1

IC0408u40 IC5 76 RT-12B RT-12B REPLACE RELAY 9

04MAY04 04MAY04 DR-Y ML-Y 0

06:00 14:59 ORT3-Y R-N 210 1

IC9937804 IC5 76 PIT-02745A 1PIT-2745A&B REPLACE 24 04MAY04 07MAY04 DR-Y ML-Y 0

SENSINGTUBING 068:0u 07:59 ORT3-Y R-N 211 1

IC9950759 IC5 76 N-Ml04t N41 ECAD CABLE 3

04MAY04 04MAY04 DR-Y ML-Y 0

TESTING 07:00 09:59 ORT3-Y R-N 212 2

IC0301006 IC5 76 ICP-02.001 RPAND SGANALOG 5

04MAY04 04MAY04 DR-N ML-N 0

TEST-WHITE 07:00 11:59 ORT3-N R-M 213 2 IC040u536 ICs 75 LC-0u473E 2LC-473E REINSTALL 5

04MAY04 04MAY04 DR-Y ML-Y 300 MODULE 07:00 11:59 ORT3-Y R-N 4-40 :CAD CABLE MNI FIS rESTING 3ION CHANNEL IC0408039RT-1 B REPLACE RELAt 0408039 TRAIN B F E ICv408040RT-1 REPLACE RELA" 4080391 TRAIN B IFf IC99378041PT 45MB REPLACE S 99378040 IC9950759N ECAD CABUETE T 9950759 NI POWER RANGT 4 IC0301066 SG ANALOG 1 '

0301006 REACTOR PR01 IC04005362L 73E REINSTALL 114 0400536 2HX-1B SG L I

IC0306031 2L -3586A CHANGE MI ning611 Pi IAPnAM I ACTOR TRIP REL EACToR TRIP tRE k SENSING TUBING

,_fii~

ING CHANNEL ST-WHITE

'ECTION AND SAF IDULE

)P LOW LEVEL BIS iNTING BOLTS

-EVEL TRANSMl1

-GUARDS ANAL

'ABLE ER 2141 2 IC0306031 IC5 76 LT-03586A 2LT-3586A CHANGE MOUNTING BOLTS 8

04MAY04 04MAY04 I DR-Y ML-Y 07:00-14:59 ORT3-Y R-N 253

_______________ 11J.

J I

I Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATION Sheet 12 of 29 C Prlmavera Systems, Inc.

FL.03 Execution Publication Set l

after 03MAY04 12:00 U1R28 WORKING SCHEDULE after 03MAY04 12:00 U

ID RESP WO EarD DESCRPTION RD ES EF RISK MF MAY MnTue 4

wed 5 ST

__-.1-12,14,16,f 2O.2210,246

.4 8.101l2,14,16.18,202210,2,4,6,8.l01l2-l4,l6i 215 1 IC4.32B Ic5 76 1ICP-04.03 P29 LOW SUCTION 2

04MAY04 04MAY04 DR-N ML-Y 443 IC4.32E LOW SUCTION PRESS TRIP CAL PRESS TRIP CAL 09: 00 1-O59 ORT3-N R-N 03009 AFW SYSTEM A D CHARGING FLO V ELECTRONIC 218 1

1C9950780 Ics 76 N-00042 N-42 ECAD CABLE 3

04MAY04 04MAY04 DR-N ML-Y 0

IC99507 N-42 ECAD CABL TESTING TESTING 10:00 12:59 ORT3-N R-N 99507 [iNI POWER R kNGE CHANNEL 217 1 1C4.39STK Ics 76 1ICP-04.03 ICP 4.39-1 GOVERNOR 40 04MAY04 07MAY04 DR-Y ML-Y 0

IC l(P 4.39-1 GOVER OR VALVE STROF E VALVE STROKE 10:00 16:59 ORT3-N R-M

.03009_

218 1 IC9109761 IC5 76 N-00043 N-43 ECAD CABLE 3

04MAY04 04MAY04 DR-N ML-Y 0

Ic9 507 61 N-43 ECAD C IBLE TESTING TESTING 13:00 15:59 ORT3-N R-N 9 50761ANN POW R RANGE CHANN L 219 1 1C215A IC5 76 ICP-0ZOI5 ICP Z15 RP 4

04MAY04 05MAY04 DR-Y ML-Y 37 1C2.15AICP 2.15 rP PERMISSIVE)NI LAC PRE-CRIT PERMISSIVEN LOGIC 15:00 07:59 ORT3-N R-N 0300807[^

F EACTOR PO 220 1

IC9950762 Ics 76 N4-0044 N-44 ECAD CABLE 3

04MAY04 DR-N ML-Y 192 Is0995762 N-44 EC CABLE TESTIN TESTING 16:00 07:59 ORT3-N R-N 9950762t~

1 POWER RANG 221 1

IC0300941 ICV 76 RH-00626-0 RH-626 DIAGNOSTIC 2

03MAY04 03MAY04 DR-Y ML-Y 0 003 0941 RH-626 tGNOSTIC CHEC.

CHECK 1000A 13:59 ORT3-Y R-N E

HX-1 lAB R HX BYPASS FL W CONTROL OPER %TOR 0300941 222 1 1C0300939 ICV 76 RH-00624-0 RH-624 DIAGNOSTIC 10 03MAY04 03MAY04 DR-N ML-N 0 0C03 0939RH-624 GNOSTIC CHEC CHECK 14:00 23:59 ORT3-N R-N HX-I1A RHR H K OUTLET CONTRC OPERATOR0300 39 3

3 1 IC5.69-624 ICV 76 11CP-5.06 ICP-05.069ATRAIN A 10 03MAY04 03MAY04 DR-N ML-N 0 CS.

62lCP-0.

SATRANA 14:00 23:59 ORT3-N R-N

  • RTINARHR EAT EXCHANGER ALVEANDCONTR tLER0300989 224 0

IC0213035 ICV 76 IA-01249 LA-1249 AIR LEAKS 4

03MAY04 03MAY04 DR-Y ML-Y 0

IC0213035-A 249 AIR LEAKS 19:00-22:59 ORT3-Y R-N 0213035 ICV-133 RHR T LETDOWN ISOL CONTROL AIR INLET 225 1

IC0406275 ICV 76 MS-02706 1MS-2706, POST 4

03MAY04 03MAY04 DR-Y ML-Y 0

IC0627S1M 2706. POST REP. CK DIAGNOSTIC REPACK DIAGNOSTIC 19:00-22:59 ORT3-Y R-N 0406275 HP TURBINE D IN EXTRACTION ET CONTROL 226 1

IC5.10-133 ICV 76 ICP-05.010 CV-133 LTDN VALVE 4

04MAY04 04MAY04 DR-N ML-Y 2

IC5.

  • 33 3 LTDN ALVE STROKE STROKE 00 00-03:59 ORT3-Y R-N 030 852MMVALVE

- MISCELLANEOUS PRIMARY PLANT-I CONT 227 1 IC0216627 ICV 76 CV-01296 ICV-1296 POST MTN 4

04MAY04 04MAY04 DR-Y ML-Y 0

IC0216627i V'1296 POST MTN D GNOSTIC DIAGNOSTIC 19:00-22:59 ORT3-N R-N 0216627 AUXILIARY CHA GING LINE ISOL 228 1 IC0304454 ICV 76 CV-00296-O ICV-296 CHECK IA SY 1

04MAY04 04MAY04 DR-N ML-N 3

IC03044 1CV.296 CHECKI SYFOR FOREI FOR FOREIGN MATL 22:00' 22:59 ORT3-Y R-N 03044

[UIHX-2REGEN H TO AUXILIARY 229 1 100303022 ICV 76 CV-00296 1CV-296 POST REPACK 4

04MAY0.4 05MAY04 DR-Y ML-Y 0

1C03030 ICV-296 POST REAC DIAGNOS DIAGNOSTIC 22.00 9 01:59 ORT3-Y R-N 0303 1HX-2REGN HXTOAUXIL 230 1 MM0214055 MMI 76 HX-015A HX-15A. MOTOR 26 26APR04 05MAY04 DR-Y ML-Y 0 M0 14055HX-1 MOTOR COOLING COIL NTERNAL IN PECTION COOLING COIL 02:00A 23:59 ORT3-N R-N 231 1

MM9924975A MM1 76 HS-1 HS-1, REBUILD &TEST 10 26APR04 04MAY04 DR-Y ML-Y 12 M9 24975AHS1. REBUILD &TEST BER (SHOP)

SNUBBER(SHOP) 06:00A 10:59 ORT3-N R-N I

HX-IASGMAIN FTEAMLINEWEST;NUBBER99249 232 1 MM9934376A MM1 76 HS.15 HS-15. REBUILD&TEST 20 02MAY04 05MAY04 DR-Y ML-Y 0 Mg 34376AHS-15 REBUILD&TEsTlNUBBER(SHOP) l SNUBBER (SHOP) 10:OOA 09:59 ORT3-N R-N

__CONTAINMEN Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATION Sheet 13 of 29 C Primavera Systems, Inc.

I FL-03 Execution Publication Set

after 03MAY04 12:00 U1R28 WORKING SCHEDULE afterO3MAY04 12:00 ID IRESPI WO M^t EatD DESCRIPTION RD ES EF RISK hMFIN~

Mon3 I

Tie 4 IWed 5

ST B,10112,14,16,1120,221 02, 4,6, 8,10112,14,16,18,20,221 0, 2 t4 i6, 8iV012,4,161.

2331 1 MM0408036 I MMI 76 P-015B 1P-158.

18 I 02MAY04 I 04MAYD4 REPAIR/REPLACE SEAL I 18:00A 05:59 DR-N ML-N ORT3-N R-N 0 mmolo9o3s1P-158.1 REPAIRIREPLACE~SEAL.

I 234 1

MM0407674 MMI1 76 VNCRD 1VNCRD, WELD REPAIR 4

03MAY04 03MAY04 DR-Y ML-Y 183 DUCT 00:OOA 21:59 ORT3-N R-N 235 1

MM0305397 MM 1 76 W-W1C1 W-1CI REPLACE 30 03MAY04 06MAY04 DR-Y ML-Y 19 SPRING ISOLATORS 06 00A 08:59 ORT3-N R-N 236 1 MM9933444 MM1 76 W-001C2-A W-1C2-A REPLACE 94 03MAY04 07MAY04 DR-Y ML-Y 0

BACKDRAFT DAMPER 06:OOA 17:59 ORT3-N R-N 237 1 MM0214187A MM1 76 C-2 INSPECT UPPER HATCH 20 03MAY04 05MAY04 DR-Y ML-Y 0

18:00' 02:59 ORT3-N R-N 238 1 MM0214024A MM1 76 C-1 INSPECT LOWER HATCH 20 05MAY04 07MAY04 DR-Y ML-Y 169 03:00 00:59 ORT3-N R-N 239 1 MM9934376B MMI 76 HS-15 HS-15. REINSTALL 2

05MAY04 0SMAY04 DR-Y ML-Y 0

SNUBBER. AS-LEFT 10:00 11:59 ORT3-N R-N 240 0 MM0407886 MM1 71 PIPING LA,1298 BROKEN PIPE 10 05MAY04 OSMAY04 DR-Y ML-Y 392 SUPPORT 12:00-22:59 ORT3-N R-N 241 1

MM-8857A1 MM1 82 HX-015B HX-15B, PERFORM SW 6

05MAY04 06MAY04 DR-Y ML-Y 0

r 3 LEAK CHECK & INSTALL 12W00 06:59 ORT3-N R-N 242 1 MM99249758 MM1 76 HS-1 HS-1. REINSTALL 6

05MAY04 06MAY04 DR-Y ML-Y 186 SNUBBER, AS-LEFT 12:00 06:59 ORT3-N R-N 243 1

MM0304995 MM2 76 P4028B P40288 - OVERHAUL 82 30APR04 10MAY04 DR-Y ML-Y 0

MAIN FEED PUMP 15:OOA 16:59 ORT3-N R-N 244 1

MM0407390 MM2 76 P-028B I P-288 INSPECT SPEED 6

01MAY04 03MAY04 DR-Y ML-Y 153 INCREASER 09:OOA 17:59 ORT3-N R-N 245 0 MM0407967 MM2 76 K-026 K-26. AIR UNE LEAK 3

02MAY04 03MAY04 0

13:00A 14:59 246 0 MM0304233 MM2 77 Z-675 RE ROPE INSPECTION 4 03MAYo4 03MAY04 DR-Y ML-Y 615 12:00-15:59 ORT3-N R-N 247 0

MM0201756 MM2 76 G-501 CHECK FREEZE POINT 1

03MAY04 03MAY04 DR-Y ML-Y 617 OF COOLANT 13:00' 13:59 ORT3-N R-N 248 0 MM0309475 MM2 77 SERVICE STORAGE LOCKER 6

04MAY04 04MAY04 DR-Y ML-Y 596 INSPECTION 07:00' 12:59 ORT3-N R-N 249 0 MM0201221 MM2 77 PBF-9148 GREASE PUMPS PER 8

04MAY04 04MAY04 DR-Y ML-Y 594 PBF-9148 07:00' 14:59 ORT3-N R-N i4040136 M0 07674 1VN C 4, WELD REPAIR DICT INC RD SYSTEM J¶ULTI ANDhOR NON aM0j0S3§?W.1C1 WEPLACE SPRING I OLATORS qIUMBERED EOUIPMENT0407674

  • r-
  • m





im M34W-C244 REPLACE BA'CIkaT DAMPER l



-R!pppp99w

'AN1214ig7A1NSF ECT UPPER HATCH I 024187 i 87f--I E

qsO N

ESONEL ACCESS AllI MMI214024AINSPECT

.OWER HATCH 0214024I§ "

MM993437(

99343.

MM04I 04(

MM-021 MM9924 992 LHS-115, REI NS I6fCONTAINPv Y8LA.1298 BR

~7A1 HX-158. Pi 4064w~j~

mB 5 HS-1. REIPE 4975-1 M01049928P-08 OVERHAUL MAIN tEED PUMP IEI qf-g f

-ll Mc MI Mc Mc

,0739 l1P-2813 STE

~

07967K-26, A MnSCBAIEB 104233WIRE R MTRAINII 01i756CHECI(

EG-O5 GTGI l

NSPECT SPEED INCREASER 1M GENERATOR FE D PUMP0407390 tUNE LEAK CHARGING COMP ESSOR 0407967

)PE INSPECTION S BLDG RM 140 OV-RHEAD CRANE 031

-REEZE POINT OF QOOLANT NERATOR AUXILW Y POWER SUPPLY MM0309475sTCRAGE LOCKER IN 0309475 MISC EUIPI MM0201221 SE PUMPS PER I 02012211 OUARTEF MM0201305PECT FIRE EXTING 0201305 WELDING 4233 DIESEL0201756

PECTION 4ENT REPAIRISERV

'BF-9148 LY PUMP GREASIN lJISHERS AND CUTTING EQt ICE 3S IPMENT 2501 0 I MM0201305 MM2 77 WELDING-EO INSPECT FIRE EXTINGUISHERS 8

04MAY04 04MAY04 07:00' 14:59 DR-Y ML-Y ORT3-N R-N 594 A

LL I. _______

J.

X l

Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATION Sheet 14 of 29 C Primavera Systems, Inc.

I FL-03 Execution Publication Set I

e

after O3MAY04 12:00 U1R28 WORKING SCHEDULE after O3MAY04 12:00

  1. U ID RESP WOl EQID DESCRIPTION RD ES EF RISK MF MAY

_ I I

ST I

I l10 12,14.16,18,20,2210

  • 2. 4.46. 8,10112.14,16,18,20.221.2.4.6. 810112i14i16i1 251 2

MM0301159 MM2 76 P-011A CHANGE OIL FLUSH 6

04MAY04 04MAY04 DR-N ML-N 0

MM0301159C GANE OIL, FLUSH 3EARNG SANDC BEARINGS AND CLEAN 08 00-13:59 ORT3-N R-N 0301159 COMPONE COOLING WATE PUMP 252 1 MM0305790A MM2 76 SC-1A CLOSE WATERBOXES 1 005MAYO4 OSMAY04 DR-Y ML-Y 2

MMO3O5790ACLO EWATERBOXE AFTER INSPECTION 06o00 15 59 ORT3-N R-N 0305790 CON 253 0 MM0201279 MM2 77 W-088 LUBRICATE AND 1

OSMAY04 05MAY04 DR-Y ML-Y 0

MM0201279i RICATE AND M MAINTAIN FAN 07 00 07:59 ORT3-N R-N 02012791 DE BLDG SUm 254 1 MM0301116 MM2 77 P-028A DRAW OIL SAMPLE FOR 2

05MAY04 05MAY04 DR-Y ML-Y 0

MM0301116D OIL SAMPLE ANALYSIS 07:00 08:59 ORT3-N R-N 0301116 STEAM GENER) 255 0 MM0201723 MM2 77 Z-389 REVERSIBLE BOOM 8

05MAY04 05MAY04 DR-Y ML-Y 572 MM0201723R SIBLE Boo CRANE QUARTERLY 07:00 14:59 ORT3-N R-N 0201723 REVE 256 0 MM0201323 MM2 77 P-138A GREASE PUMP 2

05MAY04 05MAY04 DR-Y ML-Y 0

MM0201323 REASE PUMP B BEARINGS 08:00 09:59 ORT3-N R-N 0201323 LETDOWN GA 257 1

MM0301117 MM2 77 P-028B DRAW OIL SAMPLE FOR 2

05MAY04 05MAY04 DR-Y ML-Y 576 MM0301117 RAWOILSAM ANALYSIS 09s00 1ias5 ORT3-N R-N 0301117 STEAM GEN 258 0 MM0201332 MM2 77 P-1388 GREASE PUMP 2

05MAY04 05MAY04 DR-Y ML-Y 575 MM02013 2GREASE PUM BEARINGS 10o00 11:59 ORT3-N R-N 02013 2OLETDOWN 259 1

MM9919654 MM2 77 P-028B IP-28B STOP OIL 30 05MAY04 08MAY04 DR-Y ML-Y 32 MM99196 4IP-28B STOP LEAKEINSTALL BAFFLE 10o00 06:59 ORT3-N R-N 99196 260 1 MM0305791A MM2 76 SC-1B CLOSE WATERBOXES 6

05MAY04 06MAY04 DR-Y ML-Y 0

MM030 r1ACCLOSEWA AFTER INSPECTION 12z00 06:59 ORT3-N R-N 03 261 1

MM0213109 MMV 76 CS-00038C 1 CS-00038C BODY TO 10 19APR04 04MAY04 DR-YML-Y 35 MOI 31 9l 38CBODYTO3BON LEAK BONNETLEAK 0900A 1Z.59 ORT3-NR-N U

IHX-18AIBS BDHXCLGFLOW ETURNTO1S 262 1 MM0216627 MMV 76 CV-01296 CV-1296-INSTALLNEW 8

27APR04 03MAY04 DR-NML-N 20 MO 627CV-129 -INSTALLNEW MPERMODO02 TRIM PER MOD 02-027 08:OOA 20.59 ORT3-NR-M AUXLIARYCHARGI GLINEISOLATION 216627 263 1 MM0407621 MMV 76 CVO)0296 1CV-296, BODYTO 12 27APR04 04MAY04 DR-Y ML-Y 0 M 07621 C

  • BODYTO 80 LEAK BONNETLEAK 21:00A 21:59 ORT3-NR-N 1HX-2 REGEN HX O AUXILIARYS 264 1

MM0303680A MMV 76 MS-02005 I MS-2005 - PERFORM 1

01MAY04 03MAY04 DR-Y ML-Y 22 MO 03680A1MS-2 05-PERFORM MO FOR ROUNDED E RANCE MOD FOR ROUNDED 1 I00A 12:59 ORT3-N R-M HX-1B SG HE ADERSAFETY0303 0

265 1 MM0214023 MMV 76 AF-00104 AF-104-INSPIMAINTAIN 13 01MAY04 04MAY04 DR-Y ML-Y 0

MO 14023AF.104 INSPIMAINTAIN ECKVALVE PER dMP9158 CHECK VALVE PER 1100A 15:59 ORT3-N R-N P-38BA PDISCHARGE TO HX-1B SGCHE 266 1 MM0407600 MMV 76 MS-00282 lMS-282 VALVELEAKS 8

01MAY04 04MAY04 DR-YML-Y 0 AM 0761MSM28 VALVEBLEAKS BY 20:00A 02:59 ORT3-N R-N HX.1 B SC BLOWDOWN TO HI-1 8B1/2 SGBD HXO 7600 267 1 MM0407601 MMV 76 MS-00478 1MS-478 REPACKVALVE 4

03MAY04 03MAY04 DR-Y ML-Y 35 M JI 6011M47 REPACKVALVE 0700A 15:59 ORT3-N R-N HX-1B G HEADER PT-478 I OOT 0407601 268 1 MM0400526 MMV 76 RC-00537 RC-537 - REPLACE 3

03MAY04 03MAY04 DR-N ML-N 0 M 00526RC-537 -REPLACE RELIEF PALVE RELIEF VALVE 12:00 14:59 ORT3-N R-N RC-500J REACTORVESSE LT-447/447ATHER REL0400526 Run Date 03MAY04 13:481 LT-03 STANDARD PUBLICATION Sheet 15 of 29 C Primavera Systems, Inc.

IFL.03 Execution Publication SetI

after 03MA Y04 12:00 1UlR28 WORKING SCHEDULE -7after 03MAYV04 12:00 U

ID MM0303681A RESPI WO ST EOID MS-02010 DESCRIPTION lMS-2010 -PERFORM MOD FOR ROUNDED ENTRANCE RD I

30 ES EF RISK MF mon 3 I

MA

.24.Tue 4

.4.AAM 2.1A.1 wed S 1.1011 il.2.4. A.R 1.11('112.14.IR.1 2591 1 mmV 75 03MAY04I 06MAY04 I DR-Y ML-Y 12:00 08:59 ORT3-Y R-M IAM0 03681AIMS.2t)10 - PERFORM MO§) FOR ROUNDED EfMTANCE

- I I -- -----

z1u I3 mmuWUUazo MMV lbi R(C-UUz1IA RC-52aA - REPLACE RELIEF VALVE I---.

3 UJMAYU41 I0MAYU4 I IJK-N ML-N 13:00 15:59 ORT3-N R-N 0

1.

1 I... -

. 1-v __

1 I -

i 4 1 1 1 1 IVmmFIatJ~

rMmv to KLUU~qDLI REIEF VALVE j

03MAY04 I04MAY04 IDR-N ML-N 14:00 07:59 ORT3-N R-N LC

--- I..



v I.

U RELIEF VALVE 03MAY04 I04MAY04 I L)R-N ML-N 15:00 08:59 ORT3-N R-N v3 I

273 1 MM0214141 MMV 76 SC-00991 SC-991 - REPLACE WITH PRETESTED VALVE 3

03MAY04I 03MAY04 I DR-Y ML.Y 19:00' 21:59 ORT3-N R-N



Io INSPECT VALVE -

RIVMMI1'.

W I UJMAYU4 I UbMAYLK UK-Y ML-Y 19:00' 00:59 ORT3-N R-N E

4-dgJI I M~mv

'U RC-00547D I RC-547D - REPLACE REIFVALVE

.3 04MAY04 I 04MAY04 I DR-N ML-N 07:00 09:59 ORT3-N R-N LC

- I...........

I de(b

-I MmLrz1b334q mmv lb

-St-00844A_ 1St-44ASEATLEAKAGEI 6 04MAY04 I 07MAY04 I DR-Y ML-Y I

07:00' 15:59 ORT3-Y R-N C0

~MM 1052sRC-S kREPLACE RELI 'VALVE WOR-1 RV EVEL INDICATOR VRPRESSURE PRXTECTION R0405 5

.AMO 0 0 MRC-545 -REPLACE REUE 'VALVE R-1 X-1A SG COLD LEG CHIANNELHEAD VE 4TOVERPRESS

%iM O1 528RC-546

- REPLACE REUE VALVE 040 X-IB SG HOT LE CHANNELHEADVE OVERPRESS AM0214141 5 991 -REPLACE WrHPRETESTED VA 0214141 CPP-280 PZR LIQ ID SMPL PIPE PEN1 7TION THERM M0214110M 218.OPEN &INS 'ECTVALVE.RMP 309-1 0400529 HX-1A SG HOT CEI-ICANNELHEAD %ETOVERPRE MM0216334 1S SEATLEK; MM0400530R 48-REPLACE IELIEF VALVE 0400530 HX-IBSGCOL LEG CHANNELME VENTOVERP MM030382S CONT ISOti N VALVE LEAK;Y MM0407697AW 1780AR REPLACE DLA 0407697 MM040T698A1 4 78-ARLEAK1 REPLACE DI 04OT6981 MM0214109 A 1

SPMAINTAIN0OPERATO 02141 09~~

MMO3 3680B1MS-200 0i0368 IMP NNE OR FAC PROGD-SNTAINMENT 44 FT tEN AREA I.

I

, I-.

I---

I.

c C7",1 mmIv M¶L.-Uc.Dqou RELIEF VALVE 3

04MAY04I 04MAY04 I DR-N ML-N 08:00 10-59 ORT3-N R-N C

1Za MMLUMMUJJ MMV Ifb bUU~p:1 SC-953 - CONT 1 20 1 04MAY04 I06MAY04 DR-Y ML-Y ISOLATION VALVE LEAKS1 06:00' 09:59 ORT3-N R-N C

t--t-----



+...4 4-I.

WU-U1(5d-VU IW(-1l68-VAJiLEAK,~

I 10 I 04MAY04 I Ob"MY134 REPLACE DLAPHRAGM I 119:00' 19:159 LC 7

I M~mv 75 1 WG-0118-11G1789-0 AIR LEAKI 10 I04MAY04 I05MAY04 I790 REPLACE DIAPHRAGM j

119:00" 119:59 LC

 A I I.......

I I.-

.CalI I I MMIJ2141UM Immv it)

Im_1_uzu11_U MS-2017 - INSP /

130 0 4MAY04 I07MAY04 DR-Y ML-Y MAINTAIN OPERATOR - I 119:00' 121:59 ORT3-N R-N RMP9309-2 1..- t---

-a 2B2 1

MM0303880 I MMV 76 MS-02005 IST-SISI lMS-2005 -REINSTALL VALVE AFTER MOD 10 05MAY04 I05MAY04 IDR-Y ML-Y 13:00' 23:59 jORT3-N R-M 564 U

49 2831 1 1 NG44CFCIND INDE NDE FOR FAC PROG-26 126APR04 I06MAY04 IDR-Y ML-Y CONTAINMENT 44 FT 08:00A 07:59 ORT3-V R-N GP1NJAREA I

j.,-=

I -

t I- -

I 2154 I1 Qlv

I .

NUE 77 U1-CONTAIN IVSAL INSPECTION OF-1 76 130APR04 I12MAY04 IDR-Y ML-Y CTTLINER PLATE I

08:OOA 07:59 ORT3-Y R-N 96

~p1

~UAL INSPECTION OF E~!iNPRLATE ElIU I

I I

I 3

285J1 1 JNG44TFCI1ND INDE 77 IST-SIS1 NDE FOR FAC PROG-16 103MAY04104MAY04 DR-VMLY TRB HALL 44FT GEN II09:OOA 107:59 ORT3-Y R-N AREAI PR

-TRB HALL 44 FT}3N RE

  • * ~~~

f~I%&Ufl4J

,~e,

~~~.AJ1IJVP-O-w--ISCNDR INSEROCr. E INSPECTION 2861 1 EP0301951 I NDE 77 a

CV009

~Qsz I I I E~qn1OE4 1 -C I

I.

n. --

t_

f-V-ZO - CHECK VALVE_

CLOSURE 3

034MAY04 0 4MAY04 01:00' 03:59 DR-Y ML-Y ORT3-V R-N 0

EPO:

0:

01951 CV-295 -CHE 01951=IHX-2 F OK VALVE CLOSLIF

'GEN HX CH-ARGIN E RADIOGRAPHY

'TO LOOP A COLD LEG CHECK II I..~...

a-".'"'r" I__

.I_

__I.I

-IJI I

Run Date 03MAY04 13:48 LT-03 STANDARD PUBLICATION ISheet 16 of 29 C Primavera Systems, Inc.

I FL-03 Execution Publication SetI

after 03MAY04 12:00 U1R28 WORKING SCHEDULE after 03MAY04 12:00 U j jRESPl WO j EQID DESCRIPTION RD ES EF RISK MF MAY LI I

I ST I I 910 12,14 16,11820.221 0. 2.4, 6, 8.10012,14.16,18,20221 0. 2. 4. 6. 8,10012,14,16.1 IE -

3 n__I E

287 1

EP0301953 NDE 77 CV-00304A CV304A CHECKVALVE 3

04MAY04 04MAY04 DR-Y ML-Y 0

EPO 01 954CV304A.C ECKVALVE CLOS RE RADIOGRAPHY CLOSURE 01:00 03:59 ORT3-Y R-N 0

0 1953 1PtIA RCP SEALWATER IN JECTION CHECK RADIOGRAPHY 288 1

EP0301954 NDE 77 CV-00304B CV-304B-CHECK VALVE 3

04MAY04 04MAY04 DR-Y ML-Y 0

EP3154V34 -CHECK VALVE CLOSURE RADIOGR ~PHY CLOSURE 04:00' 06:59 ORT3-Y` R-N 0301954an1 P 18 RCP SEAL WAT ~R INJECTION CHECK

~RADIOGRAPHY 289 1 EP0301955 NDE 77 CV400383 CV 383 CHECK VALVE 3

04MAY04 04MAY04 DR-Y ML-Y 23 EP0301955CV-383 CHECK VALVE CL SURE RADIOGRA fY CLOSURE 04:00 06:59 ORT3-Y R-N 0301955]WR LOOP B COLD LEG UX CHARGING Li E CHECK RADIOGRAPHY 290 1 ND0407589A NDE 76 T-026 T-026 - NDE /

10 05MAY04 06MAY04 DR-Y ML-Y 2

RADIOGRAPHY OF 17.0 03:59 ORT3-Y R-N ND0407589AT REPAIREDAREA

-0407673*

291 1

NM0309240 NMS 77 FE-02904A FE-2904A-CAL CHECK 2

04MAY04 04MAY04 DR-Y ML-Y 159 M

0g 4 R0AC CHKOFUTNDCS OF UTTRANSDUCERS 13 00-14:59 ORT3-Y R-N 0 09240EW01C1 C NT RECIRC FAN M TOR CLR INLE 292 1 NM0407660A NMS 77 FE42804A FE-2804A-CAL CHECK 2

05MAY04 05MAY04 DR-Y ML-Y 155 NM0407660AFE 804A.-CAL CH OF UT TRANSDUCERS 07:00 08:59 ORT3-Y R-N 0407660 W-1A1 CONT 293 0

OP0301239 OPO 77 O-PG021A WEEKLY 5

04MAY04 04MAY04 DR-N ML-N 597 OP0301239 LVMISCELLANEDUS DATA READIN S MISCELLANEOUS DATA 07:00-11:59 ORT3-N R-N 0301239 WEEKLY MISC ZLANEOUS DATA INGS READINGS__

294 0l OP0301237 OPO 77 O-PC-073.4 FP VALVE PosmoNl 4 05MAY04 05MAY04 DR-N ML-N 576 P0301237FP ALVEPosmo VERIFICATION CHECK 07:00 10-59 ORT3-N R-N

_P0301237 FPCOSTIO 295 0 OP0301277 OPO 77 PT-FP-006 FP CONTROL VALVE 4

05MAY04 05MAY04 DR-N ML-N 576 VOP0301277 POSmON 07:00 10:59 ORT3-N R-N OP030127 FPCONTR 296 0

OP0211062 OPO 77 04T-0007D IT-07E. P-32D SERVICE 2

05MAY04 05MAY04 DR-N ML-N 0

P l

P3 WATER PUMP

10100, 11:59 ORT3-N R-M P02110 2 P.320 E

297 0

0P021 1070 OPO 77 04IT-0007E IT-07E, P-32E SERVICE 2

05MAY04 05MAY04 DR-N MAL-N 0

00 7 ~E' WATER PUMP 1Z00 1359 ORT3-NR-M l0211070 NP-32E 298 01 OP0301061 OPO 77 O-IT-0007F IT-07F, P.32F SERVICE 2

05MAY04 05MAY04 DR-N ML N 0

lOlFOP 3 o 1 F

6 1 ^

-WATER PUMP 14:00 15:59 ORT3-N RM OP)1061IPT3 299 0 OP0301281 OPO 77 O-IT-0007G IT-07G, SERVICE WATER 4

05MAY04 05MAY04 DR-N ML-N 567 P0301281 ~

MOV TESTING 16D00 20:59 ORT3-N R-M 001281 300 0

OP0215356 OP1 77 O-PCMIDS WOPERATIONS MIDlSHIF 30APR04 06MAY04 DR-N ML-N 175 0PC 1 535 6OPERA IS MID SHIFT YROUTINE WEEKLY ROUTINE 00OOA 06:59 ORT3-N R-N 301 0 1 OP0301324 OPI 77 O-PC-102 PUMPSHIFTINGAN 2

04MAY04 04MAY04 DR-N ML-N 194 0P03 32 4SPUMPSHI GADP B

UMPS CWN PUMP BUMPS 00:00' 01:59 0RT3-N R-N P03C 1324SWNTL PUMP SHI F

TING AND CW PUMV P BUMPS 302 2 1 OP0301601 OP1I O-TS-034 TS-34. U2CACCIDENT 2

04MAY04 04MAY04 DR-N ML-N 194 _P03 j 6 0jT&34,U2CAC EIENTFANCOO UNITS FAN COOLER UNITS 00:00 01:59 ORT3-N R-N P03C i6OITSU34r2COACCIETFN UISSRTS Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATION Sheet 17 of 29 OPrimavera Systems, Inc I

FL-03 Execution Publication Set

tI after O3MAY04 12:00 l

U1R28 WORKING SCHEDULE afterO3MAY0412:00 U

ID RESPl WO EQID DESCRIPTION RD ES EF RISK MF Wed5

__I IST

.910112,14,16,18,20,221O 2,4. 6.8 8 10 2p16.18.20,2210o.2

.4.

6.8.1DI12.14.16.1 303 0 OP0301331 OP2 77 O-PC-DAYS OPERATIONS DAY SHIFT 35 03MAY04 08MAY04 DR-N ML-N 164 P0 1331 OPERA ONS DAY SHIFT Y ROUTINE WEEKLYROUTINE 08:OOA 11:59 ORT3-N R-N U

304 1

oP0301546 OP2 77 TS-ECCS-00 SAFEGUARD SYSTEMS I

03MAY04 03MAY04 DR-N ML-N 198 po jS4 6SAFEG ARD SYSTEMS VA[ VE AND LOCK VALVE AND LOCK 12.00" 12:59 ORT3-N R-N SAFEGUAR SYSTEMS VALVE A 1D LOCK CHECKLIU T030S46 305 0 OP0215479 OP2 76 O-IT-0011 IT-11.P1-12WBSPENT 2

03MAY04 03MAY04 DR-N ML-N 1 Po 1 54 7 9 T-, P-12An SPENT FUEL OOL FUEL POOL 12:00" 13:59 ORT3-N R-N P-12AIB S NT FUEL POOLCC OLING PUMPS021! 479 306 0 OP0301374 OP2 77 TSSW-001 SW VALVE POSmON 2

03MAY04 03MAY04 DR-N ML-N 197 DPO 1374 SW VA E POSON VER CAON VERIFICATION 12:00 13:59 ORT3-N R-N "SERVICE ATER FLCOW PATH ALVEPOSmON VE IFICAT 0301374 307 0 OP0301376 OP2 77 O-PC-008.2 MONTHLYAFW PUMP 1

04MAY04 04MAY04 DR-N ML-N 195 OP0301376 NTHLY AFW PUM DISCHARGE PtP G

DISCHARGE PIPING 08:00-08:59 ORT3-N R-N 0301376 MONTHLY AFW PU P DISCH PIPING T -MPERATURE C 308 0 OP0301378 OP2 77 TS-AFW-002 AF SYSTEM VALVE AND 1

04MAY04 04MAY04 DR-N ML-N 195 OP0301378 SYSTEM VALVEA NO LOCK CHECKS LOCK CHECKS 08 00w 08:59 ORT3-N R-N 0301378 AF SYSTEM VALVE rND LOCK CHECK N E 1

-~l -I u_ -

.l __ -

309 0 OP0215624 OP3 77 O-PC-043.3 CLEANSERVICEWATER 7

22APR04 03MAY04 DR-N ML-N 668 po 1s624CLEAN ERVICEWATERS RAINERS STRAINERS 16.WA 18:59 ORT3-N R-N SE VCE WATER STPI JNERSo215624 310 2 OP0301629 OP3 77 O-PC-025 PURIFYRWST I

03MAY04 03MAY04 DR-N ML-N 195 Po 016 2 9PURIFY RWST 16:00 16:59 ORT3-N R-N 0 01629[URECIF CULATION OR PUR FICATION OF RWS1 511 2 OP0301632 oP3 77 04C058 H2SEALOILSYSTEM t

03MAY04 03MAY04 DR-N ML-N 195 o 0 16 32H2SEA OILSYSTEMTEST TEST 16:00" 16:59 ORT3-N R-M 0 01632aHYDR GEN SEAL OIL sY TEM 312 0 OP0301447 OP3 77 O-TS-009 TssCONTROL ROOM 24 i 03MAY04 06MAY04 DR-N ML-N 172 P

01447TS-9. C NTROL ROOM W ;YSTEM CHECKS HNSYSTEM CHECKS 16:00-18:59 ORT3-N R-M 0 1447D I 313 0 OP0308219 OP3 77 O-PC-045.1 BLOWDOWNAIR 1

04MAY04 04MAY04 DR-N ML-N 188 p0308219BL0WD AIRRECEIVE S RECEIVERS 16:00W 16:59 ORT3-N R-N 0308219[1PER1 IC BLOWDOWN 0 AIR RECEIVER 314 0 OP0301387 OP3 77 04-C-001.4 PABVEINTlLATION 32 04MAY04 08MAY04 DR-N ML-N 157 OP0 3013 87PABVE TONCHECK CHECKS 16:00" 19:59 ORT3-N R-N 0331387 315 2 l U2GNDR011 OP3 l P0C-021.3 DRAINU2 MAIN 1

04MAY04 04MAY04 DR-YML-Y 0

U2GNDR011DRA NU2MAINELECTf ICALGENERAT ELECTRICAL 18:00 18:59 ORT3-Y R-N

[I 316 2 OP0301635 OP3 77 O-PC-025A.

SECURE RECIRC OF I

05MAY04 05MAY04 DR-N ML-N 181 P0301635SEC RWST/RESTORE SFP 16:00W 16:59 ORT3-N R-N 03016351S 317 0

OP0301393 OP3 77 O-PC-SWING OPSSWINGSHIFT 49 05MAY04 11MAY04 DR-NML-N 133 l2P030i3g3OPS WEEKLY ROUTINE 16:00" 22:59 ORT3-N R-N OPEI TIONS SWING S FT WEEKLY ROUTI E0301393*

EN I,-

U _ -

318 1 SOP-B04A OPS r

-42 PREPARATION FOR 8

03MAY04 03MAY04 DR-N ML-N 5 SOP 04APREPARTION FOR 18-4201 ITAGE 1B-42OUTAGE 0300A 1959 ORT3-N R-N 319 1 IT-531A OPS 77 O-IT-0531 LRPMRHRTOSUMPB 4

03MAY04 03MAY04 DR-N ML-N 0

P RHRTOSUMI BTRAINA TRAIN A 09:00A 15:59 ORT3-N R-N UNIT 1 ONT SUMP B SUC ION LINE LEAKTE (RFSD) 320 1 OP0205513 OPS 82 B52433E CW00003 PERFORM 1

03MAY04 03MAY04 DR-N ML-N 0 0P0 s513CW 3 PERFORM PMTI S OKE PMTSTROKE 12:00 12:59 ORT3-N R-N PWRTO 1C0 3SEAL WELLOU1 LETMOV0205513 Run Date 03MAY04 13:481 LT.03 STANDARD PUBLICATION Sheet 18 of 29 C Primavera Systems. Inc.

FL-03 Execution Pubilcation Set

after O3MAY04 12:00 l

U1R28 WORKING SCHEDULE I

after O3MA Y04 12:00 ID RESP WO EQID DESCRIPTION RD I ES I

EF I

RISK I MF M

MAY T

ST I

Tue 4 Wed 5 S

I I WO I I

I 1120.22 0. 2.4.6i 8I011204,16,18,20.2210.2

.4i6t 80i1104 E

1 :i -I _ to].

321 1

OP0300992 OPS 82 SC-00966C-I PMT STROKE SC-966C I 1 I 03MAY04 03MAY04 I DR-N ML-N PER IT 60 12:00 12.59 ORT3-N R-N 1 O 322 1

EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4

03MAY04 03MAY04 DR-Y ML-Y 364 OF INITIAL RCS 12:00 15:59 ORT3-N R.N 323 1

O-RT-068B OPS 77 O-RT-068 POST ULRT ON P-lA 4

03MAY04 03MAY04 DR-N ML-N 342 O CCW LINES 12:00 15:59 ORT3-N R-N 324 1 RF-3405 OPS 77 O-RF-340B CLEAN CHANGE 8

03MAY04 03MAY04 DR-N ML-N 144 HOTWELL & WATERBOX 12:00 20:59 ORT3-N R-N 325 1

OP0300945 OPS 76 SC-00955-0 SC-955 PMT STROKE 1

03MAY04 03MAY04 DR-Y ML-Y 0

PER IT 330 13:00-13:59 ORT3-N R-N 326 0 013sAGO OPS Gm01 RE-ALIGN G-02 TO 2A-05 I

03MAY04 03MAY04 DR-N ML-N 100 14:00 14:59 ORT3-N R-M 327 1 O-RT-035B OPS CPP-28A ULRT HOT LEG SAMPLE 4

03MAY04 03MAY04 DR-N ML-N 357 LINE - POST ORT 14:00 17:59 ORT3-N R-N 328 0 TRAIN-CE OPS REDUCED INVENTORY 2

03MAY04 03MAY04 333 JITT. CREW E 15:00 16:59 329 1

CL1.0C010 OPS CL-10C TURBINE HALL SW 6

03MAY04 03MAY04 DR-N ML-N 0C VALVE UNEUPS 15:00 21:59 ORT3-N R-N 330 1

YO4BRIEF OPS Y-04 IPTE BRIEF TO 1

03MAY04 03MAY04 0

DE-ENERGIZE 1Y-04 16:00 16:59 331 1

OP02151 62 OPS 82 AF-04006-0 AF-4006-O MOV PMT 2

03MAY04 03MAY04 DR-N MI-N 371 O STROKE PER IT-290 16:00 17:59 ORT3-N R-N 332 1

OP0306893 OPS 82 MS-02082-M 1MS-2082-M PMT 2

03MAY04 03MAY04 DR-N ML-N 338 n STROKE PER IT-8A 16:00 17:59 ORT3-N R-N 333 1

IT-531D OPS 77 O4T-0531 INSTALL SUMP B 4

03MAY04 03MAY04 DR-N ML-N 0

SCREEN 16:00 20:59 ORT3-N R-N 334 0 OPS-037-02 OPS 76 D72-16-08 IWP-037-02 OPS PMT &

1 03MAY04 03MAY04 DR-N ML-N 0

ALIGNMENT POST MOD 18:00 18:59 ORT3-N R-N 335 1

O-RT-027 OPS 77 O-RTM027 LURT SEAL 4

03MAY04 03MAY04 DR-N ML-N 14 RTRNtEXCESS 20:00-23:59 ORT3-N R.N 336 1 O-RT-032B OPS 77 O-RT-032 POST URT OF N2 TO SI 4

03MAY04 03MAY04 DR-N ML-N 375 ACC CONTINGENCY 20:00-23:59 ORT3-N R-N 337 0 TRAJN-CB OPS REDUCED INVENTORY 2

03MAY04 03MAY04 327 JITTCREWB 21:00 22:59 338 1

OP0300939 OPS 76 RH-00624-O RH-624 PMT STROKE I

04MAY04 04MAY04 DR-N ML-N 0

I PER IT 390 00:00 00.59 ORT3-N R-N 11P0

~P04

F-3 00992PMT snI IRC HOT LEG 33494AOPERI REACT(

0gPOST U OCCWTt

[OB CLEANICH, IOKE SC-966C PER SAMPLE SOLENOIt TING SUPPORT OF IR COOLANT SYSnI IT ON P-1A CCWL AND FROM P-IA Q INGE HOTWELL &

GAUGE GLASS CH, IT60 0300992 INITIAL RCS WALK M (RCS) PRESSUF NES (CONTINGENC

-15iP.17)0216001 VATERBOX GAUGE NGEOUT0215940 UWN

TEST-INtO40349 GLASSES PO1 0094 5sC-955 IERCHOTLE MT STROKE PER It 330

. SAMPLE ISOLATION OPERATOR 0300 45 013 14m RAI CLI Y0' OPO~

P01, 0:

G01-BRE-ALI PI 035BU-RT HC HOT I-CEREDUCEI C010TURBINE 3RIEFIPTE BR 1 5 1 6 2 AF4W6 15162Rf1P-2 06893 IMS-20i 06893]P-29

. 531DINSTAIl 15919m_

PS-037.021WP`

03061103PV O-RT-027U 02159661 O-RT-032B 0215970E TRAIN-CS OP03ti 030 O-RT-021 N G-02 TO 2A-05 r LEG SAMPLE UN LEG SAMPLE UNE INVENTORY JITT, HALL SW VALVE L ITURBINE HALL SE EF TO DE-ENERGD O MOV PMT STROI I AFP SUCTION FR(

2-M PMT STROKE I A.FP OVERSPEED T SUMP B SCREEN UNIT 1 CONT SUMF n7.02 OPS PMT & I R TO IC-04 SAFEG RT SEAL RTRNtEX

!REACTOR CO

)ST LLRT OF N2 TC NrrROGEN TO IEDUCED INVENTi 0939RH-624 PMT 9

)939§HX-IIARHR 15 FAPRE LLRT HX.

5987_B STEAl

  • POST ORT REW E NEUPS RVICE WATER VAL E IY-04
E PER IT-290 M SERVICE WATEF

'ER IT-8A lIP MOTOR B SUCTION LINE L UGNMENT POSTh lARDS BUS A (1MC

'ESS LETDOWN

)LANT PUMP SEAL SI ACC CONTINGE THE SI ACCUMUUJ RY JITT, CREW B ROKE PER IT 390

-IX OUTLET CONTF B SAMPLE UNE A GENERATOR SAl E LINEUPS OPERATOR AK TEST (RFSD) 3D m19)

ZETURN (P-1 1)

ICY ORS (P-14C) 31 OPERATOR PLE ISOLATION (P-339 1

O-RT-052A IOPS 77 O-RT-052 PRE LLRT HX-1 B SAMPLE LINE 4

04MAY04 I 04MAY04 00:00' 03:59 0

4C)

LLJ.

J.

Z..J A

L J..1.

Run Date 03MAY04 13:48j LT-03 STANDARD PUBLICATION Sheet 19 of 29 0 Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after 03MAY04 12:00 l

U1R28 WORKING SCHEDULE afterO3MAY0412:00 tD RESP wo Ear DESCRIPTION RD ES EF RISK MF o 3 Tue 4 Wed 5 II I ST I I

I I

10112.14.16,1.20,221 02.4. 6. 8.1012.14,16,18.20.22 0.2,4.

1 E1i Le -_,

i 3401 I

RF-070 OPS 77 O-RF-070 RF-70, CTMT FIRE HOSEf 8 SURVEILLANCE 04MAYO4 04MAY04 I DR-N ML-N 00:00 07:59 ORT3-N R-N 0

t 341 1

B421PTE OPS B-42 IPTE BRIEF TO I

04MAY04 04MAY04 0

DE-ENERGIZE 1B-42 01:00 01:59 342 0 013sAG02-C OPS G-02 ALIGN G-02 TO IA-OS &

I 04MAY04 04MAY04 DR-N ML-N 0

2A-05 FOR 1B42 01:00 01:59 ORT3-N R-M 343 1

0157-010 OPS 01-57 FILL & VENT RCDT 2

04MAY04 04MAY04 DR-N ML-N 130 PUMPS IAW O 57 02.00 03:59 ORT3-N R-N 344 1

O-RT-040 OPS 77 O-RT-040 LLRT P-B SEAL SUPPIY 4 04MAY04 04MAY04 DR-N ML-N 0

02:00-05:59 ORT3-N R-N 345 1 SOP-B04B OPS B-42 DE-ENERGIZE 1B42 PO 4 04MAY04 04MAY04 DR-N ML-N 0

1-SOP-4-B04 02:00 05:59 ORT3-N R-M 346 1 PT-FP-001 OPS 77 PT-FP-001 TEST CONTAINMENT 8

04MAY04 04MAY04 DR-N ML-N 468 FIRE DETECTORS 02:00-09:59 ORT3-N R-N 347 1

CL14AO10 OPS CL-14A TURBINE EHC VALVE 4

04MAY04 04MAY04 DR-N ML-N 0

LINEUPS 05:00 09:59 ORT3-N R-N 348 1 OP13A100 OPS TG-01-T EHC OIL SYS 4

04MAY04 04MAY04 DR-N ML-N 0

3 RESTORATION 05:00 09:59 ORT3-N R-N 349 1

O-RT-039 OPS 77 O-RT-039 LLRT P-A SEAL SUPPLY 4 04MAY04 04MAY04 DR-N ML-N 06:00 09:59 ORT3-N R-N 350 2

AC-377-1A OPS P-011A ENTER TSAC 3.7.7A FO 0

04MAY04 04MAY04 DR-N ML-N 602 2P-1 1A 07:00 05:59 ORT3-N R-N 351 2

01-178-2 OPS 0-17A RESTART U-2 LDGS 2

04MAY04 04MAY04 DR-N ML-N 600 07:00 08:59 ORT3-N R-N 352 1

IT-700 OPS 77 04T-0700 REACTORCOOLANT 4

04MAY04 04MAY04 DR-N ML-N 124 GASVENTVALVES 07:00 10:59 ORT3-N R-N 353 1

SOP-841A OPS B-41 PREPS FOR 12 04MAY04 04MAY04 DR-Y ML-Y 0

DE-ENERGIZING 1B-41 07:00 18:59 ORT3-N R-N 354 1

Ca1OB010 OPS CL-1OB CONTAINMENT SW 10 04MAY04 04MAY04 DR-N ML-N 11 VALVE 08:00 17:59 ORT3-N R-N 355 0 TRAIN-CC OPS REDUCED INVENTORY 2

04MAY04 04MAY04 311 JnTT CREW C 13:00 14:59 356 0 OPS-037-07 OPS 76 D72-21-08 IWP-037-07 OPS PMT &

1 04MAY04 04MAY04 DR-N ML-N 0

ALIGNMENT POST MOD 14:00 14:59 ORT3-N R-N 357 2 OP0301159 oPS 76 P-011A 2P-11APMTRUN 1

04MAY04 04MAY04 DR-N ML-N 0

15:00 15:59 ORT3-N R-N R - 7 0 RF-70, CTMT F 021 935[_F B21PTEIPTE BRIEF1 0135 G02-CAUGN G-021 11 tN57-010 FIU VEN N

C4T. 0 4 0 L.RT P-1B 215977SEA S P-BO4BDE-ENERG P1.FP.001 TEST CON 216009M_

CLi4A010TURBI OP13AI00EHC0 O-RT.039LURI 0215976M AC-377-IAEN I

0-17B-2RE IT.700RE 0215924w SOP4B41APR p

CB10B010C TR OP 0

RE HOSE SURVE1U RE HOSE AND FIRE O DE-ENERGIZE 1B 0IA-05&2A-05 F r RCDT PUMPS IAM SEAL SUPPLY INJECTION TO 1'-

ZE 18-42 PER 1-SO AINMENT FIRE DET EUNIT 1 CONTAIN&

4E EHC VALVE UNI ITURBINE EHC VAJ L SYS RESTORAhI(

RELECTRO HYDRA P-1A SEAL SUPPL' ESEAL INJECTION -

rER TSAC 3.7.7A F START U-2 LDGS

%CTOR COOLANT 6 NUNrT I REACTOI

-PS FOR DE-ENER(

DNTAINMENT SW V l

SER I1N-CCREDUCED IN X

603 7.0 71WP-037-07

)3061171P'WRTO P03011592P-11IA PA 0301159ECOMPd AC-377-IZEXITTS I

I ANCE STATION SURVEIL 42 1B-42 OUTAGE 0157 B (P-29B) 1-480-B04 CTORS ENT FIRE DETECT(

UPS (CL-14 VE LINEUPS IN JLIC CONTROL OIL

-0 IP-1A (P-29A)

)R2P-I1IA AS VENT VALVES COOLANT GAS VE ING 1141 PER I kLVE ICE WATER IN Cot IENTORY JIlT CR1

)PS PMT & ALIGNA C-04 SAFEGUARDt T RUN SIENT COOLING WP c 37.7A FOR 2P-1 ANCE TEST

)R TEST (REFUI N)

SYSTEM NT VALVES (CS SOP-480-BO2 ITAINMENT WC ENT POST MOC BUS B (1MOB-4 TER PUMP IA 358 2

AC-377-IZ OPS P-01 1A EXIT TSAC 3.77A FOR 2PA-1IA 0

04MAY04 I 04MAY04 I DR-N ML-N 16:00 15:59 ORT3-N R-N 593 L

I L ______________.L1.1 I

I__

Run Date 03MAY04 13:481 LT-03 STANDARD PUBLICATION I

Sheet 20 of 29 O Primavera Systems, Inc.

I FL.03 Execution Publication Set I

after 03MAY04 12:00 U R28 WORKING SCHEDULE after O3MA Y04 12:00 oID RESP WO EQID DESCRIPTION RD ES EF RISK MF M~rl 3 TUQ 4 MWed ST

_o 1310,41,82.20246

_,020 6

6_ 8.

_i 12.1_16 359 1 0 TRAIN-CD OPS REDUCED INVENTORY 1 2 1 04MAY04 04MAY04 JITT. CREW D 1 6:00 17:59 308 360 2 AC-381E-SA OPS G-01 ENTER TSAC 3.8.1.E 0

04MAY04 0

FOR A TRAIN DIG OOS 17:00 361 1

B41IPTE OPS B-41 IPTE BRIEF TO I

04MAY04 04MAY04 0

DE-ENERGQZE 1B-41 18:00 18:59 362 1

SOP-B418 OPS 8-41 E-ENERGIZE 18-41 PE 2

04MAY04 04MAY04 DR-N ML-N 0

1-SOP480-B02 19:00 20:59 ORT3-N R-M 363 0 TRAIN-CF OPS REDUCED INVENTORY 2

04MAY04 04MAY04 305 JITT, CREW F 19:00-20.59 364 1

SOP-BS-03C OPS T4008C RECIRC & SAMPLE C 3

04MAY04 04MAY04 0

HUT 19:00 21:59 365 1

RF-400 OPS 77 O-RF-400 REFUELING CAVITY 3

04MAY04 04MAY04 DR-N ML-N 393 SKIMMER PUMP FILTER 20 00 22:59 ORT3-N R-N 366 1

O-RT-059 OPS 77 O-RT-059 LLRT TRAIN A CONT 8

04MAY04 05MAY04 DR-N ML-N 0

SPRAY CIV 21:00 04:59 ORT3-N R-N 367 1

OP0407661 OPS 76 VNPSE-0324 VNPSE-3245. PMT 2

04MAY04 04MAY04 0

o STROKE PER IT 360 22:00 23:59 368 1

SOP-841C OPS B-41 E-ENERGIZE 1B-41 PE 2

04MAY04 04MAY04 DR-N ML-N 0

1-SOP-480-302 22.00 23:59 ORT3-N R-N 369 1

O-RT-034B OPS 77 O-RT-034 POST LLRT OF NORMAL 4

04MAY04 05MAY04 DR-N ML-N 0

CHARGING 22:00-01:59 ORT3-N R-N 370 2 AC-38AE-5Z OPS G-01 EXIT TSAC 3.8.1.E FOR A 0 04MAY04 416 TRAIN D/G OOS 23:59 371 1

OP9C-075 OPS OP-9C RESTORE 1

05MAY04 05MAY04 DR-N ML-N 63 CONTAINMENT PURGE 00.00 00 59 ORT3-N R-N 372 1 OP0216627 OPS 76 CV-01296 1CV-1296 PMT STROKE 1

05MAY04 O5MAY04 DR-Y ML-Y 0

PER IT 320 01:00 01:59 ORT3-N R-N 373 1 OP0303022 OPS 76 CV-0296 ICV-296 PMT STROKE 1

05MAY04 05MAY04 DR-Y ML-Y 43 PER IT 320 02:00 02:59 ORT3-Y R-N 374 1 O-RT-046B OPS 77 O-RT-046 POST LLRT FOR AUX 4

05MAY04 05MAY04 DR-N ML-N 0

CHARGING 02:00 05:59 ORT3-N R-N 375 1 SOP-CV-018 OPS CL-05A PERFORM SOP-CV-003 7

05MAY04 05MAY04 DR-N ML-N 0

ATTACHMENTS 1 & 2 02:00 08:59 ORT3-N R-N 376 1 O-RT4060 OPS 77 O-RT-060 LLRT TRAIN B CONT 8

05MAY04 05MAY04 DR-N ML.N 0

SPRAY CIV 05:00 13:59 ORT3-N R-N TRAIN-CD REDUC C-381E-5A ENTEI B41IPTEIPTE SOP-B41BDE TRAIN-CFRE SOP-BS-43CRE RF-400 R 0215943!

O-RT-054 0215992 OP04076i 040761 SOP4341 O-RT-034 021 591 AC-38AE Opg OPO OP 0-SOT D INVENTORY J

, CREW D TSAC 3.8.1.E FOR TRAIN DIG 00 BRIEF TO DE-ENE GIZE 1B-41 ENERGIZE 18-41 P R 1.SOP-480-Bi UCED INVENTOR) JITT, CREW F IRC & SAMPLE C UT I

TFUELING CAVITY KIMMER PUMP WREFUELING CA SKIMMER P LRlT TRAIN A CON ' SPRAY CIV P.14A PUMP/SI862A 1VNPSE-3245, PM STROKE PERT 19MW-2A/B U1C P RGE SUPPLY F

'RE-ENERGIZE 18 1 PER 1.SOP4 IPOST LLRT OF NlRMAL CHARGII ONORMAL C ARGING LINE(

5Z EXITTSAC3.

.EFORATRAI1

.075 RESTORE COI TAINMENT PUF 166271CV-1296 PH STROKE PER 16627DAUXLIARY HARGING LINE 3030221 CV296 PA r STROKE PER 303022E1HX-2RE EN HXTOAUX TC046B POST LLRI FOR AUX CHAF 21598101AU LIARY CHARGIN CV-018 PERFORM OPCV-003 ATI WO

=FILL & VENT CV, Q

~OR6LLRT IN B CONT S 0215993 P-14B F O-RT.066C l CONT PRESS 0215999 CONTAINMEN 37711 O-RT-066C OPS 77 O-RT-066C I LLRT CONT PRESSURE TRANSMITTER UINE 3

05MAY04 I 05MAY04 I DR-N ML-N 07:00X 09:59 ORT3-N R-N 3731 a-,

A A

J Run Date 03MAY04 13:48 LT-03 STANDARD PUBLICATION Sheet 21 of 29 C Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after 03MAY04 12:00 U1R28 WORKING SCHEDULE after 03MAY04 12:00

_I MAY U

tD RESP WO EQID DESCRIPTION RD ES EF RISK MF MAY Mon 46 u 14

.2205 I

ST 310 12,14,16,la20.221 0. 2.4. 6,

  • 0*02,14,16,18,20,21 O* 2.4
  • 6. 8*10012,14,16 i 378 0 OPS-037-01 OPS 76 D72-17-03 WP-037-01 ALIGN MOBS 2

05MAY04 05MAY04 DR-N ML-N 0

OPS-037-01 W037-01 AUI AND RESTORE P-038A 09.00 10:59 ORT3-N R-N 0306114 PWR TO C-0 379 1 SOP-CV-019 OPS CL-05A PERFORM SOP-CV-003 3

05MAY04 05MAY04 DR-N ML-N 0

SOP-CV-019 ERFORM SOP.

ATTACHMENT 3 09:00 11:59 ORT3-N R-N FILL & VEN 380 1 O-RT-055A OPS 77 O-RT-055 PRE LLRT HX-1A 4

05MAY04 05MAY04 DR-N ML-N 0

O-RT0 SAPRE LLRT BLOWDOWN 11:00 14:59 ORT3-N R-N 021509

_A STE 381 1

O-RT-067B OPS 77 O-RT-067 POST LLRT EX LTDN HX 8

05MAY04 05MAY04 DR-N ML-N 0

O-RTo, m POST LLRT CCW LINES 11:00 19:59 ORT3-N R-N 021 t 00 382 1 SOP-CV-021 OPS CL-05A PERFORM SOP-CV-003 6

05MAY04 05MAY04 DR-N ML-N 0

SOP-

.021 PERFORM ATTACHMENTS 4 & 5 12.00 17:59 ORT3-N R-N I

383 0 OPS-037-03 OPS 76 D72-16-13 IWP-037-03 OPS PMT &

I 05MAY04 05MAY04 DR-N ML-N 5

OPS 137.03 rWP037-ALIGNMENT POST MOD 13:00 13:59 ORT3-N R-N 0 06112EPWRT 384 0 TRAIN-CA OPS REDUCED INVENTORY 2

05MAY04 05MAY04 287R JNCAREDUCE JIIT CREWA 13:00 14:59 385 1 CSB11Z PPG P-0256-M ENDCONDENSATE 0

03MAY04 03MAY04 DR-N ML-N e124 C

IZENDCOND -NSATEPUMP-245 ORK PUMP-25B WORK 13:00 1259 ORT3-N R-N lCONDENSA1 EPUMP P-25B 86 1 SWTOIZ PPG MILESTONE CLOSETURBINE 0

03MAY04 03MAY04 DR-N ML-N 0 SV IZCLOSE Tn IRBINESERVICEW TERWORK WIND W SERVICEWATERWORK 15:00 14:59 ORT3-N R-N ITURBINE BUILDING SERVI WATER 387 1 CVX01Z PPG MILESTONE END CVCS HIGH 0

03MAY04 03MAY04 DR-N ML-N 157 CVX01ZEN CVCS HIGH PRES URE LETDOWN W)RK PRESSURE LETDOWN 19:00 18:59 ORT3-N R-N

.EI DCHARGING MAKE UP/LENDER WORK 388 1 RHAOiZ PPG MILESTONE END RHRA LOOP WORK 0

04MAY04 04MAY04 DR-N ML-N 0

HAOIZEND RHR LOOP WORK WINEOW WINDOW 02o00 01:59 ORT3-N R-N lEND RHR LOOP WORK 389 1 VNCC852Z PPG MILESTONE END CONTAINMENT FAN 0

04MAY04 04MAY04 DR-N ML-N 0

VNCCB52ZE 0 CONTAINMENT FAN COOLERS D V )RK COOLERS D WORK 08:00 07:59 ORT3-N R-N

.I ND CONTAINMENT AN COOLERS D \\/ )RK (B TRAIN) 390 1 CVX04Z PPG MILESTONE END CVCS SEAL 0

04MAY04 04MAY04 DR-N ML-N 136 CVX04 ZEND CVCS SEAL ILECTION WORK INJECTIONWORK 10:00 09:59 ORT3-N R-N lEND CVCS SEAL JECTION WORK 391 1

AC-3T5C2A PPG MILESTONE TSAC 3.7.5.C P-038A 0

04MAY04 04MAY04 DR-N ML-N 0

AG.375C-2ATSAC 3.7..C P-038A DOS TO UNIT 2 OOSTO UNIT 2 15:00 14:59 ORT3-N R-N l

IP438A EECTRIC DRIVEN A X FEED PUMP 392 1 AFA11A PPG MILESTONE START ELECTRIC 0

04MAY04 04MAY04 DR-N ML-N 0

AFAI1ASTART ELECTRIC DRIVEN TIN A AUX FEE DRIVENTRAINAAUX 15:00 14:59 ORT3-NR-N l 393 1 CVX02Z PPG MILESTONE END CVCS LOW 0

04MAY04 04MAY04 DR-N ML-N 11 CVXo2ZEND CVC LOW PRESSURE ETOWN WOR PRESSURE LETDOWN 15:00 14:59 ORTS-N R-N

.END CVC NORMAL LETDO WORK.

394 1 CVX05Z PPG MILESTONE END CVCS EXCESS 0

04MAY04 04MAY04 DR-N ML-N 388 CVX05ZEND CVC EXCESS LTDN & EAL RTN WOR LTDN & SEAL RTN 15:00 14:59 ORT3-N R-N lEXCESS ETDOWN & SEAL ETURN WORK 395 1 RHX99Z PPG MILESTONE 1 125V IWP 00-037 Ale 0

04MAY04 04MAY04 DR-N ML-N 0

RHX99ZI 125V 00-037 AIB TRAIN INTERFERANC TRAIN INTERFERANCE 15:00 14:59 ORT3-N R-N IMOM3 IFICATION 00-37 PSECUENCIN Run Date 03MAY04 13:481 LT-03 STANDARD PUBLICATION Sheet 22 of 29 C Primavera Systems Inc.

I FL-03 Execution Publication Set I

after 03MAY04 12:00 U1R28 WORKING SCHEDULE after 03MAY04 12:00 ID RESP EQID DESCRIPTION RD ES EF RISK MF MOn3 MAY Wed5 IU I I wo I I.II 12,14,111120.22 0, 2.4.6.,012.14,16,18,20,2210.2.4.6.l8112,14,16,1 396 1 AC-375C-2H PPG

SUMMARY

TSAC 3.7.5.C P-038A 349 04MAY04 19MAY04 DR-N ML.N 0

A; H35C-2HTSAC 3.7. C P038A OS TOUNIT 2 003 TO UNIT2 15-00 0359 ORT3-N R-N P-038A ELECT IC DRIVEN AUX PUMP 397 1

CVXo7Z PPG MILESTONE END CVCS 0

05MAY04 04MAY04 DR-N ML-N 2

CV 07ZEND CVCS MA KEUPIBLENDER MAKEUPIBLENDER 00:00 23:59 ORT3-N R-N lEND CHARGI G MAKEUP/BLE 398 1

CVX03Z PPG MILESTONE END CVCS NORMAL 0

05MAY04 05MAY04 DR-N ML-N 0

03ZEND CVCS ORMAL CHAR CHARGING WORK 02_00 01:59 ORT3-N R-N IEND CVCS NORMAL CHAR 399 1 S A02Z PPG MILESTONE CLOSE CTMT SPRAY A 0

05MAY04 05MAY04 DR-N ML-N 119 SIA02ZCLOS CTMT SPRAY TRAIN P-14A WINDOW 05:00 04:59 ORT3-N R-N

.ENDV10RKCTMTSPF 400 1

CVX06Z PPG MILESTONE END CVCS AUXILIARY 0

05MAY04 05MAY04 DR-N ML-N 125 CVX06ZEND CVCS AUXILL4F CHARGING WORK 06:00 05:59 ORT3-N R-N IEN CHARGING MA) 401 1

AFA1 1Z PPG MILESTONE END ELECTRIC DRIVEN 0

05MAY04 05MAY04 DR-N ML-N 90 AFA IZEND ELE TRAIN AAUX FEED 11 00 10-59 ORT3-N R-N 402 1

SIB02Z PPG MILESTONE CLOSE CTMT SPRAY B 0 05MAY04 05MAY04 DR-N ML-N 110O TRAIN P-14B WINDOW 14:00 13:59 ORT3-N R-N lEND 403 1

RPSH041-R RPI PACKAGE 41 REMOVE SHIELDING 3

03MAY04 03MAY04 DR-Y ML-Y 412 RPS 041RREMOV SHIELDING FOR I C-427 FOR RC-427 12:00 14:59 ORT3-Y R-N 04 2 RPSH096-R RP1 PACKAGE 96 REMOVE SHIELDING 8

03MAY04 03MAY04 DR-Y ML-Y 0 RPS 096RREMOV SHIELDING FOR FAN SHIELD WAL FOR C FAN SHIELD 12:00 20:59 ORT3-Y R-N 405 1

RPSH094-R RP1 PACKAGE 94 REMOVE SHIELDING 6

03MAY04 03MAY04 DR-Y ML-Y 0 RP H094-RREMO E SHIELDING FOR SIG MANWAY PL T.RHR PIPE FOR A SG MANWAY 17:00 23:59 ORT3-Y R-N 1

406 1 RPSH095-R RP1 PACKAGE 95 REMOVE SHIELDING 6

03MAY04 03MAY04 DR-Y ML-Y 0 RP H095R1REMO SHIELDING FOR SIG MANWAY HO LEG PIPE OR A SIG MANWAY HOT 17 00 23:59 ORT3-Y R-N 407 1

RPSH052-R RP1 PACKAGE 52 REMOVE SHIELDING 2

04MAY04 04MAY04 DR-Y ML-Y 0

RPSH052-RRE OVE SHIELDING F:)R 21 RHR UNE FOR21RHRLINE 07:00 08 59 ORT3-Y R-N 408 1 RPSH044-R RP1 PACKAGE 44 REMOVE SHIELDING ON 4 04MAY04 04MAY04 DR-Y ML-Y 382 RPSH044-RRE AOVE SHIELDING N RH-700 RH-700 07:00 10:59 ORT3-Y R-N 409 1

RPSH045-R RPI PACKAGE 45 REMOVE SHIELDING 66' 5

04MAY04 04MAY04 DR-Y ML-Y 381 RPSH045-RREW SHIELDING 6 FLOOR GAP FLOOR GAP 07:00' 11:59 ORT3-Y R-N 410 1

RPSH078-R RPI PACKAGE78 REMOVE SHIELDING ON 3

05MAY04 05MAY04 DR-Y ML-Y 0

RP H078-RREMOVE S ELDING ONR REGEN FOR CV-296 02:00 04:59 ORT3-Y R-N 4

S SDS CI-N E-G-

-NI

_E E

-I-411 TSDGS191 SDS 1CONT ENGINEERING 43 08APR04 10MAY04 DR-Y ML-Y 72 SI-191 ENGINEERING W

-SUMP INTRUSKo ISSUES WALKDOWN. SUMP 0800A 14.59 ORT3-Y R-N 412 1

SECCW03 SEC l 2

1B52-433E SECURITY OFFICER 1

03MAY04 03MAY04 DR-N ML-N 151 rEC 3SECUR OFFICERREQUI RDFORCW-0003SROKE

.REQUIREDFOR 1200 1259 ORT3-NR-N PWRTO 1CN?-3SEALWELLOu MOV0205513 Run Dat 03MAY041341 LT-03 STANDARD PUBLICATION Sheet 23 of 29 Pr~mivera Systems, II.C.I.

FL-03 Execution Publication SetI

after 03MAY04 12:00 U1R28 WORKING SCHEDULE j

after O3MAY04 12:00 to IRESF WO ST EQID D

D-24 DESCRIPTION SECURITY TO ESTABUSH COMPENSATORY RD ES EF RISK MF MAY 413 0 I SECB42COMP I SEC 2

04MAY04 I 04MAY04 DR-N ML-N 00:00 01:59 ORT3-N R-N Mn 3 I

Tue.- -

Wed s 1,t12.14,16,1920 2210,2,4,6. 81002,14,16,18.20,221 0.24.6840102,14,16f SECB42 MPSECURITY TO _STABUSH COMPE SATORY MEAS

_S

  • SECURITY PYSTEM BATERY 'HARGER rGs PORTPROV E CRANE, RIGGE AND TOOUROOM UPPORT(PT2)

____!in P

-I_

4 14 1 1 TiSUPPDRI T1G TG-01-T PROVIDE CRANE, RIGGER, AND TOOL ROOu 107 13APR04 I10MAY04 DR-YML-Y

_ OOA 18:59 ORT3-Y R-N 296

_4 I

I ---

I 413 I

i bU3Uz1qU I TGGl 70 PIPING CRO CROSSUNDER PIPING 19 1 20APR04 05MAY04 I DR-Y ML-Y INSPECTION/

I 1iOOA 14:59 ORT3-Y R-N REPAIRS(PT) o rGa 240CROS SNOER PIPINGI tNSr NIREPAIRS+12) rHP nL

^1s s

Ta.nwn71zm

=nn 7s I 11 I.. I I I bUU I-1 to L~j1ULzJO LO-258 -OVERHAUL 1 15 I 27APR04 05MAY04 DR-Y ML-Y SEAL OIL REUEF VALVE I I 07:00A 10 59 ORT3-Y R-N 6 I'TG 0 -LO.-25a OVERHAUL SEAL IL REUEF VALVE

-9P-59AAB AIR 417 1

TG99491 02B TGG 76 TG-01-TI LP1 - REMOVE 1 30 29APR04 04MAY04 DR-Y ML-Y 0

SCAFFOLD AFTER 16 00A 21:59 ORT3-Y R-N A41 1

rnn^,n,^

rl.

I 4I BELLOWS I

r I na Av 10

-oua

-:J I.I--

IyrK I^~t U-w( M-..

rG9 9102BLP - F OVE SCAFFO BELLOWS I ii i I -

I -

U -

U 1 I I -Vl--

I --

IV n'3-Uu.J-'-,

I "nraO nrLr, HYDROGEN RFCUI LATOR U17 00A4

.4 I

5 L9-T_ MLY 17OA 02:59 ORT3-Y R-N UZ rGO 2262 1HG.55 I ml I

419 1

TG-30770 TGG 76 1 TG-01-T I INSTALL AND TIGHTEN 5

29APR04 03MAY04 DR-YML-Y 0

HP UPPER HALF BLADE 18:OOA 16:59 ORT3-Y R-N Af>O I I Iy TflLAIV'hfQV m

70A1 Uv nn I

Alc nra IocmeF an

,nI A

nI flAU.I*A n-l Ul I

rG-3 rGH:

0 INSTALL J HHIGH 22DASYMSRI tEPLACE HYDROG TG-01 TG

,ND TIGHTEN HP Ul

)RESSURETURBIN TUBESIDE REAS_

EN REGULATOR.

HYDROGEN HEADI PER HALF BLADE

=0302153 EMBLY EPLACEMENT ILP1 LOW PRESSI R PRESSURE CON INGS

'ARATOR REHEATI RE TURBINE99 TROL 0302262 R0214086

--- I..

I -

I.

I ---

REASSEMBLY 11:00A 11:59 ORT3-Y R-N l ii a urizn i q

F 1

TG0303847 TGG 76 MS4)0006 MS VALVE LEAKING 5

30APR04 03MAY04 DR-Y ML-Y 0

BY, REPLACE VALVE 15:00A 16:59 ORT3-Y R-N 422 1

TG-30690 TwG 76 TG-01-T HAND CLEAN HP CYL 2

03MAY04 03MAY04 DR-Y ML-Y 0

HORIZONTAL JOINT 07DOA 16:59 ORT3-Y R-N 423 1

TG0302141 TwG 76 RO-02711 RO-2711 - INTERSTAGE 3

03MAY04 03MAY04 DR-Y ML-Y 0

ORIFICE INSPECTION 08DOOA 14:59 ORT3-Y R-N 424 1

TG03021368 TGG 76 P-037A P-037A-REASSEMBLE 4

03MAY04 03MAY04 DR-Y ML-Y 77 ZERO SPEED ASSEMBLN 10:00A 15:59 ORT3-Y R-N 425 1

TG-30870 TwG 76 TG-01-T INSTALL HP OUTER CYL 15 03MAY04 04MAY04 DR-Y ML-Y 0

COVER & BOLTING 17:00 11:59 ORT3-Y R-N 426 1

TG-8376B TwG 76 HX-023A HX-023A - CLOSE 10 03MAY04 04MAY04 DR-Y ML-Y 0

TURBINE LUBE OL 18:00' 17:59 ORT3-Y R-N COOLER 427 1

TG(403278 TGG 10 Z-008 GAS LEAK DOWN 20 03MAY04 05MAY04 DR-Y ML-Y 0

STREAM OF TEST 18:00' 17:59 ORT3-Y R-N SOLENOID_

428 1 TG-HX52-PT TGG7( 82 HX-052 HX-052 - PRESS TEST 4

03MAY04 04MAY04 DR-Y ML-Y 136 GEN EXCITER COOLER 22:00 01:59 ORT3-Y R-N 429 1 TG0302142 TwG 76 RO-02712 RO-2712-INTERSTAGE 7

04MAY04 04MAY04 DR-Y ML-Y 0

ORIFICE INSPECTION 07:00 13:59 ORT3-Y R-N A ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~...

.^_......o o^

~cTrs sA j*V^

r ~~s A

.TGO:,

T GW (0'

TGW, U

T T

03847MS-6-V MMHP Tn 1690HAND CU

-HIGH I

1 2

41RO-2711 NTG-1 HP 02136BP-037A TURBIN 30870INSTA ULVE LEAKING BY.

RB CYL HTG STEAP AN HP CYL HORIZI

'RESSURE TURBIN l INTERSTAGE ORI TURBINE INTRAST) l REASSEMBLE ZE

- LUBE OIL PUMP (:

.L HP OUTER CYL I REPLACE VALVE I SUPPLY YS-27441 INTALJOINT

E0302153

-ICE INSPECTION GE DRAIN ORIFICE O SPEED ASSEMI tHAFT DRIVEN)030:

OVER & BOLTING s v_ l vrxc %21-LOWDOWN030384 1302141 136 E TURBINE 302153 _

H I

G HI PRESSUP rG-8376BHX-0 0213957_

30403278SA M3A

- CLOSE TURBIE LUBE OIL COOL

_L..._r i.. __r _..

__i LEAK DOWN STREIM OF TEST SOLENplD u ivvE lL Wv a

0403278 I

TG-HX52-P 030211 rHX-052 - PRESS T 3TG-01 TG E (TG 0 30 2 14 2 RC 0302142P TG-3 030 IST GEN EXCITER

-01 EXCITER COOL 2712 - INTERSTAGI TTG-01 HPI IR74PRESTRESSI OOLER

~R ORIFICE INSPECI IRBINE INTRASTAI I TURBINE CASINC 3N E DRAIN ORIFIC BOLTING

'4oUI I I U-vD I Uu to ILWo-1 TURBINE CASING BOLTING 40 U4MAY04 06XMAY04 I LDR-Y ML-Y 12:00 19:59 ORT3-Y R-N U

I 7._

Run Date 03MAY04 13:48l LT.03 STANDARD PUBLICATION Sheet 24 of 29 C Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after 03MAY04 12:00 U1R28 WORKING SCHEDULE after O3MA Y04 12:00

  1. l U1 ID IRESPl WO EalD DESCRV N

RDI ES EF RISK MF MaA3

,Tue4 Wed5 Mn on 3

-flTu 4iiiwro ii ST I

I I

.10 12,14,16&la20221 0. 2.4.6 81001214,16.18.2,220

, 2.2.4. 6. 8.10012.14.16.11 431 1 TG0302143 TGG 76 RO-02720 RO-2720 - INTERSTAGE 7

04MAY04 05MAY04 DR-Y ML-Y 0

TG 3302`1RO-2720 -

STAGE ORFIC EINSPECTION ORIFICE INSPECTION 14:00 12:59 ORT3-Y R-N 302143!

TG-01 H 432 1 TG-8377B TGG 76 HX-0238 HX-023B - CLOSE 10 04MAY04 05MAY04 DR-Y ML-Y 0

TG837TBHX B. CLOSE TURB IE LUBE OILC TURBINE LUBE OIL 18:00 17:59 ORT3-Y R-N 0213958 r T

433 1 TG0302114B TGG 76 SC-1A COND FINAL INTERNAL 2

04MAY04 04MAY04 DR-Y ML-Y 6

TG0302114 COND FINALINTE RNALINSP (1A)

INSP (lA) 22:00 23:59 ORT3-Y R-N 03021 4[CONDENSER DEAERATING) 34 1

TG0302114 TGG 76 SC-lA SC-1A-CONDENSER 10 04MAY04 05MAY04 DR-Y ML-Y 578 TG03021 SC-iA. CONDEN ER INTERNAL I INTERNAL INSPECTION 22:00 08:59 ORT3-Y R-N 03021 CONDENSER(D 435 1 TG03021 158 TGG 76 SC-lB COND FINAL INTERNAL 2

05MAY04 05MAY04 DR-Y ML-Y 0

TG030211

  • COND FINAL I INSP (18) 10:00 11:59 ORT3-Y R-N 03021 5OCONDENS 436 1 TG0302144 TGG 76 RO-02721 RO-2721 - INTERSTAGE 7

05MAY04 06MAY04 DR-Y ML-Y 0

TGO 02144RO-2721 ORIFICE INSPECTION 13:00 11:59 ORT3-Y R-N 0 02144 437 1 TG0213965 TGG 76 MS-02729 INSTALL X4NDER UNE 5

05MAY04 05MAY04 DR-Y ML-Y 5

TG0213965K FLUSHING FIXTURE 17.00 21:59 ORT3-Y R-N 0213965 R~

{

]

I'.' -

Ui _

38 1 CL-2B WCC CL2B MODE 6TO MODE5 38, 25APR04 19MAY04 DR-N ML-N 0 L-2 MODE 6TO ODE S CHECKLIST I CHECKLIST 08O0A 08 59 ORT3-N R-N 39 1

CL-2E WCC CL2E MODE3TO MODE 2 557' 02MAY04 26MAY04 DR-N ML-N 0 1-MODE3TO ODE2 CHECKLIST CHECKLIST 19:00A 16:59 ORT3-N R-N 440 1 CL-2F WCC CL 2F MODE 2 TO MODE 1 577* 02MAY04 27MAY04 DR-N ML-N 0 C-MODE 2 TO t ODE i CHECKLIST CHECKLIST 19:00A 12:59 ORT3-N R-N 441 1

T-0475-R WCC SC-955 1 SC SC-955 IC REVO-1 I

03MAY04 03MAY04 1 T-04 IR1SC SC-9 5 IC REVO-1 12:00 1259 I SCSC-955 CREVO-10010475 442 1 T-1271-R WCC P-025A 1 CS P-25A OIL MM I

03MAY04 03MAY04 62 t-12 I RCS P-2 OIL MM REVO-1 REVO-1 12:00 12:59 ICSP-25AC ILMMREVO-10011 71 443 1 T-2607-R WCC SC-955-S I SC SC-955-S IC REVO-1 1 03MAY04 03MAY04 0 r-26 1 SC SC-S 5-S IC REV0-1 12:00 1Z59 1 SC SC-955 S IC REVO-1 001260 444 1

T-2706-R WCC P-0250 1 CS P-25B OIL MM I

03MAY04 03MAY04 0 T 27 1 CS P-2 i OIL MM REV0-1

_ I W

REVO-1 12:00 12:59 1 CS P-25BC IMMREVO-10012 06 445 1 T-7969-R WCC CV L/D I CV CV LfD SYSNVCT 1

03MAY04 03MAY04 37 799R 1 CVCVL SYSNCT MMV R

.1-1 MMVREVO.1-1 12:00 12:59 1 CVCVLD SYSVCTMMVR 1-10017969 446 1

T-8443-R WCC FS-2852 ISW FS-2852 MM 1

03MAY04 03MAY04 105 15W FS-2 52MM REVt-1 REVI-1 12:00 12:59 1SWFS-285 MMREV1-100184A3 447 1 T-8808-R WCC P-288 1 CS P-28B EM REVO.3-1 I

03MAY04 03MAY04 DR-Y ML-Y 177 i

T I CS P-28 EM REVO.34 l

12:00 12:59 ORT3-N R-N 1 CS P-28BIE MREVO.3-1 001880 448 1 T-0509-R WCC W-IA1/1A2 IVNCCW-iA1/1A2MM 2

03MAY04 03MAY04 98 T059 RIVNCCW WAtiA2MMREV0.

REVO1 1200 13:59 1VNCCW-AIIIA2MMREVO-1 010509 R03 1803 STANDARD PUBLICATION Sheet 25 of 29 C Primavera Systems, Inc. _

FL-03 Execution Publication Set I

after O3MA Y04 12:00 l

U1R28 WORKING SCHEDULE after O3MAY04 12:00

  1. l t

lRESP WO EQID DESCRIPTON RD ES EF RISK MF Mon YTue4 I

I I

I I

I I

O.2*141 20

.2.4J 6, 8,1I214,1618.2,22.

012.4 6 8.102,14.161

-g

-=

._.nI iM T-071-H -02A 1 H Z24A P.1 OP 2

0MAY4 03AYO 15 I-H1FZ.

RPBOSRE.

91'1 T-0721.H wCC Z-024A I FH Z-24A RP-1B OPS REVO-I 2 1 03MAY04 03MAY04 12:00 13:59 156 450 0 T-1678-H WCC IA-1249 O IA A-1249 IC REVO-1 2

03MAY04 03MAY04 5

12:00 13:59 451 1

T-2604-R WCC SC-966C 1 SC SC-966C MMV 2

03MAY04 03MAY04 0

REVO-1 12:00 13:59 452 0 T-7689-R WCC G-02 0DG G-2 HX-55B112 MM 2

03MAY04 03MAY04 0

REVO-1 12:00 13:59 453 1 T-7992-R WCC MS-2016 1 MS MS-216 MMV 2

03MAY04 03MAY04 124 REVO-1 12:00 13:59 454 1

T-8378-R WCC P-2A I CV P-2A MM REVO-1 2

03MAY04 03MAY04 DR-N ML-N 162 12:00 13:59 ORT3-N R-N 455 1 T-0510-R WCC W-1B111B2 I VNCCW-1BlIfB2 MM 3

03MAY04 03MAY04 70 REVO-1 12:00 14:59 456 1 T-1273-R WCC HX-21A I CS HX-21A MM REVO-1 3

03MAY04 03MAY04 217 12:00 14:59 457 1

T-8606-R WCC TURBINE I SWTTURBINE OPS 3

03MAY04 03MAY04 0

REVI.1 12:00 14:59 458 1

T-2659-R WCC P-029 I AF P-29 MM REVO-1 4

03MAY04 03MAY04 0

_1Z00 15:59 459 1 T-0467-R WCC RH-626 1 RH RH-626 IC REVO-1 1

03MAY04 03MAYO4 10 14:00 14:59 460 1 T-2095-R WCC ICP-5.77 1 VNCC ICP-5.77 IC 1

03MAY04 03MAY04 16 REVO-1 15:00 15:59 461 0

T-8731-R WCC K-26 O EBA K-26 MM REV1 1

03MAY04 03MAY04 671 15:00 15:59 462 1 T-2617-R WCC OiT-0531 1 SI HT-531 P-10A OPS 1

03MAY04 03MAY04 9

REVO-1 16:00 16:59 463 1 T-6929-R WCC 072-16-08 1 125V rWP 00-037-02 EM 1 03MAY04 03MAYO4 0

REVO-1 16:00 16:59 464 1 T-848-R WCC IT-531 1 SI HT-531 OPS REVO-2 I

03MAY04 03MAYO4 9

16:00 16:59 465 1 T-8853-R WCC RVLI 1 RC RVU RELIEFS MMV 1 03MAY04 03MAY04 153 REV2-1 16:00 16:59 466 1 T-3790-R WCC S6050A I IOPS S-6050A IC 1

03MAY04 03MAY04 79 REVO-1 18:00 18:59 1-H1I FH Z-24J IN 1 FH Z-24A 8HO IAlt-12j 00 IA IA-124!

LR I SC SC-9 MI SC SC-9(

5-R0 DGOG-21 NO DOG G-2 2R1 MS MS-E1 MS MS-2

&R 1 CV P-2A 1 CVP-2A1

-R 1 VNCC "1

VNCC%

I CS HX-2 m10 CS HX-:

-R I SW TUR 1 SWTUI

,R I AF P-29

~1 AF P--

rR I RH RH 0I RHRH-5-R1 VNCC I

!0951l VNCC I1-RO EBA K-'

731 I0 EBA P 617 R t SI I-1 1261711 SIln 929-R1 125VI 1692911 125' 848-R 1 SI IT-!

1884811 SI n 853-RI RCR%

t8853E1 RCI T.3790-R1 K1 00137901 T-8806H 1 101 00188061111 RP-IB OPS REVO-1 P-lB OPS REVO-1I IC REVO-1 IC REVO-10011678 6C MMV REVO-1 MMV REVO-1 001 X-558112 MM REVO V-55BI MM REVO.

6 MMV REVO-1 16 MMV REVO-I 001 M REVO-.

~M REVO-10018378 18111B2 MM REVO-181/1B2 MM REVO A MM REVO-1 IA MM REVO-10011 INE OPS REVI.I BINE OPS REV1-10 AM REVO-I MM REVO-100126 IC REVO-I 26ICREVO-100104 P.S.77 IC REVO-1 ICP-5.77 IC REVO-1 6MM REVO-I 26 MM REVO-1 1 P-10A OPS REVC 53 P-10AOCPS RE%

00P 0-037-02 EM RE IWP 00-037-02 EM I 1 OPS REVO-2 531 OPS REVO-2 REUEFS MMV RE RELIEFS MMVWj S S-6050A IC REVO SPS S-405A IC RE\\

S S-6050A IC REVi]

~PS SOSQA IC REY 010721 2604 0017889 r992 10010510 173 18606 o1 I

vo-1 VO-1 ZEVD-I V2-1 EV2-1

)-1 1-1 4671 1 T-8806-H wcc S-6050A 1

1PS S-6050A IC REVI-l 1

03MAY04 I 03MAY04 18:00 I

18:59 0

_~

________..1.

L Run Date 03MAY04 13:48j LT-03 STANDARD PUBLICATION Sheet 26 of 29 Plmavera S-ems. Inc.

I FL-03 Execution Publication Set I

after 03MAY04 12:00

l.

U1R28 WORKING SCHEDULE I

after O3MAt04 12:00

  1. lU l ID RESPI WO I EQID I

DESCRIPTON RD ES EF RISK IMF

-- MAY I II ST I _1.10112f14k16g2022102 24 6.8MOI12,14161820,2210, 2 4,6 8 1?U12,14i16,1 z7i; 1&_-61 I

ieq411#

Y.04~~~~~

~

r 4MFV120MY4 3A0 MRV-4681 I T-2622-H I WCC Y.04 I V Y-4 EM REV0-1 2

03MAY04 9MAY04 18:00 19:59 a

469 1 T-8771-H WCC CV-1296 I CV CV-1296 MMV I

03MAY04 03MAY04 21 REV2-1 19:00 19.59 470 1 T-2726-R WCC VNPSE-3213 I VNPSE VNPSE-3213 IC 1 03MAY04 03MAY04 25 REVO-1 20:00 20:59 471 1

T-7438-R WCC 0-rr-0531 1 SI IT-531 OPS REVI-1 1

03MAY04 03MAY04 129 21.00 21:59 472 0 T-167-R WCC 141249 0IA1W1249ICREV-1 I

03MAY04 03MAY04 23:00 23:59 473 1 T-7109-H WCC TG-01-G 1 TU TG-01-G EM REV4-1 1 04MAY04 04MAY04 DR-Y ML-Y 00_00 00:59 ORT3-Y R-N 474 1 T-7149-H WCC 1F52-122 1 345KV 1F52-122 APS 1

04MAY04 04MAY04 DR-N ML-N REV3-1 00:00 00:59 ORT3-Y R-N 475 1 T-0685-R WCC ICP-5.69A I RH ICP-5.69A IC REVO-1 1

04MAY04 04MAY04 01:00 01:59 476 1

T-7108-R WCC TG-01-G I TU TG-01-G EM REV3-1 1

04MAY04 04MAY04 DR-Y ML-Y a

01:00 01:59 ORT3-Y R-N 477 1

T-8439-R WCC RC-5268 I RC RC-526B MM 1

04MAY04 04MAY04 363 REVO-1 01:00 01:59 478 1

T-8809.R WCC TG-01-T 1 TUTG-01-TREV8.1-1 1 04MAY04 04MAY04 I 02:00 02:59.

479 1

T.7048-H WCC P-28B 1 CS P-28B EM REV2-1 1

04MAY04 04MAY04 DR-Y ML-Y a

04:00 04:59 ORT3-N R-N 480 1 T-7941-H WCC MS-02084 1 MS MS-2084 REVO-1 3

04MAY04 04MAY04 41 04:00 06:59 481 1

0135AG02-A WCC G-02 WPl-037-01 ALIGN G02 1

04MAY04 04MAY04 DR-N ML-N a

TO 1A05 & 2A05 PER 05:00 05:59 ORT3-N R-N 482 1

T-2622-R WCC YV04 1 Y Y-4 EM REVO-1 I

04MAY04 04MAY04 a

0600 06:59 483 1

T-7150-H WCC 1 F52-122 1345KVW1 F52-122 APS 1

04MAY04 04MAY04 a

REV2-1 06:00 06:59 484 1

T-7590-H WCC MROI-128 1480VIMR01-1281B142 2

04MAY04 04MAY04 BUS BRACING EM 06:00 07:59 485 1

T-8824-R WCC P-015B 1 SI P.158 MM REVO-1 3

04MAY04 04MAY04 8e 06:00 08:59 T-2622-H1,Y) 0012622*1 T-8771-14I C 00187711 T-2726-R1 00127263 T-7438-R 0017438 T-167 0011 T.7' 001 T-71 001 T-~

0o 01 04

-4 EM REVO-1 V

MM4 EM REVO-1 V

CV-1296 MMVRE CV CV-1N296 MMV 1VNPSE VNPSE-321:

I VNPSE VNPSE-3, 1 SIT.531 OPS RE 1SI IT-531 OPS RI 7 R 0 [A IA-1249 IC M810 AWO1249 I 09-H 1 TUTG-01.GI 710931 TULTG-01-C 49441 345KV 1F52-714931 345KV 1FS 685-R I RH ICP-5.61 1068531 RH ICP-5 108-RI TUTG-01C-1710831 TUT-0 439R 1 RC RC-526 1843931 RC RC -8809R 1 TU TG01

)01880931 TUTGal T-7048H 1 CS P.:

001704831 CS T.7941.H 1 MS M!

0017941_1 0I35AG02-AfPlI 001691931 12 T-2622-R I Y) 001262231)

T.7150-H 1 34 001715011 Z T-7590HI1 481 0017590Ol T-8824-R1 5 1 0018824 T-7109-R 1 'T 001710931 p-1 IV2-1 IC REVO-1 13 IC REV0-1

'1-1

.1.

V~I.

~EV0-1

  • M REV4-1

[EM REV4-1 122 APS REV3-1

-122 APS REV3-1

'A IC REVO-1

9A IC REVO-1 EM REV3-1 G EM REV3-1 3MM REVO-0 6B MM REVO-1 T REV8.1.1 1-T REV8.1-1 8B EM REV2-1 28B EM REV2-1

-2084 REVO-1 IS MS-2084 REV0-1 7-01 ALIGN G02 TC V IWP 00-037-01 El

-4 EM REVO-1 Y.4 EM REVO-1 KVIF52-122APSF 45KV 1F52-122 APS VMR 01.1281B.42 80VMR 01-128 1B

'-15B MM REVO-1 1 SI P-15B MM REV TG EM REV TUTG-01-G EM RE 1A05 & 2A05 PER C REVO-1 EV2-1 IREV2-1 2US BRACING EM 12 BUS BRACING E

-1

.1 4-1 1-35 EV01 A REVO-1 4861 1 T-7109R wCC TG-01-G J1TUTG-01-GEMREV4-1j 1 04MAY04 04MAY04 I DR-V ML-V 07:00 07:59 ORT3-Y R-N Run Date 03MAY04 13:48l LT-03 STANDARD PUBLICATION l

Sheet 27 of 29 C Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after O3MAY04 12:00 U1R28 WORKING SCHEDULE after O3MA Y04 12:00

  1. l U l

)

ID lRESP WO I EalD DESCRWTICON RD ES EF ISK MF Me I I I

ST I.12,1P416,1120.2210,

2. 4 8*
6. 110 12,14,16,1820.2210, 2 4, 6. 8 §1 Oij214,16,1 V~i;;ls aIZL140~1.-

I_~

fi 48171 1 T.7147-R wcc I1F52-122 1 345KVF82-122 APS REVI.1 I

4MAY04 I 07AY04 07:00 j07:59 I09 488 2 T.7690-H WCC P-011A 2CCP-11AMMREVO-1 1

04MAY04 04MAY04 0

07:00 07:59 489 1 T-7783-H WCC TG-01-G I TUTG-01-G EM 1

04MAY04 04MAY04 86 REV4.1-1 07:00 07'59 490 1 T-8697-R WCC EQW/D 1 VNCC EQ W/D IC 1

04MAY04 04MAY04 0

REVO-1 07:00 07:59 491 1

T-6123-R WCC CV-00275 1 CV CV-275 MW 3

04MAY04 04MAY04 0

REVO-1 07:00 09.59 492 1 T-8620-R WCC 5-YR I CW 5-YR DIVER CE I

04MAY04 04MAY04 DR-N ML-N 143 REV2.1 10:00 10:59 ORT3-N R-N 493 1 T-7048-R WCC P-288 1 CS P-288 EM REV2-1 3

04MAY04 04MAY04 DR-Y ML-Y 140 10W 12:59 ORT3-N R-N 494 1

T-6939-R WCC D72-21-08 1 125V IWP 00-037-07 EM 1 04MAY04 04MAY04 0

REVO1 11:00 11:59 495 1

T-2083R WCC PRT 1 RC PRT MMV REVO-1 3

04MAY04 04MAY04 282 11:00 13:59 496 1

T-0683-R WCC ICP-5.16 1 CV ICP-5.16 IC REVO-1 I

04MAY04 04MAY04 0

14:00 14:59 497 2 T-7690-R WCC P-011A 2 CC P-1 IA MM REV0-1 1

04MAY04 04MAY04 0

14:00 14:59 498 1 T-6919-H WCC D72-17-03 I 125V IWP 00037-01 EM I 04MAY04 04MAY04 13 REVO-1 15:00 15:59 499 1

T-69304-H WCC D72-16-07 1 125V IWP 00-037-03 EM 3

04MAY04 04MAY04 0

REVO-1 15:00 17:59 500 1

T-8804-R WCC AF-104 I AF AF-104 MMV REV1-1 1

04MAY04 04MAY04 65 16:00 16:59 501 1

T-9779-R WCC PZR I RC PZR HTRS EM I

04MAY04 04MAY04 DR-Y ML-Y 378 REVO-1 17:00 17:59 ORT3-Y R-N 502 1

T-5950-R WCC S140871A 1S SI-871A EM REVO-1 3

04MAY04 04MAY04 DR-Y ML-Y 18:00 20.59 ORT3-Y R-N 503 1

T-6122-R WCC CV-00296 1 CV CV-296 MMV 1

04MAY04 04MAY04 REVO.1 22:00 22:59 504 1 T-8770-R WIC CV-01296 1 CVCV-1296 MMV I

04MAY04 04MAY04 0

-_ I REVI-1 23:00 23:59 T.7147-R 1 0017147[i1 T.7690-2 C 0017690[I T-7T83-H1I 0017783011 T-8697-R1I 0018697111 T-6123-R1 C 0016123f§ T-862G 0018&

T-7048.

0017TO T-693 0016 T-20F 0012 5KV 1F52-122 APS 345KV 1F52-122 AP P-11A MM REVO-1 CC P-1 1A MM REV(

J TG-01-G EM REVA TlJTG01 EM RE ICC EQ W/D IC REI

/NCC EQ W/D IC RI CV-275 MMV REV I CV CV-275 MMV 1 CW 5-YR DIVER 0II CW 5-YR DIVE t1 CS P.288 EM RE 3p I CS P-28B E

-R1 125VvWPOO-0 39111 125VIwP00 1R I RC PRT MMVI 83 1 RC PRT t

.0683-R 1 CV ICP-5S 01068311 CV ICP-690R 2 CC P-1A 017690112CCIP-1I T-6919" 1 125VIW 0016919111 125VI T-6930- I1 125V W 0016930t1 12, T-8804-R I AF AF 001880411 AFA T-9779R 1 RCF 0009779111 RC T.5950-R 1 SII 0015950m T.6122-001612 T-877 0018*

T-87 001 REVI-1 3 REVI-1

.1-1

.1.1 10-1 REV4-1I rE REV2.i I CE REV2-1 V2-1 M REV2-1 7-07 EM REVO-1 D37-07 EM REV0-1 IEVO.1 MV REVO-1 16 IC REV0.1

.16 IC REV0-1 MM REV0-1 NMM REV0-1 00.037-01 EM 110.1 NP 0-037-01 EM R -

00-037-03 EM RE\\0.1 V P 00-037-03 E REVO-1 104 MMV REV1.1l

.104 MW REVI-1I ZR HTRS EM REV0 PZR HTRS EM RE%1 I-871A EM REV0.1 1 SI SI-871A EM RE I1 1 CV CV-296 MMV REVO-1 2111 CV CV-296 MNV REVO-1 w R1 CV CV-1296 MAV REVI-1 70°1 CVCV-1296 AMVREV1-1 TIR 1 CVCV.1296 MVREV2.1 1771111 CV CV-1293 MMV REV2-1 s0511 T-8771-R wCC CV-1296 I CVCV2-1296M REV2-1 00 0% 0 05M0A5Y 0000 593 c

I

.L

.5.

.5.



.5

.L I

Run Date 03MAY04 13:481 LT-03 STANDARD PUBLICATION Sheet 28 of 29 0 Primavera Syslems, Inc.

I FL-03 Execution Publication Set I

after O3MAY04 12:00 U1R28 WORKING SCHEDULE after O3MA Y04 12:00 U l U RESP WO EQID DESCRIPFlON RD I ES I

EF I

RISK MF MAY ST

.Mon 3

Tue 4

_p.,

I 1112n14,1618,20,2210,2, 4,6.

8,1011214,16,18,02 2 ;j0.224j6,8, jjfl2,l4l6I 506 1

T-3715-R WCC P-01 4B I SI P-148 MMV REVO-1 3

05MAY04 05MAY04 0

_S3715-R 1 StP-14 IMVREV0-1 02.00 04:59 l01375E1 SI P 148 MMVREV-507 1 T-7043-R WCC P-028A-M I CS P-28A-M EM REVO-1 1

05MAY04 05MAY04 DR-Y ML-Y 0

T-7043-R1 CS P-8A-M EM REVO-04:00 04:59 ORT3-Y R-N 0017043 1 CS F-28A-M EM REV 508 1 T-7047-H WCC P-028A-M 1 CS P-28A-M EM REV1-1 1

05MAY04 O5MAY04 DR-Y ML-Y 0

T.7047.H 1 CS P-28A-M EM REVI-04:00 04:59 ORT3-Y R-N 0017047t11 CS F-28A-M EM REV 509 1 T-0964-H WCC 621A01 1 MRR 6VJA01 RMP 1

05MAY04 05MAY04 I

T-0964-1I MR 62/A01 RMP 931 9302-1 EM REVO-1 05:00 05:59 001096411 MF R 62/AOI RMP 510 1 T-6919-R WCC D72-17-03 1125VIWP00-037-01EM 1

05MAY04 05MAY04 0

T-6919R 11 I 5V WP00-037-REV0-1 07:00 07:59 0016919J1 125VIWP0003 511 1

T-7047-R WCC P-028A-M 1 CS P-28A-M EM REV1-1 1

05MAY04 05MAY04 DR-Y ML-Y 77 T-7047-R CS P-28A-M El 09.00 09:59 ORT3-Y R-N 0017047 1 CS P-28A-M 512 1 T-6930-R WCC D72-18-07 i 125V IWP 0037-.03 EM 1 05MAY04 05MAY04 0

T-6930lRI 125V IWP REVO-1 10:00 10.59 00169 0§1 125VIWPI 513 1 T-1832-R WCC HX-15B I VNCC HX-158 MM 2

05MAY04 05MAY04 0

T-1832 IVNCCHX-15 REVI-1 10:00 11:59 0

0011182[1VNCCH) 514 1 0135AG0{24 WCC G-01 IWP-037-01 ALIGN G01 1

05MAY04 05MAY04 DR-N ML-N 101 O135AGC 23WP-037-01 J TO1AOSPER01-35A 11:00 11:59 ORT3-NR-N 0016)19tj 125VI\\M 515 t T-0964-R WCC 62VAO 1 MRR 62/A01 RMP 1

05MAY04 05MAY04 DR-Y ML-Y 63 T

64 I MRR62 9302-1 EM REVO-1 13:00 13:59 ORT3-Y R-N 0 1096411 MRRi 516 1 T-0460-H WCC MS-5958 1 MSMS-59581CREV0-1 2

05MAY04 05MAY04 67 T-0460-IlM S I 15:00 16:59 0010460f1Ui 517 1 T-2078-R WCC CWSYSTEM 1CWCWSYSTEMEPT 1

05MAY04 05MAY04 1131 T-2078-RI CV REVO-1 16:00 16:59 001207811 Run Date 03MAY04 13:48 lLT-03.

STANDARD PUBLICATION Sheet 29 of 29 Pv sytems, Inc.

I FL-03 Execution Publication Set

Run Date 03MAY04 13:59 Work Activity Risk Assignment Sheet lof 2 U

ACT WO GRPl HPE EQUIPMENT Activity Cal DUR START FINISH MYu ID ST l

RISK Description I12 Z

611 6

6 I

1;1lU l

1 CE1600R001 76 CE8 DR-Y ML-Y R-1 MOBILIZE REPAIR CREW 1

91 03MAY04 07MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M TRAINING AND BADGING 12:00 06:59 213476 - 128CE 1

CEI600R005 76 CE8 DR-Y ML-Y R-1 OFF-LOAD REPAIR 1

10 04MAY04 04MAY04 O]REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M EQUIPMENT AND MOVE 14:00-23:59 0213476 - 128CE 1

CEI600RO10 76 CE8 DR-Y ML-Y R-1 SETUP EQUIPMENT FOR 1

24 05MAY04 06MAY04 REACTOR VESSEL AND ASSEMBLY ORT3-Y R-M CUTTING THERMAL SLEEVE 07:00-06:59 0213476 - 128CE 1

EM0216638A 76 EM DR-N ML-N P-001B-M P-lB RE-ASSEMBLY OF 1

56 01MAY04 05MAY04 IREACTOR COOLANT PUMP MOTOR ORT3-N R-M MOTOR 18 OOA 19:59 0301756 128EM 2

EM0305106 76 EM DR-N ML-N D-205 MONTHLY NON-SAFETY U

4 03MAY04 03MAY04 125V DC STATION BATTERY ORT3-N R-M 125V DC STATION 13:00-16:59 0305106 - B07A2 2

EM0305117 76 EM DR-N ML-N D-205 QUARTERLY NON-SAFETY U

4 03MAY04 03MAY04 125V DC STATION BATTERY ORT3-N R-M 125V DC STATION 13:00-16:59 0305117 - B07A2 2

EM0305128 76 EM DR-N ML-N U2A-UV TEST U2 TRAIN A U

3 04MAY04 04MAY04

[OTRAIN A 4.16 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS UNDERVOLTAGE AND 12:00-14:59 0305128 - B07A2 2

EM0305133 76 EM DR-N ML-N U2B-UV TEST U2 TRAIN B U

3 04MAY04 04MAY04 OTRAIN B 4.15 KV AND 480 V SWITCHGEAR RELAY TEST ORT3-N R-M RELAYS UNDERVOLTAGE AND 15:00-17:59 0305133 - B07A2 IC0307192 76 IC1 DR-Y ML-Y Z-016 Z-16 CONTINGENCY 1i 5 03MAY04 03MAY04 0

REACTOR CAVITY MANIPULATOR v

ORT3-Y R-M TROUBLESHOOTER" 06:OOA 16:59 0 7192 - 1281C 2

IC0301006 76 IC5 DR-N ML-N ICP-02 001 RP AND SG ANALOG TEST -

5 5

104MAY04 04MAY04

[]REACTOR PROTECTION AND SAFEGUARDS ANALOG ORT3-N R-M WHITE 07:00' 11:59 0301006 - B07A2 1

1IC4.39STK 76 IC5 DR-Y ML-Y 11CP-04.039-1 ICP 4.39-1 GOVERNOR 5

40 04MAY04 07MAY04

[IE ALA BINE VALVE CATIBRATONIFUN ORT3-N R-M VALVE STROKE 10:00l 16:59 0300976 - 1281C lI M

PM 3

0 1

MM0216627 76 MMV DR-N ML-N CV-01296 CV-1296 - INSTALL NEW U

18 127APR04 03MAY04 UXIUARY CHARGING UNE ISOLATION ORT3-N R-M TRIM PER MOD 02-027 08:OOA 20:59 216627 128MM 1

MM0303680A 76 MMV DR-YML-YV MS-02005 IMS-2005 - PERFORM MOD 5

101MAY04 03MAY04 HX-1B SG HEADER SAFETY ORT3-N R-M FOR ROUNDED ENTRANCE 11:WOA 12:59 303680 128MM I

MM0303681A 76 MMV DR-YMLtY-MS-02010 IMS-2010-PERFORMMOD 5

30 03MAY04 06MAY04 HX-IA SG HEADER SAFETY ORT3-Y R-M FOR ROUNDED ENTRANCE 12:00 08:59 303681 - 128MM 1

MM0303680B 76 MMV DR-YML-VY MS-02005 1MS-2005-REINSTALL U

10 05MAY04 05MAY04

[IHX-1B SG HEADER SAFETY ORT3-N R-M VALVE AFTER MOD 0303680 - 128MM 0

OP0211062 77 OPO DR-N ML-N l O-IT-0007D IT-07D. P-32D SERVICE U

2 05MAY04 05MAY04 UP-32D SERVICE WATER PUMP TEST ORT3-N R-M WATER PUMP 10:00*

11:59 0211062 - B07A2 0

OP0211070 77 OPO DR-N ML-N O-IT-0007E IT-07E. P-32E SERVICE U

2 05MAY04 05MAY04 OP-32E SERVICE WATER PUMP TEST ORT3-N R-M l lWATER PUMP 12.00-13:59 0211070 - B07A2 NMC I WE lLT-81 HUMAN ERROR RISK BARCHART

___________/WE________FL-81 HUMAN ERROR POTENTIAL eSe.I PBNP U1 Refueling 28 OutageF HR O Prlmavera Systems. Inc.l

Run Date 03MAY04 13:59 Work Activity Risk Assignment Sheet2of2 U

ACT lWO GRP HPE EQUIPMENT Activity Cal DUR START FINISH ID ST RISK Description ID F

2181i62116I9 t 67: ti 211 9 0* 61411'21 9

R0 6 _

o OP0301061 77 OPO OR-N ML-N O-IT-0007F IT-07F. P-32F SERVICE U

2 05MAY04 05MAY04 OP-32F SERVICE WATER PUMP TEST ORT3-N R-M WATER PUMP 14:00 15:59 0301061 - B07A2 O

OP0301281 77 OP0 DR-N ML-N O-IT-0007G IT-07G. SERVICE WATER U

4 05MAY04 05MAY04

[WSERVICE WATER MOV TESTING ORT3-N R-M MOVTESTING 16:00 20:59 0301281

-l--

i

i 0

OP0301447 77 OP3 DR-N ML-N O-TS-009 TS-9. CONTROL ROOM H/V 3

24 03MAY04 06MAY04 ONTROL ROOM HEATINGIVENTILATION SYS ORT3-N R-M SYSTEM CHECKS 16:00-18:59 0301447 - B07A2 2

OP0301632 77 OP3 DR-N ML-N O-PC-058 H2 SEAL OIL SYSTEM TEST 3

1 03MAY04 03MAY04 OHYDROGEN SEAL OIL SYSTEM ORT3-N R-M 16:00-16:59 0301632 - B07A2 I

U 0

0135AG01-B OPS DR-N ML-N RE-ALIGN G-02 TO 2A-05 1

1 03MAY04 03MAY04 I

ORT3-N R-M 14:00 14:59 B07A2 0

0135AG02-C OPS DR-N ML-N G-02 ALIGN G-02 TO 1A-05 & 2A-05 1

1 04MAY04 04MAY04 0

ORT3-N R-M FOR 1B-42 OUTAGE 01:00 01:59 1

SOP-B04B OPS DR-N ML-N 842 DE-ENERGIZE 1B-42 PER 1

4 04MAY04 04MAY04 I]

ORT3-N R-M 1-SOP-480-304 02:00 05:59 1280P I

SOP-B41B OPS DR-N ML-N B-41 DE-ENERGIZE 1-41 PER U

2 04MAY04 04MAY04 D

I ORT3-N R-M 1-SOP-480-802 19:00 20:59 1280P r%)

NMC /WE LT-81 HUMAN ERROR RISK BARCHART PBNP U1 Refueling 28 Outage FL-S1 HUMAN ERROR POTENTIAL O Priravera Systems. Inc.