c tat 0(

Commined to Nuclicar EKIII7c

)

T E t

PnMT ERA

  • alRES Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Thursday Apr1i 22, 2004 Start Time:

1800 NSB Cafeteria ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer / Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator (SSC)

Shutdown Safety Assessor (SSA)

Site Management (SSM)

General Supervisors First Une Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)

S. Maintenance Coordinator Turnover (MOC)

6. Engineering Coordinator Turnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Work Activity Risk-Manager Assignment (SOM)
10. Management Expectations (SSM)
11. ACEMAN Assessment Results (SOM)
12. Shift Goals (SOM)

Items Included In Daily Package:

Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Defined Critical Path Work Activity Risk Assignment Outage Schedule Work Week Schedule Information In this record was deleted in accordance withke Freedom of Information Act, executions FOIA/~Ct s

BRIEFING NOTES 1

t

Site Communication Revised 4/12/04 Priorities:

  • The Safe Operation of Unit 2
  • Safely Commence Scheduled Outage Work Activities on Unit 1 and Common Systems Using Unit 1 R28 Recovery and Restart Checklist 1" Priority Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2nd Priority Focused Specialty Activities

-SG Eddy Current and Sludge Lancing

-Main Turbine and Generator Work

-Rx Vessel Head Inspection

-Hx Hydro Lance and Eddy Current 3P Priority Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:

Outage Briefing Schedule - NSB Cafeteria:

Day Shift Night Shift Activity 0600 -0640 1800-1840 OCCTurnover **

0645 -0725 1845 - 1925 Supervisor Communication of OCC Turnover to Work Force 0730- 0800 1930 -2000 Supervisor Feedback to OCC of Turnover to Work Force

    • Outage Briefing Schedule Notes:
  • The following personnel are required to attend the OCC turnover meeting:

Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity for outage activities.

  • Attendance will be taken at the OCC turnover meeting.
  • It is recognized that this will result in longer durations for the outage. Since the safest place to be is on schedule, the outage schedule is being revised to include these meetings.
  • Very few exceptions will be made to the briefing schedule requirement. The OCC will control all exceptions.

Additional Changes:

  • Just in Time Information Sharing identified in the Priority Working Schedule shall be developed and presented for the associated significant task.
  • A responsible Manager will be assigned to selected work activities as directed by the OCC. These managers will monitor the job from pre-job briefing through completion or end of their shift.

These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.

2

NM Coninmilted to Nucdear ExcellcnoE O

Point Beach Nuclear Plant U1R28 Refueling Outage c-ba ef y,-!

pic ToeKQTp rW 4ii.2 Theme for the week This week's theme Is Outage Reminders. An outage puts tremendous stress on all individuals Involved.

This stress Is an accumulation of several factors Including long work hours, poor nutrition habits, schedule adherence, unanticipated events and other Items to numerous to mention. We must all remember to take care of each other, our families and ourselves during this time.

Daily Safety Snippets Sundav "Remember to use STAR and you will shine" STAR Is an acronym we can rely on to keep us on track for a successful outage. Stop - Think - Act and Review It Is as simple as that.

Mondav "Three way communication is a key communication tool" "I understand Three way communication is a key communication tool" "That Is correct" Three way communication Is not just a good Idea It Is a great process that we can use to clearly define the message sent was In fact the message heard. Hold each other accountable for the use of this practice and soon It will become standard.

Tuesday "Avoid and recognize error likely situations Distractions and Unfamiliar tasks are just two of the 'error likely" situations that we could encounter of a daily basis. As an example of the consequences of this error situation, consider what happened at Calvert Cliffs in January 2004. Three workers, one being a student employee, were sent to empty salt from a dump truck. The two experienced workers were called away, leaving the student to finish. He brushed salt off an auger with his hand when his hand was caught a pulled Into the machine.

Wednesday "Follow the schedule or risk dancing with the devil (or Shift Outage birector)"

OE17554 - October 2003 Quad Cities - While performing scheduled cleaning In the condensate demineralizer, the crew noticed the atmosphere had become hazy. Upon exiting the space they found out welding was going on in a nearby heat exchanger and the turbine building ventilation was shut off for work.

Following the schedule helps to prevent such competing activities.

Thursday s'Re educated-not melicated' Is the outage giving you a headache? Remember many people suffer serious side effects from the use of aspirin, laxatives, cold remedies, vitamins, herbals and diet aids. Misusing the product - like using too much, often causes reactions. More Is not necessarily better. Recommended dosages are determined by the amount needed to achieve the desired effect without causing other problems.

Friday "If the heat is making you sick, get out of the area quick."

OE1 7082 - September 2003 Fort Calhoun - RP technician working the in the lower cavity started experiencing heat stress symptoms. Rather than stopping the job and exiting the area, he decided to continue. The result was an ambulance ride to the local hospital of a contaminated worker. Do we all remember the signs of heal stress?

Saturday "Onlv fools would not use their error reduction tools" A reminder to use your error reduction tools for every job and every task, these Include: Co-worker coaching, challenging Information, peer checking, place keeping and procedure use and adherence to name just a few.

3

q.

Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 18 Path NP Picture Meets Radiation Performance I his indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's >. 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Meets:

<=75 Rem Actual Cum.

Exceeds:

<=71 Rem Dose:

26.886 Rem Udy

-tr 9 lllol Actual = 1.011 Cumulative = 26.886 Cumulative Forecast = 61.429 Meets: <=18.Exceeds: < 12 Actual PCE's:

5

  • 6 0- Iv 0

Stu Thomas I

Personnel Contamination Events Cummulative Dose Exposure I4 i

Is b

8 20 _.

16 -

14-12 10-i 6

1 4

2 -

2 4123 0

2 4 6 8 10 12 1416 1820 2224 2628 3032 34 Actual

--Forecast Goal c9 CD 0

It a

00 0

0I 0

eo -

, o

-I 40-.'

I.

20 -

0

  • 2 4

6 8

10 12 14 18 18 20 22 24 2X Actual v-

-Forecast

~GGoal

Nice Commrnited to Nuclear Czc.llenc:~,P Outage Status Report Plant:

Point Beach Unit I Day:

Thursday Today's Date/Time:

4/22104 1600 Outage Duration: Day 19 Of A 28 Day Scheduled Refueling Outage

,, ';$f-,:'S ^, tl*, E~ia,

z,,,

bet,,,i,'

,>\\, ',:

! S et Sitas,

  • -,j',:,2

'i':;:,

^ ^

, : 3r,8,,.;,,z e,

^r Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Significant near misses 0

Total for this outage I

Summary Radiological Dose outage to date 26.886 Projected to date 61.429 Outage Goal 575 R Difference

-34.543 NumnberofPCEs 5

Summary:

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Sumnmary. 4/21/04 Incore TIC Column Protective Sleeve Installation Under Evaluation Mode:

E Hot Standby (Mode 3)

El Hot Shutdown (fode 4) C Cold Shutdown (ModeJ) 0 Refueling Shutdown (Mode 6)

RCS:

Temperature:

95 Pressure:

Vented to Atmosphere RV Level:

4' Above RX Vessel Flange Timre to Boll:

61 Minutes

..s-;6.

t e
7'

! s,

.-- 1.. 1K

>2A Reactivity:

Green Core Cooling:

Containment:

Green Inventory:

Yellow Power Availability:

Green Yellow Spent Fuel Pool Cooling:. NIA r

-1 W~s -,s.'M'i:>>;z.t.iS Sh tild Wi Soafead Mi sesslre t -Do gt i it d Equ~I ip int:- ';P,' ! $,:r 4 --

-. A e L

&Yzlud-

ifeA liai:iii4'it:U-i!,--.';.-:.--;,-..i,- -,

a Rx Vessel Head Lift a Incore T/C Column Protective Sleeve Eval

  • Incore T/C Column Protective Sleeve Installation
  • Continue Cavity Flood for Rod Unlatch
  • Rod Unlatch
  • Remove Upper Internals
  • B SIG Sludge Lancing t-t !t-Of'a'ntbut'tSnd1n4 J~ss e Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4/30/04 Scott Manthei 4/04/04 I P2A Charging Pump Troubleshooting 4/30/04 Clay Hill 4/08104 Incorporate Lessons Learned from Ir Reduced Inventory Orange Path 4/25104 Dave Dyzak 4/22/04 Procedure Changes to Allow Hoses thru Hatch during Fuel Motion 4/23/04 Clay Hill 4/22104 IP-IOB RHR Pump Return to Service Plan 4/24/04 Steve Bach 4/22104 RP-IC SFP Pump Operability Requirements 4/23/04 Ken Sokol

-S,?

ts "

-s;~-

R

'. s t,,,^.X<

U s ~ n Mi

"'iutnen t'

  • .'X

>t uS.'

us ai-,.

ra.-_- -

f a1zG

-1.-----

-I

-a--

w-as At 1

Scheduled j

- Actjual J

Scheduled

. Actual Date I Time lDate Tie Dme l

D T Time lDate Time Cooldown <2000 4/03104 i 200 4103104 2230 Heatup >200e 4/25/04 f 0900 Head Lift 4/09 40900 4121/04 1550 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4130104 0100 5

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST.

OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

Aprl 22, 2004 TIME:

1400 KEY SAFETY FUNCTIONS:

REACTIVITY:

GREEN CORE COOLING:

YELLOW POWER AVAILABLE:

GREEN INVENTORY:

YELLOW CONTAINMENT:

GREEN SFP COOLING:

NA PROTECTED EOUIPMENT:

COMMENTS:

Unit 1 Is in Mode 6 Fire Protection Condition III: Credit is taken for fire rounds as fire prevention contingency RCS Time to Boil is 61 minutes RCS Level Is 4 ft above Reactor Vessel Flange Hot Leg Vent Path is the Pressurizer manway PBF-1562 Rctefrnces: NP 10.3.6 Revision 2 In/3QMt2 Pag& of 9 NP 10.2.1

-v

Defined Critical Path I

APR U

ID DESCRIPTION OD RD Cal U SYS EQD' TF APR I

.6 8.10112 1.6.82 2O.2. 4. B. 8.10112,14.1ff 18,20.2210 O 2. 4 6. 8.10021414;16,18,20.22 NG-SGB-ASL SIG B - SETUP FOR 5

5 5

1 MS HX-001B 0

G-SG IG 8-SETUP FOR TUBESHEET CLEANING TUBESHEETCLEANING 03139-22APR04 16:5922APR04 10:OOA I NG-SGA-BSI. SIG B - SETUP HOSE THRU 1 1 5 1 MS HX-001A 0

NG*SGA._SI G B - SETUP *OSETHRU HATCH HATCH 23APR04 07:0030301938-23APR04 07:59 t NG-SGB-BSL SIG B - PERFORM 14 14 5 _

MS HX-001B 0

NG-SGB.S SIG B - PERFORM TUBESHEET CLEANING TUBESHEET CLEANING 03019

- 24APR04 11:5923APR04 08 00 I

MM0214034 CV-370-INSP/MAINTAIN 40 40 X I CV CV-00370 2

MM0214034CV-370 - INSP I MAINTAIN CHECK VALVE 20RMP9003 CHECK VALVE - RMP900-8 0214034-30APR04 01:5923APR04 21:00 fillpI 11E 1 NG-SGB-CSL SIG B -REM SL EQUIP AND 6

6 1

1 MS HX-001B 0

NG.SG.CSLS1G 9-REM SJL EQUIP AND CLOSEOUT INSPECTION CLOSEOUT INSPECTION 0301939-24APR04 17:5924APR04 12 00 1 NG-SGA-ASL

- SIG A-SETUP FOR 4

4 1

1 MS HX-001A 0

NG.S3GA.ASLS/G A - SETUP FOR TUBESHEET CLEANCN TUBESHEET CLEANING j0301938-24APR04 18:5924APRO4 1 5:00~

Co Run Date 22APR04 13:29 LT-16 DEFINED CRmCAL PATH Sheet1 of I o

t Inc FL-16 DEFINED CRICAL PATH SET

after22APR04 12:00 I U1R28 WORKING SCHEDULE after22APR04 12:00

  1. U ID RESP WO I EQID DESCRIPTnON RD ES EF RISK MF APF R

,,u95, Fri 23 Sat 24 ST

.10121416.1S20,22O.2.4.6.8.1o41Z14.1a

,10*2*4.6*8,10il214,16 1

1 PM-BRIEFI ADM ADMIN OCC INTERACTIVE 2

22APR04 22APR04 710 p 4MEFIOCO INTERACTIVE n RNOVER and FOLLOWUP TURNOVER and 18:00.

19:59 H

S 2

1 AM-BRIEFI ADM ADMIN OCC INTERACTIVE 2

23APRO4 23APRO4 698 AM-BRIEFIOC INTERACTIVE TU6NOVER and FOl LOWUP TURNOVER and 06:00' 07:59 3

1 PM-BRIEF2 ADM ADMIN OCC INTERACTIVE 2

23APR04 23APR04 68E PMBRIEF20CC' INTERACTIVE TU INOVER and F(

TURNOVER and 18:00 19.59 4

1 AM-BRIEF2 ADM ADMIN OCC INTERACTIVE 2

24APR04 24APR04 674 1 AM4BRIEF2)C INTERACTIVE TURNOVER and 06800 07:59 U

EN:41ls1Zs*

S 5

1 AP0215130 APM 76 X-02 INSPECT CAL AND SET 10 23APR04 24APR04 DR-N ML-N 9

AP021513 NSPECT CALANO SET X-02 X-02 0900W 10:59 ORT3-N R-N 021513

-UNTAUXIL E 03064.1e,,1 76NAE=

NPCCI jj jj R

  • ~S Ei~I

~U Y

AN _OMEUAD 6

1 AP0215121 APR 76 B-04 18-04 CALIBRATE TE-I5 23APR04 23APR04 DR-N ML-N 0 _

AP021512 0TECH SPEC RE VS

__ISPEC RELY 09:0W-16:59.

ORT3-N R-N 021512 80 AEUARDS LO fD CENTER 7_ 0 CE0306041 CE1 76 INTAKE CRI INSPECT CRIB.

70 05APR04 30APR04 DR-Y ML-Y 188 601NPEaT CRIB, INSTAU INSTALL BUOYS AND 10: WA 11:59 ORT3-Y R-N 1

CEDMNSP CE1 76 CW UNDERWATER 27 21APR04 27APR04 DR-Y ML-Y C

PUNDE"WATER INSPEWON OF CIRC WATER

,INSPECTION OF CIRC _

09:WOA 14:59 ORT3-N R-N

_=

9 1

CE08TOHTI CE4 77 IST-SISI REINSULATE - FAC 37 20APR04 24APR04 DR-Y ML-Y 179 C Tn4JRENSOLATE - FAC PRO

- TUR9 HALL 8 PT OVERHD PROG -TURB HALL 8 15:00A 16:59 ORT3-Y R-N

-SE 10 1

CE300869SI CE4 76 ICP-05.049 BUILD SCAFFOLDING 2

21APR04 22APR04 DR-Y ML-Y 596 Z3 69UILDSCAFFOLDING I P 5A9 SEC CONTROLVALVES ICP 5A9 SEC CONTROL 10:OOA 13:59 ORT3-Y R-N SECONDARY PLANT CONTI OL VALVES0300869 11 1

CE-1600-05 CE4 76 R-1 BUILD SCAFFOLDING 2

22APR04 22APR04 DR-Y ML-Y C UI SCAFFOLLING TO SUPPOR' 1600 INSPECTION TO SUPPORT 1600 09:OOA 13:59 ORT3-Y R-N REACTOR VESSEL AND AS EMBLY 12 1

CE-RPI-SI CE4 76 RPI BUILD SCAFFOLD FOR 8

22APR04 22APR04 DR-Y ML-Y 78 UILO SCAFFOLD FOR R I COIL ON RX HEAD RPI COIL ON RX HEAD 10:00A 21:59 ORT3-Y R-N

  • _RPI SYSTEM M LT] ANDIOR NON-NUMBERED EQUI 'MENT021521Z 13 1 CE212843SA CE4 76 P-028B-M MODIFY EXISTING 4

22APR04 22APR04 DR-Y ML-Y 0

E2 2 A7AODIFY EXISTING SC OLDING FOR 1IP,-28B-M SCAFFOLDING FOR 1200 15:59 ORT3-Y R-N

_STEAM'GENERATOR FRD PUMP M0TR212843 14 1

CE2i404ETR CE4 76 HS-CS-01 REMOVE INSULATION 4

22APR04 22APR04 DR-Y ML-Y 9 CE2 4,TRREMdVE INSULATION OR HS-CS-01i FOR HS-CS01 12:00 15:59 ORT3-Y R-N CONDE)NSATE LINE GB-4 SNUBBER0214040 15 1

CE202527SI CE4 76 B-42 BUILD SCAFFOLDING 17 22APR04 23APR04 DR-V ML-Y 0 E2 2527SBULQ RSCAFFOLDING F )R1B-422 FOR 18-42 14:00 14:59 ORT3-Y R-N

_0V MOTOR CONTROL C NTER PAB SA 16 1

CE212843SB CE4 76 P-028B-M REPLACE 4

22APR04 22APR04 DR-Y ML-Y 22 283oEPlaCE MODIFICATI N OF SCAFFOLDING FOR 1 P-28B8 MODIFICATION OF 16:00' 21:59 ORT3-Y R-N 0 284*_STEAM GENE TOR FEED PUMP MOTOR Run Date 22APR04 13:12 LT-03 STANDARD PUBLICATION Sheet l of 33 O Primavera Systems, Inc I

FL-03 Execution Publication Set T

after22APRO412:00 U1R28 WORKING SCHEDULE after 22APR04 12:00 I

.I2 WOK-N

.CEDL I

ID RESF WO ST EQID P-001B-M DESCRIPTION I RD I ES RISK I MF APR ThilU Z 1.1n1121.1L1

---I--

Frl 91 Snt,'A i.Inf9l,2A.1rRqn~f.9qI n. 9.A. r-* A.lnlil9AAA.RI 17 j I CE66C00151I lCE4 BUILD SCAFFOLDING 10 22APR04 23APR04 FOR B RCP MOTOR 17:00-04:59 DR-Y ML-Y I E

ORT3-Y R-N 18 1

CE309511TI CE4 76 SW-02882 INSTALL INSULATION 8

22APR04 23APR04 DR-Y ML-Y 174 ON ISW-2862 21:00-21:59 ORT3-Y R-N 19 1

CE309697T1 CE4 82 MS-00177 INSTALL INSULATION 8

23APR04 23APR04 DR-Y ML-Y 460 FOR 1MS-177 00:00' 13:59 ORT3-Y R-N 20 1

CE305523SI CE4 76 CV-00110C BUILD SCAFFOLDING 8

23APR04 23APR04 DR-Y ML-Y 0

FOR CV-1 10C 01:00 14:59 ORT3-Y R-N 21 1

CE207075TR CE4 76 FE-00134 REMOVE INSULATION 8

23APR04 23APR04 DR-Y ML-Y 0

FOR IFE-134 02:00 15:59 ORT3-Y R-N 22 1

CE214034SI CE4 76 CV-00370 BUILD SCAFFOLDING 12 23APR04 23APR04 DR-Y ML-Y 0

FOR CV-370 05:00 20:59 ORT3-Y R-N 23 1

CE213464SI CE4 76 CC-00779 BUILD SCAFFOLDING 8

23APR04 23APR04 DR-Y ML-Y 40 FOR 1CC-779 09:00-16:59 ORT3-Y R-N 24 1

CE950096SI CE4 76 CV-00313A-BUILD SCAFFOLDING 8

23APR04 23APR04 DR-Y ML-Y 11 FOR CV-313A-S 09:00' 18:59 ORT3-Y R-N

.25 1 CE206957T!

CE4 76 CS-00466C INSTALL INSULATION 8

23APR04 24APR04 DR-Y ML-Y 94 FOR 1CS-466C 21:00 10:59 ORT3-Y R-N 26 1

P1274-TI CE4 77 PIPING EB-NDE/ISI - REPLACE 12 24APR04 24APR04 DR-Y ML-Y 374 INSUL-PIPING NEAR 01:00 14:59 ORT3-Y R-N 27 1

CE927251SI CE4 76 MS-00117 BUILD SCAFFOLDING 8

24APR04 24APR04 DR-Y ML-Y 0

FOR MS-117 02:00 15:59 ORT3-Y R-N 28 1

CE214031SI CE4 76 CV-00257 BUILD SCAFFOLDING 5

24APR04 24APR04 DR-Y ML-Y 0

FOR CV-257 09:00 13:59 ORT3-Y R-N

.29 1

CE214048T1 CE4 76 HS-CS-01 INSTALL INSULATION 10 24APR04 24APR04 DR-Y ML-Y 0

FOR HS-CS-01 1iZW 23:59 ORT3-Y R-N 30 1 CE927251TR CE4 76 MS-00117 REMOVE INSULATION 2

24APR04 24APR04 DR-Y ML-Y 0

FOR MS-117 16:00 17:59 ORT3-Y R-N 31 1

CE2114113TI CE4 76 MS-02719 INSTALL INSULATION 6

24APR04 24APR04 DR-Y ML-Y C

_FOR MS-2719 16:00 23:59 ORT3-Y R-N 32 1 CESISIPREP ICE5 IST-SISI PREP OF SECONDARY 130AR429APR04 DR-Y ML-Y 1241!

_COMPONENTS FOR 0WA 14:59 ORT3-Y R-N C001SIBUILD SCAFFOLDING F XRREAC CE3o9gsjTiNSTALL INSULA 03095I1t[1 CE309q97TINSTALL INSI 0309697' CE30i523SeULD SCAJ 0305523M CE207O75TRREMOVE I CE214034S.RUIL-02t4034j*

I CE213464S 0213464 CE950096S j

995009(

OR B RCP MOTORl TOR COOLANT PUMP MOTOR ION ON 1SW-2861

-HX-53A AIR SIDI ILAION FOR IMS-177

_111IIIII7.54 At: MA11SURM SEPARI i

j_

-C -Z~ -

I[

sE rz A

q I

FOLDING FOR C'41t0C

=1T-4 VCr, BORIC ACID INLE 4SULATION FOR IFE-134

_I1HX-3IAB NON-REGEN H j SCAFFOLDING FR CV-370

_H1HX-2 REGEN HX BUILD SCAFFOLdING FOR ICC-77S 1T-12'CC SURGETANK BUILD SCAFFOLD4ING FOR CV-313 1P-1A1B RCP #1 SEAL V CE2069,T 7 ST1ALINSULA 02069._

P1;174.TINDEnlSI Rl 03038 77_-f CE9272515IBUILD SC'

'SEAL OIL CO, TOR OUTLET TFLOW CONT (OUTLET FLO' CHARGING INI RELIEF TO WA

-S

'ATER RETURt ION FOR ICS4

-4 i

IFDX-IA bU PLACE INSUL -

i FW XFFOLDING FOI 1

wqs1; E.

CE21403tS a

0214031 I.

i CE2141 021 C

IC BUILD SCAFFC 1F1T-4 VC 4TNSTALL.II 2921751TREIV 9927251n1 E214113TINS1 0214113_

-ESISIPREFPIREPIOF SECONDARY ~OMPONENTS FCIR FAC' El -

I I -.I I

-41 33 1

CE0301623 CE5 76 FD-00208A I IFD-208A-REPLACE 22 21APR04 23APR04 DR-YML-Y C

VALVE 2200A 17:59 ORT3-Y R-N oil1231FD-208A - REPLACE VA YE EC I

i--+

+

34 II CE0305003 CE5 76 FD-00210A FD-210A - STEAM LEAK REPLACE VALVE 22 21APR04 I 23APR04 DR-Y ML-Y I 0

22:00A 17:59 ORT3-Y R-N 05003FD-210i-STEAM LEAK.

HX.1A HP FWH 5A LE I

l I

REPLACE VALVg HX-21A HP FWH SA Le

-2637 LOWER

-2378 UPPER I

__w-I -

A J.-....L

.J.

L Run Date 22APR04 13:121 LT-03 STANDARD PUBLICATION F1 -n3A =var-94t#%n Puihilr~utinn Qrt Sheet 2 of 33 ON DhRmnvmn-Cvetm In..

CV.

C

.F O t I

  • S A s S II~

I

after22APR0412:00 U1R28aWORKING SCHEDULE I

after 22APR04 12:00 EQID__

UlR28 WOKN MSHDL U

ID CE0206957 RESPI WSO I EQID DESCRIPTION RD ES EF RISK MF Thu 29 Fri 23 Sat 24

!.I Oil 214,16,112O2A 0.2,4,6, 8i

1. 9. A: Ft. A.1 no 9.11A.1 rv 35 J 1

CE5 76 CS-00466C 1CS.466C REPLACE VALVE' 10 122APR04 I 23APR04 DR-Y ML-Y 21:00.

10:59 ORT3-Y R-N C

36 0

CE0306266 CE5 76 IA-01258 IA-1258-AIR LEAK.

10 22APR04 23APR04 DR-Y ML-Y 0

REPLACEVALVE 21:00.

10:59 ORT3-N R-N 37 1

CE9927254 CES 76 MS-00115 IMS-115LEAKSBY 10 23APR04 24APR04 DR-YML-Y 0

SEAT - REPLACE 18:00 07:59 ORT3-Y R-N 38 1

CE0304989 CE5 76 CV-D-12 CV.D REPLACE 12 23APR04 24APR04 DR-N ML-N 77 VALVE 23:00 14:59 ORT3-N R-N CE02069511CS-466C.'REPL*CE VALVE 0206957_1H XY-1A 0S 1F1;-466 HIGH SIDEF CE030626A-1258 AIR LKREPLACE VAL1E 030626 6 1 SC-953 PZR LPD SPACE SAMPI CE99272541MSIIS LEAKS BY SE

)OT E CIV OPER A IT - REPLACE II I

131s _A_... -.

CE030468SEL-q REPI AQ.U Lr r vy r IACE VALVE 0304$ B

-- t I

HX-~

39 1 1 CE9927250 CE0210988 CES CE6 76 7

77 MS-00116 1MS-116 - LEAKS BY SEAT - REPLACE SEC SUPPORT MR 99-01 BS 10 24APR04 I 24APR04 DR-Y ML-Y

_ 08:00 17:59 ORT3-Y R-N C

CE9927250 RS416 - LEAK' no'7a" II y -17 t

140 0 SEC 91 05APR04 I 07MAY04 DR-N ML-N 07:00A 14:59.

ORT3-N R-N mmoliogai;SEC SUPPORT MR 99.01*B 41 101 CE0210989 ICE61 761 SEC 1 SEC, INSTALL NEW 911 05APR04 07MAY04 DR-N ML-N 80

_ EQUIP MR 99-011 E I 08:OOA 14:59 ORT3-N R-N 42 1 1

-- I I -

CE01306103A I CE61 76 102-1RTG-0 I MR00-1Go1 84 PRO4 27APR04 D

0R-V MI-V IREPLACE PROT I 21:00-08:59 ORT3-N R-N C

WI-?

I 4

1---

43 1

CE0306104A I CE6 76 102-2VTG-0 MR 01-092 (102-2ITG-01 1 84 22APR04 27APR04 DR-Y ML-Y R&R GEN PROT 21:00.

08:59 ORT3-N R-N C

41 4-4-4 1

4-4 4

44 I

CE0407589A I CE6 20 T-026 T-026 - REPAIR PACKAGE ENERGIZE AND CAL UNDERHEAD 20 23APR04 26APR04 DR-Y ML-Y

. 15:00-10:59 ORT3-Y R-N 0

45 1 CE-1600-20 CE8 76 R-1 15 13APR04 I 23APR04 I DR-Y ML-Y 02:OOA 05:59 ORT3-Y R-N CE a8sEC. IISTALL NEWEQtPMR99 011E W

CE0306103 R 01-092 102 101 REPLACE PROT RELAYS)-PrT 0306107r W,,.

CE03061 R01 0092 (102 0-01 R&R GEN PPOT RELAYS)-PT 03061 0

-CE k07559026

- REPAIR PACKAGE REPARAT1O ZE4 QQ.20ENERGIZE AND CAL UN ERHEAD INSPECTION EQUIPMENT

-_RE}

,TOR VESSEL ANb ASSEMBLY021 472 t

I CE-460b-RFORM UNDERqEAD INSPECTIO OF RX HEAD 02134

_HD3RCS Ct TSR 3A.5.2 l

-1 WMISC CHE C'HO10031 CS DO TSR 3A.5.1

__S MISC CHE C RCS BORON SR 3.9.1 MISC CHE 0

46 1

CE-1600-22 CE8 76 R-1 PERFORM UNDERHEA 118 23APR04 29APR04 DR-Y ML-Y 0

INSPECTION OF RX 08:00 03:59 ORT3-Y R-N 47 1 l CH0300358 CH 77 M-SAMP RCS CL TSR 3.4.5.2 120 18APRO4 24APRO4 DR-Y ML-Y 278 I 07:OOA 11:59 ORT3-N R-N 48 1

CH0300371 CH 77

'HEM-SAMPI RCS DO TSR 3.4.5.1 20 18APR04 I 24APR04 I DR-Y ML-Y 07:OOA

. 11:59 ORT3-N R-N 278 49_1 CH0300401I CH 77 kHEM-SAMPIl RCS BORON SR 3.9.1.11 20 1 18APR04 I 24APR04 IDR-Y ML-Y 1 278 I

11 07:OOA l11:59 l ORT3-NR-N 50 2

CH0300498 77

_HEM.SAMPIl RCS CL TSR 3.4.52 1 20 18APR04 I 24APR04 DR-Y ML-Y 07:OOA 11:59 ORT3-N R-N 278 CHOL4LRCS CIL TSR 3.452

_E l -

I

_I-MISC CH R22APR4 1312 LT-03 STANDARD PUBLICATION 0 Plrmavera Systems, Inc.

I FL-03 Execution Publication Set t7

after22APR0412:00 I

UR28 WORKING SCHEDULE fter22APR04 12:00 APP ID RESP WOI ST EQID DESCRIPTION RCS DO TSR 3.4.5.1 RD ES EF RISK Thu 22 Fri 23 I

Sat 24

!.101214.16,11820,22f 0

  • 2.4.6.8.1011Z,14,161820.2Sl 0.*2.4.6, 8 10i12t4,16, 1-4.

0o 1RCS DO TSR 3.

4 J5.1 M

IQI MISC CHE 511 2 CH0300511I CH 77 -

HEM-SAMPL 20 1 1WAPR04 I 24APR04 I DR-Y ML-Y 278 07:OOA 11:59 ORT3-N R-N 52 0

CH0300195 CH 77 MHEM-SAMPL BAST BORON TSR 8

19APR04 23APR04 DR-Y ML-Y 163 3.5.1.2 07:00A 11:59 ORT3-N R-N 53 1

CH0300385 CH 77 HEM-SAMPL SGBDFO GAMMA SCAN 8

19APR04 23APR04 DR-Y ML-Y 163 07:OOA 11:59' ORT3-N R-N 54 1

CH0300440 CH 77 HEM-SAMPL RE-229 ISOTOPIC 8

19APR04 23APR04 DR-Y ML-Y 163 07:OOA 11:59 ORT3-N R-N 55 2

CH0300524 CH 77 rHEM-SAMPL SGBDFO GAMMA SCAN 8

19APR04 23APR04 DR-Y ML-Y 163 07:OOA 11:59 ORT3-N R-N 56 2

CH0300550 CH 77 CHEM-SAMP RE-229 ISOTOPIC 8

19APR04 23APR04 DR-Y ML-Y 163 07:OOA 11:59 ORT3-N R-N 57 1

SOP-CV-005 CH T-008C SAMPLE 'C HUT FOR 2

23APR04 23APR04 DR-N ML-N 0

OXYGEN PER 03:00 04:59 ORT3-N R-N 58 1

RPIC-070 CH O-RP-OOC SAMPLE REFUELING 2

23APR04 23APR04 DR-N ML-N 48 CAVITY FOR BORON 09:00 10:59 ORT3-N R-N

_m 59 2

EE0302353 EEP 77 TB-2 VIBRAtPON ROUTE 8

24APR04 24APR04 DR-Y ML-Y 234 DATA POWE-R T 08:00 15:59 ORT3-Y R-N 6 0 EE04073117 EEP 76 W-030B-M W-30B-M MCTAIN ALYZ 3

24APR04 24APR04 R

MTAND CURRENT DATA 16:00 16:59 61 1

EM0215208 EM 76 P-0Z5A-M PC02EA MCE ANALYZE 3

22APR04 22APR04 DR-Y ML-Y 1

MOTOR(1A52-0711A-01) 12:00 14:59 ORT3-N R-N 62 1 EM0306115B EM 76 D72-19-03 IWP-037-04 SUPPLY 3

22APR04 22APR04 DR-N ML-N 2

TEMPPOWERETO 12:00 14:59 ORT3-N R-N 63 1

EM023A153 EM 76 P-0308 M P-030B MCE ANALYZE 3

22APR04 22APR04 DR-N ML-N 0

MOTOR (A52-12/IA-02) 15:00' 17:59 ORT3-Y R-N 64 1

RP4A 030 EM O-RP-004A CLEAR WALKWAY FOR I

22APR04 22APR04 DR-N ML-N I

MANIPULATOR 17:00 l17:59 lORT3-NR-N 65s 1. EM0309955A EM 76 G06 1G-06 RE-INSTALL 2

22APR04 l22APR04 lDR N ML-N 0

VOLTAGE REG.

17:00 l20:59 lORT3-N R-N 66 11 0123A-15 EM 01-23A PHASE CHECK AND 3

22APR04 l22APR04 lDR-Y ML-Y 0

START TRI NUKE 17:00 21:59 lORT3-N R-N 5BJAIg*A:ST'ORON TSR 3.5.12' 1111111FIIIIII O GA IS C

MISCCHEM1$TRY SAMPLINGO 00195 z Q15SGBDPO GAMMA SCAN I -

1 UI

_MISC CHEMIdTRY SAMPLING 0 00385

5 104401RE 229' ISOTOPIC r

1

=

M I

SC CHEMISTRY SAMPLING0 00440

=

QQ4SGBDIo GAMMA SCANl MISC CHEMITRY SAMPLINGO 100524 5 i 550RE 229' ISOTOPIC MIMISC CHEMISTRY SAMPUNG0 00550 SoP-C-V-0055AMPLE I

RP1C-07C lC HUT FOR OXY SAMPLE REFUEU U

II

EN PER SOP-CV 10 CAVITY FOR Bl EE0302353V 03023539 002

)RON PER RP BRATION ROL UNI

.o 4 0 7T3SW-3 04073871-5-

EM0 EM0 EM0 021 R

EMO I

[1s0Op025A MCE ANALYZE IJ MCONDE?.SATE PUMP MOT 11 5BlWP.437-O4 SUPPLY TE

!PWR TO, -01 SAFGDS BU 151P230B MCE ANALYZE h 15 CIR dULAnNG WATEF

'4A-030CLEA, WALKWAY FOF 09955Ai G.-

RE-INSTALL VOl 30995510=IROD CONTROL IV 23A-15PHASE CHECK AND ST l DINSTAWLCONNI M0215243AP'YPASS 8KR TES1 02152431REACTOR TRIP DTOR (1A52-0711A-01)

)R02152081 RIP POWER TO 1-IVL-1728 B (1MOB-110-119t1MOB-146-03061 OTOR (1A52-1211A-02)

PUMP MOTOR MANIPULATOR rAGE REG.

GSET LRT TRI NUKE FILTRATION UNIT CT CAVITY FILTER UNIT NG PER IRMP 906-1 STEP S.16 IYPASS BREAKEA 67 1 i I EM21s243A I EM 78 521BYB BYPASS BKR TESTING PER 1RMP 9026-1 STEP 2

22APR04 I 22APR04 I DR-N ML-N 20:00-21:59 ORT34N R-N 188 I

Run Date 22APR04 13:121 LT-03 STANDARD PUBLICATION I

Sheet 4 of 33 a Primavera Systems. Inc.

I FL-03 Execution Publication Set I.

after 22APRO4 12:00 I

U1R28 WORKING SCHEDULE I

after 22APR04 12:00 APR U

ID RESP wo ST EQID P-129D DESCRIPTION RD ES RISK MF Thu 22 Sat 24 l

e.1 n 1211R.1 0.2.4.6.8, O t2. 4 6. 841i 1 416 68 1 EM0302139A IEM 76 P.129D -DE-TERM #6 1 2 1 22APR04 I 22APR04 DR-Y. ML-Y BEARING LIFT PUMP 20:00-21:59 ORT3-Y R-N 0

69 1

EM0215209 EM 76 P-025B-M P.025B MCE ANALYZE 3

22APR04 22APR04 DR-Y MLY 0

MOTOR (1A52-11/IA-02) 20:00' 22:59 ORT3-N R-N 70 1

EM0407696 EM 77 SERVICE 1SERVICE OBTAIN 3

22APR04 22APR04 DR-N ML-N 589 GREASE SAMPLE 20:00-22:59 ORT3-N R-M 71 1

EM0215217 EM 76 T-001 TEST HEATER 10 22APR04 23APR04 DR-Y MLtY 0

INSULATION 20:00*

05:59 ORT3-N R-N 72 0

EM0306115 EM 75 D72.19-03 IWP-037-04 REPL 25-22APR04 24APR04 DR-N ML-N 0

IMOB-110-119/146-154 20:00 00:59 ORT3-N R-N 73 1

EM0309956A EM 76 G-07 1G-07 RE-INSTALL 2

22APR04 22APR04 DR-N ML-N 11 VOLTAGE REG.

21:00 22:59 ORT3-N R-N 74 1

EM0309006A EM 76 MS-00231 IMS-231.

5 22APR04 23APR04 DR-N ML-N 0

RE-TERMINATE HEAT 21:00-01:59 ORT3-N R-N 75 0

EM0306115A EM 76 D72-19-03 IWP-037-04 REPL 16 22APR04 23APR04 DR-N ML-N 0

1MOB-110-119114B-154 21:00 14:59 ORT3-N R-N

,75 1 EM0216164Z EM 76 ISOL PHASE REMOVE BUS LINKS 8

22APR04 23APR04 DR-N ML-N 0

'ALL BUT 1 PER PHASE 21:00*

22:59 ORT3-N R-N 77 1

EM0305572 EM 76 POS-00476 INSTALL WEEP HOLE 8

22APR04 23APR04 DR-Y ML-Y 0

IN FLEX CONDUIT 21:00-22:59 ORT3-N R-N 78 1

EM0216167 EM 76 E-01 INSPECT AND 10 22APR04 24APRO4 DR-N ML-N 0

MAINTAIN EXCITER 21:00-00:59 ORT3-N R-M 79 1

EM0301758 EM 76 P-037D-M 1P-037D-M PERFORM 3

22APR04 23APR04 DR-N ML-N 0

MCETESTING 23:00 01:59 ORT3-N R-N 80 1

RP4A-031 EM O-RP-004A RESTORE WALKWAY 2

23APR04 23APR04 DR-N ML-N 65 POST ROD 00:00 01:59 ORT3-N R-N 81 1

EM0301995 EM 76 P-037C-M P-037C MCE ANALYZE 4

23APR04 23APR04 DR-N Mt-N 0

MOTOR 0Z:00 05:59 ORT3-N R-N 82 1

EM0407740 EM 76 P-001B-M P-1B PERFORM OIL 12 23APR04 23APR04 DR-N ML-N 0

FLUSH 05:00 20:59 ORT3-N R-N 83 1

EM0306569 EM 76 G52-07-AM 1G52-7-AM REPLACE 4

23APR04 23APR04 DR-N ML-N 0

AMMETER 08:00' 11:59 ORT3-N R-N 84 0

EM0407387 EM 76 W-030B-M W-30B-M COMPLTE 20 23APR04 24APR04 0

INSTALLATION OF 08:00 05:59 M0302139AFA29D

  • DE-TERM 0302131TURBINE BEARI EM02152O9Pr025B MCE ANAL 0215209CCONDENSATE EM0407691SERVICE OBTAIN 040769 MISC EOUIPM EM0215217 PST HEATER INSI 021521 7RPRE EM0306115WP 037t04 REPL i 030611_

EM0309956 G-07 RE4NSTAL 0309956ROD CONTRO EM0309006IIMS-231, RE-TEF 030900 A HX-1A SG EM0306115s&&;70;EPL 030611 Li EM0261 s6 4

164MO2 BUS Ut 02161 EM03osS7t!!sTALL WEEP H 0305

_7 EM0216167NSPECTAND M1

k a

I 8 BEARING UFT PUMP MOTOR IG #6 OIL LIFT PUMP ZE MOTOR (1A52,11I1A-02)

PUMP MOTOR IREASE SAMPLU NT REPAIRtSERVhCE LATION RESISTANCE

,SURIZER TANK IOB-11O-1191146-154 (B)

_gPWR TO C-

.VOLTAGE REG.

MG SET vINATE HEAT TRACE

-EADER ST-2029 INLET 1MOB-110 1191148,-154 WPWR TO C-01 SAFGODS BU (S -ALL BUT 1 PiR PHASE" (REST ISSOL PHASE C

)LE IN FLEX CONDUIT HX-X1B SG FA NTAIN EXCITER ItUSES PER MWP mTT.01 TURI WFORM MCE TESTING

ENCY LUBE OIL IUMP MOTOR LKWAY POST RqiD UNLATCHING E ANALYZE MOTbR(1B52-414UM1E LURNING GEAR LLOBE OIL PUMP MO ERFORM OIL FL4SH

_tREACTOR COOU

52-7-AM REPLAdE AMMETER M1G52-07 GENRATOR OUTPUJ

-30B-M COMPLTEINSTALLATION C lI 4

02¶561.

C EMO3OIT581PO37DM PE 0301t5dOC EMER RP44-031RESTORE W EM0301995P-037C MI 6301995=AC-

'EM0407740P1B B 0407744"f I

EM03065891 03065EN EM0407387Y 0407387i EM0215211 0215211 1 SAFGDS BU B (lMO B-l CT REGULATOR 04.

INE GENERAT

.1) kOR NT PUMP MOl BREAKER AMI SF MOTOR IRF29 PAB EXH rALVE AULATION FAN I

85 1

EM0215219 EM 76 W-001B1-M W-1BI-M INSPECT EQUALIZATION VALVE I

23APR04 23APR04 DR-N ML-N 09:00 I 09:59 I ORT3-N R-N 0

9W1B1-M INSPECt EQUAUZATION I ISCONTAINMENT CCIDENT RECIRIT--

Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION l

Sheet 5 of 33 C Primavera Systems, Inc.

I FL-03 Execution Publication Set l

after 22APR04 12:00 I U1R28 WORKING SCHEDULE after 22APR04 12:00 RESPl WO EQID DESCRIPION RD ES EF RISK22 Fri 23 I

Sat 24

-ST ol~mm1i 2210l2 4.6.8.1 01Z14jm2l122j0,2,4,6-8,1OZ14,16l Il4l^-ll 1 u -'*_

=1_

86 1

EM-BMFP-PJ EM 76 P-02BB-M P28B PRE-JOB BREIFING FOR MOTOR 3

23APR04 I 23APR04 I DR-Y ML-Y 09:00-11:59 ORT3-N R-M a

87 1

EM0203130 EM 76 W-001D2-M IW-1D2-M CLEAN 16 23APR04 24APR04 DR-N ML-N 0

CONNECTIONS 09:00-16:59 ORT3-N R-N 88 1

EM0215220 EM 78 W-001C1-M INSPECT I

23APR04 23APR04 DR-N ML-N 0

EQUALIZATION VALVE 10:00 10:59 ORT3-N R-N 89 1

EM0215221 EM 76 W-001D1-M INSPECT I

23APR04 23APR04 DR-N ML-N 0

_QUALIZATION VALVE 11:00, 11:59 ORT3-N R-N 90 1

EM-BMFP-1 1 EM 76 P-028B-M P28B PREP WORK FOR 6 23APR04 24APR04 DR-Y MIL-0 MOTOR COVER 12:00 09:59 ORT3-N R-M 91 1

EM0212843 EM 76 P-028B-M 1P-28B-M CORR 60 23APR04 30APR04 DR-Y ML-Y 87 SKEWED BEARING 12:00' 15:59 ORT3-N R-N 92 0

EM0306115C EM 76 D72-19-03 IWP-037-04 PERFORM I

23APR04 23APR04 DR-N ML-N 0

PMTFOR 16:00 16:59 ORT3-N R-N 93 1

EM0213072 EM 76 CS-02188-S 1CS-2188-S CONDUIT 4

23APR04 23APR04 DR-N ML-N 0

BROKE 20:00, 23:59 ORT3-N R-N 94 1

EZMRCP-E1 EM 76 P-OO1B-M P-1B BIW &

2 23APR04 23APR04 DR-N ML-N 0

a)

RESISTANCE ON THE 21:00 22:59 ORT3-N R-N 95 0

EM0306115D EM 76 D72-19-03 IWP-037-04 RESTORE 4

23APR04.24APR04 DR-N ML-N 195

_-WL-1728 TO PERM 21:00 00:59 ORT3-N R-N 96 1

EM0304544 EM 76 POS-00466 POS466 INSTALL 8

23APR04 25APR04 DR-N MILN 0

WEEP HOLE IN FLEX 23:00 00:59 ORT3-N R-N 97 1

EZMRCP-2B EM 76 P-001B-M INSP P-lB MOTOR ON 36 23APR04 25APR04 DR-N ML-N 0

THE STAND 23:00 16:59 ORT3-N R-N 98 1

EM0216638 EM 40 P-001B-M PERFORM REPAIRS 140 23APR04 30APR04 DR-N MILN 0

FOR P-1B HIGH 23:00 22:59 ORT3-N R-M 99 1

EM0216166 EM 76 E-01 CHECK EXCITER 2

24APR04 24APR04 DR-N ML-N 44 GROUND DETECTION 01:00-02:59 ORT3-N R-N 100 0

EM0407387B EM 76 W-030B-M W-30B-M PERFORM 1

24APR04 24APR04 DR-N ML-N 0

MCE TESTING 08:00 08:59 ORT3-N R-N 101 1

EM-BMFP-01 EM 76 P-028B-M P289 REMOVE OIL 6

24APR04 24APR04 DR-Y ML-Y 0

I LINES AND MOTOR 10:00 15:59 ORT3-N R-M 102 0 EM0407387C EM 76 W-030C-M W-30B-M PERFORM I

24APR04 24APRW4 DR-N ML-N 0

BUMP FOR ROTATION 15:00 15:59 ORT3-N R-N EM-BMFP-P 031203!

EM020313f 020313 EM02152 0215 EM0215 0215 EM-BMI 03 EM021 02 II E

II II.

If P28B PRE-JOB BREWING FOR MOI WSTEAM GENERATOR FEED PU IW-1D2-M CLEAN'CONNECTnONS

)RWORK IP MOTOR

~I -"

Ci 4NSPECT EQUAILIZATION VALVES IfbCONTAINMENt ACCIDENT RECII 21INSPECT EQU4LZATION VALVE 21ICONTAINMEN, T ACCIDENT RE(

.11P28B PREP WORK FOR MOTOI I

CULATION FA IRCULATION F COVER REMO ISTEAM GEM tING BRACKE

~lim~o

.1 843 1P-28B-M COpR SKEWED BEA _

t 7R43_-

10306115CYWP-03i-04 PERFORM PIV 030611!IPWR tO C-SAFGDS EM0213072!.-188-5 CONDI 0213072_

'1P-28B SGFF EZMRCP.Eo-1 B BIW & RESIt 021520!UREACTOR COI EM0306115037Tu 4 RESTI 030611 !iPWR TO C.

EM030454APOS-66 INSTA 0304w4 EZMRCPI21NSP P-1B MOI 021 EM021663FPERFORM REF FOR IMOB-1 IUS B (1 MOB-i 7BROKE MINI RECIRC I rANCE ON TH-LANT PUMP &

RE 14WL-1728 I SAFGDS BU

.L WEEP HOU S

IR ON THE ST I -

USRS FOR P-l REAcTOR COOLANT PpMP MOTOR021663 S~I EM0216166CHECK EXC 0a1616ff RTG-01Tn EM0407387BV I

0407381 EM-BMFP-j 03120:

EM El TER GROUND RBINE GENES

-30B0M PERFO F-231F-29 PAB 1P288 REMOV STE 407387CW-301 04073871F-2l 1030611-,0 030611_n I

103 0 1 EM0306116 EM 78 D72-21-07 IWP-037-06 REPL 1MOB-080 - 083 24APR04 25APR04 DR-N ML-N 15:00 15:59 1 ORT3-N R-N 0

A ___________ A



.1.

Run Date 22APR04 13:121 LT-03 STANDARD PUBLICATION l

Shoot 6 of 33 Prirmavera Systems, mnc FL-03 Execution Publication Set I

after 22APR04 12:00 U1R28 WORKING SCHEDULE l

after 22APR04 12:00 ID RESP WO EQID DESCRPTION RD ES EF RISK MF R

Fd23 Sat24

-IIST I

10246la2 21,.,.,011.fi

_a2 -

fi 2.4.6_.li Zl4la1 104 0

EMo407387E EM 76 W-030B-M

- W-30B-M PERFORM I

24APR04 24APR04 DR-N ML-N 0 _

_o4o7387EW PMT RUNOFMOTOR 16:00 16 59 ORT3-NR-N 0407387F-105 1 EM-BMFP-R7 EM 78 P-028B-M P28B REMOVE COND.

2 24APR04 25APR04 DR-Y ML-Y 0

E -1MFp-RP2 8 RETURNUINESPOOL 16500 0959 ORT3-NR-N 031203 105 0

EM0306116A EM 75 D72-21-07 IWP-037-06 REPL 16 24APR04 25APR04 DR-N ML-N 0

a E 0308116AW

_1MOB-080-083 16:00 11:59 ORT3-NR-N s

030611 107 0 EM9808988 EM 76 17-L-08 17-08 MOD CKT PER 4

24APR04 24APR04 DR-N ML-N 325 EM98089881 7 RERS 95-0077 #1 17:00.

22:59 ORT3-N R-N 980898

-;7;1S^z E

108 1 EM0215163 EMV 76 CC-00754A-CC-754A-0 MOV 10 21APR04 22APR04 DR-Y ML-Y 0

C-754A-O MOV ACTUA OR CHECK-OUT (ROUBLESHOO1 ACTUATOR 09:OOA 23:59 ORT3-N R.N NiP-1A RCP C INLET MOV OPEPATOR0215163 109 1 EM0403300 EMV 76 R-o00516o RC516-O PERFORM 7

22APR04 22APR04 DR-N ML-N 0 C-6 PERFORM STEM LUBE A 0 FBJ INSPECTION STEM LUBE AND FBJ 09:OOA 20:59 ORT3-N R-N PZR RC-430

)WER-OPERATEd RELIEF ISOL OP R 110 0

EM0405880A EMV 76 W-013B1 W-01381 INSTALL 6

22APR04 22APR04 DR-N ML-N 0 EMO W1-VB1I INSTALL JUM ER PER IWP 01-1>8'E-FN JUMPER PER IWP 12 00*

17:59 ORT3-N R-N _CONTROL ROOM RE RC FAN0405880' 111 0

EM04058808 EMV 75 W-013B1 W-013B1 JUMPER 3

22APR04 22APR04 DR-N ML-N 0

EM040588O0W-01301 JUMPE TESTING PER IWP 01-128sE-FN TESTING PER IWP 21:00 23:59 ORT3-N R-N 040588sCONTROL R OM RECIRC FAN; 112 1 EM9927043A EMV 76 CC-007s4A-ICC-754A-O REPLACE 2

22APR04 22APR04 DR-Y ML-Y 9

EM992704JAC-754A-0 REI LACE LS COVER' LS COVER 22:00 23:59 ORT3-N R-N 992704,1P-IA RCP C INLET MOV OPERATOR 113 1 EM0215165 EMV 76 CC-00759A-CC-759A-O MOV 10 23APR04 23APR04 DR-Y ML-Y 0

EMO2I6IsCC-759A-O M V ACTUATOR CECK-OUT ACTUATOR 00:00 11:59 ORT3-N R-N 02*16 1P-1A RCP Ct OUTLET MOV 0 ERATOR 114 0

EM0405896 EMV 76 W-021B.

W-0218 INSTALL 4

23APR04 23APR04 DR-N ML-N 0

IMJ045s"6W.21I INSTALLJUMPE PER IWP 01-12 E.FN JUMPER PER 1WP 04:00 09:59 ORT3-N R-N

' 040589 PAB EXHAUST STACK FAN 115 1 EM9927044 EMV 76 CC-00759A-ICC-759A-O REPLACE 3

23APR04 23APR04 DR-Y ML-Y 0

I EM9927 CC-759A-O REPLACE LS COVER LS COVER 09:00 11:59 ORT3-N R-N 992704 1P-1A RCP C OUTLETMOVO ERATOR 116 0 EM0405881A EMV 76 W-030A W-030A INSTALL 2

23APR04 23APR04 DR-N ML-N 0

EM040588 NW-030A INSTALL' JUMPER PER 1W R 01-128'E-FN JUMPER PER IWP 10:00 11:59 ORT3-N R-N 04058 13F-23/F-29 PAB EXHAUST FILTE FAN 117 1

OP0215165 EMV 76 CC-00759A-CC-759A-O MOV PMT 1

23APR04 23APR04 DR-Y ML-Y 335 OP02 165CC-759A-O M~v PMT STROKE ERIT-250 STROKE PER IT-250 12:00 12:59 ORT3-N R-N 021 led1P-1A RCPPC OUTLET MOV PERATOR 118 0 EM0405881B EMV 76 W-030A W-030A INSTALL 2

23APR04 23APR04 DR-N ML-N 0

EM04C 881BWN-30A INSTALLJUMPER PE IWP 01128E JUMPER PER rWP 13:00 14:59 ORT3-N R-N 0 05881lF-23/F-2d PAB EXHAUST F TER FAN 119 1 EM0407743 EMV 71 AF-04000-o 1AF 4000-0 RHEOSTAT 6 23APR04 24APR04 0

EMo4077431AF4000O RHE STAT BROKE BROKEN 22:00' 03:59 u4077J 1P-291 FP DISCHARG 120 1 EM0202527B EMV 75 8-42 1B-42 REMOVE 20 23APR04 24APR04 DR-N ML-N 0

EM0202527BlB-42 REMOVE I UCKETS MR 0 BUCKETS MR 22o00 21:59 ORT3-N R-N, 02025t7 III 121 1 EM0303679A EMV 76 AF-04000 IAF-4000 IND. NOT 2

24APR04 24APR04 DR-N ML-N 0

EI0303679 IAF-t 0 IND. NOT WC WORKING CORRECTLY 04:00 05:59 ORT3-N R-N

' 030367a1P-3 AFP DISCHA I

Run Date 22APR0413:12l LT-03 STANDARD PUBLICATION Sheet 7 of 33 O Primavera Systems, Inc.

FL-03 Execution Publication Set A

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 22APR04 12:00 U

ID RESF wo ST EQID DESCRIPTION ENG EVAL FOR FAC PROG - TURB HALL 8 RD ES EF RISK MF tn'u22 1123 at 24

!,l01214.16.11R20,220 2.24 i6 8,10il12.1461ia20,220.*2.4. 6. 8.O1AA214d 1221 11 NGosTFC2Ev]jEPI 77 IST-SISI 1

08APR04 I 22APR04 I DR-Y ML-Y 14:00A 12:59 ORT3-Y R-N 1050 123 1 EP0301910 EPI 77 U1-CONTAIN INSPECT CTMT AND 8

22APR04 23APR04 DR-Y ML-Y 374 FEEDWATER 21:00 04:59 ORT3-Y R-N 124 1 EP0301909 EPI 77 U1-CONTAIN VISUAL INSPECTION 80 22APR04 05MAY04 DR-Y ML-Y 36 OF CTMT LINER PLATE 21:00 22:59 ORT3-Y R-N 125 1 NG26TFC2EV EPI 77 IST-SISI ENG EVAL FOR FAC 6

23APR04 23APR04 DR-Y ML-Y 75 PROG - TURB HALL 26 07:00 12.59 ORT3-Y R-N 126 1 NG44CFC1EV EPI 77 IST-SISI ENG EVAL FOR FAC I

24APR04 24APR04 DR-Y ML-Y 10 PROG - CTMT 44FT 07:00 07:59 ORT3-Y R-N 171 EP0301956 EPT 76 HX.001A EDDY CURRENT TEST 24 17APR04 124APR04 DR-N ML-Y C

__STEAM GEN A -I SHIF_

07.00A 15:59 1ORT3-N R-N ITFC2EVENG,EVAL FOR FAC F ISECONDAFP? INSERVICE INSI EP030191NNSPECT CTMT A 030191qUNrT EP030190 UALINSPECT 0G - TURB HAL4 8 FT GEN AREA

'ECTION0301897 ID FEEDWATER IiENETRATIONS I CONTAINMENT ON OF CTMT UNER PLATE t_

auails______

. NG2E3TFC2E V!EAL FOR FAC tROG - TURB HAL 0301B97'^ _SECONDARY INSERVICE INSI I NG44CFCIEVEN I

0301891eS l

.26 FT GEN AF

'ECTION 3 EVAL FOR Fi ECONDARY IN

-p0Jojg sEDDY CURRENT TEST STEAM GEN A -I SHIFT ruiI 1281 1 EP0301957 EPT 76 HX-001B EDDY CURRENT TEST I 24 1 17APR04 I 24APR04 DR-N ML-Y STEAM GEN B. ISHIF1 07:OOA 15:59 ORT3-N R-N QpJ=j~_DDY 4URRENT TEST

.~~

B-SIfIIFr

=

a CMII l

129 1 NG-SC1BNRV EPT 76 SC-lB SC-1B. EDDY 2

21APR04 22APR04 DR-Y ML-Y 56 CURRENT REVIEW I 11:OOA 13:59 ORT3-Y R-N 130 1 NG-SCIBSRV EPT 76 SC-lB SC-1 B - EDDY 5

22APR04 22APR04 DR-Y ML-Y 53 CURRENT REVIEW /

04:OOA 16:59 ORT3-Y R-N 131 1

NG-SGB-ASL EPT 76 HX-001B SIG B - SETUP FOR 5

22APR04 22APR04 DR-Y ML-Y 0

BESHEET CLEANING 10:00A 16:59 ORT3-Y R-N 132 1 EP0301962 EPT 76 HX-020A HX-020A - EDDY

.22 22APR04 23APR04 DR-Y ML-Y 0

CURRENT INSPECT 4A 10:00A 13:59 ORT3-Y R-N 133 1

EP0311835 EPT 77 HX-001B HX-1B - EXAMINE 1

22APR04 22APR04 DR-N ML-Y 0

SEALING SURFACE 21:00 21:59 ORT3-N R-N 134 1 EP0311836 EPT 77 HX-001A HX-1A - EXAMINE I

22APR04 22APR04 DR-N ML-Y C

SEALING SURFACE 22.00 22:59 ORT3-N R-N 135 1 NG-SGA-BSL EPT 76 HX-001A SIG B - SETUP HOSE 1

23APR04 23APR04 DR-Y ML-Y C

THRU HATCH 07:00 07:59 ORT3-Y R-N 136 1 NG-SGB-BSL EPT 76 HX-001B SIG B - PERFORM 14 23APR04 24APR04 DR-Y ML-Y a

TUBESHEET CLEANING 08:00 11:59 ORT3-Y R-N 137 1 EP0301968 EPT 76 HX-048 HX-048 - EDDY 12 23APR04 24APR04 DR-Y ML-Y C

CURRENT INSPECT 14:00 01:59 ORT3-Y R-N 138 1 EP0301962A EPT 76 HX-020A HX-020A - EDDY 12 23APR04 24APR04 DR-Y ML.YV 1

CURRENT 14:00 15:59 ORT3-Y R-N U0 wc 1BNRV#C-iB - EDDY CURREI CONDENSER (DEAERATING MpnSC.1'B

  • EDDY CURREI

_CONDENSER(DEAERA AL5SIG

-SETUP FOR TU 1STEA$

GENERATOR03 0ijm 2 X-020P.EDDY CURREf El fTREVIEWIRERUN (IBN) 10301980 IT REVIEW I RERqN (1BS)

ING)0301980 3ESHEET CLEANIhG P1939 T INSPECT4A LP FW HEATER UP FEEDWATER HEATER 4A SEAUNG SURFAtE TOR E SEAUNG SURFACE ATOR I B - SETUP HOSZ THRU HATCH TEAM GENERATCI

k.

B - PERFORM TU3ESHEET CLEA ce EP0311830IX1B - EXAMINE 031183!STEAM GENERP EP03118 6HX-IA - EXAMIN 0311834STEAM GENEF NG-SGA-8S S/1 030193US

  • NG-SGB-BSL5 0301939 EPI I

P:

EPO:

0301962 NING MSTEAM G PECT GLAND EAM CONDEN EVIEWIRERUI IP.

IDY CURRENT Uo-o01 TG I

I 130196

!x-m YO CURRENT INS AN641 illllllllll1_AAIn Q1 1 l iU l

U A______

r VOl 019s 2 4H020A -EDDY CURRENT I 3nlq IEI0mmmmmmm

. a_

1391 1 EP0301967 EPT 76 HX-027 HX-027 - EDDY CURRENT INSPECT 6

24APR04 I 24APR04 I DR-Y ML-Y 02:00 11:59 ORT3-Y R-N a

EP6301967tX-X27 -El A30I9%967 U

Run Date 22APR04 13:12 LT-03 STANDARD PUBLICATION Sheet 8 of 33 C Primavera Systems, Inc.

_I FL-03 Execution Publication Set T

after22APR04 12:00 l

U1R28 WORKING SCHEDULE l

after22APRO4 12:00 UI ID RESPI WO EQID DESCRIPnON RD ES EF RISK MF APR hu 22 Fri 9.

_St 24 ST m.1n, VI D.2.4.6.

,lOil2,14,1&IFL20.2210.2.4.6.8.lOil2,14,16' 14011 EP0301968A I EPT 76

.HX.048 HX-048 - EDDY CURRENT 121 24APR04 26APR04 DR-Y ML-Y 07:00 08:59 ORT3-Y R-N 8

141 1

NG-SGB-CSL EPT 76 HX-001B SIG B - REM S/L ECUIP 6

24APR04 24APR04 DR-Y ML-Y 0

AND CLOSEOUT 12:00 17:59 ORT3-Y R-N 142 1 EP0301967A EPT 76 HX-027 HX-027 - EDDY 12 24APRo4 24APR04 DR-Y ML-Y 3

CURRENT 12:00 23:59 ORT3-Y R-N 143 1 NG-SGA-ASL EPT 76 HX-W01A SIG A - SETUP FOR 4

24APR04 24APR04 DR-N ML-N 0

_ESHEET CLEANING 15:00 18:59 ORT3-Y R-N 144 1 EP0301956T EPT 76 HX-001A 1HX-1A PLUG SIG 12 24APR04 25APR04 DR-N ML-Y 0

TUBES 16:00 05:59 ORT3-N R-N 145 1 EP0301957T EPT 76 HX-001B IHX-1B PLUG SIG 12 24APR04 25APR04 OR-N ML-Y 0

TUBES 16:00 05:59.

ORT3-N R-N Mais Il I___

146 1 FG309424P FG1 76 CW-00138A PAINT ICW-138A 5

21APR04 22APR04 DR-Y ML-Y 142 VALVE AND PIPING 09:OOA 16:59 ORT3-Y R-N 147 1 FG0212814P FG1 76 PIPE AC 01 PIPE AC 0152N-04 45 21APR04 24APR04 DR-Y ML-Y 260 STRIP/REPAINT (part 2) 20:OOA 16:59 ORT3-Y R-N 148 0 FG0302074 FG1 77 MANHOLE PUMP ELECTRICAL 3

22APR04 22APR04 DR-Y ML-Y 295 PM MANHOLE SUMPS 07:00A 14:59 ORT3-Y R-N 149 1 FG0212794 FG1 77 U1-CONTAIN CONT 46 FT SUPPORTS 27 23APR04 24APR04 DR-Y ML-Y 355 NEED PAINT 08:00-14:59 ORT3-Y R-N 150 1 FG301623P FG1 76 FD-00208A PAINTDVALVES 4

23APR04 I 24APR04 DR-Y ML-Y 230 C

LFD-207A

& 1FD-208A 23:00 02:59 ORT3-Y R-N 15t FG305003P FG11 76 FD-.00210A PAINT PIPE.

4 23APR04 l24APR04 DR-Y ML-Y 338 ASSEMBUIES FOR 23:W-0l 02:59 ORT3-Y R-N 152 t FG0212816 FG1 76 CPP 36 ICPP-36 CLEAN RUST 28 24APR04 l26APR04 DR Y ML-Y 155

_AND PAINT 07:00 l14:59 ORT3Y R-N 153 1 HP7.51..6B H4P 8'5 HP PURGE TIPURGE RMS TRIP TEST 24APRO4l 24APR04 DR-Y ML-Y 1

(HPIP 7.51.6) 10:00' 1t:59 ORT3-Y R-N 154 l2lIC0407898 l

C l76 lLT-0093 I

LT-934/935 LEVEL l4-l 20APR04 l APR04 DR-Y ML-Y l714 DEVIATION 21:00A l 15:59 lORT3-Y R-Ml 15l1lIC5.47-1 l C 8lICP-05.047 I SECONDARYLVL l12Bl 19APR04 l05MAYo41l DR-Y ML-Y I 0

llCON;TROLLERS AND-l I 1:00A l09:59lOR3Y-l I

.I 2424_pPANT ICW-138A VALVE CWP-30 P DISCHARGI pPE AC 01 52N-04 STR II II II II EP0301968~n n301951t1_i NG-SGB 030 EP0301 030 NG-E E

,CS SIG B -E 193in 3GA-AS SG

,03011936T1 N130195w1

~030195711H P0301957?I 08-EDDY Ct AND PIPING HEADER VENT0309424

'/REPAINT (part 2)

==_

I

U -

U f' 20174 UMP TLECTRICAL MAN TPORTABE ELECTRICAL 11 O

FG0212794C 02127941 I

I In IOLE SUMPS WNHOLE SUMP PUMPS0302074.

lNT 46 FT SUPPdRTS NEED PAIN1

\\_w

.,,_P J

w.

s_

FG30 9PIAN VLE 030116 II2A I FG305003 PAlNT PIPE A.-

0305~00HX-21A I FG0212816lC 021281CU IFD-207A & iF P FVNH 5A LS-

.EMBUES FOF P FWH SA LS-

)P-36 CLEAN F I

HP7.5t. BPURGE RMS 0301fq4UUNrr 1 CC IC04m T-934/035 LEVEL DEVIAtON

__T348 S ACCUMULATOR"EVELTRANSMrr1ER0407898 ICj.jNECONDARY LEVEL CONTI OLLERS AND Sw4T m

Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION FL-03 Execution Publication Set l

Sheet 9 of 33 0 Prlmavera Systems. Inc.

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 22APR04 12:00 ID RESPI WO EQID DESCRIPTION I RD ADD ES EF RISK MF l ST i

Ii I56I 1C0302099 I01 76 LC-02514 LC-2514 REFURBISH 11281 19APR04 07MAY04 DRY ML-Y 11:00A 09:59 ORT3-Y R-N 17 157 1 IC0305085 IC1.

76 LS-02376 I LS-2376 SMALL 128 19APR04 07MAY04 DR-Y ML-Y 7

STEAM LEAK ON LVL 1:OOA 09:59 ORT3-Y R-N 158 1 ICLS3579 I11 76 LS-03579 DISASSEMBLE. CLEAN 128 19APR04 07MAY04 DR-Y ML-Y 17 AND INSPECT LEVEL 11:OOA 09:59 ORT3-Y R-N 159 1 ICLS3580 IC1 76 LS-03580 DISASSEMBLE. CLEAN 128 19APR04 07MAY04 DR-Y ML-Y 17 AND INSPECT LEVEL 11:00A 09:59 ORT3-Y R-N.

160 1 ICLS3581 IC1 76 LS-03581 DISASSEMBLE. CLEAN 128 19APR04 07MAY04 DR-Y ML-Y 17 AND INSPECT LEVEL 11:00A 09:59 ORT3-Y R-N 161 1

ICLS3582 IC1 76 LS-03582 DISASSEMBLE. CLEAN 128 19APR04 07MAY04 DR-Y ML-Y 17 AND INSPECT LEVEL 11:00A 09:59 ORT3-Y R-N 162 1 IC4.26N41 ICt 76 ICP-04.026 ICP 4.26 NIS PR 13 21APR04 23APR04 DR-Y ML-Y 0

CAUBRATION 11:W0A 14:59 ORT3-N R-N 163 1 IC0309955 IC1 76 G-06 IG-O6 INSPECT/REPAIR 5

22APR04 22APR04 DR-Y ML-Y 0

VOLTAGE REG.

07:OOA 16:59 ORT3-Y R-N tO IC0309956 IC1 76 G-07 IG-07 INSPECT/REPAIR 5

22APR04 22APR04 DR-Y ML-Y 0

CD VOLTAGE REG 07:OOA 16:59 ORT3-Y R-N 165 1 IC4.3-4 ICI 76 IICP-04.00 ICP-04.003-4 5

23APR04 23APR04 DR-N ML-Y 105 CHARGING FLOW 07:00 11:59 ORT3-N R-N 166 1 IC4.10-1 IC1 76 I1CP-04.01 ICP-04.010-1 FIRST 7

23APR04 23APR04 DR-Y ML-Y 0

STAGE PRESSURE 07:00-13:59 ORT3-Y R-N 167 1 IC0213740 I11 76 FIT-00458 FIT-458 DRY BA 12 23APR04 24APR04 DR-Y ML-Y 0

BUILDUP ON XMITTER 07:00 08:59 ORT3-Y R-N 168 1 IC5.60 IC1 76 1ICP-05.06 RTD MANIFOLD 12 23APR04 24APR04 DR-Y ML-Y 0

FLOW/CO 07:00-08:59 ORT3-Y R-N 169 1 1IC4.14 I10 76 ICP-04.014 ICP 4.14 BA CONTROL 20 23APR04 25APR04 DR-N ML-N 0

INSTRUMENT CAL 09:00 08:59 ORT3-N R-N 170 1 IC0400553B IC1 76 SERVICE SERVICE MAINT 20 23APR04 27APR04 DR-Y ML-V 9

SUPPORT-EQ 10:00 13:59 ORT3-Y R-N 171 1

1IC5.65A IC1 76 11CP-05.06 ICP-05.065 LETDOWN 3

23APR04 23APR04 DR-Y ML-Y 10 PRESS PT-135 14:00 16:59 ORT3-Y R-N Thu 22 E. FrL3 Sat 24

.e10l?142,116,la20.22 0.2.*4. 6. 8.0Z14,161820.2.2 0. 2.4.6. 8.10i?1416,l

-209L-2514 REFURBISH I

s LS-237 SMALL STEAM K ON LVL SW,

-f ISASSEMBLE, CLEAN AD0 INSPECT LEVEL NSTRU CU ISASS4MBLE. CLEAN A D INSPECT LEVE¢ INSTRU

~JSIIASSEMBLE, CLEAN.~ INSPECT LEVEL INSTRU I,

];'ISAS~

MBLE, CLEAN A f4PCTLV~

INSTRU s

-II

-~2 1 ~4.29NISPRCAUBI~

I nnu I-QW-0 6 INSPECT/REPAIRN

_ROD CONTROL MG SE 9956G -07 ItOSPECTIREPAIR N WROD ¢ONTROL MG SE' IC43.I4C 030096B IC4.10-iICI

  • I nnn.7*

Ilurm I

NUCLEO INSTRUMENTA LTAGE REG.

0309955 LTAGE REG 0309956

  • 1

-04.003-4 CHARGING FLOW CHARGING FLOW TRANSMITT

-04.010-1 FIRST *TAGE PRESSURE I'lON SYSTEM I RS AND INDIC XMTR CAL

  • _UlDET orHre nDrel lDr n

.- rA re PAI 1-s Ll lAtiH L'ALIH I

II wu.uum I IC0213740T

  • Rmm-rIRS I a I 1.-r rriroaumr¶ 458 DRY BA BUIIUDUP ON XMI TTEI

= :

0213741 I li IC560T IFOLD FLO¶YICO

=

.RC LOOP A RI RTD MANIFOL rCAL 0n30nni U_

I 4 CONIOL INSTRUMENs (lfli I

E

____W- -

1C040055

.A UP T

3SERVI E MAINrSUPPORT EO VEFIFYING 04005~

I c5.65AICP-05.06e LETDOWN PRES 300986MLErDWN AND RCP SE 4261441CP 4.26 MS PR CALBRAI 030083fm n

smmm PT-135 AL D/P TRANS ON 17211 IC4.26N42 ICl 76 ICP-04.026 iCP 4.26 NIS PR CALIBRATION 15 23APR04 I 25APR04 I DR-Y ML-Y 15:00 09:59 ORT3-N R-N 0

0 1731 1 IC0302376 IC2 76 TS-02134 TS-2134 RELOCATE SWITCH 20 14APR04 I24APRO4I DR-N ML-Y 22:OOA 04:59 ORT3-Y R-N 120 IC0 1 i237STS-213j REOCATE Sr Dt-VA-f DHYDpROG

.9.

LL I

I Run Date 22APR04 13:121 LT-03 STANDARD PUBLICATION,

FL1)

-A%

tnnPeiltn Cnt I

Sheet 10 of 33 Or P ~

snr C.-

m-Inr

-I

-7.

I I

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 22APR04 12:00 ID RESP 1C2 WO ST APR EQID DESCRIPTION RD ES EF RISK I MF ThU 22 3.1mi21416.1

_ _ _ _F Sat 24

. 24.6.

.1 l.2. 4.6 F. 1RM114,1E' 1741 1 IC5.52-1 76 ICP-05.052 ICP 5.52 SECONDARY 1 20 14APR04 24APR04 DR-Y ML-Y TEMPERATURE INST 23:OOA 00:59 ORT3-Y R-N 52 CS.12.11CP 5.52 SECONDARY TEMqERATURE INST I-nK nAP Pi

{

17511 IC4.1D IC2 76 1 ICP-04.001 I DELTA T SP2 & F(T I 19 19APR04 24APR04 DR-N ML-Y AVG) CAL - 4.1 D 23:OOA 03:59 ORT3-N R-N 0 IC4. DDELTA T SO2 & F(T AVG) CA

  • 4.1 D z_=socwvvoro r ~ANT TEMF
  • ~

U I

RPISAJI IiGIARDS ANI 1t 4

4-4 4

4 4-1761 1 IC5.22 IC2 76 1 ICP-05.022 IFEEDWATER CONTROLI 54 1 19APR04 28APR04 I DR-N ML-Y SYSTEM CAL 23:00A 22.59 ORT3-N R-N

. 6 IC5.

FEEDWATER CONTROL SYS4EM CAL L,

a

 -

I I

4 4- _

1 1771 1 1C0212948 1 IC2 C0; 29481PT-12 INSTALL NEW VI

-i 76 1 PT-00124 1PT-124 INSTALL NEW I 19 I 21APR04 I 24APR04 I DRY ML-Y I__ TIVENT PLUGS 21:00A 03:59 ORT3-Y R-N 138 NT PLUGS

&IS

~

I4n 4fl

-na I *~

l l

17811 1C0407786 IC2 w

s 76 I TC-00404A1 TC-404AID FAILED BISTABLE 19 1 21APRo4 I 24APR04 I DR-Y ML-Y 21:OOA 03:59 ORT3-Y R-N 121 co4786TC-404AD FAILED BISTA LE

-__r-lu fjr LJC E Il nnI I

'UA Eri l I ll

'791' I4 1791 1 IC5.14RCP IC2 76 1 11CP-05.01 ICP 5.14 RCP SEAL INSTRUMENT CALS 19 1 21APR04 I 24APR04 I DR-Y ML-Y 21:OOA 03:59 ORT3-Y R-N 0

1C.SRCpCP 5.14 RCP SEAL IN UMENT CALS 1

\\.,_S_ lOW) LOOF mU nIr~rI~MIAg 000C 4

180 1

IC4.3-1PRT IC2 76 11CP-04.00 ICP-04.003.1 PRT 6

22APR04 23APR04 DR-Y ML-Y 0

LEVEL XMTR CAL 19:00' 00:59 ORT3-Y R-N 181 1

IC0212748 IC2 76 TM-W04010 lTM-4010 NEED 18 22APR04 24APR04 DR-N ML-Y 82 REFURBIBAD 19:00 02:59 ORT3-N R-N 182 1 IC0212949 IC2 76 PT-00131 1PT-131 INSTALL NEW 19 22APR04 24APR04 DR-Y ML-Y 138 VENT PLUGS 19:00 03:59 ORT3-Y R.N 183 1 IC0310192 IC2 76 LT-00442 1LT-442 REPLACE 36 22APR04 26APR04 DR-Y ML-Y 14 POWER SUPPLY 19:00 00:59 ORT3-Y R-N 184 1

IC5.9 IC2 76 ICP-05.009 MISC TURBINE 40 22APR04 27APR04 DR-Y ML-Y 0

INSTRUMENTATION 19:00 04:59 ORT3-Y R-N 185 1

IC4.3-1PZR IC2 76 1ICP-04.00 ICP-04.003-1 PZR 30 23APR04 26APR04 DR-Y ML-Y 0

LEVEL XMTR CAL 19:00-04:59 ORT3-Y R-N 188 1

IC0306469 IC2 76 LT-00428 lLT-428 BA BUILDUP 36 23APR04 28APR04 DR-Y ML-Y 0

ON MANIFOLD 19:00 00:59 ORT3-Y R-N 187 1

IC0306470 IC2 76 LT-00427 ILT-427 BA BUILDUP 36 23APR04 28APR04 DR-Y ML-Y 0

ON MANIFOLD 19:00 00:59 ORT3-Y R-N 188 1

IC0407901 IC2 10 FC-00475AI FC-475AtB VERIFY 3

24APR04 24APR04 DR-Y ML-Y 106 BISTABLE SET POINT 04:00 20:59 ORT3-Y R-N 189 1

IC4.7-1 IC2 76 11CP-04.00 ICP 4.7-1 FEED FLOW 8

24APR04 25APR04 DR-Y ML-Y 13

_ _XMTR CAL tJ4:00 01:59 ORTM R-N.

190 2 IC3.16RUNI IC2 76 ICP-03.016 IOPS MONTHLY TEST I

24APR04 24APR04 OR-N ML-Y 552 17:00' 17:59 ORT3-N1 R-M t11 tt1 IC5.54-1 tC5 78 ICP-05.0S4 ICPS54 SECONDAY. 421 19APR404 29APR04 DR-Y ML-Y LOW RANGE 1 1:00A 13:59 ORT3-Y R-N

4.31PR1,ICOI04.003A1 PRT LE 0300961_PZR AND; CO2127 481T1W40`10 NEED REI

'EL XMTR CAL R RELIEF TANK L¢VEL TRANSMITT I

JREBBAD CAPACITORS_

c

'RS OUTAG C

C 02127 CH 1 (RE D) F(TAVG) IM

0212949 Pt-131 INSTALLNE NVENTPLUGS 021294 1P-1A

[

ZP LA3YRINT

03119i LT-442 REPLACE P ER SUPPLY 03 t019_9 ICS. MI$C TURBINE IN UMENTATION 03 0 0 8 5 1!1-_

I II 1.I I

III IC4.3-1 pyCP-04.003-PR LE 03 0 0 ~ ~

IC03064691T-428BA ULDUI 03054 1C030 54TO1L.T427 EIA _BUILDUI

'EL XMTR CA[

I

-~

ON MANIFOL ON MANIFOL n~nFATRA UiVUW.v

,IC0407901FC-475 4 B VERIFY 8I5 0407901i-I IC4.7-.1P 4.711 FEED FLOW (1300971 IC3.16RUL0I 0301000 1i A

SSCONDARY LOW

=IANGE PRESSURE RESTART w

Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION FL-03 Execution Publication Sat I

Sheet 11 of 33 C PrImavera Systems. Inc

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 22APR04 12:00 I

ID RESP ICS WO ST 75 76 EQID DPS-05933 DESCRIPTION RD ES EF

. RISK MF U

n APR Thu 22 m.171wn1 F.l 2 CR*

4A rn zo I

In.

2. -4. Qj 8.10t1Z14A&1B,20,2.A 0. 2,4.6,

.1011Z9.1A.16,1 19211 IC9944161 IDPS-5933 INSTALL' 42 19APR04 26APR04 DR-Y ML-Y SNUBBERS 11:00A 13:59 ORT3-Y R-N

'Cge141SIIDOPS-5g33 INSTALL SNU~qERS I

-linkt m uuin 1931 1 IC5.7-1 lCS 76 ICP-05.007 ICP 5.7 EH CNTL CAL I 80 I 20APR04 I 01MAY04 DR-Y ML-Y THRU STEP 4.49.11 09:OOA 11:59 I ORT3-Y R-N 0

_C449.11 RESIRT U -

N 194 1

IC0307357 IC5 76 RDC-1BD RDC-1BD REPAIR 12 22APR04 23APR04 DR-Y ML-Y 0

SUPRESSION CIRCUIT 12:00 13:59 ORT3-Y R-N 195 1 IC5.74 IC5 76 ICP-05.074 RDC BLOCKING DIODE 12 22APR04 23APR04 DR-Y ML-V 0

CHECK 12:00 13:59 ORT3-Y R-N 196 0

IC0307138 IC5 77 ICP-07.030 INSPECTION OF 3

23APR04 23APR04 DR-Y ML-Y 284 METEOROLOGICAL 13:00*

15:59 ORT3-Y R-N 197 1

IC0213084 ICS 76 LT-00433 LT-433 REPLACE 10 24APR04 24APR04 DR-N ML-N 0

MANIFOLD 07:00*

16:59 ORT3-Y R-N 198 1

IC5.61 IC5 76 IICP-05.06 ICP-05.061 10 24APR04 24APR04 DR-N ML-N 0

PRESSURIZER LEVEL 07:00-16:59 ORT3-Y R-N 199 1 1IC0300795 IC5 76 I&C MISC VISUAL INSPECTION 12 24APR04 25APR04 DR-Y ML-Y 68 OF RELAY RACKS 07:00' 08:59 ORT3-Y R-N 200 1 1 IC5.49DAY1 ICV 76 l ICP-05.049 ICP 5.49 SEC CONTROL 130 21APR04 05MAY04 DR-Y ML-Y 25 VALVES' 14:0A 11:59 ORT3-Y R-N Co OC-IBDREPAIRSUPRE SIONCIRCUIT I

RDC BANIS BID GROUP i C C5. RCLOCING DIODE CHE RDC LOKING DIODE CHE

[ICl 0713 INSPECTION OF METEOROL(

0 07138MMETEdROLOGICAL MO I

I 00IC0213084L1

£,

0213084 I 'IC5.611Cl 030098 IC0300o95V T

RCUIT CABINI K ANDMERC GICAL SITES TORING SYSI 433 REPLACE

-05.061 PRES!

I p

UAL INSPECT 030077 9dE C5.J9DAyICP 5.49 SEC CONTROL PALVES 2011 1 1C5.49NGTI ICV 76 ICP-05.049 lICP 5.49 SEC CONTROLI 1301 21APR04 l 03MAY04 I DR-Y ML-Y VALVES j 19:00A 02:59 ORT3-Y R-N 0

lp"MR!

F

202 1 IC5.49C ICV 76 ICP-05.049 ICP 5.49 CS-2273 130 22APR04 03MAY04 DR-Y ML;Y 63 HEATER BYPASS 17:00-02:59 ORT3-Y R-N 203 1 IC5.16-142 ICV 76 I1CP-05.01 CV-142 NORMAL 5

23APR04 23APR04 DR-N ML-N 0

1 1

CHARGING 07:00-11:59 ORT3-Y R-N 204 1

1l0304451 ICV 76 CC-00761B-ICC-761B-OCKIASY I

23APR04 23APR04 DR-Y MLY-282 FOR FOREIGN MATL..

08:00-08:59 ORT3-Y R-N 205 1 1IC0304453 ICV 76 CV-00142-0 ICV-142 CHECK IA SY I

23AiR04 23APR04 DR-N ML-N 169 FOR FOREIGN MATL 08:00 08:59 ORT3-Y R-N 206 1IC0304452 ICV 76 CC-00761A-ICC-761A-O CK IA SY I

23APR04 23APR04 DR-Y ML-Y 281 FOR FOREIGN MATL 09:00' 09:59 ORT3-Y R-N 207 1 1lC5.16-130 ICV 76 IICP-05.01 CC-130 NONREGEN HX 4 23APR04 23APR04 DR-Y ML-Y 0

CLGVLVDIAG 12:00-15:59 ORT3-YR-N 208l 1 1 IC5.69-625 ICV 76 IICP-05.06 ICP-05.069B TRAIN B 10 23APR04 24APR04 DR-N ML-N 0

19:00-04:59 ORT3-N R-N C5.49CI!!CS27HEA4R BYPASS_______

U n

innondam u

r

.~

I...:N~

IC5.16-142 030097i IC03044511 03044513 IC03044531 0304453 IC0304452 0304452 1CS.11 030 I

142 NORMAL CHARGING

_RCS AND CV:S INSTRUMENTS

-C-7611-O CK IA ;Y FOR FOREIGN IlP-1B RCP THERMhAL BARRIER CO(

.V-142 CHECK IA$Y FOR FOREIGN

CHARGING LINE 1LOW CONTROL C 1CC-761A-O CK IA SY FOR FOREIGI 11 P-1A RCP THEAMAL BARRIER Cq

..130 CC-130 NONnEGEN HX CLG Vt p97I1RCS AND CVCS INSTRUI IC5.6"29Cd 50.069B TRAIN B 030099 RAls IC0300940-!5S DIAGNOSTI 030094t4"HX-11B RHR I I

OUTAGE CAL FAATL ILING RETURP MATL PERATOR I MATL OLING RETUF V DIAG ENTS OUTAG B RHR HEAT CHECK 0e OUTLET CC 20911 IC0300940 ICYI 76 RI--00625-O I RH-625 DIAGNOSTIC CHECK 4

23APR04 I 23APR04 DR-N ML-N 20:00 23:59 ORT3-N R-N a

Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION Sheet 12 of 33 C Prlmavera Systems. Inc.

}

FL-03 Execution Publication Set I

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE after 22APR04 12:00 U

ID RESP WO EQID DESCRIPTION RD ES EF RISK MF APR III ST

.1011214.16 1820 220 2.4. 6R.l8.101114.16182a22 0.A 2.4. 6.8.1011224,lr 1e{v.^s i -d ---

U _1z; 2101 1 IC9950095 ICV 76 CV-00313A-CV-313A-S REPLACE 5

24APR04 24APR04 DR-N ML-Y 0 _

IC995009 313A REPI SOLENOID VALVE 085 00 12.59 ORT3-N R.N 995009 P-tArB 211 1

IC4.14A ICV 76 ICP-04.014 CV-110ABAFLOW 3

24APR04 24APR04 DR-N ML.N 0

,IC4.

IDAIVCV-OA CONTROL VALVE 11 001 13:59 ORT3-N R-N 0300 BORIC 212 1 IC5.10-957 ICV 76 ICP-05.010 S1-957 ACCUM VENT VA 5 24APR04 24APR04 DR-Y ML-Y 0

ICs. 0.957SI-957 A 13:00 17:59 ORT3-Y R-N 0 0085_

213 1 1IC4.14B ICV 76 ICP-04.014 CV-111 RMLIW 3

24APR04 24APR04 DR-N ML-N 50 C4.14BCV-111 DILUTION FLOW 14:00 16:59 ORT3-N R-N I3008346 B

214 1 IC5.16.135 ICV 76 1ICP-05.01 CV.135 LETDOWN LINE 4

24APR04 24APR04 DR-N ML-N 179 ICS.16-13 17:00 22:59 ORT3-Y R-N 030097E 215 1 MM0301148 MM1 76 HX-015B8 HX-15B8, CFC COIL 1

15APR04 22APR04 DR-Y ML-Y 83 M 101148-1538, CFC COIL INT RNAL INSPICLEANING INTERNAL 02:OOA 17:59 ORT3-N R-N COINrTAINMENT ACCIC NT RECIRC HEAi EXCHANGER03 1148 216 1 MM0214171 MMI 76 W-001B1 W-1B1. INSPECTAND 2

15APR04 22APR04 DR-Y ML-Y 0

M 1417 1W-¶1B1 INSPECTANo L IBRICATE FAN BIARINGS LUBRICATE FAN 02:OOA 18:59 ORT3-N R N CONTAINMENT ACC ENT RECIRCUL"TON FAN021417 217 1 MM0214064 MMI 76 HX-015B HX-15B, MOTOR I

1SAPR04 22APR04 DR-Y ML-Y 144 14064HX-158, MOTOR COOU G COIL INTERNAL INSPECTION COOLING COIL 10:OOA 12.59 ORT3-N R-N W-1B1 ACCtDENT RECIRC FA MOTOR COOLING COIL0214064 I1_

218 1 MM0306449 MM1 76 HX-015B1 HX-015Bi. CFC COIL 6

19APR04 22APR04 DR-N ML-N 139

-O1481, CFC COIL IN ERNAL INSPICL;ANING INTERNAL 14:OOA 17:59 ORT3-N R-N NCOITAINMENT ACCIC _NT RECIRC HEAT EXCHANGER03 6449 219 1 MM0306450 MM1 76 HX-015B2 HX-015B2. CFC COIL 6

19APR04 22APR04 DR-N ML-N 139 M

-01 4B2 CFC COIL IN ERNAL INSPICLEANING INTERNAL 14:OOA 17:59 ORT3-N RN CONTAINMENT ACCI NT RECIRC HEAt EXCHANGER03 6450 220 1 MM0306451 MM1 76 HX-015B3 HX-015B3, CFC COIL 8

19APR04 22APR04 DR-N ML-N 139 MIX-01 B3, CFC COIL IN ERNAL INSPICLEANING INTERNAL 14:OOA 17:59 ORT3-N R-N CONTAINMENT ACCIC ENT RECIRC HEAT EXCHANGER03 6451 221 1

MM0306452 MM1 76 HX-015B4 HX-015B4. CFC COIL 6

19APR04 22APR04 DR-N ML-N 78 M a645 X-0184, CFC COIL IN ERNAL INSPICLEANING INTERNAL 15:OOA 22.59 ORT3-N R-N CONTAINMEIN ACCIDENT RECI*C HEAT EXCHAN ER0306452 222 1 MM0407919 MMI 71 R-I RESTORE BULLET 5

21APR04 22APRO4 0 M ESTORE BULLET NOS ON INTERNALS' NOSE ON INTERNALS 20:00A 16 59 REACTOR VESSEL AN ASSEMBLY0407919 223 1 MM9924975 MMI 76 HS-1 HS-1, AS-FOUND VT-3, 2

22APR04 22APR04 DR-Y ML-Y 0

4gTSHS1. *S.FOUND VT-3, F EMOVE SNUBBE4 FOR TESTING REMOVE SNUBBER 12:00' 13:59 ORT3-N R-N I-1A SG)AAIN STEAM LIN WEST SNUBBERP924975 224 2

MM0213893 MMI 77 ELECT PENE INSPECT AND 4

22APR04 22APR04 DR-N ML-N 594 M U33NSPECT AND MAINTAI 03 AND 058 MAINTAIN 03 AND 058 12.00 15:59 ORT3-N R-N UNIT 2 ELECTRICAL PEN TRAIONS02138 43 225 1 MM9933444 MM1 76 W-001C2-A W-1C2-A REPLACE 20 22APR04 24APR04 DR-N ML-N 0 MM W-1C2'.A REPLACE MC DRAFT DAMPER_

BACKDRAFT DAMPER

-13:00' 12:59 ORT3-N R-N I

CONTAII 226 1 MM9934376 MMI 76 HS-15 HS-15. AS-FOUND VT-3, 2 22APR04 22APR04 DR-Y ML-Y 0 M 34376HS 15.AS-FOUND VT-3, REMOVE SNUBBER FOR TESTING REMOVE SNUBBER 14:00 15:59 ORT3-N R-N ECONTAINMENT SPRAY H 'ADER SNUBBER6934376 227 1 MM-1600-20 MM1 76 R-1 INSTALL CONOSEAL 3

22APR04 22APR04 DR-Y ML-Y I M n.,tVNSTAII.L CONOSEAL CC VERS COVERS 14:00 16:59 ORT3-N R-N REACTORVESSELANC ASSEMBLY0213472 Run Date 22APR04 13:12 LT-03 STANDARD PUBLICATION Shoot 13 o_33 C Primavera Systems, Inc.

I FL-03 Execution Publication Set

after 22APR04 12:00

.. I U1R28 WORKING SCHEDULE I

after 22APR04 12:00 Ul ID RESP WO I EQID DESCRIPTION RD ES EF RISK MF APR 228 1 MM0304672 MM1 75 HS-601R-73 IHS-601R-73 CHANGE 32 22APR04 25APR04 DR-Y ML-Y

_0 M 046=-15-eqR-73 CHANGE UBER STROKe& SWAP SNUBBER STROKE&

16:00 07:59 ORT3-Y R-N 0 1 4..

229 1 MM0214170 MM1 76 W-001B1 W-1B1. REPLACE 2

22APR04 22APR04 DR-N ML-N 64 MM 214170W-18ia REPLACE AUT MATIC LUBRICAOR AUTOMATIC 17:00 18:59 ORT3-N R-N 21417uCCNTAINMENT ACC ENT RECIRCUL/TION FAN 230 1 MM0214182 MM1 78 W-003A W-3A.

2 22APR04 22APR04 DR-N ML-N 0 MM 2141 2,-3A.S INSPECTiLUBRlI ATE BACKDRAFT DAMPER INSPECTtLUBRICATE 17:00-18:59 ORT3-N R-N 214182-CONTAINMENT CON ROL ROD DRIVE SHROUD FAN 231 1

MM0214183 MM1 76 W-003B W-3B.

2 22APR04 22APR04 DR-N ML-N 48 MM 214183W-3B,INSPECT1LUBRI ATE BACKDRAFt DAMPER INSPECT/LUBRICATE 17:00 18:59 ORT3-N R-N 21418A1CONTAINMENT CO OL ROD DRIVE SHROUD FAN 232 1

MM0305396 MM1 76 W-001B1 WM1B1 REPLACE 36 22APR04 25APR04 DR-N ML-N 0 MM 305396W-IBI REPLACE SPRI ISOLATORS SPRING ISOLATORS 17:00 04:59 ORT3-N R-N 30539 233 1 MM-8480E2 MM1 76 IN JIT INFO SHARING 2

22APR04 23APR04 0

MMe848E.2I INFO SHA ING PRIOR TO UPER INTERNALS *FT PRIOR TO UPPER 23:00 00:59 0214134.1REACTOR ESSEL AND ASSEMBLY 234 1

MM-8480E1 MM1 76 R-1 UPPER INTERNALS 1

23APR04 23APRo4 DR-Y ML-Y 0

MM4480E1UPPER INTI RNALS UFT IPTE' BRIEF LIFT IPTE BRIEF 01:00 01:59 ORT3-N R-N 0t141341REACTO VESSEL AND AS$EMBLY 235 1

MM-8480E MM1 76 R-1 REMOVE UPPER 4

23APR04 23APR04 DR-N ML-N 0

MI8480EEMOVE PPER INTERNALg INTERNALS 02:00 05:59 ORT3-N R-H 0214134A RE TOR VESSEL AND ASSEMBLY

'AS 1

MM-8859A MM1 82 W-001D1 W-1D1. FME CLOSE 1

23APR04 23APR04 DR-Y ML-Y 138 S

MM-8 5gYW-1D1, FMEbLOSE OUTINSP 'TON OUT INSPECTION 12:00-12:59 ORT3-N R-N 021 179ICONTAINM4NTACCIDENT R CIRCULATION 237 1

MM0214167 MM1 76 W-001A1 W-IAI. INSPECTAND 40 23APR04 27APR04 DR-N ML-N 0

MMO 14167W1A1I INSPECTAND LUBRI TE FAN BEA LUBRICATE FAN 13:00 12:59 ORT3-N R-N 0 141 238 1

MM0305857 MM1 76 P-010B IP-1OB REPLACE 30 23APR04 25APRo4 DR-N ML-N 0

MM0305b57IP-10B REPLA E ROTATINGI ROTATING ELEMENT 23:00 10:59 ORT3-N R-N

0105, 239 1

MM-84800 MM1 76 R-1 CLEAN REACTOR HEAD 45 24APR04 26APR04 DR-Y ML-Y 209 MM-841 LEAN REAC STUDS 10:00' 14:59 ORT3-Y R-H 02141 240 1

MM0407700 MM1 75 CV-00200C CV-200C, INSTALL NUT 1

24APR04 2iAPR04 DR-N ML-N 376 MM04 CV-20C ON PIPE SUPPORT 12:00' 12:59 ORT3-N R-N 04 0(LETDOV 241 1

MM0407701 MMI 10 CV-01296 CV-1296. REMOVE I

24APR04 24APR04 DR-N ML-N 376 MM04 01CV-1296.

CLOTH FROM PIPE 1200 12:59 ORT3-N R-N

_.AUXILIAI

-U,^,sw

=-

^2z,-, e;.:,-2h - -

U _

I 242 1 MM0306054 MM2 76 P-028A P-028A - CONTINUE 35 18APR04 25APR04 DR-Y ML-Y 0 M 0

028A *CONTINUE OVERHAUL MAIN FEED PUMP OVERHAUL MAIN FEED 11:00A 16:59 ORT3-N R-N 243 1 MM0407389 MM2 76 P-028A I P-28A, CONTINUE 1

21APR04 22APR04 DR-Y ML-Y 70 MdT'7891P-2&4. CONTINUE INS CTSPEEDINCRFASER INSPECT SPEED 09:00A 12:59 ORT3-N R-N STEAM GEPIERATOR FEED P MP0407389 244 1

MM0301046 MMZ 76 LG-02561 I LG-2561 LEVEL 3

21APR04 22APR04 DR-N ML-N 123 M 10461LG-2561 LEVEL GAUGE STUCK GAUGE STUCK 22:OOA 19:59 ORT3-N R-N I

1X-22C MSR LEVEI GAUGE0301046 245 1 MM0309696 MM2 78 LG-02697 ILG-2697 FLUSH LEVEL 12 21APR04 23APR04 DR-N ML-N 36 M oggmiLG-297 FLUSH LEVEL INDICATOR INDICATOR 22:OOA 04:59 ORT3-N R-N

_In M25A MSR STILLING MANIFO_ LEVEL G UGE039696 Run Date 22APR04 13:121 LT03 STANDARD PUBLICATION Sheet140f33 Pdmavera Systems, Inc.

l FL-03 Execution Publication Set v

after 22APR04 12:00 l

WORKING SCHEDULE after 22APR04 12:00 ID IRESPI WO EQID ST DESCRIPTION 3M:=1 HX-056A-HYDROLANCE CLEAN RD ES EF RISK MF Thu 22 Fi23 Sat 24 AXN 0.10112,14.16.IR20.2210.2.4.6.,810:1214.181FL20.220.2,4,6.8,10il2A4,l1&

24B1 1 MM0214098 MM2 76 HX-056A 2 1 22APR04 I 22APR04 I DR-N ML-N 11:00A 13:59*

ORT3-N R-N 5

247 1 MM0214100 MM2 76 HX-0568 HX-056B -

2 22APR04 22APR04 DR-N ML-N 47 HYDROLANCE CLEAN I11:00A 13:59 ORT3-N R-N 248 1 MM0305772 MM2 76 HX-021A IHX-21A PLUG TUBES-I S 22APR04 22APR04 0

CONTINGENCYWO 12:00 16:59 ml~

IAM 409gHX-056A - HYDROLANCI

  • P-28A SGFP OIL COOLER0O 14100HXO05 4B. HYDROLANC
  • P-28B SGIP OIL COOLER0O IDSMHX-21A PLUG TUBES.

HP FHEDWATER HEATI QQ OPEN4pLEAN AND INSP 2491 1 MM0306061 Mw 75 T-052A OPENICLEAN AND INSPECTLO 10 I22APR04 23APR04 DR-N ML-N 12:00 11:59 ORT3-N R-N 61.

I E

250 1 MM0301048 MM2 76 LG-02563 LG-2563 LEVEL GAUGE 6

22APR04 22APR04 DR-N ML-N 36 STUCK 17:00 22:59 ORT3-N R-N 251 1

MM0304206 MM2 76 FD-00249A FD-00249A.- INLET 6

22APR04 22APR04 DR-N ML-N 180 PLUGGED 17:00' 22 59 ORT3-N R-N 252 0 MM0201304 MM2 77 WING-EQ INSPECT FIRE 8

22APR04 23APR04 DR-N ML-N 352 EXTINGUISHERS 17:00' 00:59 ORT3-N R-N 253 1 MM0214082A MM2 76 HX-021A HX-21A. CLOSE HP 8

22APR04 23APR04 DR-Y ML-Y 0

FEEDWATER HEATER 17:00 00:59 ORT3-N R-N 2#4 1 MM0311587A MM2 76 HX-021B 1HX-218 CLOSE HX 8

22APR04 23APR04 DR-N ML-N 124 AFTER ECT 17:00 00:59 ORT3-N R-N 255 1 MM0400290 MMZ 76 LG-02564 1LG-25B4 LEVEL 8

22APR04 23APR04 DR-N ML-N 36 GAUGE STUCK 17:00 00:59 ORT3-N R-N 256 1 MM0214128 MM2 76 P-029-T P-29-T. INSPECT IB & 20 22APR04 24APR04 DR-N ML-N 0

OS BEARING OIL 17:00' 00:59 ORT3-N R-N 257 0

MM0201361 MM2 75 W-030A W-30A, LUBRICATE 4

23APR04 23APR04 DR-Y ML-Y 0

AND MAINTAIN FAN 05 00 10:59 ORT3-N R-H 258 1 MM0214048 MM2 76 HS-CS-01 HS-CS-01.

5 23APR04 23APR04 DR-N ML-N 0

REMOVEIREPLACE 07:00' 11:59 ORT3-N R-N 259 1 MM0214087 MM2 76 HX-023A HX-023A-20 23APR04 25APRW4 DR-N ML-N 8

HYDROLANCE CLEAN 09:00' 08:59 ORT3-N R-N 260 1 MM0214088 MM2 76 HX-0238 HX-023B -

20 23APR04 25APR04 DR-N ML-N 14 HYDROLANCE CLEAN 09:00' 08:59 ORT3-N R-N 261 1

MM0207075 MM2 76 FE-00134 1FE-134 REPL FLANGE 8

23APR04 24APR04 DR-N ML-N 0

GASKETS 23:00' 18:59 ORT3-N R-N 262 1 MM0214129 MM2 76 P-029-T EMERGENCY GOV 6

24APR04 24APR04 DR-N ML-N 0

INSPECTION P-29-T 01:00 18:59 ORT3-N R-N MM MM MM UMC MM MM 30 10 48LG-2563 LEVEL GAUGE 30104_1HX-22D MSR L 30420oaT:2249A - INLET PLU 304200 HX-19A LP FW 20130WNSPECT FIRE EXTINGI 201304 WELDING A

!14082At2IASLOSE HP FE 21408 IHP FEEDW, Ilia 1H21 CLOSE HX A 31188 HP FEEDWJ 4002901 LG-2S64 LEVEL GAUG 40029 HX-22B MSI 214 128P-29-1. INSPECT 1B & C CLEAN SGFP COIL COOLER'.

4098 CLEAN SGFP Ol. COOLER 4100 ONTINGENCY WO R SA030577Z

-CT LO RESERVCOR

.P-28A SGFP IUBE OIL RESERM STUCK EVEL GAUGE IGED 13A LG-2536 LOWER ISOLATION ISHERS ID CUTTING EQUIPMENT 1DWATER HEATER 5A TER HEATER 5A TER ECT TER HEATER 58

'STUCK LEVEL GAUGE IBEARING OIL CPOLERS P1P

-29 AUX I LUBRICATE AND MAINTAIN FAN

  • F-23/F-29 PAB b0HAUST FILTER CS.01. REMOVEIqEPLACE SNUBE CONDENSAT LINE GB4 SNUI IX-023A - HYDROLANCE CLEAN TU

)IR0306061 EEDWATERTI

'AN ER WIREBUILI

,ER SINE LUBE 01

. 1.

=

IMM0201361W-30A

10201361Ein MM021404SH!

021404wN M0214081 MM0214081 0214081 X

F-0238. HYDROVANCE CLEAN ThBNLUBE Ol I.

1MMO2O7OTSFE-134 REPL 0207 1i MM0gI4129EM!ERGENC

{LANGE GASKI lio e GOV INSPEC 0:1 41_

1U 263 1

MM0214080A I MM21 76 HX-020A HX-20A, CLOSE LP FEEDWATER HEATER 6

24APR04 24APR04 DR-N ML-N 17:00' 22:59 ORT3-N R-N 158 IM0214080A 021408!%

Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION Shoet15of33 I

IPimaveraSystemslnc I

FL-03 Execution Publication Set

after 22APR04 12:00 U1R28 WORKiNG SCHEDULE I

after 22APR04 12:00 ID RESP M

MM3 WO ST EOID DESCRIPTION P-1B, REMOVE PUMP COUPUNG RMP 9002-5 RD ES RISK MF APR ThU 22 Fri 23 Sat 24 MEI 0,9.4.6. I.1 R 09.

A.. A-. A.10n12.1A.1r6.

26411 MM-8485C 76 P-001B 14 22APR04 I 23APR04 I DR-Y ML-Y 12:00 03:59 ORT3-Y R-M 0

8REMOVE PUMP CC

__REACTr 265 1 MM-8485K MM3 76 P-001B P-IB, ALIGN SEAL 1

22APR04 22APR04 DR-N ML-N 245 COLLECTIONTO 21:00 21:59 ORT3-N R-M 266 1. MM-8485D MM3 76 P-001B REMOVE SEAL P-1B 10 23APR04 23APR04 DR-Y ML-Y 0

RMP 9002-5 04:00 15:59 ORT3-N R-M 267 1 MM-848S MM3 76 P.001B P-1B. INSPECTI 50 23APR04 26APR04 DR-NML-N 0

MAINTAIN SEAL RMP 16:00 03:59 ORT3-N R-M l

1

  • y 3

-Y1' 268 1 MM0303383 MMV 76 SC-00966B SC-966B-VALVE 13 09APR04 I 24APR04 DR-Y ML-Y 0

LEAKING BY. REPAIR 11:00A 10:59 ORT3-N R-N MM.848504MB., ALIGN SEA 021411SREACTOR COO

'MM.8485DREMOV JPLING RMP 9002-S R COOLANT PUMP0214119 COLLECTION T?) CAViTY Rmp90C ANT PUMP E SEAL P-1 B RMP 9002-5 I!REACTbR COOLANT PUI lMM.8485P-113 IOSPECTIMAINTAI 0214119_

1P 4SEALRMP9' mmCIO3383SC-964B -VALVE LEAKIG BY, REPAIR 261 I MM0213109 I MMV 1 78 CS-00038C I 1CS-00038C BODYTO 1 8 119APR04 l 23APR04 I DR-Y ML-Y BONNET LEAK 09:00A 12:59 ORT3-N R-N 0

l ll 2701 1 I MM0304279 MMV 1 76 I

1-MS-02037 IMS-2037 - VALVE 11 I 19APR04 I 23APR04 1 DR-NM-N LEAKS BY, REBUILD 10:00A 15:59 ORT3-N R-N 7

,l 2711 1 1MM04069V6 IMWJ~

MS-02016 IMS-2016VALVE 28 I 20APR04 I 27APR04 I DR-Y ML-Y LEAKS BY 22.00A 03:59 ORT3-N R-N 0

2721 1I MM0214044A IMMVj 75 1

FD-02413 FD-2413 - REINSTALL I I 21APR04 I 22APR04 [ DR N ML-N lVALVE AFTER TESTING 09:OOA 12:59 lORT3-N R-N 35 PZR LIQUIF MMI In91CS-00038C BODY TO B TEAK

_ _1 t-A B

GBD CLG FLCW RETURN TC MM" IMS-2437 -VALVE LEA S BY, REBUILD V*LVE

_-53A/q PRIMING AE IN TSTEAM REC MMI llMS-2016 VALVE LEAKZ BY MM 14044AFD.2413 -REINSTALL VALVE AFTER TESTNG l-3HDT SAFt IY02140"'

MM 4042AFD-2404 - REINSTALL VALVE AFTER TESTING

-23 HOT tAFETY0214042 MM S3A

-2j19 - RE-INSTALL E AFTER TE"TING GLAND STEAM HEADER RELIEF021 MM N CHC VLERRMI5 l

w 27111 MM0214042A IJMMJ I 76 FD-02404 FD-2404 - REINSTALL 2 1 21APR04 I 22APR04 I DR-N ML-N VALVE AFTER TESTING I 09:00A 13:59 ORT3-N R-N 34 274 1 MM0214113A MMV 76 MS-02719 MS-2719-RE-INSTALL 8

21APR04 23APR04 DR-N ML-N 0

VALVE AFTER TESTING 09:00A 12.59 ORT3-N R-N 275 1 MM0214025 MMV 76 CS-00022A CS-22A - INSP I 20 21APR04 26APR04 DR-Y ML-Y 0

1 MAINTAIN CHECK 21:OOA 10:59 ORT3-N R-N 2761.1 MM030295 JMMV 76 SC-00966C 1SC-966C - PACKING 113 1 21APR04 24APR04 DR-N ML-N LEAK 23:00A 02:59 ORT3-N R-N 402 SC-966C - PACKING L4

,0 a

O#- LIFYT I 277 1 MM0214156 MMV 76 SW-02885 SW-2885 - REPLACE 2

22APR04 22APR04 DR-Y ML-Y 30 M(

WITH PRETESTED 12:00 13:59 ORT3-Y R-N 278 1 MM0212945 MMV 76 RC-00574 1RC-574 MISSING 3

22APR04 22APR04 DR-N ML-N 9

M PACKING SCREW 12:00 14:59 ORT3-N R-N 279 1 MM0407620 MMV 76 CV-00200C ICV-200C RETORQUE 3

22APR04 22APR04 50 MC PACKING 120W 14:59 280 1 MM0216395 MMV 78 SC-00946A I SC-946A LEAK AT 4

22APR04 22APR04 DR-N ML-N 0 MC FITTING 12:00 15:59 ORT3-N R-N 281 1

MM0407623 MMV 76 CS-00460BA ICS460BA REPACK 6

22APR04 23APR04 26 MM 12:00-10:59 U.41i62W28b5 - REPLACE Wl

-HX-23R Lq COOLER OUTLE Cjl9451RC-574 MISSING PACH R-1 RV HkAD VENT LINE L

!o 01CV-2I0C RETORQUE P MLETDOW1N ORIFICE C OI 1

s1SC 46A LEAK AT FIT QHX-14CRC HOT LEG SAI g31CSJ4qOBA REPACK H PRETESTED V4LVE REUEF02114156 G SCREW

)W POINT DRAIN6212945 CKING ET CONTROL040620 ING I

PLE HX DI FLUSR CHECK0216395 EMMX-A SG 1IT 460B WIDE RAM j

nv nv l EG SAMPUE0

~E LOWER ROC II I

Run Date 22APR04 13:121 LT-03 STANDARD PUBLICATION I

Sheet 16 of 33 zD Primavera Systems. Inc.

FL-03 Execution Publication Set Prm vr Sytm.Ic 1 0 x c to u lc to e

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 22APR04 12:00 ID RESP WO ST EOID DESCRIPTION RD ES5 EF RISK I MF APR 2 4n.4!j4A 4924 Fri 23 Sat 24 In. 2.4.S.8.1ni12l?

ION OUTL.ET C 2821 1 MMD406275 MMV 76 MS-02706 IMS-2706, 8 1 22APR04 I 23APR04 DR-Y ML-Y REPACKITEST VALVE 12 00 12:59 ORT3-N R-N 80 MM(

=95lMS-2T06,- REPACKrrEqT VALVE

.r 283 1 MM0407719 MMV 76 MS-02746 1 MS-2746 REFURBISH 30 22APR04 27APR04 2 UM VALVE 12:00 13:59 284 1 MM0214137E MMV 76 RC-00434 RC-434 - SWAP VALVE 14 22APR04 23APR04 DR-Y ML-Y 0

WITH SPARE, SHIP FOR 20:00 11:59 ORT3-Y R-N 285 1 MM0214022 MMV 76 AF-00101 AF-101 - REMOVE 4

22APR04 23APR04 DR-N ML-N 3

VALVE TO SUPPORT 21:00 00:59 ORT3-N R-N 286 1 MM0311052 MMV 76 SI-00830A SI-830A - REPLACE 8

22APR04 23APR04 DR-N ML-N 74 REUEF VALVE - [ST 23:00 23:59 ORT3-N R-N 287 1 MM0214137D MMV 76 RC-00434 RC-435 - LOOSEN 10 23APR04 23APR04 DR-Y ML-Y 0

VALVE TO INSTALL 08:00 17:59 ORT3-N R-N 288 1 MM0216196 MMV 76 CV-00275 ICV-275 PACKING 6

23APR04 24APR04 DR-N ML-N 0

LEAK 6DPM. REPACK 13:00 11:59 ORT3-N R-N 289 1 MM0304280 MMV 76 SW-00015A 1 SW-15A - MANUALLY 10 23APR04 24APR04 DR-Y ML-Y 0

CYCLE VALVE FOR IST 13:00 15:59 ORT3-N R-N 290 1 MM0216627 MMV 76 CV-01296 CV-1296 - INSTALL NEW 40 23APR04 30APR04 DR-N ML-N 3

TRIM PER MOD 02-027 15:00 12:59 ORT3-N R-M 291 1 MM0214022A MMV 76 AF-W101 AF-101 - REINSTALL 4

23APR04 24APR04 DR-N ML-N 0

VALVE AFTER 21:00 00:59 ORT3-N R-N 292 1 MM0214034 MMV 76 CV-00370 CV-370 - INSP I 40 23APR04 30APR04 DR-Y ML-Y 0

MAINTAIN CHECK 21:00 01:59 ORT3-N R-N 293 1 MM020707N MMV 76 cv-S0Sm NCVE REPLACE BP B 12 24APR04 26APR04 DR-N ML-N 0

T GASKET E

09:00 13:59 ORT3-N R-N 294 1 NG26TFC2ND NDE 77 IST-SISI N

NE FOR FAC PROG.

4 05APR04 22APR04 DR-Y ML-Y 9

TURB HALL 26 FT GEN 07:00A 15:59 ORT3-Y R-N 295 1 NG08TFC2ND NDE 77 IST-SISI NDE FOR FAC PROG F

07APR04 22APR04 DR-Y ML-Y 15 1 ETURB HALL 8 FT GEN 0800A 12:59 ORT3-Y R-N 296 1 TGHX22DUT NDE 76 HX-0~22D NDE UT 8 22APRW4 22APRW4 DR-Y ML-Y 9 HG

_MEASUREMENT MSR CD 12:00 21:59 ORT3-Y R-NI 297 1 P1201NDE NDE 7n PIPING EB-HX-01B *EXAMINE FW 6 22APRW4 23APR04 DR-Y ML-Y 0 2121

_ __NOZZL FWUELDS 12ZW0 07.59 ORT3-Y R-NI 298 1 P1246NDE NDE 77 PIPING EB-EXAMINE PIPING 6

22APR04 23APR04 DR-Y ML-Y 19 P12i WELDS AND 12:00 07:59 ORT3-Y R-N 299 1 P1274NHDE NOE 77 PIPING EB-EXAMINE PIPING 8

22APR04 23APR04 DR-Y ML-Y 9 P121 WELDS NEAR 12:00' 07:59 ORT3-Y R-N

[g=91MS-2t46 REFURBISH URBINE DRAIN EXTRACI

=

M021413

-SAVA 021 41 MM021402 A-1 ( -REMOVE C02140X2WIHX-1B SGI MM03110522+/-LC0A - REPL VE WITH SPARE tSHIP FOR TESTIN Wr-i PZR SAFkrY TO T-2 PRT VALVE TO SUPP(RT PIPING INSP UXILIARY FEEDVTATER FIRST OFF lCE RELIEF VALVE - IST PROGRAIM r-MR""A TA,3A Sl Arir CHECK JMULATOR RE n i l i h i,5 -

I i;

I I

I MM0214137D 0214137 MM(

MMI 1I C -435 - LOOSEN YALVE TO INSTAL

_O 1r-I PZR SAFETY TO T 161961CV-275 PACKING LEAK 6DF

- RC-434 2 PRT A, REPACK D11619 FF-39A/B I I

1 042801SWI15A - MANUALLY CYCLE LVEFOR IS D

0428M ___

H X

Ml I,

10216r27CV-1296-,INSTALL NEWTR ER MOE)0D0 f1i L6 jj NDNDE'FOR FAC PROG -

ISECONDARY INSERVICE jFC2NoNDEIFOR FAC PROC -

SECONDARPY INSERVICE INS D=DE UT MEASUREMEN

_SMOIISTURE SEP EXAMINE FWN MM021402211_0 - REINSTA 02140221IHX-1B SG MM0214034CV 70. INSP I MJ 021403 MM020707; 020707.

IUR8 HALL 26 F1 GEN AREA INSPECTION0301897 YIJRS HALL a FT OEN AREA tECTION0301897:

f MSRD MRATOR REHEATIR0302111 i=1E WELDS EEDWATER CON, ISOL VALVES TO AND SUPPORTS NEAR FW-4763B IEDWATER CONt ISOL VALVES TO NEAR FW-4768BB FW FROM CONT ISOLATION VALVE ICV-277 REPLA L.VALVEAFTI 6UXILIARY FEE INTAIN CHECK

=S*1, PI P W~EAMIqE PIPING WELD~S I

i STEAM GENE]

STEAM GENE TO FWHEAC M.

...P

.I G.

MgtAMINE PIPING WELDS I.

RA I

Run Date 22APR04 13:121 LT-03 STANDARD PUBLICATION FL-03 Execution Publication Set I'

Sheet 17 of 33 2 Prdmavera Svstems. Inn

--- --- -,--.- I..-

I

- I after 22APR04 12:00 I.

U1R28 WORKING SCHEDULE after 22APR04 12:00 U

ID ND0407673 RESP Wo ST EQID DESCRIPTION RD ES EF RISK MF APP Thu, 99 FrI 92 SRt 74 A _

300 1 NDE 76 T-026 T-026 -DETERMINE 10 22APR04 23APR04 DR-Y ML-Y EXTENT OF REPAIRS 13:00 14:59 OR-R-N 0

301 1

CE-1600-BH NDE 77 R-1 PRELIMINARY RX BARE 4

22APR04 22APR04 DR-Y ML-Y 0

HEAD WITH NRC 14:00' 17:59 ORT3-Y R-N 302 1 EP0301912 NDE 77 Z-021 EXAMINE REACTOR 10 22APR04

'23APR04 DR-Y ML-Y 56 HEAD LIFT RIG WELDS 14:00 13:59 ORT3-Y R-N 303 1 NGNDE18X NDE NDE-18 MINt-SUB 3

23APR04 23APR04 DR-N ML-N 3

SPECTIONS-INTERNAL 02:00 04:59 ORT3-N R-M 304 1 NG44CFCIND NDE 77 IST-SISI NDE FOR FAC PROG -

10 23APRD4 23APR04 DR-Y ML-Y 0

CONTAINMENT 44 FT 07:00 16:59 ORT3-Y R-N 305 1 TG0302107 NDE 76 EH PT EH FITTINGS 10 23APR04 23APR04 DR-Y ML-Y 70 07:00 16:59 ORT3-Y R-N 306 i NM0214475 NDE 77 R-1 EXAMINE FOR LEAKING 10 23APR04 24APR04 DR-Y ML-Y 51 CRDM CANOPY SEAL 09:00-08:59 ORT3-Y R-N 307 1 P1126NDE-A NDE 77 PIPING RC EXAMINE PZR SURGE 4

24APR04 24APR04 DR-Y ML-Y 0

LUNE SUPPORTS AND 16:00.

21:59 ORT3-Y R-N 20 1 P1126NDE-B NDE 77 PIPING RC EXAMINE PZR SURGE 4

24APR04 24APR04 DR-Y ML-Y 28

_UNE SUPPORT AND 16:00 21:59 ORT3-Y R-N 309 1 OP0309956 OP 76 G-07 PMT IG-07 ROD DRIVE 2

23APR04 23APR04 DR-N ML-N 0

MG SET IAW 0131 17:00 20:59 ORT3-N R-N 310 2 OP0215270 OPO 77 O-PC-0932 INSPECT OPERATIONS 32 24APR04 I 24APR04 DR-N ML-N 195 STORAGECALINETST 08:00 10:59 ORT3-NR-N 311 0I OP0215406 OP1 77 O-MIDS1 r-OTPRLYFAILOSAFD 4

23APR04 23APR04 0DR-V MI-V 19 l

fl lg STROKETEST l

l00:00-00:59lOR3N-312 l2 lOP02160 32 lOP1 l 77 O0-TS-OIOAB lTS-10A, U2C AIR LOCK l2 l23APR04 l23APR04 lDR-Y ML-Y 208 DOOR SEAL TEST 00:00-01:59 ORT3-N R-M 3.31 ° OP0215355l OP 1l 77 O-PC-MIDSl OPERATIONS MID 49 23APR04l 29APR04l DR-Y ML-Y 161 SHIFT WEEKLY 00:00 06:59 ORT3-N R-N 314 1

OP0215794 OP1 77 TS-RE-004 AXIAL FLUX 2

24APR04 24APR04 DR-N ML-N 201 DIFFERENCE AND 00:00' l01:59 ORT3-N R-N NWO CE4 EPO T

26 -,DETIERMINE EXTI

.I I 00jeREU*INARY RX BARE l

REAr TOR VESSEL AN l01LEXAMINE REACTOR HEA 0

NGflDEISXMINI-SUS XMINN-I NG44CFCINFl 03018D9l TG0302IO7P 03021O0f I

NM021447!

I O1 1Z14.1&2022 0.2,4.6 NT OF REPAIRS TO BD TANK

_BLOWDOWN TANK 040767:

HEAD WITH NRC D ASSEMBLY021A475 D LIFT RIG WELDS R-1 REACtOR VESSEL HEA NSPECTIONS4NTERNALS LIFT (1

U5 INSPECTIONq PER NDE-18 FOR FAC PROG CONTAINMENT 4

_ESCCONDARY INSERVIC EH FITTINGS EH SYSTEM MULTI ANt EXAMINE FOR LEAKING CROM CA1 I LIFTING RIGI DE-1B)

IFT GEN AREJ

- INSPECTION

'OR NON-NUN OPY SEAL REACTOR VEI 126NDE4A 030385 126NDEXA 030388 I

.n I

0214471W 41 P

PI OP03 9S56PMT 1I&7 ROD DRIVE I SET IAW 01 l

030995ROD CONTROL SET OP0 2152zq2SPECTOPERJ 021 527OSTORAGE i 0P021*40rT-16, QTRLY 021 5404QTRLY FAIl OP021603,! 10A, U2C 021 P03QUI2 CONT OP021p3550LERATONI' FAIL-SAFE STROKE TEST

-SAFE STROKE TEST OF AIR-OPER UR LOCK DOOR $EAL TEST JR LOCK DOOR S)AL TEST MID SHIFT WEEKLY ROUTINE

.I NTED VLVS iq S

OPO21T794AXIAL FLUX I 021 P794UAXIAL FLL OP9215 071AXIAL FLUX I 021 bo75IAXmAL FLt IFFERENCE Al (DIFFERENCI IFFERENCE Al X DIFFERENCI 3151 2 OP0216071 Opi 77 TS-RE-004 AXIAL FLUX DIFFERENCE AND 2

24APR04 24APR04 DR-N ML-N 00:00' 01:59 ORT3-N R-N 201 Run Date 22APR04 13:12 LT-03 STANDARD PUBLICATION Shoet 18 of 33 0 Primavera Systems, Inc.

FL-03 Execution Publication Set T

after 22APRO4 12:00

-r U1R28 WORKING SCHEDULE I

after 22APR04 12:00 U I ID lRESPl WO E0ID DESCRIPTION RD

-ES EF I

RISK MF APR I ST

.22 Fri23 SIt 24

.1 2116 22 0....8112,4lal2.21,.,

I 8.10 Zv11;f14* 1 W3 3`16 11 OP021573 OP1 77 O-PC023.5 CHARGING PUMP 3 124APR04 2iAPR04i D-R-N ML-N 2X.OPO 2i C HARGING P MP ROTATnO1 ROTATION AND 00 00' 02.59 ORT3-N R-N 021673 CHARGI G PUMP ROT, 317 2 1OP021B050 OP1 n7 O-PC-023.5 CHARGING PUMP 31 24APR04 24APR04 DR-N ML-N 200

.OP021 60SCHARGING P JMP ROTAIO~

_ IROTATION AND 00 00' 02 59 ORT3-N R-N 02 HADZIbD IG PUMP ROTo 318 0 OP0215433 OP2 77 O-PC-DAYS OPERATONS DAY 17 19APR04 24APR04 DR-Y ML-Y 191 PERAONS DAY SHI WEEKLY ROUTE SHIFT WEEKLY 08:OOA 14:59 ORT3-N R-N OPEF 319 0 OP0215484 OP2 77 O-PC-028.1 TEST OF FIRE.

1 23APR04 23APR04 DR-N MI-N 204 0P0Z15484 S OF FRE, EVACUATION AND EVACUATION AND 08:00' 08:59 ORT3-N R-N 0215484 TEST OF FIRE. EVACUATION AND SHERMEN A 320 2 OP0216112 OP2 77 O-PC-023.7 BUMP (OLE HEATER 1

24APR04 24APR04 DR-N ML-N 197 OP021611 PIDLEHE DRAIN TANK PUMP 08:00' 08:59 ORT3-N R-M 021611 BUMPING IDU 321 0

OP0215457 OP2 77 O-PC-043.5 PC 43.5. SW TO AFW 2

24APR04 24APR04 196.

OP02154 43.5SWTO PUMP UNE FLUSH 08:00' 09:59 02154 SERVICE WA 322 0

0P0215493 OP2 77 O-PC-078.2 JOCKEY PUMP AND 2

24APR04 24APR04 DR-N ML-N 196 OP0215493J KEY PUMPd ACCUMULATOR 08:00' 09:59 ORT3-N R-N 021549 FIRE MAIN PI 323 0 OP0215495 OP2 77 O-PC-078.6 QUARTERLY NORTH 4

24APR04 24APR04 OR-N ML-N 194 OP021 549 URTERLY NC SERVICE BUILDING 08:00' 11:59 ORT3-N R-N 021549 QUARTEF 324 1 OP0215869g OP3 77 TB1 MONTHLY 21 21APR04 24APR04 DR-N ML-N 189 P0 158 691 MONTHLY HEATING VENTILATION O-PC-2 HEATINGNENTILATION 16:00A 22:59 ORT3-N R-N I

325 0 OP0215549 OP3 77 O-PC-SWING OPS SWING SHIFT 42 21APR04 27APR04 DR-Y ML-Y 168 0P0 1 54 NG SHIFT WEEI LY ROUTINE WEEKLY ROUTINE 16:WOA 22:59 ORT3-N R-N 326 0 OP0215562 OP3 77 O-PC-045.2 RADWASTE HEAT 3

22APR04 22APR04 DR-Y ML-Y 207 0P0 15562=WASTE HEAT TRAC AMPS LOG TRACE AMPS LOG 16:00' 18:59 ORT3-N R-N 0 5562MdNTHLY RADWAS E SYSTEM HEAT iRACING LOG 327 0 OP0215624 OP3 77 O-PC-043.3 CLEAN SERVICE 32 22APR04 26APR04 DR-N ML-N 178 DP0 1562 SERVICE WATE STRAINERS WATER STRAINERS 16:00*

19:59 ORT3-N R-N 0: 562 328 2 U2GNDR005 OP3 O-PC-021.3 DRAIN U2 MAIN 1

22APR04 22APR04 DR-Y ML-Y 0

G DR005DRAIN U2 MAIN ELE ICAL GENERATOR PER PC 213 ELECTRICAL 17:00

'17:59 ORT3-Y R-N II 329 0 OP0215586 OP3 77 O-PC-083.6 VERIFY ANY OOS CON I

23APR04 23APR04 DR-N ML-N 202 Po21 5 f8eJERIFYlANY OOS CONT I 0LVALVES Al ISOL VALVES ARE 16:00' 16:59 ORT3-N R-N 0215586UCONTIAINMENT ISOLAT ON VALVES 01 330 0 OP0215574 OP3 77 O-PC-009.6 MONTHLY SHIFTING O 2

24APR04 24APR04 DR-N ML-N 194

)P0215574MO?

K-3AIB SERVICE 16:00' 17:59 ORT3-N R-N 0215574Ul 331 2

U2GN0R006 OP3 O-PC-02t.3 DRAIN U2 MAIN I

24APR04 24APR04 DR-Y ML-Y 0

U2GNDR006D ELECTRICAL 17:00 17:59 ORT3-Y R-N I

_I_

Run Date 22APR04 13:12 LT-03 STANDARD PUBLICATION Sheet 19 of 33

, Primavera Systems. Inc.

I FL-03 Execution Publication Set

after 22APR04 12:00 U1R28 WORKING SCHEDULE after22APR04 12:00 0

I ID RESP WO EQID I

DESCRIPInON IRDI ES I

EF I

RISK MF Thu 22 FAr 23 1

ST 10i12l4,l6.1a2,2021Q.2.4.6. 8.10i12,I.l4ia2Q.2;210Q.2. 4.6. R.

890iI2 l4.l1 m

I Z(L11F IQ 23,Sat 24 E

L1 332 1 1 OPSB-050 OPS T-0088 3ATCH BA TO T-8B HUI IAW OP 5B PART 4 21 03APR4 I 22APR04I DR-Y ML-Y 12:00A 13:59 ORT3-N R-N 15 333 1 OII0A-010 OPS T-008C PROCESS C HUT PER 2

06APR04 22APR04 DR-Y ML-Y 0

01 I1A 02:OOA 13:59 ORT3-Y R-N 334 0 01150-30 OPS T-024A RESTORE HOSES &

4 20APR04 22APR04 DR-N ML-N 417 CST PER 01-150 08:OOA 15:59 ORT3-N R-N 335 1 01100-40 OPS T-034A DRAIN SI 6

22APR04 22APR04 DR-Y ML-Y 0

ACCUMULATORT-34A 07:WOA 17:59 ORT3-N R-N 0P25 SOP 6.050BATCH BA TO T-813 HUT It I-01PROCE;S'C'C HUT PER 01

-30RESTORE HOSES & CST P WRESTOkE FROM WARM I

-I 140DRAIN SI',ACCUMULATOR' 1304APREPARATION FOR 1 B-4 I

V2 3361 1 SOP-1304A OPS B-42 PREPARATION FOR 1 42 OUTAGE 8

22APR04 23APR04 DR-Y ML-Y 08:00A 12:59 ORT3-N R-N 0

I_

337 1 01-164-A OPS T-008C ENSURE C HUT LEVEI 12 22APR04 23APR04 DR-N ML-N 0

> 20%

14:00 03:59 ORT3-N R-N 338 1 RP4A-050 OPS O-RP-004A JIT INFO SHARING FOR I

22APR04 22APR04 0

ROD UNLATCH 17:00 17:59 339 1 IT-760-3 OPS 77 O04T-0760 HIGH HEAD SI CHECK 2

22APR04 22APR04 DR-N ML-N I

FULL FLOW TEST 17:00 18:59 ORT3-N R-N

?g 2 OPS-P23B OPS P.023B ALIGN P.0238 TO U-2 3

22APR04 22APR04 DR-N ML-N 0

BLENDER FOR IWP 17:00 19:59 ORT3-N R-N 341 1 RPIA-060 OPS O-RP-001A FILL CAVITY FOR ROD 2

22APR04 22APR04 DR-N ML-N 0

UNLATCH 17:00 20:59 ORT3-N R-M 342 1 RP4A-060 OPS O-RP-004A BRIEF FOR ROD 1

22APR04 22APR04 0

UNLATCH 20:00 20:59 343 1 IT-760-C OPS 77 O-IT-0760 HIGH HEAD SI CHECK 3

22APR04 22APR04 DR-N ML-N 8

FULL FLOW TEST 20:00 22:59 ORT3-N R-N 344 1 O-RT-030 OPS 77 O-RT-030 LLRT RCDT VENT' 4

22APR04 22APR04 DR-Y ML-Y 356 HEADER 20:00' 23:59 ORT3-N R-N 345 1 RP4A-020 OPS O-RP-004A UNLATCH CONTROL 3

22APR04 22APR04 DR-N ML-N 0

RODS 21:00 23:59 ORT3-N R-M 346 1 EP0403494A OPS 76 PT-RCS-1 OPERATING SUPPORT 4

22APR04 23APR04 DR-Y ML-Y 321 OF INITIAL RCS 21:00 00:59 ORT3-N R-N 347 1 0123A-20 OPS01-23A INMATE CAVITY 1

22APR04 22APR04 DR-N ML-N 57 PURIFICATION 22:00 22:59 ORT3-N R-N 348 1 OP0403299 OPS 76 RC-00515-0 RC-515 PMT STROKE I

22APR04 22APR04 DR-N ML-N 0

PER IT-200 22:00 22:59 ORT3-N R-N 31-1 R

01 R

4AENSURE 'C' HUT LEVEL >

4A-4seIT INo SHARING FOP r-7604BHIGH,HEAD SI CHECK I 21592ZUUNIT 1 HIGH HEAD S 9-P23BAUGi P-023B TO U.2 B

'1A-06nILL CAVITY FOR ROD "FILL UPPER CAVI RP4A-06 CBNEF FOR ROD Ul IT.760.CHIGH HEAD Si CHE 021592CMUNrr I HIGH H O-RT-030!4_RRCDT VENT I 0215960RCDTTO VE RP4A 020UNLATCH CONTF MUNLATCH CC EP0403494Ip!EATING SUP 0403494_REACTOR 0123A-iUNmATE CAVIT EINmATECAVr OP04032SRC-515 PMT ST 0403294T-1 PZR RC-43 OP04 033IORC-516 PMT STf 04033QttT-1 PZR RC-43 W OP 58 PART 4 ICA R 0I-150 POF CSTTO 110,DEGF

-34A OUTAGE 20%

ROD UNLATCH LILL FLOW TEST' CHECK VALVES FLOW TEST (RF)

.ENDER FOR IWP:00-037-04 INLATCH Y FOR UNLATCHING RODS (RP-1 LATCH K FULL FLOW TEST RECOVERY hAD SI CHECK VALVES FLOW TEST EADER rT HEADER (P-12q) bLRODS ETROL RODS :

(RP-4A)

'ORT OF INITIAL RCS WALKDOWN DOLANT SYSTEM (RCS) PRESSURI PURIFICATION a

Y PURIFICATION:'

tOKE PER IT-200:

C POWER-OPERATED RELIEF ISOl OKE PER IT-200 :

I POWER-OPERATED RELIEF ISOL

  • 1)

'(RF)

'TEST-INt j OPER bPER 349 1 0P0403300 OPS 76 RC-00516-01 RC-516 PMT STROKE PER IT-200 I

22APR04 22APR04 I DR-N ML-N 22.00 22:59 ORT3-N R-N 0

Run Date 22APR0413:12l LT-03 STANDARD PUBLICATION Sheet 20 of 33 Q Primavera Systems, Inc.

FL-03 Execution Publication Set T

after 22APR04 12:00 U1R28 WORKING SCHEDULE I

after 22APR04 12:00 U

ID RESP WO EOID I

DESCRIPTION RD ES EF tRISK IMF 22 Rt II

[a]II, R-1;-.

tSR I ;

350111 1T-200 lOPS 77 O-IT-0200 PZR PORV & BLOCK VALVES 6

22APR04 I 23APR04 DR-N ML-N 22.00 03:59 ORT3-N R-N 0

351 1

OP0215163 OPS 76 CC-00754A-CC-754A-O MOV PMT 1

23APR04 23APR04 DR-Y ML-Y 274 STROKE PER IT-250 t0:00 00:59 ORT3-N R-N 352 1

RPIA080 OPS O-RP-Ot1A FILL CAVITY FOR 2

23APR04 23APR04 DR-N ML-N 0

INTERNALS UFT 00:00 01:59 ORT3-N R-N 353 0 Ot-39A OPS 76 W-030A SECURE PAB 3

23APR04 23APR04 0

VENTILATION 00:00 02:59 354 1 O-RT-034A OPS 77 O-RT-034 PRE LLRT OF NORMAL 4

23APR04 23APR04 DR-N ML-N 0

CHARGING 02:00 05:59 ORT3-N R-N 355 0 0135AG02-C OPS G-02 ALIGN G-02 TO iA-05 & 1 23APR04 23APR04 DR-N ML-N 0

2A-05 FOR 1B-42 08:00 08:59 ORT3-N R-N 356 1 RPIA-090 OPS O-RP-001A FILL CAVITY TO 1

23APR04 23APR04 DR-N ML-N 0

REFUELING HEIGHT 08:00 08:59 ORT3-N R-N 357 0 G02-ALIGN1 OPS G-02 2 AUGNED TO 1A-0 128 23APR04 28APR04 DR-N ML-N 0

& 2A-05 FOR 1842 08:00 15:59 ORT3-N R-N 358 1 0151-020 OPS 01-51 OPEN SFP/XFER CANAL 1

23APR04 23APR04 DR-N ML-N 48 DOOR 09:00 09.59 ORT3-N R-N 359 1 O-RT-0158 OPS Z-016 FUEL XFER CHECKS 2

23APR04 23APR04 DR-N ML-N 47 OVER CORE 09:00 10:59 ORT3-N R-N 360 1 O-RT-046A OPS 77 O-RT-046 PRE LLRT FOR AUX 4

23APR04 23APR04 DR-N ML-N 0

CHARGING 09:00 12:59 ORT3-N R-N 361 1

SOP-CV-015 OPS T-004 DRAIN LETDOWN PER 8

23APR04 23APR04 DR-N ML-N 0

SOP-CV-002 SECT 5.2 09:00 16:59 ORT3-N R-M 362 1 SOP-B04B OPS 8-42 DE-ENERGIZE 1B-42 4

23APR04 23APR04 DR-N ML-N 0

PER 1-SOP-480-B04 13:00 16:59 ORT3-N R-N 363 1 OP0309955 OPS 76 0-06 PMT OF 1;-06 ROD 2

23APR04 23APR04 DR-N ML-N 0

DRIVE MG SET IAW 01 15:00 16:59 ORT3-N R-N 364 1 O-RT-032B OPS 77 O-RT-032 OST LLRT OF N2 TO S 4

23APR04 23APR04 DR-N ML-N 322 ACC CONTINGENCY 16:00 21:59 ORT3-N R-N 365 0

OPS-037-04 OPS 76 D72-19-03 IWP-037-04 ALIGN 2

23APR04 23APR04 DR-N ML-N 0

MOBS AND RESTORE 17:00 20:59 ORT3-N R-N 366 1

01-164-OPS T-008C PREPARE C HUT FOR 10 23APR04 24APR04 DR-N ML-N 0

ICV-257 20:00 05:59 ORT3-N R-M IT.2(0PZR PORV & BL 02158B9UNIT 1 OPO2I'i 63 CC-754A-O M 021P163N1P-1A RCP RPIA-O8CFILL CAVITY WUFILL CAVI 06939ACURE PAS 040P881.F-23F-25 O-RTT034 JLLRT 62IS97_NOF 0135AG02-CA RPIA-09OF G

G02-AUGNIG 0151-02C a

O-RT-015E a

O-RT-0461 0215981

)CK VALVES IORV AND BLOCK VALVES (CSD)

)V PMT STROKE IER IT-250 C INLET MOV OPgRATOR 2OR INTERNALS I+/-FT Y FOR INTERNALS UFT VENTILATION l

PAB EXHAUST FI.TER FAN OF NORMAL CHARGING UAL CHARGING LONE (P-26)

LGN G-02 TO IA-5 & 2A-05 FOR II LL CAVITY TO RdFUEUNG HEIGHT UILL CAVITY AND EQUALUZE WITH E

-42 OUTAGE FP 1-42 OUTAC I_

_-I SOP-CV.0I1!

SOF 0

PEN SFPIXFER 6ANAL DOOR IFUEL TRANSFEq SYSTEM IN CAN TUEL XFER CHECKS OVER CORE UQFUEL MANIPUL:ATOR/FUELTRAI, PRE LLRT FOR AtX CHARGING AUXILIARY CHARGING LINE (I DRAIN LEDOWIN PER SOP.CV-002

-804BDE-ENERGI?E I B-42 PER 1 SI

'O3099,5PNT OF *G-06 ROD DRIVE I 030995$UROD 4-ONTROL MG SEI O0RT-032BPOST LLRT OF N2 TO StA 021597_I"NITROGEN TO I OPS-03T44W4WP-OJ7-4 AUGN MOBS 030611 I"PWRTO C-01 SAF 01.164-WREPARE C HUIT FC OP030094DH-625 PMT 5 030p940AHX-IIB RHF SFER SYSTEM

  • .32C)

SECT 5.2 P-480-304 IG SET IAW Of CC CONTINGE HE SI ACCUML

, AND RESTORI

'GDS BUS B (1 IR ICV-25T REV 1ROKE PER IT HX OUTLET C 3671 1 0P0300940 OPS 76 RH-0062-0 RH-625 PMT STROKE I 1 I 24APR04 I 24APR04 I DR-N MI-N PER 17 390 00:00 100:59 1ORT3-N R-N 4

_____________.1.

.L.L A

A L

flt A

Run Date 22APR04 13:12 LT-03 STANDARD PUBLICATION I Sheet 21 of 33 Primavera Systems, Inc.

l FL-03 Execution Publication Set T

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE after 22APRO4 12:00 a

U ID RES WO EQID I

DECRIPTION I RD ES I

EF I

RISK MF ATP22 Fd 23 SRt24 l

ST l

II -

U 10 Z116,1820.2210*2.4,6.8 8.12,14,1a1&20,2210,2,4, 6 8.1jjZ14jjj 368 1 OP0306894 OPS 82 AF-04000-M IAF-4000-M PMT 2

24APR04 24APR04 DR-Y MI-Y 1

9 PFPM STROKE PER IT-4A 08:00 09:59 ORT3-N R-N 03068 11P.29 AFP DI 369 1 IT-700 OPS 77 O-IT-0700 REACTOR COOLANT 4

24APR04 24APR04 DR-N ML-N 18

.,r.7 OREACTOR CC GAS VENT VALVES 10:00' 13:59 ORT3-N R-N 02159 4_UNIT I 370 1 0P9950096 OPS 76 CV-00313A CV-313A-S PMT 1

24APR04 24APR04 DR-N ML-Y 0

P

  • 5009 6 CV4313 STROKE PER IT 250 14:00 14:59 ORT3-N R-N 950096XI1P-1s 371 1 IT-320A OPS 77 O-IT-0320A CV-294 LIFT TEST 4

24APR04 24APR04 DR-N ML-N 14 IT 320ACV-21 (SEAL RETURN) 15:00 20:59 ORT3-N R-N 021 590mM 372 1

OP9GC-070 OPS OP-9C SECURE 1

24APR04 24APR04 DR-N ML-N 101 OP9C.070SEC CONTAINMENT PURGE 16:00 16:59 ORT3-N R-N 373 1 AF31 1A PPG MILESTONE START ELECTRIC 0

22APR04 22APR04 DR-N ML-N 0

AFBI1ASTART ELECTRIC IRIVEN TRAIN B AUX FEED WORK DRIVEN TRAIN B AUX 20:00 19 59 ORT3-NR-N 374 1

ENFPC04D PPG MILESTONE ENTER SID FIRE PROT 0

22APR04 22APR04 DR-N ML-N 294 ENFPC04c"NTER SID FIRE ROT COND IV COND IV 21:00 20:59 ORT3-N R-N 375 1 SIB01A PPG MILESTONE START HHSI B LOOP 0

22APR04 22APR04 DR-N ML-N 138 SIB01ASTART HHSI B L OP WORK WORK 21:00 20:59 ORT3-N R-N ISTART HIGH H SAFETY INJECTION B LOOP WOR 375 1 CVX03A PPG MILESTONE START CVCS NORMAL 0

23APR04 23APR04 DR-N ML-N 0

(VXC3ASTART CV CS NORMAL CHAOGING WORK CHARGING WORK 02:00 01:59 ORT3-N R-N ISTART N RMAL CHARGINGWORK 377 1 SIA01F PPG MILESTONE RECOVER HHSI A 0

23APR04 23APR04 DR-N ML-N 0

SIA01FRECOVER HHSI A LOOP FOh REACTIVITY FL W PATH LOOP FOR REACTIVMTY 02.00 01:59 ORT3-N R-N IEND HIG HEAD SAFETY INIECTION A LOOP ORK 378 1

VNCCA51A PPG MILESTONE START CONTAINMENT 0

23APR04 23APR04 DR-N ML-N 2

, VNCCA51ASTA lT CONTAINMENT, FAN COOLERS WORK AN COOLERS A WORK 06:00 05:59 ORT3-N R-N ICO% AINMENT FAN COOLERS A (A-TR IN) 379 1 480VB01A PPG B-04 START 480V BUS B04 0

23APR04 23APR04 DR-N ML-N 0

480VBOI START 480V BUS 104 RELATED EN RGIZED WOI RELATED ENERGIZED 09:00 08:59 ORT3-N R-N B EGINNING OF B rRAIN BUS WOR WINDOW 380 1

CVX02A PPG MILESTONE START CVCS LOW 0

23APR04 23APR04 DR-N ML-N 0

CVX0Z START CVCS LOW PRESSURE LE dOWN WORK PRESSURE LETDOWN 09:00 08:59 ORT3-N R-N START NORMAL LETDOWN WORK 381 1

CVX04A PPG MILESTONE START CVCS SEAL 0- 23APR04 23APR04 DR-N ML-N 0

CVX04 START CVCS SEAL INJECTION WO K INJECTION WORK 09:00 08:59 ORT3-N R-N START CVCS SEAC INJECTION WO K 382 2 CVX06A PPG MILESTONE START CVCS 0

23APRo4 23APR04 DR-N ML-N 0

CVX0 START CVCS AUXIUARY CHARGIN WORK AUXILIARY CHARGING 09:00 08:59 ORT3-N R-N START CVCS AUXILIARY CHARGIN WORK 383 2 CVX07A PPG MILESTONE START CVCS 0

23APR04 23APR04 DR-N ML-N 0

CVXo7J START CVCS MAIEUP/BLENDER ORK MAKEUPIBLENDER 09:00 08:59 ORT3-N R-N START CHARGIN MAKEUP/BLEND R WORK 384 1

RHBOtA PPG MILESTONE START RHR B LOOP 0

23APR04 23APR04 DR-N ML-N 0

RHB0tJ START RHR B LOOP WORK WORK 09:00 08:59 ORT3-N R-N START RHR B LO)P WORK 385 1 RHX90A PPG MILESTONE START REACTOR 0

23APR04 DR-N ML-N 0

RHX9OA ARTREACTORCAVITY FLOODE CAV1lY FLOODED 09:00 ORT3-N R-N SAFETY MONITOR PLANT OPERA NG STATE M Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION, Sheet22of33 OPrimaveraSystems, Inc.

FL-03 Execution Publication Set

after 22APR04 12:00 U1R28 WORKING SCHEDULEI after 22APR04 12:00 U l ID lRES WO l EQID DESCRIPTION RD ES EF RISK MF APRS Sj111 Fri 23 Sat '4

_.II ST I.

._'110 1214,16.11120,210. 24, 45 6 8,1 0dZ214,1611 B,210.246,10iZ4,6 388 1 480VBOIZ PPG B-04 END 480V BUS BW 0

23APR04 23APR04 DR-N ML-N 154 480VB01ZEND 480V BUS B04 REL kTED ENERGIZ RELATED ENERGIZED 17:00 16:59 ORT3-N R-N IEND CF B04 BUS WOR WINDOW 387 1

AFBI1Z PPG MILESTONE END ELECTRIC DRIVEN O 23APRW4 23APRW4 DR-N ML-N 78 AFB112£ND ELECTRIC DI IVEN TRAIN B TRAIN B AUX FEED 21:00 20:59 ORT3-N R-N 388 1 StX31A PPG MILESTONE START RWST AND 0

24APR04 24APR04 DR-N ML-N 0

SX3IASTART NSTAND COM COMMON ECCS 03:00 02:59 ORT3-N R-N REFUELNG CAVITY FL, IZV-

-"*Its]

1 389 0 PR0407903 PRE 76 Z-025A Z-25A INSPECT OPEN 3

22APR04 22APR04 76rPRI 03Z 25A IYSPECT OPEN C LLS CELLS 12.00 14:59 SPENT FUEL POOL STO GE RACKS (SOUIH)0407903 390 1 RPSHO814 RP1 PACKAGE 81 INSTALL SHADOW 3

22APR04 22APR04 DR-Y ML-Y 381 RPS 0814NSTAL SHADOW SHIEL DING (FROM RX 1I EAD)

SHIELDING (FROM RX 12:00 14:59 ORT3-YR.N

-N 391 1

RPJF-121C RP1 76 R-1 UNDERHEAD DECON 2

22APR04 22APR04 DR-Y ML-Y 0 RP F-121CUNDEhHEAD DECON PE4OB BRIEF PRE-JOB BRIEF 17:00 18:59 ORT3-Y R-N 21347ZrERCTOR VESSEL ND ASSEMBLY 392 1 RPJF-121B RPI 76 R-1 ERFORM UNDERHEAC 12 22APR04 23APR04 DR-Y ML-Y 1

PJF.1218 ERFORM UNDERHEAD DECON IN PRfPARATION FOR SP DECON IN 19:00 06:59 ORT3-Y R-N 02134 RI 'qCTOR VESSEL AND ASSEMBLY I

RPSH078-I RPI PACKAGE 78 NSTALL SHIELDING 0 3

24APR04 24APR04 DR-Y ML-Y 7I RPSH078-U. SHIEL REGEN FOR CV-296 09:00 11:59 ORT3Y R-N 394 I SD GSI-191 SDS CONT ENGINEERING 32 08APR04 28APR04 DR-Y ML-Y 75 SI91-ENGI EERING WALKUcwN - SUMP INTRIJISION ISSUES WALKDOWN - SUMP 0800A 11:59 ORT3-R-N 395 0 SECB42COMP SEC D-24 SECURrJy TO 2

23APR04 23APR04 DR-N ML-N 0 I SECB42COMPSEORrry TO ESTABLISH COMPENSA DRY MEASUR ESTABLISH 07.00 08 59 ORT3-N R-N SECURTY SYST6M BATTERY C GER

~-_

0IE 396 1 TG9949102N TGG 76 TG-01-TI LPI-REPLACE 18 13APR04 24APR04 DR-Y ML-Y 0 09 g102qLMI RELAC EXTRA4TION BELLOWS 11GHTS)

IX CTION BELLOWS 00:OOA 00:59 ORT3-Y R-N I _

_U1 LOW P ESSURE TUR 397 1 TG9949102D TGG 76 rT-01-TI LP1-REPLACE 15 13APR04 23APR04 DR-Y ML-Y I 0

1-EPLACE EXTR(ATIONBELLOWS(AYS)-PT2 ElTRACTION BELLOWS 09:OOA 16:59 ORT3-Y R-N lP*

LO2W PRESSURE T

RBINE994910 398 1 TGSUPPORT TGG TG-01-T.

PROVIDE CRANE, 187 13APR04 05MAY04 DR-Y ML-Y 248 GS PPORWROVDE CRANE. RIGER, AND TOOLROOM SUPPORT(M 2)

RIGGER. AND 09:OOA 18:59 ORT3-Y R-N l 399 1 lTG30540R TOG 76 TG-01T lPERFORMREPAIRSTOlZ5l17APR04 23APR04 DR'YML-Y l29 i

4RPERFO REPAIRSTO l

HP BLADE RINGS 14:O0A 16:59 ORT3-Y R-N P

_I.IGH PRESSURE TURB NE0302153 400 1 TG-30615 TGG 76 TG-01-T PERFROMREPAIRSTOl 7 119APR04 22APR04 DR-VML-Y 0O RFROM REPAIRS TO UNDER BASED ON INSPECTION CYLINDER BASED ON 09:00A 18:59 ORT3-Y R-N l HICHPRESSURETU BINE03021 53 Run Date 22APRo413:121 LT-03 STANDARD PUBLICATION Sheet 23 of33 O PRImavera Systems, Inc.

I FL-03 Execution Publication Set I

I

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 22APR04 12:UU I

ADD 2 IU ID RESP WO ST EQIlD MS-02026 DESCRIPTION RD ES EF RISK MF 4011.1 TG0302133B TGG 76 MS-2026 -REINSTALL 5

t 19APR04 I 23APR04 DR-Y ML-Y LH STOP AND PILOT.

09:OOA 08:59 ORT3-Y R-N 18 402 1 TG0302140 TGG 76 PIPING CRO CROSSUNOER PIPING 27 20APR04 27APR04 DR-Y ML-Y 0

INSPECTION I 11:WOA 14:59 ORT3-Y R-N 403 1 TG0302134B TGG 76 MS-02027 MS-2027 - REINSTALL 10 21APR04 23APR04 DR-Y ML-Y 13 RH STOP VALVE 08:00A 13:59 ORT3-Y R-N 404 TG9919338 TGG 76 PIPING EB-MS-2751 - REAIJGN 11 21APR04 23APR04

. DR-Y ML-Y 0

PIPING DOWNSTREAM 15:OOA

.14:59 ORT3-Y R-N Thu. 22

,Fri 23A Sat 24 MoI vMS-2026 - REINSTALLH STOP AND PILOT VALVE iP TURBINE LEF" HAND STOP030 33 c

4 CROS5UNDER PIPING IE I REPARS(PT2) r,0 021 gMS-2027 - REINSTALL H STOP VALVE HP TURBIUE RIGHT HAND < rOP0302134 2 19339MS-27.

- REAUGN PIPI I DOWNSTREAMt OF VALVE-PT2 MAIN STAM SUPPLY TO I HE TURBINE9 11HX-22C: REPLACE WE ED DRAIN LINE

_ISTURE SEPARPTOR REHEATER 07681 DVISMSR INTERNALS IN ECiON (SHELL PIDE)

MOISTURE SEPARATOR REHEATE 0302111 EG 2137PO058-i*H2DSIDESEALOI PUMP OVERHAIJI HYDHYDROGi N SIDE SEAL' 4051 1 TG040761 TGG 76 HX-022C 1HX-22C: REPLACE WELDED DRAIN LINE 4

22APR04 I 23APR04 08:OOA 07:59 17 4061 1 TGHX22DVIS TGG 76 HX-22D MSR D INTERNALS INSPECTION (SHELL 5 1 22APR04 23APR04 DR-Y ML-Y 08:00A 08:59 ORT3-Y R-N 0

407 1 TG0302137 TGG 76 P-058 P-058 - H2 SIDE SEAL 34 22APR04 24APR04 DR-Y ML-Y 0

OIL PUMP OVERHAUL 08:OOA 01:59 ORT3-Y R-N 408 1 TG-30440 TGG 76 TG-01-T CLEAN HP SPINDLE 8

22APR04 22APR04 DR-Y ML-Y 0

09:OOA 19:59 ORT3-Y R-N 4D9 1

TG0306590 TGG 76 L0-00256-0 LO-256 CANNOT 20 22APR04 23APR04 DR-Y ML-Y 0

ADJUST AIR SIDE SO 13:00-12:59 ORT3-Y R-N 410 1 TG0302116 TGG 76 T-036 T-036 - LUBE OIL 6

22APR04 22APR04 DR-Y ML-Y 42 RESERVOIR 17:00 22:59 ORT3-Y R-N 411 1

TGO215001 TGG 76 HX-053B HX-53B - REPLACE 8

22APR04 23APR04 DR-Y ML-Y 0

BRASS RING 17:00-00:59 ORT3-Y R-N 412 1 TG-30600 TGG 76 TG-01-T INSPECT HP TURBINE 4

22APR04 22APR04 DR-Y MLY 0

EXHAUST PIPING 19 0 22:59 ORT3-Y R-N 413 1 TG0302136 TGG 76 P-037A P-037A - INSPECT MAIN 7 22APR04 23APR04 DR-Y ML-Y 0

LUBE OIL PUMP 20:00 02:59 ORT3-Y R-N 414 1 TG0306774 TGG 78 LO-W254 1 LO-254 -

6 22APR04 23APR04 DR-Y ML-Y 130 REPACKWGLAND 21:00-02:59 ORT3-Y R-N 415 1 TG-30520 TGG 76 TG-01-T MEASURE HP INNER 16 22APR04 23APR04 DR-Y ML-Y 0

STEAM GLAND 22:00 17:59 ORT3-Y R-N 416 1 TG0302139 TGG 76 P-129D P-129D - REPLACE #8 32 22APR04 26APR04 DR-Y ML-Y 0

BEARING LIFT PUMP 22:00-13:59 ORT3-Y R-N 417 1

TG-30620 TGG 76 TG-01-T FINAL CLEAN NOZZLE 15 22APR04 23APR04 DR-Y ML-Y 0

BLOCK IN-PLACE 23:00 17:59 ORT3-Y R-N CLE rMo TG TG N HP SPINDLE Hz_

-$GH PRESSURE 7 lRBINE oL0-256,CANNOTADJUS AIR SIDE SO PRLSS REG VLV MEW!AIR SIDE SEAL OIL PRESSUR REC 30 2 t1t 6T036 L LUBE OIL RESE MOIR INSPECTION 3021 lgl TURBINE LUB OIL RESERVOIR 215001HXI

-R PLACE BR SS RING 215001 _

YHYDROGE SIDE SEAL OIL CpOLER TG.3060dNSPECT HP TURBI EXHAUST PIPING 0302153 _HIGH PRESSU IETURBINE TG0302136PrO37A - INSPECT UUN LUBE OIL PtiMP 030213 RBIN LUBE OIL PUMP (SHAFT DRIVEN)

TG030674 1LO-254 - REPAC UGLAND FOLLOW~ER COCKED 030677_P-59A Al SIDE SEAL OIL FUMP DISCHARG HEAl TG.305OMEASURE HP I NER STEAM GLAID CASINGS 03021

-IHIGH PRESSURE TUR INE TG30213S°-129D - REPLA 9E E AR iNG P Ump GULATOF DER IS nflnf2l-ii-TG.3002c0!! CLEAN lOZZLE BLOCK IN-PLACE 03021

_HI PRESSURE TUR TGO21'i39!2

-531 - C SE HYDROGEN bIDE SEAL OIL Ct 1 396

.HYDROGEN SID SEAL OIL COOL i

418 1 1 TG0213962A TGG I 76 HX-053B HX-53B - CLOSE HYDROGEN SIDE SEAL 5

23APR04 23APR04 DR-Y ML-Y 01:00 09.59 ORT3-Y R-N 0

)INE OLER

'R Run Date 22APR04 13:12w LT-03 STANDARD PUBLICATION Sheet 24 of 33 C Primavera Systems, Inc.

I FL-03 Execution PublIcation Set I

after 22APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 22APR04 12:00

  1. IU ID REspi WO

-.IST EQID HX-022B DESCRIPTION 1HX-22B: REPLACE WELDED DRAIN LINE RD ES APP EF RISK MF Thu 22 Fr 2'3 I

Sat 24 I 2 D.9 A

, A 4

n 18tiniZ14 RI1 FQ. 9.A. A.AAM1214.1&1 4191 1 TG0407680 TGG 76 8

23APR04 23APR04 DR-Y ML-Y 1 07:00 14:59 ORT3-Y R-N f

420 1 TG0407682 TGG 76 HX-022D 1HX-22D: REPLACE 8

23APR04 23APR04 DR-Y ML-Y 12 WELDED DRAIN LINE 07:00 14:59 ORT3-Y R-N 421 1

TG0302149 TGG 76 TG-01 MECHANICAL 15 23APR04 23APR04 DR-Y ML-Y 33 OVERSPEED DEVICE 07:00 21:59 ORT3-Y R-N 422 1

TG0214117 TGG 76 SR DUO-CH INSPECT AND 20 23APRo4 27APR04 DR-Y ML-Y 43

_MAINTAIN MSR 07:00' 10:59 ORT3-Y R-N 423 1

TG0403278 TGG 10 Z-008 GAS LEAK DOWN 20 23APR04 27APR04 DR-Y ML-Y 0

STREAM OF TEST 07:00-10:59 ORT3-Y R-N 424 1 TG0214999 TGG 76 TG-01-T2 LP2 - EROSION 30 23APR04 28APR04 DR-Y ML-Y 0

SHIELDS OVER BRG 07:00 12:59 ORT3-Y R-N 425 1 TGHX22DRP TGG 76 HX-022D MSR D INTERNALS 10 23APR04 26APR04 DR-Y ML-Y 0

REPAIRS (SHELL SIDE) 09:00 10:59 ORT3-Y R-N 426 1 TG0213961A TGG 76 HX-053A HX-053A - CLOSE AIR 5

23APR04 23APR04 DR-N ML-N 5s SIDE SEAL OIL COOLER 10:00 14:59 ORT3-N R-N 427 1 TG0302132 TGG 76 L0-00291 L0-291 - OVERHAUL 25 23APR04 28APR04 DR-Y ML-V 0

PRESSURE REDUCING 13:00 13:59 ORT3-Y R-N 425 1 TG-30625 TGG 76 TG-01-T OBTAIN TIGHT-WIRE 20 23APR04 26APR04 DR-Y ML-Y 0

MEASUREMENTS OF 18:00 17:59 ORT3-Y R-N 429 1 TG-30690 TGG 76 TG-01-T HAND CLEAN HP CYL. 30 23APR04 27APR04 OR-Y ML-Y 0

HORIZONTAL JOINT 18:00 07:59 ORT3-Y R-N 430 1 TG0214131 TGG 76 P-058 P-058 - CLEAN, 2

24APR04 24APR04 DR-Y ML-Y 0

INSPECT AND LUBE 00:00 01:59 ORT3-Y R-N 431 1

TG9818789 TGG 76 TG-01-T ITG-01-T REPLACE 5

24APR04 25APR04 DR-Y ML-Y 116 STEAM CHEST FITTING 01:00 19:59 ORT3-Y R-N 432 1 TGO2161678 TGG 76 E-01 REINSTALL DUCT 4

24APR04 26APR04 DR-N ML-N 0

FOLLOWING EXCITER 01:00 08:59 ORT3-N R-N 433 1 TG021500 GG 76 TG-01-Tl LPI - EROSION 40 24APR04 28APR04 DR-Y ML-Y 2

___SHIELDS OVER BRG 01:W0 00:59 ORT3-Y R-N 434 1 TG0216537 rGG 76 P-059A IP-59A REPLACE AIR 20 24APR04 27APR04 DR-Y ML-Y 106 SIDE SEAL OIL PUMP 02.00 01:59 ORT3-Y R-N

_4 _Ltse _ _ _ ie m..: II __

4351 _

T-127D-R VCC CC-769 11CC CC i69IC REVC-1 I

22APRo4 22APR04 0

12:00 12:59 II I

II I

I II I

- II TG04076801

-229: REPLACEWELDED DRAIN L NE 040768a MISTURE SEPARATOR R --HEATER TG040768 HII-220: REPLACE 'XVELDED DRAIN L NE 040768 MOISTUIqE SEPARATOR R -EATER TG0302149M4 CHANICAL OVERSPEED DEVICE IN PECTION 0302149 RBINE GENE ATOR (GENEF TG0214117 1 P

D MAINCAIN MSR DUO-C ECK VALVES 021411 TG0403278 0 S LEAK DOWN STREAM OF TEST S LENOID 040327 TG0214999LP - EROSION SHEI;DS OVER BRG St 0D DRAIN LN-F 021499 TGHX22DRI USR D INTERNALI REPAIRS (SHEl L SIDE) 0302111-TG021396 053A - CLOSE AIR SIDE SEAL )IL COOLER 02139 1 AIR SIDB SEAL OIL COOLEI TG0 0213*2-291 - OVARHAUL PRESSUT E REDUCING 0 1021 3

3_U TG.3O62SOBTAIN TIGHT-WIRE I 03021 TG.30890HAN) CLEAN HP CYL I EASUREMENT.'

  • 5-IORIZONTAL J MM fl1 I

TGO21.4131P-058 - CLEAI 0214131EHYDROGE TGqdj57891TG-01-TRE 95.1 7840in T~ov265d~

EPHSTALL TG0JI 5000LP1 - EROSI 0211500CJNJ TG02165371P4a9A Ri I, INSPECT AM N SIDE SEAL PLACE STEAM

)UCT FOLLOW PLACE AIR 511 021 6537w r-12 Y-1RI CC CC-769 IC REV0.1 1 CC CC--764 IC REV0-10011ZO 1441 480V B#2-429DLJDR EM F EVO-1 I 480V B52-429DIJDR EM REM 01 0018001 436 I

T-001-H WCC B52-429DL I 480V 852-429DLIDR EM REVO-1 I

22APR04 22APR04 12:00' 12:59 47 Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION Sheet 25 of 33 O Prlmavera Systems, Inc. _

FL-03 Execution Publication Set I

after 22APRO4 12 00 U1R28 WORKING SCHEDULE after 22APR04 12:00

  1. U ID lRESI WO ECID DESCRIPTION RD ES EF RISK MF APR
  1. IIDR 1WEF RS MPm72Fri 23 Sat 24 ST t1011211416ja2022 0. 2.4.6 i 8 101Z14.1f112122I 0.2.4.6. 8.10OZ14 I43'1' T-8265-R wCc RMP 1 RP RMP 9026-4 EM REV2-1 I

2WAPR04 1

25APR04 12:00 112:59 S

438 1 T-0477-R WCC T-034B 1 SI T-34B MMV REVO-1 2

22APR04 22APR04 19 12:00 13:59 439 1 T-5945-R WCC SI-00860A 1 SI SI-860A EM REV0-1 2

22APR04 22APR04 DR-Y ML-Y 190 12:00 13:59 ORT3-Y R-N 440 1 T-7712-R WCC HX-046A 1 CS HX-46AIB MM 2

22APR04 22APR04 DR-Y ML-Y 324 REVO-1 12 00 13:59 ORT3-N R-N 441 1 T-0512-R WCC W-1D111D2 1 VNCCW-1D1/D2 MM 3

22APR04 2W R04 DR-Y ML-Y 154 REVO-1 12:00 14:59 ORT3-Y R-N 442 1 T-2077-R WCC CV-01342 1 CVCV-13421i343MMX 3

22APR04 22APR04 183 REVO-1 12:00 14:59 443 1 T-1764-R WCC SC-00946A 1 SC SC-946A MMV 2

22APR04 22APR04 321 REVO-1 16:00 17:59 444 1 T-6933-H WCC D72-19-03 1 125V WP 00-037-04 1

22APR04 22APR04 0

EM REV0.1 20:00 20:59 445 1

T-8018-R WCC W-013B1 1 480V rWP 01-128 E-N 1 22APR04 22APR04 0

0)

(W-13B1) EM REVO-1 20:00 20:59 446 1 T-8507-H WCC POS-476 1 CS POS-476 EM I

22APR04 22APR04 DR-Y ML-Y 0

REV0.2-1 20:00 20:59 ORT3-N R-N 447 1

T-06824H WCC ICP-5.10 I MMS ICP-5.10 IC 2

22APR04 22APR04 DR-Y ML-Y 33 REVO-1 20:00 21:59 ORT3-N R-N 448 1 T-3717 H WCC T-034A 1 SI T-34A MMV REVO-1 3

22APR04 22APR04 DR-Y ML-Y 0

20:00 22:59 ORT3-N R-N 449 1

T-2587-R WCC RC-00516 1 RC RC-516 EM REVO-1 I 22APR04 22APR04 0

21:00 21:59 450 1 T-2068-R WCC 1 Y 1GY-4-M REVI-1 1

22APR04 22APR04 0

2200 22:59 451 1

T-2566-R WCC PRIMARY I RC PRIMARY I 122APR04 22APR04 DR-Y ML-Y 11 MANWAYS EPI REVO-1 23:00 23:59 ORT3-Y R-N 452 1 T-8019-H WCC W-013B1 I 480V IWP 01-128'E-FN 1

23APR04 23APR04 10 (W-13B1) CAUT REV0-1 00:00 00:59 453 1

0199-010 WCC SI-826A AUGN & WID BAST &

2 23APR04 23APR04 DR-N ML-N 0

IP-15A FOR REACTIVITY 00W00 01:59 ORT3-N R-N r-82 r-04 r-57 r-05 r-20 T-1 0!

R1 RP RMP 9026.4 EM REV2.

ml RP RMP 9026-4 EM REV2-1 C SI T-346 MMV REV0.1 I1 SI T-34BMMV REVO-1 0010 L1R 1 SI SI-860A EM REV0-1 N1 SI sw8A EM REVD-1001!

12.p CS HX6AIB MM REV0.1 M1 CS HX-4"B MM REVO-101 R12 VNCC W4-1D11102 MM RE' "I

VNCC 4 1D1/1D2 MM RE iB1 CV CV.134211343 MMV RI

_1 CV CV-434211343 MMV RI i Sc d-94eA MMV REVO ll1761SC: SC-946A MMV RE T-89334' '125V IWP 00-037-001693691 125V INP 00-03 T-801 W1480VrWP i`12B8I l001801Ei 480V IWP 01-12 T-850740-CS POS-476 EM F l 001B50/M CS POS-476 EN T.068240 IUMS ICP-S.10 IC I 0010682!1 MMS ICP-5.10 T-3717T 1 'SI T-34A MMV RE 0013717_1 SI T-34A MM T.25874wtRC RC-516 EM I 001258t1 RC RC-516 EM T-2068 IY IGY4-M RE 00120401 IT-256g-RC PRIMARY 001256 N1 RC PRIMAF I T40I 1

BW480V 1WP 0 001o019o1 480V IWP I019 1-OOUGN & WIC 0017417?1 SI SI-8l

.T-8023441 480V rWP 0 001 O023U1 480V rw 018265 945 17712

/0-1 0010512 V0-1 WVD-1001207T v.1 1

'1 4 EM REV0-1

'-04 EM REV0-1 E1-FN (W-13B1) EMREV0-1 1'E-FN (W-13B1) EM REV0 1 EV02-1 REVO.2-1 tEVO-1 IC REV0-1

,o-1 r REV0-1 EV0-4 REV0-1 I

.I MANWAYS EPI REV0-1 MANWAYS EPI REV0-1

-128E-PH (W-1311) CAUT REV0.1 1-128 E-FN (W-14B1) CAUT REV0-1 BAST & P-15A FOR REACTIVITY FL A CT OPS REVO-li

-128-E-FN (0139)'EM REV01 01-128 E-FN (OI-p9) EM REV0-1

)WPATH 454 1

T-8023-H WCC W-021A I 480V IWP 01-128-E FN (01-39) EM REVO-1 2

23APR04 I 23APR04 I 00:00 01:59 11 Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION I

Sheet 26 of 33 0 Primavera Systems, Inc.

I FL-03 Execution Publication Set I

affer22APR0412:00 l

U1R28 WORKING SCHEDULI l U I ID lRESPl l

ED I DESCRIPTION IRDT ES I

EF I

RISK I I

.I M hiS T-23R X2A tSH-2AM 2AR4 3P0 after 22APR04 12:00 APR Frl -Xt Snta 24 45 1 T-1273-R wCc HX-21A I CS HX-21A MM REVO-1 3

23APR04 23APR4 01:00 j03:59 312 456 1 T.7521-1R WCC MS-00231 I MS MS-231 EM I

23APR04 23APR04 408 REVO-1 02:00 02:59 457 1 T-7935-R WCC P-037D-M I LO P-37D-M EM I

23APR04 23APR04 138 REVO-1 02 00 02:59 458 1 T-8020-H WCC W-021A 1 480V IWP 01-128 E-FN I 23APR04 23APR04 0

I (W-21X) EM REVO-1 03:00 03:59 459 1 T-8021-H WCC W-021A 1 480V WP 01-128.E-FN 1 23APR04 23APR04 0

(W-21A) CAUT REV0-1 03:00 03:59 460 0 T-8203-H WCC W-030A 0 VNPAB W-30A MM 2

23APR04 23APR04 0

REV0-1 (IN GROUP 03:00 04:59 461 0 T-8359-H WCC W-030B 0 VNPAB W-30B-M EM 3

23APR04 23APR04 2

REV2.1-1 (IN 2004-001) 03:00 05:59 462 1 T-3790-H WCC S6050A I IOPS S-6050A IC 2

23APR04 23APR04 40 REVO-1 04:00 05:59 453 1 T-8117.H WCC MR 01.128 1480VMRO1-12818-42 3

23APR04 23APR04 0

CAUTION TAGS EM 04:00 08:59 464 1

T-2368-R WCC B.42 REMOVE CYCLEOPS 1 2 23APRO4 23APR04 0

480 1B-42 CTS OPS 05:00 08:59 465 1 T-3161-R WCC B-42 REMOVE CYCLEOPS 1 2 23APR04 23APR04 0

480V 1B-42 BUCKETS 05:00 08:59 466 1 T-8123-H WCC MR 01-128 1 480V MR 01-128 1B-42 2 23APR04 23APR04 0

CAUTION TAGS EM 05:.W 08:59 467 1 T-0711-R WCC Z-024A I RC Z-24A RMP-9096 I

23APR04 23APR04 49 MM REVO-1 08:00 08:59 468 1 T-1679-R WCC P-037C 1 LO P-37C EM REVO-1 I

23APR04 23APR04 134 08:00 08:59 469 1 T-74171H WCC SI-826A I SI SI-826A CT OPS 1

23APR04 23APR04 DR-Y ML-Y 0

REVO-1 08:00 08:59 ORT3-Y R-N 470 1 T-9779-R WCC PZR 1 RC PZR HTRS EM 1

23APR04 23APR04 DR-Y ML-Y 357 REV0-1 08:00 08:59 ORT3-Y R-N 471 1

T-2095-H WCC ICP-S.7 It VNCC ICP-.577 IC 2

23APR04 23APR04 DR-Y ML.Y 0

REVO-1 08:00 09:59 ORT3-Y R-N T-.1273-I HX-21 MM REVO-1 0011273 A CS H C-21A MM REVO-1I T-7521 IMS MS-31 EM REV0-1 1017521 1 MS MS 231 EM REVO-1 T-7935.R 1 LO P-37

  • EM REVO-1 601793E1 LO P-3 WM EM REVO-1
T-8 0204i1480V I fP 01-128 E-FN

-21X) EM REVO01 001802C1 480V WP 01-128 E-FN cVN-21X) EM REVO-T.-8021-.

480V IV 01 -128 E-FN (W.21A) CAUT REVC 1001802111 480V WP 01-128 E-FN (W-21A) CAUTrRE\\

,T.82034.H VNPA W-30A MM REV0-4 (IN GROUP 2004 0018203w IT-8359-H0 VNPA W-30B-M EM RE%2I1Z1 (IN 2004.001 001t359M I

I.

T-37904o-IOPS -6050A IC REV01 1 001379' 1 IOS S-6050A IC REVO-1 T-8117 480V R01 1281B-424AUTIONTAGSE?

001811 1 480V MR 01-128:18-42 CAUTION 7 T-236 VE CYCLEOPS 1 480 1-B42 CTS OP 1

001236 T-3161 EM VE CYCLEOPS I 480V 1B-42 BUCKI 1 0013161 T-8123-1 1 480 MR 01 -128 1B-42:CAUTION TAGS!

00181 1 480V MR 01-128'1B42 CAUTIONT T-0711 1 RC Z-24A RMP-90P6 MM REV0-1 0010711 1 RC Z-24A RMP-S096 MM REVO-1 Tie 679 1 LO P.37C EM REV041 0011 1 1LO P-37C EM RD0-1

  • ~

I.

T-7417-l SI SI-826A CT OP, REVO-1 001741 1 SI Sl-826A CT OPS REVO-1 T-977I RC PZR HTRS EP<REV04' 0009 1RC PZR HTRS EM REV0-1 T-2095-VNCC ICP-5.77 IC'REV0-1 001209 1 VNCC ICP-5.77 IC REV0-1 T-9892-1 VNCC W-IAIIIA2:EM REV01 000989 1 VNCC W-1A141A2 EM REVO-1 wim

-1 0-1 I REV-1.

NGS EM REVI-REV1-1

.TS EM REV0-1 M REV2-1 NGS EM REV2-4721 I T-9892-H wCC W-001AI I VNCC W-IAIIIA2 EM REVO-1 3

23APR04 08:00 23APR04 10:59 DR-VY MI-ORT3-Y R-N 67

________________________ L.L J.

L I

Run Date 22APR04 13:121 LT-03 STANDARD PUBLICATION Shoot 27 of 33 C Primavera Systems, Inc.

I FL-03 Execution PublicationSet T

after 22APR04 12:00 I U1R28 WORKING SCHEDULE I after 22APR04 12:00

  1. lU I lRSlW l EQD DESCRIPMON ID E EF I RISK IMF Th AFR
  1. tj

i11-22 Z

1 4 3 6

2 lZA1j2.2

9.

2,..810Z4_612 2_ 4.6

,01A4 T-5919H CHAGING CV CHRGING4 Z3AR04 23PR04 TU19!C CHRIN INIECNANETMVRV I43 T-5919-I-wcc CHARGING I CV CHARGING E 4 23APR4 I 23AP11904 IINSIDE CONTAINMENTJI 05:00 1 1:59 7

474 1 T-0509-H WCC W-IAIIIA2 I VNCC W-IA1/1A2 MM 5

23APR04 23APR04 DR-Y ML-Y 0

_C_.REV0-1 08:00 12:59 ORT3-Y R-N 475 1 T-1780-H WCC HX-15A 1 VNCC HX-15A MMV 5

23APR04 23APR04 DR-V ML-Y 0

REVO-1 08:00 12:59 ORT3-Y R-N 476 1 T-183D-H WCC HX-15A 1 VNCC HX-15A MM 5

23APR04 23APR04 DR-Y ML-Y 0

REVO-1 08:00 12:59 ORT3-Y R-N 477 1 T-8435-R WCC Z-24A 1 FH Z-24A RP-IA OPS 1

23APR04 23APR04 48 REVI.5 09:00 09:59 478 1 T-0683-H WCC ICP-5.16 I CV ICP-5.16 IC REVO-1 2 23APR04 23APR04 1

09:00.

10:59 479 1 T-0686-H WCC ICP-5.69B I RH ICP-5.69B IC 2

23APR04 23APR04 7

REVO-1 09:00 10:59 480 1 T-1714-H WCC LT-433 I RC LT-433 IC REVO-1 4

23APR04 23APR04 15 09:00 12.59 T-6123-H WCC CV.00275 1 CV CV-275 MMV 4

23APR04 23APR04 0

REVO-1 09:00 12:59 482 1 T-6398-H WCC LT-00427 I RP LT-427 IC REVO-1 4

23APR04 23APR04 5

09 00 12:59 483 1 T-6399-H WCC LT-00428 I RP LT-428 IC REVO-1 4

23APR04 23APR04 5

09:00.

12:59 484 1 T-9893-R WCC W-IBI/1B2 I VNCCW-11311B2 EM 1

23APR04 23APR04 140 REVO-1 10:00 10:59 485 0 T-6418-R WCC IA-1258 0 IA IA-1258 MM REVO-1 1

23APR04 23APR04 153 11:00 11:59 486 1 T-9894-R WCC W-OO1C1 1 VNCCW-1C1IIC2 EM 1

23APR04 23APR04 204 REVO-1 11:00 11:59 487 1 T-2434-R WCC CC-754A I CC CC-754A EM 2

23APR04 23APR04 DR-Y ML-Y 0

REVO-1 11:00 12:59 ORT3-Y R-N 488 1 T-2743-R WCC CS-00466C 1 CS -A FEED LINE 2

23APR04 23APR04 84 MMV REVO-1 11:00 12:59 459 0 T-8203-WCC W-030A 0 VNPAB W-30A MM 2

23APR04 23APR04 25 REVO-1 (IN GROUP 11:00 12:59 T-5919-H 001591 T-0509 0010so I

TT-1780-001178r T-18304j 001183W T-84354 001843!

T.06834 001068' T-06864 0010681

.1 T.17144 001171I

'T-B1234 001612Z T-63984 I

0016391 I

T.63994 0016391 I

T-9893 I

0009w 00616 I

T-989 ooos T-243 0012 I

T-274 0012 T-820 0018 T-21 001 1V CHARGING INSIDE CONTAINME MlCV CHARGI'NG INSIDE COWn VNCC W-`IAIIA2,MM REVO-1 1 VNCC W-1AIIIA2 MM REV3 VNCC HX.-5A MMV REVO-1

=1 VNCC HX-I5A MMV REVO-1 VNCC HX-15A MM REV0.1 I VNCC HX-15A MM REVO-1 I FH Z-24A RP-IA'OPS REVI-5 1 FH Z-24A RP-1A OPS REVI-5 I

CV ICP-5.16 IC 4mEV0-1 Ml CV ICP-5.16 IC REV0-1 I RH ICP-5.69B IC:REV0-I H1 RH.ICP-5.69W IC REVO-1 I..

I RC LT-433 IC RqV0-1 1 RC LT-433 IC REVO-I I CV CV-275 MMV:REVO.1 1 CV CV-274 MMV REVOD-I RP LT-427 IC REVO-1 W

RP LT-427'IC REV0-1 I RP LT-428 IC R<V0-1 1 RP LT-42q IC REV0.1 RI VNCC W-1 B1i1 52 EM REVO-1 1 VNCC W-1B13112 EM REVO-1 4jA IA-I1258 M REV0-1 18I0 IA IA-1258 MM REVO-i I VNCC W.1CdIC2 EM REV0-4 9U1VNCC W-Id1l1C2 EM REVO-I

~C CC-754A FM REV0.1 I CC CC-754A EM REV0-1 R1 CS -A FEED bNE MMV REV04 4^w S'A' FEgD LINE MMV REV

.tNPAB W-30A MM REV0.1 ON I 36-Hl RDC EM RE>11-1

!0831 RDC EM F~EV1-1 MMV REVO-,

INMENT MM%

I RROUP 2004) 4901 1 T-2086-H wCC EM REVI-I I

RDC EM REVI-I I I I23APR04 I23APR04 12:00 12:59 0

Run Date 22APR0413:12l LT-03 STANDARD PUBLICATION Sheet280f33 C Primavera Systems. In.

FL-03 Execution Publication Set S

after 22APR04 12:00 U1R28 WORKING SCHEDULE l

after22APR04 12:00.

IV U I D1) IESIW EQID I

DESCRJPFl0N IRDI~ ES I

E IK IM APR SITh22Fri 23 Sait 4 P.S411a

.24F,60i?1.RISK,2

,.468.~IZ41 jR~"P w-4911 1 T-2436-R WCC CC-759A I CC CC-759A EM REVO-1 I I 23APR04 I 23APR04 I DR-Y ML-Y 12:00 12:59 ORT3-Y R-N 0

492 1 T-7590-H WCC MR 01-128 1 480V MR 01-128 1B-42 1 23APR04 23APR04 0

BUS BRACING EM 12:00 12 59 493 1 T-8025-H WCC W-035 1 480VIWP 01-128 E-FN 1 23APR04 23APR04 0

(W.35) EM REVO-1 12:00 12:59 494 1

T-7401-R WCC SOP-CC-002 I CC SOP-CC-002 OPS 1

23APR04 23APR04 6

REV3-1 13:00 13:59 495 1 T-7504-H WCC SOP-CC-002 i CC SOP-CCX002 OPS 1

23APR04 23APR04 0

REV4-1 13:00 13:59 496 1 T-8348-H WCC P-14B 1 SI P-148 MMV REVI-1 I 23APR04 23APR04 DR-Y ML-Y 0

13:00 13:59 ORT3-N R-N 497 1 T-18314H WCC HX-15A 1 VNCC HX-1SA MM 2

23APR04 23APR04 DR-Y ML-Y 0

REV1-1 13:00 14:59 ORT3-Y R-N 498 1 T-2085-R WCC EM REVO-1 1 RDC EM REVO-1 2

23APR04 23APR04 0

13:00 14:59 4

1 T-2765-H WCC CV-01296 I CV CV-1296 MMV 2

23APR04 23APR04 0

REVO-1 13:00 14:59 500 1

T-3715-R WCC P-0148 1 SI P-14B MMV REVO-1 3

23APR04 23APR04 125 13:00 15:59 501 1

T-2759-R WCC CS-38C 1 CS CS-38C MM 4

23APR04 23APR04 301 REV0-1 13:00 16:59 502 1 T-8116-H WCC MR 01-128 1480V MR 01128 18-42 4 23APR04 23APR04 0

BUS BRACING EM 13:00 16:59 503 1

T-0466-R WCC LOGICS 1 ROC LOGICS IC I 23APR04 23APR04 113 REVO-1 14:00 14:59 504 1

T-6933-R WCC D72-19-03 1 125V IWP 00-037.04 1

23APR04 23APR04 0

EM REVO-1 15:00 15:59 505 1 T-8023-R WCC W-021A 1 480V IWP 01-128E-FN 1 23APR04 23APR04 22 (01-39) EM REVO01 15:00 15:59 506 1 T.8025-R WCC W-035 480V IWP 01-128-E-FN I 23APR04 23APR04 22 (W-35) EM REVD.1 15:00 15:59 507 1 T-1830-R WCC HX-15A I VNCC HX-15A MM 2

23APR04 23APR04 DR-Y ML-Y 21 REV0-1 15:00 16:59 ORT3-Y R-N I

I II II II I

I II II II I

T-2.

001 T-7' 001 T-8C 001 T-oc T-TA T.,

T.

0C T-.

TD oc T-ot TA 36.pICC CC.759A EM REVO-1 4361 CC CC-759A EM REVO-1 ioi 1 480V MR 01,128 11-42 BUS BF1 T59CII 480V MR 41-128 18-42 BUS I 254 480V IWP 01D128 E-FN (W-35) 302!31 480V NWP b1.128'E-FN (W.3!

401 14CC SOP-C*-002 OPS REV3 1740111 CC SOP$FC-002 OPS REV.

504-1 CC SOP-CC.002 OPS REV4-175041 CC SOPNC-002 OPS REV, 348. SI P-14B 4MV REV1-1 183481i SI P-14B'MMV REVI-1 8314-i VNCC HX45A MM REV14 1183131 VNCC lX-15A MM REVI.

085R1 RDC EM REVO01 12085J1 RDC EM REVO-1 7654(!CV CV41246 MMV REVO-1 1276dU1 CV CV.1 296 MMV REVO01 7154 t1, P-14B MMV REVO.1 1371T 1 SI P-1'4B MMV REVO-1 759RICSCS-38C MM REV0.1 1275 1 CS 95.38C MM REVO-11W 480V MR 01428 1B-42 BUS 1811 _1 480V MR 01-128 18-4

.04654p1 RDC LO"ICS IC REV0.1 010466I1 RDC LUGICS IC REVO-i T493 3 I 125V IWP 00-037-04 EM 00169331125V WP 00-037.04E T.80234 480V VYP 01-128'E-FN (

0018023J1 480V IWP 01-128EFN T.802 5.4480V I$'P 01-1284 E-FN 0018029j1 48OV)WP 01-128E-FN s.18304 I VNCC H.X-SA MM REVO 001183(iU VNOCHX-15AMM T-683RCV IC)-.16 IC 1

00106831 CV fP-5.16 IC REV-kCING EM REI IRACING EM F EM REVO-1 EM REVO-t

-1

.1 1ACING EM RI BUS BRACINW EVO.1 REVO-1

.39) EM REVO 1-39) EM REM

.35) EM REVO-N-35) EM REV 0-1 50811 T-0683-R WCC ICP-5.16 I CV ICP-5.16 IC REVO-i' I 23APR04 I 23APR04 16:00 16:59 203 Run Date 22APR04 13:12 LT-03 STANDARD PUBLICATION Sheet 29 of 33 a Primavera Systems, Inc.

I FL-03 Execution Publication Set

after 22APR04 12:00 I U1R28 WORKING SCHEDULE I

aner;!ZAr(U4 7Z UtW U

ID

-RES1 WO I EalD DESCRIPTION ADRES EF RISK MF Thu 22 Fr ZtI O I STI

_1011:RM 1.1014121 2

l 1O12l4.1 20,22j0,2,4, B.8 1011Z 5091 1 T-1305-H wCC CV-00313A-I CV CV-313A-S IC REVO-1.

I 23APR04 I 23APR04 17:00 17:59 10 510 1 T-7441-H WCC MR 01-128 1 480V MR 01-128 1

23APR04 23APR04 100 1852-424J (CC-738B) 17:00 17:59 511 1

T-7460-H WCC MR 01-128 1 480V MR 01-128 1

23APR04 23APR04 102 1B52-426C (CC-719) 17:00 17:59 512 1 T-7462-H WCC 052-426F I 480V MR 01-128 1

23APR04 23APR04 104 1B52-426F (CV-1298) 17:00 17:59 513 1 T-7463-H WC B52-426M I 480V MR 01-128 1

23APR04 23APR04 105 1B52-426M (RC-427) 17:00 17:59 514 1 T-7471-H WCC MR 01-128 1 480V MR 01-128 1

23APR04 23APR04 123 1B52-4210F (SW.2880) 17:00 17:59 515 1 T-7484-H WCC MR 01-128 1 480V MR 01-128 1

23APR04 23APR04 122 1B52-4210C (SW.2908) 17:00 17:59 516 1 T-7490-H WCC RC I RC SG PRIMARY I

23APR04 23APR04 0

MANWAYS EPT REV1-1 17:00 17:59 54$ I T-7492-H WCC PRIMARY I RC PRIMARY 1

23APR04 23APR04 0

O MANWAYS MM REVI-1 17:00 17:59 518 1 T-7497-H WCC T-001 1 RC PZR MANWAY MM 1

23APR04 23APRo4 0

REVI-1 17:00 17:59 519 1 T-7507-H WCC P-001B-M 1 RC P-1B-M RMP 1

23APR04 23APR04 73 9002-1 EM REV2.1-1 17:00 17:59 520 1 T-7509-H WCC P-001B-M I RC P-1B-M RMP 1

23APR04 23APR04 0

9002-1 MM REV1-1 17:00 17:59 521 1 T-7590-R WCC MR 01-128 1 480V MR 01-128 1B-42 1

23APR04 23APR04 94 BUS BRACING EM 17:00 17:59 522 1 T-6639-R WCC T-001 1 RC PZR MANWAY MM 2

23APR04 23APR04 315 REVO-1 17:00 20:59 523 1 T-7427-H WCC MR 01-128 1 480V MR 01-128 2

23APR04 23APR04 99 1852-421J (Sl-866B) 17:00 20:59 S24 1

T-7432-H WCC MR 01-128 1 480V MR 01-128 2

23APR04 23APR04 101 1B52-422J (S-878B) 17:00 20:59 525 1 T-7452-H WCC B52-425M 1 480V MR 01-128 2

23APR04 23APR04 102 1B52-425M (CV-350) 17:00 20:59 II I

II II I

I I

I I

II I

II II-II II T-13 0 54 IsCV CV-313A-S IC REY 0011C0di1 CV CV-313A-S IC RE T-74414j 480C MR 01-128 1B52-0017441lI1 48pV MR 01-128 185 T.746048OV MR 01-128 1B52-001746148bV MR 0-128 1B 7.7452441 4809 MR 01-1281B552 001746s1 489V MR 01-128 1B3 00174623s 48bVMR 01-128 1B5 T-74714t4801 MR 01-128 1B52-001747131 480V MR 01-128 1BS T-7484-HI 4804 MR 01-128 1B52-00174841 48bV MR 01-128 185 T-7490441 RC 10 PRIMARY MAN 001749ti1 RC SG PRIMARY MJ T.7492 1 RC ~RIMARY MANWA 0017491111 Rq PRIMARY MAWN T.74974. RC PZR MANWAY MM 001749111 Rd PZR MAAY M T-7507.1XRC t-15BM RMP 9002.

001750o1 lRq P-18-M RMP 900 T-75094-H RC P-1BM RMP 9002.

0017509I1 Rd P-1B-M RMP 900:

T77590 RI8O MR 01-1281-42 001759t11 489V MR 01-128 16-T-6639 I RC

=ZR MANWAY MM 00166391 RC PZR MANW, T.742744T480 MR 01-128 1t52-0017427I l 480V MR 01-128 T-7432-480t L MR 01-128 1B52-001743

-11 480V MR 01-128 T-74524 1 480V MR 01-128 1B52-001 7 4 5

1"hhl 480V MR 01-128 T.3375IRCO1f1-M RMP 9002-001337-1 RC P-1B-M RR

-1 4J (CC-738B) 424J (CC-738 26C (CC-719) C 426C(CC-711 6F (CV-1298) 26F (CV-12S M (RC-427)1 26M (RC-42 10F (SW-2B80 4210F (SW-21 210C (SW-290f i-4210C (SW-2

{AYS EPT REV NWAYS EPT R rs MM REVi-1 KYS MM REVi REV1-1 REV1-1 I EM REV2.1-1 1-1 EM REV2.1-I MM REV'11 1.l MM REV1-1 BUS BRACING 2 BUS BRACIN REV0-1 Y MM REVO-1 21J (Sf-866Bj C 1B52-421J (SI-22J (S48788) C 1B52-422J (SI-25M (v-350) C 1B52-425M (C I MM REVO-1 P9002-1 MMR 526 I

T-3375-R WCC P-001B-M 1 RC P-1 B-M RMP 9002-1 MM REVO-1 23APR04 17:00 23APR04 21:59 0

_5

_J.

Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION Shot 30 of 33 OPlmaveraSystemsInc I

FL-03 Execution Publication Set

after 22APR04 12:00 1

U1R28 WORKING SCHEDULE after 22APR04 12:00

  1. j Ul ID IRS W

I EQID I

DESCRIPfnoNI RD ES I

EF I

RSK IAFI-pR IRS I

0 ~t

~M~

Thu__2____Fri_23 Sat 24 ST El 6124165K20.21 0 i 2 4. 6.81 0Il 2,1 4,16 S20.2 210.

2 4

, 6.8.1 jjj1jj 5271 1 T-7456-H wCC CV-00296 1 CV CV-296 MMV REVI-1 3 1 23APR04 23APR04 17:00 21:59 0

528 1 T-7455-H WCC P-0108 1 RH P-10B MM REVI-1 4

23APR04 23APR04 O

17:00 2259 529 1 T-7969-H WCC CV L/D I CV CV L/D SYSNCT 4

23APR04 23APR04 0

MMV REVO.1-1 17:00 22:59 530 1 T-6411-H WCC 01-164 1 CV 01-164 OPS 5

23APR04 23APR04 58 REVO-1 17:00 23:59 531 1

T-7458-H WCC CV L/D I CV CV LUD SYSVCT 23APR04 24APR04 0

OPS REVO-1 17:00 00:59 532 1 T-7465-H WCC CV LID 1 CV CV L/D SYSNCT 6

23APR04 24APR04 0

OPS REVI-1 17:00 00:59 533 1

T-1680-R WCC PRIMARY i RC PRIMARY 1

23APR04 23APR04 95 MANWAYS MM REVO-1 20:00 20:59 534 1

T-6601-R WCC RC 1 RC SG PRIMARY 1

23APR04 23APR04 315 MANWAYS EPT REVO-1 20:00 20:59 MS I T-1715-R WCC RC-00434 I RC RC-434 MMV 2

23APR04 23APR04 297 REVO-1 20.00 21:59 536 1

T-2606-H WCC SC.96BC-S 1 SC SC-966C-S IC I

23APR04 23APR04 87 REV0-1 21:00-21:59 537 1 T-2086-R WCC EM REVI-1 I RDC EM REV1-1 2

23APR04 23APR04 192 21:00 22:59 538 1 T-8507-R WCC POS-476 1 CS POS-476 EM 1

23APR04 23APR04 DR-Y ML-Y 188 REVO.2-1 23:00 23:59 ORT3-N R-N 539 1 T-7106-H WCC TG-01-G 1 TU TG-01-G EM 2

23APR04 24APR04 42 REV1-1 23:00 00:59 540 1 T-3782-R WCC CS-2188-S 1 CS CS-2188-S EM 1

24APR04 24APR04 372 REV0-1 00:00 00:59 541 1 T-7458-R WCC CV LID 1 CV CV LID SYSNCT I

24APR04 24APR04 0

OPS REVO-1 01:00 01:59 542 1 T-2660-R WCC HX-001B I MS HX-1B AF-101 3

24APR04 24APR04 59 MMV REV0-1 01:00 03:59 543 1

T-6597-R WCC HX-048 1 CS HX-48 EPT REVO-1 1

24APR04 24APR04 390 0Z00 0259 II I

I II II I

I II II II II T-7456.H1 CV CV-296 MMV REV 001745U-U1 CV CV-296 MN T-7455-H1 RH 0.10B MM REV1.1 001745 SI-1 RH P-101 MA T-7969411 CV CV UD SYSNCT 1 0017969 I1 CV CV LIDS T-6411 4 0CV -164 OPS REVO-0016411E1_d_1 CV01-164 T.7458I4ICVCV LID SYSNCT C 001745f0 1 CVCV LAt T.746541CV V D SYSVCT C 001746*-4*_1 CV CV LK T-16804 1RC PRIMARY MA?

0011681 RC PRIMARY M T.6601 RC SG PRIMARY I 0016601E1 RC SG PRIMAR T.171<

IC RC-434 MMV I 001171 M 1RC RC-434 MN T-260640_SC SC-966C-S II 0012606I1 SC SC-966C-S T 2086i6-R RDC EM REVI-1 001208 1 RDC EM RE%

T-850TRI CS POS-476 0018S0711 CS POS-47 T.710 4L-1 TU TG-01.G I 0017106R1 TU TG-01i T.372.R1 CS CS-21BS 001 7T821 CS CS-211 T.4458-RCV CV LD 0017450i CVCVL T-2660 R1_MS HX-15 012660M1 MS H 1',659741 CS HX-4 001659711 CS HX.

I1-7394 41i CV CV-1 90173941 CVCV.

REVI-1 REVi-1 MVREVO.1.1

'SNCTMMVR PS REVO-1 SREVO-1 SYSNCT OPS PSREV1-1 SYSNCT OPS WAYS MM RE%

UNWAYS MM F IANWAYS EPT MANWAYS E EV0O1 VREV0-1

  • REVO-1 IC REVO-1 EM REV021 i-1

-M REVO.2-1 IEM REVO.2-1 M REV1-1 EM REV1-1

-S EM REVO-1 8-S EM REVO-SYSIVCT OPS D SYSJVCT OF 4F.101 MMV RI

(-1D AF-101 MI I EPT REV0-1 48 EPT REVO-1 12C EM REV0.1 112C EM REVt 544 1 T-7394-H WCC CV-112C I CV CV-I 12C EM REVO-1 1

24APR04 24APR04 02:00 1 02:59 a

1 L.

I I

1.L____L Run Date 22APR04 13:12l LT-03 STANDARD PUBLICATION Sheet 31 of33 C Prilmavera System, Inc.

I FL-03 Execution Publication Set I

after 22APR04 12:00 l

U1R28 WORKING SCHEDULE I l after 22APR04 12.00

  1. U ID lDRESF WO I ro DESCRIPTON RD ES EF RISK MF APR IITu Fri 23 Sat 24 r
jRw, II Wei 5451 1 T-7407-H wCC CV-1 12C I CV CV-112C EM REV1-l I

24APR04 I 24APR04 02:00 02:59 10 546 1

T-7465-R WCC CV LD

.1 CV CV LI SYSNVCT I

24APR04 24APR04 158 OPS REV1-1 03:00 03:59 547 1 T-7047-H WCC P-028A-M I CS P-28A-M EM 1

24APR04 24APR04 DR-Y ML-Y 65 REVI-1 04:00 04:59 ORT3-Y R-N 548 1 T-0686-R WCC ICP-5.69B 1 RH ICP-5.698 IC 2

24APR04 24APR04 116 REVO-1 05:00 08:59 549 1 T-8433-R WCC AF-04000-M 1 AF AF-4000 1 24APR04 24APR04 334 INDICATON EM REVO-2 08:00 08:59 550 1 T-7970-H WCC CV-257 I CV CV-257 MM 4

24APR04 24APR04 7

REVO.1.1 08:00 11:59 551 1

T-2584-R WCC FIT-00458 1 RC FIT-458 IC REVD-1 2

24APR04 24APR04 313 09:00 10:59 552 0 T-8360-H WCC W-030B 0 VNPAB W-30B-M EM 3

24APR04 24APR04 0

REV3.1-1 (IN 2004-001) 09:00 11:59 5M3 1 T-66f0R WCC HX-27 I TU HX-27 EPT REVO-1 I

24APR04 24APR04 DR-Y ML-Y 287 12:00 12:59 ORT3-Y R-N 554 1 T-6123-R WCC CV-00275 1 CV CV-275 MMV 3

24APR04 24APR04 94 REVO-1 12:00 14:59 555 0 T-B359-R WCC W-030B 0 VNPAB W-30B-M EM 3

24APR04 24APR04 0

REV2.1-1 (IN 2004-001) _

1ZW0 14:59 556 1 T-1305-R WCC CV-00313A-1 CV CV-313A-S IC I

24APR04 24APR04 0

REVO-1 13:00 13:59 557 1 T-6938-H WCC D72-21-07 1 125V IWP 00-037-06 1

24APR04 24APR04 0

EM REVO-1 15:00 15:59 558 1 T-7394-R WCC CV-112C 1 CV CV-112C EM 1 24APR04 24APR04 0

REVO-1 15:00 15:59 559 1 T-8439-H WCC RC-5260 I RC RC-526B MM 1

24APR04 24APR04 DR-N ML-N 12 REV>-1 16:00 16:59 ORT3-N R-N 560 1 T-1306-H WCC CV-00371A-I CV CV-371A-S IC 2

24APR04 24APR04 20 REV-1 16:00-17:59 561 1 T-17EU}R WCC HX-15A 1 VNCC HX-15A MMV 2

24APR04 24APR04 0

REV0-1 16:00 17:59 7T,7407441 CV CV-1 S017407U1 CVCV-

T-74654RICv CV I
001746j I1CVC T-7047.4 CSP-0017041i1 CS I T.0686.RIRHI!

0010666l!U T-8433-RI 0 lu----U 00184JY T-7970-C4 0017971 I

T-2584-0012584 T-8360+

I 001836C I

T-6e 001 T-61 001 l

T413 T-83

  • ~001

'2C EM REVI-112C EM REV' ID SYSIVCT 0 LID SYSNCT 8A-M EM REV

.-28A-M EM RE P-5.69B IC RE I RH ICP-5.691 AFAF-4000 IN I AFAF-40001 CV CV-257 MM M 1 CVC I RC FIT-458 IC Ml RCFIT-4t

)VNPAB W-30 o0ITU HX 5601 TU HX-S2l"1CV 594; NPAB 335WM 305R1CvCVC 1130591 CVC T-6930H 125' 0016934l1 1 r-73944RiCVi 001739451 C T-84394-l R(

00184341 T.130840 C1 001130U1 0011780m T-7965-1CA 0017964w I

I 562 1 T-796"H wCC CV-112C I CV CV-1I12C MMV REVO.1-1 4

24APR04 24APR04 16:00 21:59 0

Run Date 22APR04 13:121 LT-03 STANDARD PUBLICATION I

Sheet 32 of 33 0 Primavera Systems, Inc.

I FL-03 Execution Publication Set I

after 22APR04 12:00 I U1R28 WORKING SCHEDULE after 22APR04 12:00 lU ID lRESF WO EQID DESCRIPTION RD ES EF RISK MF APR ST mu3 F

2 RnIt 24 563 1 T-9895-R WCC W-001D1 1 VNCC W-1D1/1D2 EM I

24APR04 24APR04 0

T-989 REV0.1 17 00 17:59 000989 I 564 0 T-8360-R WCC W-030B 0 VNPAB W-308-M EM 3 24APR04 24APR04 a

T-8360 REV3.1-1 ON2004001) 1700 1959 001636 565 1 T-1714-R WCC LT-433 I RC LT-433 IC REVO-t 2

24APR04 24APR04 T-17144 I

I _

17:00 20:59 0011714 Run Date 22APR04 13:12

  • LT-03 STANDARD PUBLICATION l

Sheet 33 of 33 C Primavera Systems, Inc.

FL-03 Executlon Publication Set T

after 22APR04 12:00 I

WORKWEEK SCHEDULE I Ithru 24APR04 1700 U

0 0

ID CE0306041 CE0210986 RESP CEI lP T WO Y

ST P

75 A _7 EQID INTAKE CRI

, SEC DESCRIPTION

  • I RD INSPECT CRIB.

INSTALL BUOYS AND FISH SEC SUPPORT MR 99-01 1B 70 91 05APR04 10:00A 05APR04 07:00A 22 24a 30APR04 11:59 07MAY04 14:59 DR-Y ML-Y.

ORT3-Y R-N DR-N ML-N ORT3-N R-N ID 106. 47C 926 ADD EF RISK Resme I-

!.6.8 fnl4'.1IAAr EO3O604IINSPECT CRIB. INSTAI.

BUOYS AND FISH SI I

I

'I I

I

~

w6I CE6 l

I Pre-appro CE021091 ed tech spec ST - Resta AEC, tNSTALL NEW El CL not req'd UIP MR 99 01 V ll 0

CE02110989 CH03003.58 CE6 PA 76 SEC C1EM-SAMP SEC, INSTALL NEW EQUIP MR 99-011WE RCS CL TSR 3.45.2 91 20 05APR04 07MAY04 I DR-N ML-N 08:OOA.

14:59 ORT3-N R-N

>reappro ed tect spe ST. Resbt CL no re'd

~I I

I cHOj Vj CS t.L TSR 3A.5.2 I

I MI C

I CH p 18APR04 07:OOA 24APR04 11:59 DR-Y ML-Y ORT3-N R-N l

l l

l I

_ _4I FPe-appro CHO=w ad tecl) spec ST. Resta 1RCS DO TSR 3.4.5.1 CL not req'd 1

CH0300371 X

L-l l

CH 77 CHEM-SAMPL RCS DO TSR 3.4.5.1 20 18APR04 07:O0A 24APR04

.11:59 DR-Y ML-Y ORT3-N R-N E~

C m

h 4z,~

n u F

C Pr-aspprm CH0300 ted spec STl-Rest^

iRCS *ORON SR 3.9.1.

CL not reqd 4

-n

_M&oW ur l_'

I l

CH0300401 CH 77 CHEhM-SAMPI.

RCS BORON SR 3.9.1.1 20 18APR04 07:00A 24APRo4 11:59 DR-Y ML-Y ORT3-N R-N II1n~

I In I

Iier

.2 pPre-apprm CHOM4 ed tech spec ST - Restai JRCS IL TSR 3A.52.

CL not reqtd

.^_Ml;:>@

wn AS SAAA

.AA l A_

A.

2 CH10300498 CH 77 C~HEM-SAMPL -- RCS CLTSR 3.4.5.2

=

20 18APR04 07:OOA 24APR04 11:59.

DR-Y ML-Y ORT3-N R-N t-I I

MISC d

C I

- I - ---

.1-Pre-appro

H2=D5 ed tec4 spec ST-Restai RCSqO TSR 3A.5.1 CL not reqd 2

CH030051 1 CH 77 CHEM-SAMPL RCS DO TSR 3A.5.1 20 18APR04 07:OOA 24APRo4 11:59 DR-Y ML-Y ORT3-N R-N m!J R ~MISC I -

Pra-appro CHO300I ed tech spec ST - Restai 0BASYBORON TSR 3.5 4-4 4

.1-CL not reqd 1.2 0

CH0300195 CH 77 DHEM-SAMPI BAST BORON TSR 3.5.1.2 8

19APR04 07:OOA 23APR04 11:59 DR-Y MLY ORT3-N R-N

-lil pm

=

MISC CHEMISTRY SAO LING(0300195 Plre-appmo CH03003

-

.I4.t-4 4

4-4 4

.1.

ad I" spec ST - Restin sGBDFO GAMMA SCA CL not reqd

_J.

1 CH0300385 CH 77 CHEM-SAMPL SGBDFO GAMMA SCAN 8

19APR04 07:00A 23APR04 11:59 DR-Y MLY ORT3-N R-N I

4 MMIS ij-If:MI5QTRV qA~b Itrinninnitan F're-appmo

-

I-4-I--4 4

44 4

.4.

ed ted spec ST - Restai

~-2* ISOTOPIC CL not reqd 1

CH0300440 CH 77 CHEM-SAMPI RE-229 ISOTOPIC 8

19APR04 07:00A 23APR04 11:59 DR-Y ML-Y ORT3-N R-N

~MISC CHEMISeTRY SAII 1 nnnnfl0*n Pre-appro rHO3005:,

I ad tech spec ST-Restai ISGBIFO GAMMA SCA tCI not reqd

  • - ~~~~4

-MS lM~R ~~tN~lfO 7.

-r r-1.t-1

-4 4

4-4-

2 CH0300524 CH 77 CHEM-SAMPqSGBDFO GAMMA SCAN 8 19APR04 23APR04 DR-Y ML-Y 07:OOA 11:59 ORT3-N R-N

Misc 64;:ujqTRy sAmin itin n--trvn-;7A PeapprcFd ted) spec ST - Restai CL not reqd Run Date 22APR04 13:36 LT-52 WORKWEEK ACTIVITIES DURING U1R28

.Sheet I of 4 O Prera Systems, Inc.

IFL-52 Workweek Activities during U1 R28

. I

after 22APR04 12:00 WORKWEEK SCHEDULE I

thru 24APR04 1700 U

ID RESP T WO EQID DESCRIPTION Ro ES EF RISK Roes APR Y

1 ST

_I

k. 6.8 101Z,141&18,2a221 0.2,4,*6, 8.10214,lr618,2022tlo.2,4.6,8.1a12141s

.'1SSY I -

_o I-2 CH0300550 CH 77 PA-SAM RE-229 ISOTOPIC 8

19APR04 23APR04 DR-Y ML-Y V229 ISOTOPIC 07:WOA 11.59 ORT3-N R-N ISCCHEMISTRYSAM LING0300550

_.._.pp ed t spec ST - Resta CL rt req'd.

1 I

_I 2

EE0302353 EEP 77 TB-2 VIBRATION ROUTE 8

24APR04 24APR04 DR-Y Ml-Y EE030 53VIBRATION qOI DATA - TB-2 08:00-15:59 ORT-Y R-N a

030 !3 UN

-EM0304827 EM 77 P-001AIB-M INSPECTSPARERCP 0

22APR04 22APR04 NSPqCT SPARE RCP UOTOR MOTOR 12:00' 11:59 030482' 5PARq 112P-IAlB REAC TOR COOLANT PUMP MOTOR IIII 0

FG0302074 FG1 77 MANHOLE PUMP ELECTRICAL 3

22APR04 22APR04 DR-Y ML-Y 160,45 G

PUMF ELECTRICAL MHOLE SUMPS PM MANHOLE SUMPS 07:OOA 14:59 ORT3-Y R-N PqRTABIEELECICAL MANHOLE PUMP PUMPS03 2074

iA^li i

I IC0407898 IC P

76 LT-00935 LT-9341935 LEVEL 4

20APR04 22APR04 DR-Y ML-Y 330 T-934935LEVELVI AON DEVIATION 21:00A 15:59 ORT3-Y R-M B348SIACCUMULATORLEVELTANSMTTER404 898 1_

I 2

IC3.16RUN IC2 76 ICP-03.016 IOPS MONTHLY TEST 1

24APR04 24APR04 DR-N ML-Y V

321.3 IC3.16RU4O 17:00 17:59 CORT3-N R-M 030100JI' I~

l, -

1- -.

.I 0

IC0307138 ICs 77 ICP-07.030 INSPECTION OF 3

23APR04 23APR04 DR-Y ML-Y 330 IC03-0138SPiCION OF MET OROLOGICAL S METEOROLOGICAL 13:00' 15:59 ORT3-Y R-N 030713fOETEZOROLOGICA MONITORINGO 4 SITES Pre-a,proved tech Restart CL rot I *elit'll'wl:lul so F-A 11 I

v1 it' I

ll2[ d:1; A a_

8E 2

MM0213893 MM1l 77 ELECTPENE INSPECTAND 4

22APR04 22APRO4 DR-NML-N 441 M02138

_NSPECT ANDAN NO3AND ass MAINTAIN 03 AND 058 12:00 15:59 ORT3-N R-N 021383*

NIT 2

EI2ECTRI PENETRAMOOS Fr-eroed tech spec T-Restart CI nor req'd I

-1 I-PI 0

MM0201304 MM2 77 WING-EQ INSPECT FIRE 8

22APR04 23APR04 OR-N MI-N 4

M 3

NSPECT FIRE 1NGUISHERS EXTINGUISHERS 17:00-00:59 ORT3-N R-N 013 ING AND CUTT1IG EQUIPMENT I

1 11

'I 1-'

Run Date 22APRO4 13:368 LT-52 WORKWEEK ACTIVIES DURING U1R28 Sheet 2 of 4 C Primavera Systems, Inc.

I FL-52 Workweek Activities during 1U R28 I

after 22APR04 12:00 I

WORKWEEK SCHEDULE I

thru 24APR04 1700 U

ID RESP T WO EOID DESCRIPTION RD ES EF RISK Resrct APR 24 lY ST 141 1

0 MM0201361 M2 C 75 W-030A W-30A. LUBRICATE 4

23APR04 23APR04 DR-Y ML-Y MM020136 C30A.

LUBRICATE AND MAINT N FAN AND MAINTAIN FAN 05:00 10:59 ORT3-N R-H 0201361 F-231F-2 PAO EXHAUST LTER FAN 0

OP0215270 OPO 77 O-PC-093.2 INSPECT OPERATIONS 3

24APR04 24APR04 DR-N ML-N OP021i 27dNSPECT OPER STORAGE CABINETS 08:00 10:59 ORT3-N R-N 021 27CSTORAGE

_Pre-approved te 0

OP0215406 OP1I 77 04IT-0016 IT-16.QTRLY FAIL-SAFE I 23APR04 23APR04 DR-N ML-N 521.51 a6P0215401IT-1 S-ITRLY FAIL-SAFIF STROKE TEST STROKE TEST 00:00 00:59 ORT3-N R-M 0215403QTRI Y FAIL-SAFE STROKE TEST OF A R-OPERATED VLV Pre-ap roved tech spec ST - Restart CL no req d

.2 OP0216032 OPI P 77 O-TS-010AB TS-10A, U2C AIR LOCK 2

23APR04 23APR04 DR-Y ML-y OP0216032T.S_-l U2C AIR LOCKbbOOR SEALTE! T DOOR SEAL TEST 00:00 01:59 ORT3-N R-M 0216037UU2 ONTAIRLOCKIoOORSEALTES"

.Pm-ap red tech spec §T - Restart CL no reqd O OP0215355 OPI _

77 O-PC-MIDS OPERATIONS MID 49 23APR04 29APR04 DR-Y ML-Y OP 02 1535 PE TIONS MID SHIFTWEEKLY RO NE SHIFTWEEKLY 00:00-06:59 ORT3-N R-N

  • 021535 ROUTINE Pre-ap tech spec ST - Restart CL no reqd OP0215794 OPI 77 TS-RE-004 AXIAL FLUX 2

24APR04 24APR04 DR-N ML-N 3

dPo215T4AXlAL -UXDIFFEREN<E, DIFFERENCE AND 00:00' 01:59 ORT3-N R-N

' 0215794jAXIl FLUX DIFFERq

_A P E

Pre-ap roved tech spec ST 2

OP0216071 OPI P 77 TS-RE-004 AXIAL FLUX 2

24APR04 24APR04 DR-N ML-N 8P0216071 AXIAL DIFFERENCE DIFFERENCE AND 00:00-01:59 ORT3-N R-N 021607i1 FLUX DIFFERdN Pre-approved tech spec $T 1

oPo215773 OPI P 77 O-PC-023.5 CHARGING PUMP 3

24APR04 24APR04 DR-N ML-N

  • pO215773CHARt ING PUMP ROTAflC ROTATION AND 00:00-02:59 ORT3-N R-N

' 021577T CkIARGING PUMP R0 Pre-p roved tech spe T

2 OP0216050 OPI 77 O-PC-023.5 CHARGING PUMP 3

24APR04 24APR04 DR-N ML-N ldpO26OSOCHAR INC PUMP ROTAIn1 ROTATION AND 00:00' 02:59 ORT3-N R-N l

021605C ARGING PUMP qO' Pr-ap roved tech spec qT 0

OP0215433 OP2 77 O-PC-DAYS OPERATIONS DAY 17 19APR04 24APR04 DR-YMLY M

np PEFiATIONS DAY SH FT WEEKLYROIJTINE SHIFT WEEKLYV 08:OOA 14:59 ORT3-N R-N DO O

E ROUTINE m-reappro ed tecd} spec ST-Restar CLnot req'd 1

0 OP025484 OP2

-P0 77 OFO-PC-028.1 1

TESTOFFIRE.

1 23APR04 23APR04 DR-NML-N OP021 UTEST OF FIRE. EVACUATION ND EVACUATION AND 08:00 08:59 ORT3-N R-N 021 ST OF FIRE. EVACUATIO AND FISHERMIN Pr-apprvedtech spec ST - R start CL not reqd Run Date 22APR04 13:36l LT-52 WORKWEEK ACTIViTIES DURING UlR28 Sheet 3 of 4 C Primavera Systems, Inc.

I FL-52 Workweek Activities during U1R28 I

after 22APRO4 12:00 I

WORKWEEK SCHEDULE I

thru 24APR04 1700 U

ID RESPITl WO I EQID DESCRIPTON RD ES EF RISK Res APR Y ST I

D 2

OP0216112 OP2 77 O-PC-023.7 BUMP IDLE HEATER 1

24APRo4 24APR04 DR-N ML-N OP021 31 tIUMPIDLE HE DRAIN TANK PUMP 08:00-08:59 ORT3-N R-M 021 11 2BUMPING IDL

,Pre-approvedle 0

OP021 5457 OP2 S 77 O-PC-043.5 PC 43.5. SW TO AFW 2

24APR04 24APR04 OP021 s457PC 43.5, SW jO PUMP LINE FLUSH 08:00-09:59 021 s45lSERVICEW Pre-approved te 0

OP0215493 OP2 F 77 O-PC-078.2 JOCKEY PUMP AND 2

24APR04 24APR04 DR-N ML-N OP021 493JOCKEY PUMP ACCUMULATOR 08:00 09:59 ORT3-N R-N I

021 A93UFIRE MAluIF PRESSURE Preapprovo* te 0

OP0215495 OP2 P 77 O-PC-078.6 QUARTERLY NORTH 4

24APR04 24APR04 DR-N ML-N

010, OP021 S4gQUARTERLYIN SERVICE BUILDING 08:00' 11:59 ORT3-N R-N
21. 5 021 A94 6UARTEI Pre-approvedt 1

0P0215869 OP3 77 O-PC-001.2 TBI MONTHLY 21 21APR04 24APR04 DR-N ML-N

)Po21sa8 3TBt MONTHLY HEAT! GIVENTILATIONI HEATINGNENTILATION 16:OOA 22:59 ORT3-N R-N

_6.

.... appro ed tech spec ST - Resta CL not req'd O

0P0215549 OP3 77 0-PC-SWING OPS SWING SHIFT 42 21APR04 27APR04 DR ML-Y DP02155 PS SWING SHIFT WE *KLY ROUTINE WEEKLY ROUTINE 16:OOA 22 59 ORT3-N R-N re-appro ed tedc spec ST - Resta CL not reqd 0

OP0215562 OP3 i 77 O-PC-045.2 RADWASTE HEAT 3

22APR04 22APR04 DR-Y ML-Y OPO 55tADWASTE HEA TRACE AMPS LOG TRACE AMPS LOG 16:00-18:59 ORT3-N R-N 0 556-MMONTHLY RA WASTE SYSTEM HEAT TRACINC LOG Pre-appoved tech pec ST - Restart tL not reqd O

OP0215624 OP3 P 77 O-PC-043.3 CLEAN SERVICE 32 22APR04 26APR04 DR-N ML-N 52101 OP0 s624cEAN SERVICE IATER STRAINE S WATER STRAINERS 16:00' 19:59 ORT3-N R-N 0

07-Ph-approved tech pec ST - Restart CL not req'd 2

U2GNDR005 OP3 O-PC-021.3 DRAIN U2 MAIN I

22APR04 22APR04 DR-Y MLY 524 U2G DR005DRAIN U2 MAIN LECTRICAL GENERATOR PER P 21.3 ELECTRICAL:

17:00 17:59 ORT3-Y R-N GENERATOR PER PC Pre-approved ted spec ST-Restad CL not reqd

_______21.3 O

OP0215586 OP3 P 77 O-PC-083.6 VERIFY ANY OOS CONT I 23APR04 23APR04 DR-N ML-N OP021ss8 RtFY ANY 00S ONT ISOL VALVES ISOL VALVES ARE 16:00, 16:59 ORT3-N R-N 021558CONTAINMENT I OLATION VALVES Pme-approved tech pec ST - Restart Cl O

OP0215574 OP3 P 77 O-PC-009.6 MONTHLY SHIFTING 0 2

24APR04 24APR04 DR-N ML-N 52101 OC OP021557A0O0 K-3AIB SERVICE 16:00 17:59 ORT3-N R-N 02155740 2

U2GNDR006 OP3 O-PC-021.3 DRAIN U2 MAIN I

24APR04 24APR04 DR-Y ML-Y 524 I

U2GNDR00I)F ELECTRICAL 17:00 17:59 ORT3-Y R-N GENERATOR PER PC 21.3

-t Run Date 22APR0413:36l LT.52 WORKWEEKACTiVITIES DURING U1R28 I

Sheet4of4 o Primavera Systems, Inc l

FL.52 WorkcweekActivitles during U1R28 I

Run Date 22APR04 13:381 Ifirpvir A&%6,2,k#;fsr oll-le Ae-r--'2rqn"mrnf I

Sheet.I of 1 Run D.

atel r22APR0 3V Iy

381 Sh U

ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH Sun 2e ID ST RISK Descrfptlon ID 2

i121j o

.11 O.6110618 0.611214

0.

6 M

21 a O.

6

-i t",;, -^lv I:I~

1 EM-8MFP-1O 76 EM DR-Y ML-Y P-028-M P28B REMOVE OIL LINES 8

6 24APR04 24APR04

.OSTEAM GENERATOR FEED PUMP MOTOR ORT3-N R-M AND MOTOR COVERS 10:00 15:59 0312035 - 128EM 2

IC0407898 76 IC DR-Y ML-Y LT-00935.

LT-934/935 LEVEL 1

.4 20APR04 22APR04

-1T34B SI ACCUMULATOR LEVEL TRANSMITTER ORT3-Y R-M DEVIATION 21:00A 15:59 D407898 1281C Z

DH

-R.-..

,{.

I MM-84800 76 MM1 DR-Y ML-Y R-1 CLEAN REACTOR HEAD U

45 24APR04 26APR04 COREAC TOR VESSEL AND ASSEMBLY ORT3-YR-H STUDS -

10:00 14:59 0214134 - 128MM

. MM0201361 75 MM2 DR-Y ML-Y W-030A W-30A. LUBRICATE AND U

4 23APR04 23APR04 SlF-23JF-29 PAB EXHAUST FILTER FAN I ORT3-N R-H MAINTAIN FAN I

05:00 10:59 0201361 - 128EM G! U:M1A=

1

=3i S; :__-

1 MM-8485C 76 MM3 DR-Y ML-Y P-001B P-1B. REMOVE PUMP U

14 22APR04 23APR04 DOREACTOR COOLANT PUMP ORT3-Y R-M COUPLING RMP 9002.5 12:00 03:59 214119 - 128MM 1

MM-8485D 76 MM3 DR-Y ML-Y PW001B REMOVE SEAL P-1B RMP U

10 23APR04 23APR04 COREACTOR COOLANT PUMP ORT3-N R-M 9002-5 04:00 15:59 0214119 - 128MM s 1,.

-tl§,Xik -

2 OP0216032 77 OPI DR-Y ML-Y O-TS-010AB.1 TS-10A, U2CAIR LOCK 4

2 23APR04 23APR04 (lt.2 CONT AIR LOCK DOOR SEAL TEST C

ORT3-N R-M DOOR SEAL TEST 00:00 01:59 0216032 - BO5A1 NMCIWE LT.81 HUMAN ERROR RISK BARCHART CPrimaeraSystems Inc PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL