Text
3 Coninsiucd to NuclcarErecllZn
)
g{LIRIJEYfBUM gelm" - VIRZI Point Beach Nuclear Plant U1R28 OCC Interactive Turnover Meeting Agenda Wednesday April 14, 2004 Start Time:
1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)
Operations Coordinators (SOC)
Maintenance Coordinators (MOC)
Engineer/ Projects Coordinators (EOM)
Rad Protection Manager (RPM)
Site Safety Coordlnator(SSC)
Shutdown Safety Assessor(SSA)
Site Management (SSM)
General Supervisors First Une Supervisors Agenda
- 1. Safety Issue Discussion (SSC)
- 2. Radiation Protection (RPM)
- 3. Operations Coordinator Turnover (SOC)
- 4. Shutdown Safety Assessment (SSA)
- 5. Maintenance Coordinator Turnover (MOC)
- 6. Engineering Coordinator Turnover (EOM)
- 7. Major Projects Update (EOM)
- 8. Schedule Review (SOM)
- 9.
Management Expectations (SSM)
- 10. ACEMAN Assessment Results (SOM)
- 11. Shift Goals (SOM)
Items Included In Daily Package:
Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Outage Schedule Operating Unit Schedule Medium/High Risk Activities ACEMAN Worksheet Intormation in this record was deleted in accordance with tue Freedom of Inforiation Act, egnptions FQS'-24t 1
Site Communication Revised 4/12/04 Priorities:
- The Safe Operation of Unit 2
- Safely Commence Scheduled Outage Work Activities on Unit ! and Common Systems Using Unit I R28 Recovery and Restart Checklist I't Priority Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2nd Priority Focused Specialty Activities
- SG Eddy Current and Sludge Lancing
- Main Turbine and Generator Work
- Rx Vessel Head Inspection
- Hx Hydro Lance and Eddy Current rd Priority Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:
Outage Briefing Schedule - NSB Cafeteria:
Day Shift Night Shift Activity 0600- 0640 1800 - 1840 OCC Turnover **
W 0645 0725 1845 - 1925 Supervisor Communication of OCC Turnover to Work Force 0730- 0800 1930-2000 Supervisor Feedback to OCC of Turnover to Work Force
- Outage Briefing Schedule Notes:
- The following personnel are required to attend the OCC turnover meeting:
Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity for outage activities.
Attendance will be taken at the OCC turnover meeting.
It is recognized that this will result in longer durations for the outage. Since the safest place to be is on schedule, the outage schedule is being revised to include these meetings.
Very few exceptions will be made to the briefing schedule requirement. The OCC will control all exceptions.
Additional Changes:
- Just in Time Information Sharing identified in the Priority Working Schedule shall be developed and presented for the associated significant task.
- A responsible Manager will be assigned to selected work activities as directed by the OCC. These managers will monitor the job from pre-job briefing through completion or end of their shift.
These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.
2
Connitted to Nsicdar Excelicj7c S
A W
s IDU~nEY F.
_^IEREXELLEMII Ptm BERCN HIR2S Point Beach Nuclear Plant U1R28 Refueling Outage Siafet Topic for week of April.Ii-17th.. --
Theme for the week This week's theme is Housekeeping. What does housekeeping have to do with safety?
Lotsl A clean and orderly workplace is essential to avoid falls, fires and many other kinds of accidents and injuries.
Daily Safety Snippets Sunday "Outage rubble can lead to trouble" On April 21, 2001 the Point Beach declared an Unusual Event due to a small fire in the Unit I containment building during a refueling outage. The fire was in a bag of rags on the manway platform of the Alpha steam generator In Unit
- 1. The fire brigade was summoned and put out the fire within about 20 minutes.
Monday "When you clean up hazards, you scrub out accidents" Why Is good housekeeping Important? Just think about It. A clean workplace has less fire hazards, fewer safety hazards and just plain looks better. A clean workplace promotes pride in your job.
Tuesday "Improper storing can be more than annoying" What are those yellow cabinets for? Remember to properly store all flammable chemicals In fire cabinets. These should be in properly labeled containers and the storage capacity of the cabinet should never be exceeded.
Wednesday "Avoid a fatal scene; Keep your job site clean" A building contractor died when he was trapped in the burning basement of a house under construction. Another worker was using an oxyacetylene cutting torch to cut I-beams over the basement of the house. Stray sparks set fire to some sawdust and scrap wood used as packing material. The worker escaped and sounded the alarm, however the contractor Jumped into the basement, In a fatal attempt to put the fire out.
Thursday "Ashes to ashes, dust to dust; A clean workplace is a must" At the Pi a couple of years ago during a refueling outage on unit 1, welding sparks Ignited a small fire in some rags in containment. An alert fire watch was able to put out the fire Immediately but the fire was preventable with some very basic housekeeping practices.
Friday "Don't be a slob; Clean up after each job" After going through the snippets for this week makes you feel as If you have just gotten a lecture from your mother about keeping your room tidy, that's okay. Mom was rightl Housekeeping is everyone's job and working together will not only ensure a clean workspace, it will also help to ensure a safe one.
Saturday "Clean up and care will speed up repair" It is a good practice to assign one coworker as the housekeeping conscious on each job. This person is responsible not to clean up after you but to remind everybody on the job to clean up after themselves. This helps to minimize the gradual buildup of clutter as the lob progresses.
Point Beach Nuclear Plant Outage I R28 DAY Supporting Operational Excellence 10 Path Picture Meets Outaae Radiation Performance lr%-en4 MiA__#ad I
-W#
I I
LJU~3I ILJ IIL
~
.Wu This indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.
Meets:
<=75 Rem Actual Cum.
Exceeds:
<=71 Rem Dose:
23.37 Rem Uay 1U - ApnI 13 Actual = 0.424 Cumulative = 23.370 Cumulative Forecast = 35.463 Meets: <=18 Exceeds: <= 12 Actual PCE's:
5 Stu Thomas I
Personnel ContamInation Events Cummulative Dose Exposure 20 18 x16
,, 14
, 12 E 10 0
2B6 z4 2
0 I
iI
._ I I I I --
I l1
Actual
.Forecast Goal
.1i
? 60 O0 i,.
W II 0
2 4
- 6.
10 1214 16.8.0.2.2.
2 to 0 0 2
4 6
101 141 B2 222 f -Actual Goal 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34
Comnitted to Nuclear Excellnce Outage Status Report Plant:
Point Beach Unit I Day:
Wednesday Today's Date/Time:
4114/04 /
1600 Outage Duration: Day 11 of 28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases I
Significant near misses 0
Total for this outage 0
Summary: Chem Tech Received Minor Finger Laceration Radiological Dose outage to date 23.370 Projected to date 35.463 Outage Goal
- 75 R Difference
-12.093 Number of PCEs 5
Summary:
Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
Summary:
Plant Status Mode:
El Hot Standby (Mode 3)
E] Hot Shutdown (Aode 4) a Cold Shutdown (AodeJ)
Refueling Shutdown (Mode 6)
RCS:
Temperature:
98 Pressure:
Vented to Atmosphere RV Level:
68%
Time to Boil:
50 Minutes Shutdown Safety Assessment C
Reactivity:
Green Core Cooling:
Yellow Power Availability:
Green Containment:
Green Inventory:
Yellow Spent Fuel Pool Cooling:
N/A Protected Equipment:
Major Activities Completed In Last 24 Hours Critical Path *Near Critical Path Activities (Next 24 Hours)
ORT 15A Fuel Transfer System Checkout Schedule:
- Activities Required to Exit Yellow Risk Condidons
- 1) Troubleshoot & Repair Z-13 Polar Crane
- 2)
B RCP Motor Move
- 3) Reactor Vessel Head Stud Removal
- 4) Reactor Vessel Head Lift Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage
.4/20/04 Scott Manthei 4/04/04 IP2A Charging Pump Troubleshooting 4/16/04 Clay Hill 4/08/04 Incorporate Lessons Learned from I s Reduced Inventory Orange Path 4/18/04 Dave Dyzak 4/08/04 B RCP Motor Oil Sludge 4/14/04 Jim McGough 4/13/04 Z13 Polar Crane troubleshooting and oil particulate issue 4/14/04 Paul Lagasse Upcoming Ma or Milestones Scheduled Actual Scheduled Ac tal Date Time Date Time Date Time Date Time Cooldown <200° 4103104 210 4103/04 2230 Heatup >200° 4125/04 0900 Head Lift 4/0904 00 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30104 0100 Pags 1 of 1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT I
UNIT:
1 DATE:
April 14, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EOUIPMENT:
Jr Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 50 minutes RCS is at 68 % Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway I.."
PBF-1562 Revision 2 10/30/02 Pagc5 of 9
References:
NP 10.3.6 NP 10.2.1
ACEMAN INDIVIDUAL EXCELLENCE WORKSHEET P
I L
Organizational L
Excellence A
R S
I N
D I
V I
D U
A L
Accident Free Control Dose Event Free 0 Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices 0
F E
X C
E L
L E
N C
E F
l Operational Excellence Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices B
A R
R I
E R
S F
0 R
E X
C E
L L
E N
C E
14 E
X C
E L
L E
N C
E Meet Schedule Attend Training Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices Qualified Workers Job Planning & Preparations Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices I
Qualified Workers Job Planning & Preparations I Procedures & Work Instructions Verification & Validation Supervisor Oversight Worker Practices I
Date:
eime:
31
after 14APR04 12:00 after 14APR04 12:00 UI RESP S WO EqlD DESCRIPTION RD ES EF I5APR 16 IIST I
I I
I I
I4 1t0.22L 0 a. 2,.4 4
6 18.1P12.14,16118.20.221
- 0. 2-..4 1 6 I
8 I2+/-14z16 I
MM9937787 MMV 76 9937787 FD-02543A IFD-2543A -
REBUILDISTICKS &
PACK LEAK i5 05APR04 06:00A 16APR04 06:59 87WrD-5434 - REBUILDoIJMKS lE ACK LEAI II FWH 3B I
!jFIC-19P 1
NG26TFC2ND ND6 77 0301897 IST-SISI NDE FOR FAC PROG -
TURB HALL 26 FT GEN AREA 20 05APR04 07:OOA 15APR04 15:59 N'
m2TFC2NUCE FOR FAC PROC JRB I AREA EN I
S SE4 OdDARt INSERVICE[.NjPEC1ION0301891 R02140260 1
MM0214026 MMV 76 0214026 CS-00141A CS-141A. INSPECT CHECK VALVE INTERNALS. RMP 9326 20 06APR04 10:OOA 16APR04 16:59 41A, INSPECT CH E FON FAC PROC
-cI VAL' S-RMP 9326 I I II I
N ;08TFC2N
.T JRB I ALLBFTGI I
NG08TFC2ND NDE 77 0301897 IST-SISI NDE FOR FAC PROG -
TURB HALL 8 FT GEN AREA 5
07APR04 08:WOA 15APR04 12:59 REA:
INSiRVICE INSP I
I.
I SCONr lONOp01897 IA-C VERHAULh BAlFEEI I PUMP I
MM0306054 MM2 76 0306054 P-028A P-028A - OVERHAUL MAIN FEED PUMP 90 07APR04 09:OOA 22APR04 05:59 i
I I_
08TFC1 N O A E FOR FAC PROG- -1 )Rs I ALL 8 FT O1 HEAQ
-4 4-4--I-4 S---4 I
NG08TFCIND NDE 77 0301897 IST-SISI NDE FOR FAC PROG-TURB HALL 8 FT OVERHEAD 60 08APR04 00:OOA 17APR04 07:59 N
ES N4R02 T6, ISPECT AND NTAIi IVALVE.RN 138-S (c
MM0214027 MMV 76 0214027 CS-00476 CS-476. INSPECT AND MAINTAIN VALVE, RMP 9138-4 22 08APR04 11:00A 16APR04 13:59
+ -
1 I K W IHX-11 I I
MM0407389 MM2 76 0407389 P-028A 1P-28A INSPECT 3
08APR04 14APR04
._...ISPEEDINCREASER 14:OOA 14:59 gAT3891 IIIIIIIISTE)
A0211403d 2-2 3-1 IA INSPECT SPEE ENEhATOR FEE IA.jNSP I MAIN P'A All CREi MPO4 I CHE LSER 07389 K VALVE -
'9150 I
MM0214037 MMV 76 0214037 FW-00151A FD-151A-INSP /
MAINTAIN CHECK VALVE - RMP9158 20 08APR04 17:OOA 16APR04 02:59 RM 1
I 1
IP-271 HlTIT PU A021403t 3-1 ;3A, iNSPECT AN II UNT/ IN CHECK V
'E I
iP DISCHAF 1-4 t
1 4 I MM0214039 MMV 76 0214039 FD-00163A FD-163A, INSPECT AND MAINTAIN CHECK VALVE 29 08APR04 17:OOA 17APR04 01:59 I El*-
-~F-I I -
N ;25TFC1N E FOR FAC PROC -1 JRB I ALL 26 FT C 1HD M
-4 4--+-+
4-4--f 1
NG26TFC1ND NDE 77 0301897 IST-SISI NDE FOR FAC PROG -
TURB HALL 26 FT OVERHD 30 08APR04 21:OOA 16APR04 01:59
-SECO DA~ IN tEVIC INI 402i4038 3.1
-4 4-4-4 4-4-k 57A. jNSPECTAI AINT, kIN CHECK i ALIE
, INa HDT PUMP I
MM0214038 MMV 76 0214038 FD-00157A i
_I I
jP-27
- 4-t 1-4-f t
Run Date 14APR04 15:59 LT-51 PRIORITY PUBLICATION-ES Shoot I of 18 C Prdmavera Systems. Inc.
I FL-50 Priority Publication I
after 14APR04 12:00 UI2 OKN CEUEafter 14APR04 12:00 UI ID IRESI O
WO I
EQID I
DESCRIPTION IR)I Es I
EF I
6.AP1 R1 1002.14,16, i.20.221
- 0. 2.04.
.8J :2.14.16. 1 8.20.2f+/-i 0O2. 4.. 6,B+/-1Ti2,4j, 14,16, m
1 MM0303383 MMV' 76 0303383 SC-009668 SC-966B - VALVE LEAKING BY. REPAIR
- 28 09APR04 I 1:OOA 17APR04 09:59 vhMO3383qC,+G.,VALVE LEA@N4 BY, IREPAIR I- [
q
+I
.~
-1,
' I - I 901t4143 tOLANCE SC.1 B I AT:RBC
-4 4-4-44.
4 1-..1 I
MM0214143 MM2 76 0214143 SC-lB HYDROLANCE SC-lB3 CONDENSER (BOTh WATERBOXES) 42 09APRG4 I11:OOA 19APR04 13:59 XCES) i -
i m i
~
4-4-4
.4.
4-1-4.
4.
- 99491021N Pi REPLACE EXTM ONE ELLOWS (Ni 5S)I I
TG9949102N TGG 76 9949102 TG-O 1-Ti LPI-REPLACE EXTRACTION BELLOWS (NIGHTS) 78 13APR04 00:00A 23APR04 00:59 IIp~i r
i I
I I I I
aEu A600-20E 1
11_.-
- 4.
4 EF I
CE-1600-20 CE8 76 0213472 R-1 ENERGIZE AND CAL UNDERHEAD INSPECTION EQUIPMENT 26 13APR04 02:OOA 17APR04 02:59 3rzE:AND CAL Ul 133.- OVERHAUL I DOE 3INSPECTIl N I !QUI04MENT i
I i A
I I
ri LUMP33!
H i OV' k.LVE OPER 1-4-4
+
4 1
.4.
I TG030213 TGG 76 0302135 MS-02033-0 MS-2033 - OVERHAUL IH GOV VALVE OPERATOR 15 13APR04 09:OOA 15APR04 16:59 r
I I~
~T nio R e JRDIIAE LOWER L
-30470OPEl WFCRM IJPSPINDLE I
)R B 141
+
4 4-4.
4.
IRE INSPEC Fl HANtI) GOVERNOF 1
TG-30470 TGG 76 0302153 TG-01-T PERFORM HP SPINDLE ROTOR BORE INSPECTION-PT2 46 13APR04 09:0OA 18APR04 09:59
~4*
- EEE!___
I I-H~I
1 1-4 4
4-4 4-4.
4.
c9912
-Pi REPLACE EXTPJZIC ION EEELLOWS (Di ~ys II IE TG9949102D TGG 76 9949102 TG-01-T1 LPl-REPLACE EXTRACTION BELLOWS (DAYS)-PT2 77 13APR04 09:OOA 23APR04 08:59 I
I SUPPORI PR IVDE CRANE. RI(
1-1-4
- I-4 4
4-
- GE R., Al DTOOLROC UPPORT(PT2)
I TGSUPPORT TOG TG-01-T PROVIDE CRANE.
RIGGER. AND TOOLROOM SUPPORT(PT21 267 13APR04 09:OOA 29APR04 18:59 I
I I -i.'
I I
I i
1-4-4
+
4 4-4.
4.
naur33 26-.3VERHAULI HII TOP IALVE-MT 1
TGO302133 TOG 76 0302133 MS-02026 MS-2026 -OVERHAUL IH STOP VALVE-PT2 35 13APR04 112:00A 17APR04 16:59 j..i -I.
__Ep m
I+
-4 I.
I II oml?3d 27-bVERHAULI
-4 4-4--.-4 4
I 4
ITOP IALVE-PT2 a
I TGO302134 TGG 76 0302134 MS-02027 MS-2027 - OVERHAUL RH STOP VALVE-PT2 35 13APR04 12:0OA 17APRD4 16:59 i
I I
1 TG-30360 TOG 76 0302153 TG-01-T CLEAN AND INSPECT* 2 13APR04 14APR04
- 1 AND 2 BEARINGS 14:OOA 13:59 j3 36CLI WX AND0 INSPECT #1
~SURE TURBINE 0 2A: IOEPLACE WE AN 102 LID D29 153 ED DI
~ARINGS AIN LINE I
II I
I TG0407679 TOG 76 0407679 HX-022A IHX-22A: REPLACE WELDED DRAIN LINE 16 13APR04 14:00A 16APR04 07:59 4- ~ dl 1.4
+
Im4lii A~
im IIqF
- PA V¶0213779 Fb:¶45 BODY TO BO? INET LFJ
~1 1-1 9-4-4 4-.4 I...
I MM02137'79 I MMV 76 0213779 FD-00145 I II J.
C _ _ _ _ _ 1. 5 _ _ _ _
L.....
I.......
.I FRun Date 14APR04 15:591 LT-51 PRIORITY PUBLICATION-ES Sheet 2of lB 1
O Prlmavera Systems, Inc.
I FL-50 Priority PublicationI
after 14APR04 12:00 U1R28 WORKING SCHEDULE after 14APR04 12:00
-1 E I R III.
A PR I I D
RESP WO WO EQlD DESCRIPTION RD ES EF 114
.APR 16
__ ID S
T I_
I I_
I W0 214O16'18,0,22 0.2.54 16 1
851002.1.16.18,20.221 O.2.4 16 p 8 J0112,14J61 1
EP0301956 EPT 76 0301956 HX-00IA EDDY CURRENT TEST STEAM GENERATOR A 129 14APR04 00:OOA 20APR04 04:59
- Lmn46c=Ebl3nV CUIWFNT T~sT kTEIAN rG1=NFRAToR A I
-r I I 1IM;-
P _ ____
_ ~m~
l
__II__
I I-i 1
EP0301957 EPT 76 0301957 HX-OOB EDDY CURRENT TEST STEAM GENERATOR B 129 14APR04 00:OOA CURRENT TEST 20APR04 04:59
._301957EOD'
-TEAM GENERATOR 0 tI;c 1
TG-30450 TGG 76 0302153 TG-01-T PERFORM NDE OF HP 8
14APR04 14APR04 SPINDLE 02:WOA 19:59 1
MM0214093 MM2 76 0214093 HX-048 HX-048 - HYDROLANCE 5
14APR04 14APR04 CLEAN GLAND STEAM 08:OOA 16:59 Li=4~E M
-flGI PRESSURE 18-iiYDROLANC1 D STAM CONDE
)A, HYDROLANCE
'INI rui Cl CI
)LE MBINE
.EAN
- R21 EAN 0302153 SLAND STE 1093 P FEEDWA M
ER 1
MM0214079 MM2 76 0214079 HX-020A HX-20A, HYDROLANCE CLEAN LP FEEDWATER HEATER 25 14APR04 08:OOA 16APR04 16:59 HEATER
.,I-i
~
I I
4 4-S UI-l 1
TG0215004 TGG 76 0215004 HX-054B HX-54B -INSTALL NEW 4
14APR04 114APR04 EH COOLER 09:00A 15:59
_ I 04ns3A
(-5 ER B - ISTALL NEM 1O-HYDRAULIC F ICE AWNT SUPP EU UII JR COO
) COC
'-EQ
.ER LER0215004 ERIFYING I
1,
ICD400553A ICi 76 0400553 SERVICE SERVICE MAINT SUPPORT-EQ VERIFYING 58 14APR04 09:OOA 22APR04 09:59 i
_I I
I.,f I
I I
I 1 I -
-
p I -
urn S u m s -
urn i
^
I
^ i, w
w 9-app~roec
- DIVPPHsI tec Ispep ST - Reston PECT & CLEAN P CL JM not rt
'HOL q'd SE-PT2 t
CEDIVPPHSE I
.____A l
CEI 76 0400396 J1-FOREBA'v INSPECT & CLEAN PUMPHOUSE-PT2 15 14APR04 10:00A 15APR04 16:59 m.,
I -
lIi~
1 IT300BRIEF OPS PRE JOB BRIEF FOR I
14APR04 14APR04 IT-300A 12Z00' 12:59 1
T-0711.H WCC 0010711 Z-024A 1 RC Z-24A RMP-9096 I
14APR04 14APR04 MM REVO-1 12:00 12:59 1
Z13-PREJOB EM Z-013 Z-013 PREJOB BREIF I
14APR04 14APR04 FOR T/S AND REPAIR 12:00 12:59 1
T-2075-H WCC 0012075 P-029 1 AF P.29 UNCOUPLE 2
14APR04 14APR04 MM REVO-1 12:00 13:59 300BRIEFF I
i7 jj.11 RI I RC Z-2 3.PREJOE I
RE
- .z.
AXI II OB ORIEF FORr 24A MP-9096 MM IMP-4096 MM REV 3 PREJOB BREI U4COUPLE MN INCOUPLE MM RE T03 EM REVO-1 EM 1AEV0-1 00127:
1
'.3(
RE
)-I FO DA V0.1 10107 1 TIS v0.1 l _
=vl A
R AND REPAIE IFO~EBAY04003 I
I.
j_
7 6 5 4j1 Al 21 AF P*
7"444 Tt, NI1TUGC
'P.
29 RE VO-10012075 1
T-2724-H WCC 0012724 C-703 1 TU C-703 EM REVO-1 1 2 14APR04 I 14APR04 1200' 13:59
-_5 1
.i 1.J.
Run Date 14APR04 15:591 LT-51 PRIORITY PUBLICATION-ES l
Sheet 3 of 18 C Primavera Systems Inc I
FL-50 Priority Publication I
after 14APR04 12:00 l
U1R28 WORKING SCHEDULE I
after 14APR04 12:00 I
U RES WO WO EQID DESCRIPTION RD ES EF 15 16
_ST
_1002,14,16,18,20.22l 0.2. 4 6, 8,1p12.1.16.1R.9n.72l O. 2. 4 1 6 p.10112.1416l 1
T-9697-R wCC 0009697 HX-001B 1 MS HX-1 B WLU MMV REVO-1 2
14APR04 12:00 14APR04 13:59 1
IT-300ASMP CH HX-001A SAMPLE S/G HX-1A 3
14APR04 14APR04 PER IT-300A 12:00-14:59 1
T-3729-H WCC 0013729 HX-22B 1 MS HX-22B TGG 3
14APR04 14APR04 REV0-1 12:00' 14:59 1
TG-30650 TGG 76 0302153 TG-01-T REMOVE HP 3
14APR04 14APR04 HORIZONTAL JOINT 12:00 14:59 BOLT STUDS-PT2 1
T-1673-H WCC 0011673 HX-17B/19B I CS HX-17B/19B MM 4
14APR04 14APR04 REV0-1 12:00' 15:59 1
TG-30410 TGG 76 0302153 TG-01-T CLEANMNSPECT GOV 4
14APR04 14APR04 PED OIL SEAL &
12:00 15:59 ENDCOVER-PT2 1
TG-9000 TGG 76 0302150 TG-01 UNBOLT AND RMV #5 4
14APR04 14APR04 BEARING PED COVER 12:00-15:59 1
TGHX22ARP TGG 76 0302108 HX-022A MSR A INTERNALS 5
14APR04 14APR04 REPAIRS (SHELL 12:00 16:59 SIDE)PT2 1 TGHX22BVIS TGG 76 0302109 HX-022B MSR B INTERNALS 5
14APR04 14APR04 INSPECTION (SHELL 12:00 16:59 SIDE) 1 TG-30240 TGG 76 0302153 TG-01-T CLEAN I INSPECT 10 14APR04 14APR04 GOVERNOR PEDESTAL 12:00 21:59 1
TG-30615 TGG 76 0302153 TG-01-T PERIROM REPAIRS TO 10 14APR04 14APR04 CYLINDER BASED ON 12.00 21:59 INSPECTION 1
TG0205499 TGG 76 0205499 LG-03951 1LG-3951 MINOR SEAL 8
14APR04 15APR04 OIL LEAKAGE 12:00' 09:59 W7411 M 1 MSH 300ASMP-A SG I 2411 M
_1 MS I0 5 0RE
_IHIGH 1CC 1c u89Q0UNEI
_IrIuI MMi5?
=
.H V
- 3024CLv i365El I0049
- 41B VLU MMV R I WLY MMV REVO PLE &IG HX-1A Pi N FEED LINE CHE
-22B'TGG REV0-1 22B TGG REV0-1I B Ht HORIZONT)
- SSqRE TURBINE
- 17B/19B MM RE%
C.17d19B MM RE INSPECT GOV PE RESSURE TURBII ANd RMV #5 BEI E GqNERATOR (
A INTERNALS RI RRd SEPARATO t B I1"TERNALS It
`Rq SEPARATO I INSPECT GOVE ElOGH PRESSL DM REPAIRS TO
- H4GH PRESSL 951 *INOR SEAL VD 10 RI CK I
10969 r-300 VAL%
729 DINT 2153 0011 3021!
IG PE ERIC IRS(!
EHEA
_CTI(
.E.
r ES (COLD SI1IU`I IOLT STUD~ 11.
- 73 AL& ENDC(
3 D COVER SEE COMPI HELL SIDE)
TR0302108 N (SHELL SI TER0302109 DESTAL INE0302153 t BASED ON INE0302153 (AGE
)NE T;
2
'4TS)0302150 PECTION N R~iGULATOR T IN!
kNI 3
_ a m m
- a a
Tu 0 U'3 c ln c.INo.Al, LAST THE HP BU
_nz oev; rv S
LEVE L GAUGE02 I
TG-30460 TGG 76 0302153 TG-01-T DUSTBLAST THE HP BLADE RINGS 9
14APR04 15APR04 12:00 10:59 1`1 RINC w _
10HPRIFS Ill I: TtI f~RIPNFfl21!
. I Run Date 14APR04 15:59l LT-51 PRIORITY PUBLICATION-ES Sheet 4 of 18 O Primavera Systems, Inc I
FL-50 Priority Publication I
after 14APR04 12:00 U1R28 WORKING SCHEDULE after 14APR04 12:00 U I ID RESPI WOI wo EQID DESCRIPTION RD ES IEF APR
_1
__6___
10 16 1
TG-30695 TGG 76 0302153 TG-01-T CLEAN GOVERNOR PEDESTAL BASE-PT2 20 14APR04 12:00 15APR04 11:59
-,30nr6qCLW GOVERNOR PEDWS i
ul 002fn1iC N -
N4 LUbE OIL CONI bY I
TG0302119 TGG 76 0302119 Z-026 CLEAN LUBE OIL 120 14APR04 15APR04 CONDiILONER AND 12:00-11:59
__REPLACE FILTERS____
ALSE-PT2 HIGH PRE
)NER AND REPUJ E
ILUBE OIL LVES OVERHAUL
_E
.6 RE TVRBINEO3O2 FILTiRS DmIT'NER030211 I
53 i
=---
I El
ml.
I I
I*I I
I 2QZII
STO OIL REUEI¶V I
TGW302151 TGG 76 0302151 TO-al AUTOSTOP OIL RELIEF VALVES OVERHAUL 20 14APR04 12:00-15APR04 11:59 I
I I
I I x _ -
I TURRINE +/- E RATOR lGENERIt: IEE CI
'51 - tEAUGN PIP fIt DOV NSTREAM (
I TG9919338 TGG 76 9919338 PIPING EB-MS-2751 - REALIGN 14 14APR04 1 SAPR04 PIPING DOWNSTREAM 12:00 15:59 OF VALVE-PT2
- I -~
ii I
pII E
=naniari`
1A - EDDY CURRI
_-&E _
_lsv
.N1 I
ALVO-PT2 TEA4 SUPPLY TC EATER lHP FEEDV INSP :CT SA LP F TH
&T1 TUI ER HE
)MPONENT.
BINE991933 ATER 5A030 I
EP0301963 EPT 76 0301963 HX-021A HX-0Z1A - EDDY CURRENT INSPECT 5A LP FW HEATER 36 14APR04 12:00 15APR04 23:59 l 2 - I I !
n n:fn7%vi-
- H2 SIDE SEAL ILI lUMP OVERHAUL I
TG0302137 TGG 76 0302137 P.058 P-058 - H2 SIDE SEAL OIL PUMP OVERHAUL 40 14APR04 12:00-16APR04 11:59 F,
-~-
-I
- II 21U CLRWDL4 INSPEC4M
_ 4-4 4
4
+-4 4
1 TG0302155 TGG 76 0302155 TG-01-T2 LP2 TURBINE CRAWL-THROUGH INSPECTION 40 14APR04 12:00-16APR04 11:59 I. 4-I ZG s w
S I-L'2 LOW F V302140C SUNDER PIPING NIS'ECT ON I REPAII I
F I
TG0302140 TGG 76 0302140 PIPING CRO CROSSUNDER PIPING INSPECTION I REPAIRS(PT2) 60 14APR04 12:00 21APR04 11:59 Mm&.4
- "i 1
EM0407780 EM 71 0407780 Z.013 Z-013 PERFORM 8
14APR04 14APR04 TROUBLESHOOTING 13:00 20:59 AND REPAIR 1
TG-30510 TGG 76 0302153 TG-01-T CLEAN IINSPECT 4
14APR04 14APR04 INNER STEAM GLAND 14:001 17:59 CASINGS I
CESGB001SI CE4 HX-0011B BUILD SCAFFOLDING 12 14APR04 15APR04 OR S/G B HANDHOLES 14:00 01:59 1
TG-9020 TGG 76 0302150 TG-01 REMOVE THRUST 1
14APR04 14APR04 BEARING METAL T/C 15:00 15:59 SGB00IS RWP:)
-902 v 300AT AN iIC wU' PERrORM TROU ECONTAINMENT I INSPECT INNEF H PRtSSURE TUI LD SCAFFOLDINC S Li TBII SHO
,NEG EAM E03(
R SI(
4 1 MnNG AND I 0o780
&LAND CASI E153 B HANDHO TOR
EP IG IES NE
.0 UR I
NTS)P302150
-HUTbOWN)0215 l
l I
STEAM GEINEEB S6-Loop / PZR Gener
! TH4UST BEARII IE GqNERATOR (4 lHX-1A FOR IT-3(
. MAN FEED LINI I N (11, El CA
- CI 31ntei
[ETA ERIC IECK 04 I
IT-300A IOPSj 77 0215904 O-IT-0300A FILL SIG HX-IA FOR IT-300A 3 114APR04 14APR04 15:00 17:59 Run Date 14APR04 15:591 LT-51 PRIORITY PUBLICATION-ES I
Sheet 5 of 18 O Primavera Systems, Inc.
I FL-50 Priority Publication I
after 14APR04 12:00 I
U1R28 WORKING SCHEDULE
.1 after 14APR04 12:00 U I ID IRESIt WO I WO' I
EQiD D ESCRIPTON IRD1 ES I
EF
! 415 APR 1
-.ST..JJ I
[-I1 41IJ-0210, 6181M,.6 R2.21.2 6g8,01,411 I
TGHX22BLKT TGG 76 0214084 HX-022B MSR B LEAK CHECK (TUBE SIDE) 20 14APR04 15:00 16APR04 14:59 1
TG-9010 TGG 76 0302150 TG-01 UNBOLT AND REMOVE 4
14APR04 14APR04 THRUST BEARING 16:00 19:59 COVER I
NG-SCIANRV EPT 76 0301978 SC-GA SC1A - EDDY 12 14APR04 15APR04 CURRENT REVIEWI 17:00 04:59 RERUN (IAN) 1 NG-SC1ASEC EPT 76 0301978 SC-lA EDDY CURRENT 24 14APR04 15APR04 INSPECT COND (tAS) 17:00 16:59 I
IT-300AB OPS 77 0215904 O-IT-0300A PRESSURIZE S/G 2
14APR04 14APR04 HX-iA TO 100 PSIG 18:00 19:59 FOR IT-300A 1
PM-BRIEF2 ADM OCC INTERACTIVE 2
14APR04 14APR04 TURNOVER and 18:00' 19:59 FOLLOWUP 1
TG-30630 TGG 76 0302153 TG-01-T NDE HP NOZZLE 8
14APR04 15APR04 BLOCK IN-PLACE 18:00 01:59 1
TG-30511 TGG 76 0302153 TG-01-T lEANltNSPECT/REPAIF 10 14APR04 15APR04 OUTER STEAM GLAND 19:00 08:59 CASINGS 7
IC0302178A ICV 76 0302178 FD-02518A 1FD-2518A POST MTN 4
14APR04 14APR04 DIAGNOSTIC 20:00 23:59 1
O-RT-031 OPS 77 0215969 O-RT-031 LLRT N2 SUPPLY TO 4
14APR04 14APR04 PRT 20:00' 23:59 1
O-RT-035A OPS 77 0215973 O-RT-035 PRE O-RT-035, HOT 4
14APR04 14APR04 LEG SAMPLE UNE 20:00 23:59 1
IC10.1OA IC 76 0300885 ICP-10.010 A SIG INSTRUMENT 5
14APR04 1SAPR04 BLOWDOWN 20:00 00:59
- HX2~
3021 5M0¶
.-SCIANB&C I
i
.4 q
0 r ANl REMOVE 1 rUR4INE GENER, IA - EDDY CURR
,,)
l l
)STI R (GE REV EARING CO NERIC; SEE EW I RERUh rE
'(1 Apot'iENTS)
MN)
) I l
R B ICEAK CHECIO (TIOBE SIDE)
_ M..
L 03019761 C )tIMNENSEIR (DEAERJAITINC!
- -sCiASg 0301976J IT.300AE 0215909
'M-BRIEF; TG-3063C 0302152 TG-305 03021 IC03021 030Z 0ORT 021!
O-RT-C 021!
ICIO1 030C MM0301 0301 3Y CORRENT INS TCO 41D (1AS) r h _
l __
-!. P -I NI 4I)I~ENS~R (DEAERA IiI3)
PR U
Noc U1 MD~
'l I
.SSURIZE SIG HX A SGMAIN FEED
.9
'INTERACTIVE Ti HP 4OZZLE BLC
__HIGH F
LAN/ISPECTIRI
-iA J.IN 1WI CK RE PA TO I CHE OVEI IN-PL
,SUR R Ot 00 PSIG FOF CK VALVES t and FOLLC ACE E TURBINE TER STEAM IT
'C
,cc M
GL
, J Iu mPp
-I lz 1
. ba 03' 9481 35,j 97:
10/
689 14!
14!
IFDt18A POST I
_HX-22B ME LLR N2 SUPPLY NITROGEt PRE O-RT.035, HI
_HOT LEG E S S/d INSTRUMEt
_SG TRAE HX-tS5. CFC Coa inCO RI ro SI IT I 4Ti I DIAM HELL PRT PPLW EGS PLE I LOW lTTEF 5TERt INME r rr ----
-v
- NOSTIC SIDE LEVEL TO THE PZF AMPLE LINE INE (P.28A) 3OWN S - BLOWDc LAL INSP/CL NIT ACCIDEN 00Al D SIUTDOWN)
ND CASINGS RBINE NTRqL I
LIEF TANK (P-14A
.I
. FILqING AND VE ING I ECIRC HEAT EXCI cc RI UAl TF1; NITI (AM IG 3ER 1
MM0301 145 MMi 76 0301145 HX-015B5 HX-15B5 CFC COIL INTERNAL INSPICLEANING 8
14APR04 I 15APR04 20:00 03:59 Run Date 14APR04 15:59l LT-51 PRIORITY PUBLICATION-ES Shoot 6 of 18 C Primavera Systems, Inc FL-50 Priority Publication 7
after 14APR04 12:00 U1R28 WORKING SCHEDULE after 14APR04 12:00 U
ID RESP WO WO EQIDD I
DESCRIPTION RD ES IEF I
APR 12.14.16,18,20.221 0.2.4 1 6 t 81 10 12.14 1
.2.4 16 i 8.10d12.J TG 76 030F5 15~
DIASMLE1AR45P0 1
TG-9030 TGG 76 0302150 TG-01 DISASSEMBLE TURBINE THRUST BEARING 10 14APR04 20:00 15APRo4 09:59 TG4 03dDISA$SEMBLE TJR!LLE
- - - I nAn ilu ii I
MM0214064 MM1 76 0214064 HX-015B HX-15B. MOTOR 12 14APR04 15APR04 COOLING COIL 20:00 19:59 INTERNAL INSPECTION I
MM0214171 MMI 76 0214171 W-001B1 W-BI. INSPECTAND 40 14APR04 17APR04 LUBRICATE FAN 20:00 23:59 BEARINGS 1
T-8436-R WCC 0018436 Z-013 I Z Z-13 T9L REV2-1 I
14APR04 14APR04 21:00 21:59 1
EZMRCP-K1 EM 76 0215205 P-01B-M JIT INFO SHARING FOR 2 14APR04 14APR04 P-1b MOTOR LIFT 21:00 22:59 1
IC0212599 ICV 76 0212599 CC-00761A-1CC-761A-O AIR LEAK 4
14APR04 15APR04 ON DIAPHRAGM 21:00 00:59 1
IC9948487 ICV 76 9948487 FD-02513B 1FD-2513B POST 4
14APR04 15APR04 C;A REPAIR DIAGNOSTIC 21:00 00:59 1
MM-8480C3 MM1 76 0214134 R-1 REMOVE REMAINING 4
14APR04 15APR04 STUDS/I CLOSE STUD 21:00 00:59 HOLES 1
TG-30000SI CE4 76 0302153 TG-01.T BUILD SCAFFOLDING 8
14APR04 15APR04 FOR INSUL HP 21:00 04:59 TURBINE COVER 1
IC4.1A-1 IC2 76 0300822 ICP-04.001 jCP4.1AANALOGTEMP 14 14APR04 15APR04 CALIB RESTART 21:00 22:59 1
IC5.49NGT1 ICV 76 0300869 ICP-05.049 ICP 5.49 SEC CONTROL 180 14APR04 29APR04 VALVES 21:00 20:59 1
TG-30600 TGG 76 0302153 TG-01-T INSPECT HP TURBINE 4
14APR04 15APR04 EXHAUST PIPING 22.00 01:59 MM MM 021 06i H-iM K,1 iS, MOTORI LUNG iRUST BEAI IRBINE GEN COIL INTER
'INI klAJ TOR:(GENERIC: E
. INS;ECTION EE COMI -ONENTS) 021iS 06 l
-W1g1 ACCIDEN RE IRC lAN MOTOF 021 1021 17
.1.
INSPECT LUE RCATE FA B RINGS v_21 7
_I T-E 00 EZMRl 02 IC02 02 lC99 99 MM48 02 TG-3(
03 lC03 IC5.4t 03 TI EMI ZZ413 TBL RE
(¶JIT4NFO SHARI
)REACTOR C
RWP: RCP Seall 391CI;761A-O AIF IP-IA RC 71Fd-2513B POS 7_HX-21B d I
3REMOVE REMAI
_REACTO
!BULD SCAFF I
.jICP4.1AANALC I
U
- OR I ANT itenar lkK 0O HERI
'PAIF WH 5 G ST
-SSE IG FC PRE6 EMP
-1B MOTOR PUMP MOTO cee h DIAPHRAG IAL BARRIEf DIAGNOSTI
- BDUMPTO,
)DS I CLOSI
- AND ASSEI R INSUL HP
- SURE TURE
.ALUB REST r
)OLING RETURN (
IDEN$ER CONTR(
1UD HOLES tBINl COVER RATC l
30E hP.
RP/SAFEGUkROS ANPkLOG RACK I riICP.9 SECCC N[T ROLI 'ALVES I
I CII U I -
liii-I
- I -I.
bas-h
~W
'-31 30:
- 60c4SPECT HP I 153_HIGH I ER SnOBREAKER MA LMI RE NT NINEI 3SUR
'NAN DCHAUST P11 TURBINE E 1200.14
,INI 0
EM0304877 EM 76 0304877 I A52-DHVR.1 BREAKER MAINTENANCE 1200.14 24 14APR04 1SAPR04 22:00-21:59 104877 _
_pm I 4i 6KV11200 i MFVACIIUM BREAK!
Run Date 14APR04 15:59l LT-51 PRIORITY PUBLICATION-ES Sheet 7 of 18 C Primavera Systems, Inc.
I FL-50 Priority PublicationT
after 14APR04 12:00 U1R28 WORKING SCHEDULE after 14APR04 12:00 U
ID RESPO I WO EQlD DESCRIPTION RD I ES I
EF APR IST
_. __4
_2 4
._.___1 6
8 40f2 I%
1 IC4.2-1-1 IC2 76 0300959 1ICP-04.00 ICP 4.2-1 RCS FLOW TRANSMITTER CAL RESTART 16 14APR04 22:00 16APR04 01:59 IC4.6-2-1 IC2 76 0300969 1ICP-04.00 ICP-04.006-2 18 14APR04 16APR04 CONTAINMENT PRESS 22:00 03:59 XMTR CAL RESTART 1
IC0213738A IC2 76 0213738 FT-00416 1FT-416 DRY BA 26 14APR04 116APR04 BUILDUP ON XMITTER 22:00 23:59 RESTART IC0302504A IC2 76 0302504 FT-00414 I FT-414 LEAK FROM 26 14APR04 16APR04 TRANSMITTER 22:00 23:59 RESTART 1
IC0306468A IC2 76 0306468 FT-00413 1FT-413 BA BUILDUP 26 14APR04 16APR04 ON MANIFOLD 22:00 23:59 RESTART IC5.18-1 IC2 76 0300856 ICP-05.018 RSC CNTL SYS CAL 28 14APR04 17APR04 22:00' 01:59 1
IC4.4-1-1 ICZ 76 0300964 1ICP-04.00 ICP-04.004-1 RCS 22 14APR04 17APR04 PRESSURE XMTR CAL 22:00 19:59 RESTART t
IC5.6 IC2 76 0300848 ICP-05.006 TURBINE LUBE OIL 42 14APR04 19APR04 SYSTEM (ICP 5.6) 22:00-03:59 1
IC5.52-1 IC2 76 0300872 ICP-05.052 ICP 5.52 SECONDARY 150 14APR04 27APR04 TEMPERATURE INST 22:00 03:59 1
IC0302376 IC2 76 0302376 TS-02134 TS-2134 RELOCATE 150 14APR04 29APR04 SWITCH 22:00 03:59 1
EZMRCP-K2 EM 76 0215205 P-001B-M P-AB PRE-JOB BRIEF 2
14APR04 15APR04 FOR MOTOR MOVE 23:00 00:59 1
CE937787SI CE4 76 9937787 FD-02543A MODIFY EXISTING 5
14APR04 15APR04 SCAFFOLDING FOR 23:00' 07:59 1FD-2543A IC IC
.34 ILI.
d-s I IREAC T
COd P-04.006-2 CON 'AIN ENT PRESS FR CAL RESTAR1
,1.11CP 4.2-1 RCSFL()WT4ANSMITTERCAP LRE$TART ANT FLOW'
. 30 96 CO If-NME IT PRESSU 1
t 1FT-416 DRY A IL P ON XMr F RESTART
- 3 I
Iul P (21 74_*__
___e i02 4AT-414LEAK FRM TANSMITTE R STAt U30P5__'
5 D 06 68A1 T413 EAEI lUp CI N MANIFOL. I STR S
5.1 RPCCNTLSY C8L l
14.1.1IdP-04.004-1 FCSPREISURE XMT CA REiTART ljG (30 9
i(l I 5.6TURBINE LUB 0 L SYiM (CP S.
I3 (84 215.52SE CN RY MPERATU IST 30j al 30 76Ti-2134REL OH CE AR 02 93A
- P.KR-!B PRE-JC I520O REACTO l WP: RCP S TaT7SL~ODIFY EXI!
51 lal mTi IRIEF pOLA Aafnti IG SC FOR MOTOF NT PUMP M(
7nance AFFOLDING IBLPFWH31 NGL UNE 9T SAMPLIN Ml 1TC FO DI0 3L qah?7R
.A
._1a I1 O-RT-043 OPS 77 0215979 O-RT-043 ILLRTCONTSAMPLINGI 4 1 15APR04 15APR04 0c4RT40:3MLLRT CON 2159_CO 7M r~s, kMPL INME WYE R
1 I F-2543A IAIN TO HX-17B C NE (F-31B1) 5NI 'ROLI LINE 00:00 03:59 Run Date 14APR04 15:59l LT-51 PRIORITY PUBLICATION-ES Shet 8 of 18
, Primavera Systems. Inc.
I FL-50 Priority Publication I
after 14APR04 12:00 U1R28 WORKING SCHEDULE I
after 14APR04 12:00 U
1 RESI WO WO EQID DESCRIPTION RD ES EF APR ST 1002.14.116118.20.22 0.2.4 16 1 8.10112 14 16.11820.2210. 2 14 1 6 p 8 -10112.14 16:
1 IT-300A1 OPS 77 0215904 O-IT40300A RAISE SIG A PRESS TO 500 PSIG IAW IT-300A 1
15APR04 01:00 15APR04 01:59 1
MM-8480RA MMI 76 0214134 R-1 JIT INFO SHARING, I
15APR04 15APR04 CAVITY SEAL RING &
01:00-01:59 TOP HAT I
EZMRCP-K EM 76 0215205 P-0011B-M PI B MOVE MOTOR 6
15APR04 1SAPR04 FROM PUMP TO STAND 01:00-06:59 1
MM-8480RB MM1 76 0214134 R-I IPTE BRIEF. INSTALL I
15APR04 15APR04 CAVITY SEAL RING &
02:00 02:59 TOP HAT I
IT-300A2 OPS 77 0215904 O-IT-0300A SEAT LEAKAGE TEST 3
1SAPR04 15APR04 OF CS-466AA &
02:00 04:59 CS-466BB 1
TG-30620 TGG 76 0302153 TG-01-T FINAL CLEAN NOZZLE 15 15APR04 15APR04 BLOCK IN-PLACE 02:00 20:59 1
MM0301148 MM1 76 0301148 HX-015B8 HX-15B8.CFCCOIL 8
15APR04 15APR04 INTERNAL 04:00 23:59 INSP/CLEANING 1
IT300ABR OPS HX-001B PRE JOB BRIEF FOR 1
15APR04 15APR04 IT-300B 05:00 05:59 1
TG30000TR CE4 76 0302153 TG-01-T REMOVE ASBESTOS 8
1SAPR04 15APR04 INSULATION FROM HP 05:00 12:59 TURBINE COVER 1
AM-BRIEF3 ADM OCC INTERACTIVE 2
1SAPR04 1SAPR04 TURNOVER and 06:00-07:59 FOLLOWUP 1
IT-300BSMP CH O-IT-0300A SAMPLE SIG HX-1B 3
15APR04 15APR04 PER IT-300B 06:00-08:59 1
MM-8480R1 MM1 76 0214134 R-1 INSTALL CAVITY SEAL 4
15APR04 15APR04 RING 07:00 10:59 MI ml IT.3dOAjRAISE S 021 q904IA SG f
-8480RA,11r INFO 0214134REAC1 021520 RWP: R AM-8480RBIPTE B 0214134REA(
rr0ooA2SEAT OZ1590_
TG.a0620FINAL 0302153 MM0301148HX 030114E*
IT300ABT I
TG-30000TFf 0302153I AM-BRIER IT-300BSMI MM-8480 02141
- TGHX22B 0302' AIP SH, E lk JR
- LE PRE!
FEEl kRINC VESE
'OTOI
_ACT 3al Mi
. IN!
- VE!
(AGE MAIN ANN bS TO 500 PI p LINE CHEC
- , CAVITYSi EL AND ASS t FROM PUP&
pR COOLAN intenance TALL CAVI1 SEL AND AS TEST OF Cc FEED LINE 1
)ZZI BLOC IG 4V
'Hi KLI IAW Iq-300A pLVEp (COLD SHI RINd & TOP HAT 3LY I
0 STAND IMP MOTOR EAL I UNG & TOP I ABLY' SAA & CS-466BB CK VALVES (COLI 4-PLACE Tb
[Al OWN IUTO 1
YS pWN)
WFURFA"HICil-I PRESSURkil l
JRBI4E 15E I
8, CFh COIL INTEkN L IN4P/CLEANIN4 I
I
-- Mm~
P I CONTAINI E~ & ACdIDENT RECIh lOB EIRIEF FOR r-301 3'Al 11
- II 4-WE It INTI WPLE HAS STAI SRB SBESTOS II MHIGH PR
£RACTIVE TI SIG HX-1B P 3 MAIN FEE[
L CAVITY St REACTOR Vi INTERNALS RSu IRIS ER LI AL q1E]
_ATIC~N FROM HP LURE TURBINE I
OVEA and FOLLO IT-300B 4E CHECK VALVEI RINO EL AVD ASSEMBL
-AIRS (SHELL SIDl TURd SEPARATO
~I Y IC WBINEI COVER OLD PHUTDOWN) 1 TGHX22BRP TGG 76 0302109 HX-022B MSR B INTERNALS REPAIRS (SHELL SIDE) 10 15APR04 15APR4 07:00 16:59 rER
-p
~Moll EHEA Run Date 14APR04 15:591 LT-51 PRIORITY PUBLICATION-ES Sheot 9 of 18 a Primavera Systems. Inc I
FL-50 Priority Publication i
after 14APR04 12:00 l
U1R28 WORKING SCHEDULE I
after 14APRO4 12:00 U
ID RESP WO WO EQID DESCRIPTION RD ES EF 15 16 ST I
l12l4.1118,20.22 0.,2.4 6.8.l2_.I lS.18n_22_.
- 2. 4 6 28.l 4
1 16 4
I i
I RPID-005 OPS O-RP-0tID ESTABLISH RP 1D INITIAL CONDMONS 4
1SAPR04 08:00 15APR04 11:59 1
CE937787TR CE4 76 9937787 FD-02543A REMOVE INSULATION 5
15APR04 15APR04 FOR 1FD-2543A 08:00 12:59 1
CE0301623 CE5 76 0301623 FD-00208A 1FD-208A - REPLACE 24 15APR04 16APR04 VALVE 08:00 11:59 1
CE0305003 CE5 76 0305003 FD-00210A FD-21OA - STEAM LEAK. 24 15APRW4 16APR04 REPLACE VALVE 08:00 11:59 1
MM0305397 MMI 76 0305397 W-001C1 W-1CI REPLACE 36 15APR04 18APR04 SPRING ISOLATORS 08:00' 07:59 1
MM0214099 MM2 76 0214099 HX-056A HX05A - OPEN SGFP 2
15APR04 15APR04 OIL COOLER 09:00 10:59 1
TG-30580 TGG 76 0302153 TG-01-T MEASURE HP OUTER 2
15APR04 15APR04 STM GLD CLEARANCES 09:00 10:59 1
RPSH078-1 RP1 PACKAGE 78 INSTALL SHIELDING ON 3 15APR04 15APR04 REGEN FOR CV-296 09:00 11:59 1
IC5.73A-1 ICI 76 0300878 ICP-05.073 ICP-5.73 T-34A 5
15APR04 15APR04 ACCUMULATOR LEVEL 09:00 13:59 XMTR'S RESTART 0
AP0303705 APS 77 0303705 SWYD CTL B SWITCHYARD 6
15APR04 15APR04 EOUIPMENT 09:00-14:59 INSPECTION 1
IT-3W0B OPS 77 0215905 O-IT-0300B FILL B StG TO MSIV 6
15APR04 15APR04 AND PRESSURIZE TO 09:00 14:59 100 PSIG 1
EM0215183A EMV 76 0215183 SI-00860A-SI-860A-O MOV 10 15APR04 15APR04 ACTUATOR 09:00.
18:59 HECK-OUT (RESTART RP1D CE9377E 993',
CE030' 600
- 7ir, 6~z BUSH RP 1 RIEMOVE INSULA
=
HX-19B I 1 FD. 08A - REPU 1N 10 PF
'CE fIALPONDITION!
I FOD I FD-2543A VH 3b DRAIN TO VALVE 3NTROL 7B C CE MM 030 62 I
^ _
HX-21A HP E030 00 FD-2 OA - STEAM K, gEPLACE VAI 030 0 HX-2AHP I 0
39 RI ao0 039 N C EPAEP NO ISOLATORS MM02 02 TGO 03 RPSI lC5S 03 AP03 03 IT 02 EM021 MM02 140 140 105
)21 107 108 133
)gHX.
30ME I-INS
.1ICF RV" 355wl 156A - OPE1 3-28A SGFP SURE HPO HIGH PRES'
'ALL SHIEU I
5.73 T-34A ACCUI 1: Containme 1CHYARD E SC Cill
!U IIN UL
!t
(
~U FP OIL COOLER COOLER R STM GLD CLEP TUqBINE ON REGEN FOR IMULATOR LEVE fTOR, LEVEL TRAI Bnera[ Area Malnte 3MENT INSPECTI,
'ARD:CONTROL E AND'PRESSURIZ N FEED UNE CHI UAT(R CHECK-C 14A ;ONT SPRA)
- E CiEAN CONDE ICES 296 ITR'S ITTEF
- e
X scwn rq
.30 159 Els BFIL a
As -_
B SIG TO h I
SCH REDUt DOLER 2 5' mMIIP 140 IgHX-A4. HYDROL 1
MM0214089 I MM2 76 0214089 HX-024 HX-24. HYDROLANCE CLEAN CONDENSATE COOLER 1o 15APR04 16APR04 09.00, 08:59 02A40 ICOCDENSATE Run Date 14APR04 15:59l LT-51 PRIORITY PUBLICATION-ES Sheet 10 of 18 0 Prlmavera Systems. Inc.
I FL-50 Priority Publication I
after 14APR04 12:00 I
U1R28 WORKING SCHEDULE I
after 14APR04 12:00 U
ID IRESPI WOI WO EQID I
F I14 APR 1
ST I__6
__ __02,14,16,18,202 0_.2 2.4L16 8 12014 1 51A IC1I I
1C4.IJ IdI 76 0300831 ICP-04.001 PZR LVL AND FIRST STAGE PRESS CAL 16 1SAPR04 09:00-16APR04 12:59 1
tC5.19-1 ICI 76 0300857 ICP-05.019 COND STEAM DUMP 32 15APR04 17APRo4 CNTL SYS CAL 09:00 16:59 RESTART 1
IC5.47-1 ICI 76 0300867 ICP-05.047 SECONDARY LEVEL 178 15APR04 02MAY04 CONTROLLERS AND 09:00 06:59 SWIT 1
IC5.49DAY1 ICV 76 0300869 ICP-05.049 ICP 5.49 SEC CONTROL 180 15APR04 02MAY04 VALVES 09:00 08:59 I
CAMP-113A CH HX-001A CAMP-113 SAMPLE A 3
15APR04 15APR04 STEAM GENERATOR 10:00 12:59 (NO SPARGE) 1 EM0301758 EM 76 0301758 P-037D-M IP-037D-M PERFORM 3
15APR04 1SAPR04 MCE TESTING 10:00 12:59 IC425N36-1 ICS 76 0300838 ICP-04.025 ICP 425 NI IR N-36 CAL 4 15APR04 15APR04 to 10:00 13:59 I
TG-9040 TGG 76 0302150 TG-01 INSPECTTURBINE 6
15APR04 15APR04 THRUST BEARING 10:00 15:59 1
TG0303396 TGG 76 0303396 LO-00035 LO-35 VALVE STEM 8
15APR04 16APR04 BENT.
10:00 07:59 EM0301792 EM 76 0301792 A52-DHVR.3 BREAKER 24 15APR04 16APR04 MAINTENANCE 3000-01 10:00 09:59 (A52-01) 1 IC5.54-1 IC5 76 0300874 ICP.05.054 ICP 5.54 SECONDARY 71 15APR04 22APR04 LOW RANGE 10:00 08:59 PRESSURE RESTART 1
IC9944161 ICS 76 9944161 DPS-05933 IDPS-5933 INSTALL 71 15APR04 22APR04 SNUBBERS 10:00 08:59 II I
I I
II I
III I
I II i
I I
I II I
IC Ib4.iJjPZI LVL AND FlZST STAPE PRESS Ckl 0'
08 FE m RPJSA IC.1; -1COD STEAM D CNI SYS CAL IE AR 03 OE8 tW
-T IC.4I 1SE ONDARY LE VE, CONTROLLERS (N.
03 08r,
=,*
5A. DA HjCP49 SEC CC OLALVES 03 08 CA P I 3 A tP113 SA lPl E A STEAM GENE OR( O SPARG EM 30 7581 -037DM P RM VMCE TESTINI 30 75 DC EME 'GE NCY LUBE OILPU P MOT R IC4 5N amlP S4I25 Nl 1R 3 CAl.
30 83 NCLE SR NSTUMENTATC N Y M INTERMEDI G. 0401 SPECTTUR I THRUST BEARI G 30 15 BDI E GdNERATOR ( EI ERIC SEE COMP(
TG 30 390-
-35 VALVE BE4T.
30 19 Z
'-26 0 CONDT(
EM 13 792B AKER MA CE 3000-01 ( 5 1) 37 I
8 AKVI30 5 ;4P
.54 SEC ND RY tOW RANGE PR SSU E RESTAM (30(8_
1_
IC 94¶1611 PS-5933 I N
TA SNUBBERS 194 6161 M
02 I.so t4134 1
MM-M48OR2 MMI 76 1 0214134 R-1 CHECK SANDBOX &
TOP HAT COVER BOLT TOROUE 1
15APR04 115APR04 CHECK SAN IREACTOR I
)X & TOP HAT CO SSEL AND ASSEMI 41 BOL 11:00 11:59 riTORQUE Run Date 14APR04 15:591 LT.51 PRIORITY PUBLICATION-ES I
Sheet 11 of 18 C Primavera Systems. Inc.
I FL-50 Priority Publication I
I after 14APR04 12:00 l
U1R28 WORKING SCHEDULE I
after 14APR04 12:00 U
RESP WO WO EQID DESCRIPTION RD ES EF 14 15 16
_ST_0112,14.16,18,20.2210.2. 4, 6, 8 l2.l46.1820.221 0.2.4,68E.10112.14.16l 1
TG-30540 TGG 76 0302153 TG-01-T CLEAN / INSPECT HP BLE RINGS 10 I 15APR04 15APR04 11:00 1 20:59 1
TG-30590 TGG 76 0302153 TG-01-T BLUE CHECK LOWER 16 15APR04 16APR04 HALF OUTER STEAM 11:00 02:59 GLAND CASINGS 1
RP1D-010 OPS O-RP-001D FILL LOWER CAVITY 5
15APR04 15APR04 PER RP-1D 12:00 16:59 1
TG0302116A TGG 76 0302116 T-036 T-036 - CLEAN LUBE 20 15APR04 16APRW4 OIL RESERVOIR 12:00 11:59 1
EM0305450 EM 76 0305450 C-703 C-703 CLEAN AND 5
15APR04 15APR04 INSPECT P-037D 14:00 18:59 CONTROL PANEL 1
01100-40 OPS T-034A DRAIN SI 12 15APR04 16APR04 ACCUMULATOR T-34A 14:00 01:59 1
IC4.26N41 IC1 76 0300839 ICP-04.026 ICP 4.26 NIS PR 19 15APR04 17APR04 CAUBRATION 14:00 08:59 1
IC10.10B IC 76 0300885 ICP-10.010 B S/G INSTRUMENT 5
15APR04 15APR04 BLOWDOWN 15:00 19:59 1
TG-9050 TGG 76 0302150 TG-01 VISUALLY INSPECT 1
15APR04 1SAPR04 THRUST BEARING 16:00 16:59 COMPONENTS 1
RP1A-052 OPS O-RP-001A SET CLOSURE FOR 3
15APR04 15APR04 REACTOR HEAD LIFT 17:00 19:59 1
TG-9070 TGG 76 0302150 TG-01 CLEAN THRUST 4
15APR04 15APR04 BEARING 17:00 20:59 COMPONENTS 1
TG0302135B TGG 76 0302135 MS-02033-O MS-2033 - REINSTALL 8
15APR04 16APR04 LH GOV VALVE 17:00 00:59 OPERATOR I
II I
I I
II I
rG-03 rex.
3054C 12153 059o
- LEAN I INS 3LUE CHEC
'EL I-C
- T HPBLADE RIN(
RHIqH PRESSUR WER HALF OUTEI JRBII EAM E
- LAND CASI 030 215
HIGGH E SSIRE TURBINE R 10D-0 OFILL LOW R AVITY PER RP-1.
~F LL _OWER CAVITY & EtIFY IRAIN FLAN E 30 0211 AT036 -CLI LUBt OIL RESE R
3021 U
RBINE E
03' Oil IC41J 1545070 1545~
D0-40RAIN 6N41LCP 4.2 LEiIIp 31)
NI
~N AND INSPECT F 37D 6c EMERGEI CCURULATOR TA i WRCAILBRATI M.d rD CC LO F NTROL PAN LMP START l -
i~~hnoi I 10.1 oBI SIC 30088in 030215tIT RPiA-052S TG.9070 030215(
30302135EP 03021351 KRE.
S-21 TRUMENT BLOM SG ThANSMITT`E LY IN$PECT THRI INE 9ENERATOR LOSbRE FOR RE PREP.ARATION F(
N TIRUST BEARI lTURBINE GENE
- 33. -EINSTALL L 3-ST,
VN BLO%
3EAF NERI OR -
'EFUI tOMI OR (C W V)
/DOWN. FILU NG COMPOf
-; SEE COMI EAD UFT LING IONENTS tENERIC; SE lLVE OPERA' ER LEFT HAI I RERUN (1I I
NI
._ _....P1...J aL
_un sl loltlmn e nzxa ItilNtl LUWI
._E.
T'j. VIEW I
N3G-SCASRV I EPT 76 0301978 SC-lA SC-lA - EDDY CURRENT REVIEW I RERUN (1AS) 12 15APR04 16APR04 17:00 t04:59 030197EI iINUIC I: ENSj R (DEAERA l
Run Date 14APRO4 15:591 LT-51 PRIORITY PUBLICATION-ES Sheet 12 of 18 O Primavera Systems, Inc I
FL-50 PrIority Publication T
after 14APR04 12:00 I
U1R28 WORKING SCHEDULE after 14APR04 12:00 U
ID RESP WO WO EQID DESCRIPTION RD ES EF AP 16 I
_0
___ T_012.14.16,18.20.221
- 0. 2.4
- 6 p8. 10 I12.14,16,18,20,22i 0.,2.441 6 @ 8.01.14.161 1
PM-BRIEF3 ADM OCC INTERACTIVE TURNOVER and FOLLOWUP 2
15APR04 18:00-15APRW4 19:59 1
MM-8480D3 MM1 76 0214134 R-1 JIT INFO SHARING 2
15APR04 15APRo4 PRIOR TO HEAD LIFT 19:00 20:59 1
CAVFILWIT OPS 77 0215926 O0IT-0760 JIT INFO SHARING FOR 1
15APR04 15APR04 CAVITY FILL & IT-760 20:00 20:59 1
IT-300B1 OPS 77 0215905 O-IT-0300B RAISE B S/G TO 500 2
15APR04 15APR04 PSIG IAW IT-300B 20:00 21:59 1
0123A-10 OPS01-23A INSTALL PORTABLE 3
15APR04 15APR04 CAVITY FILTER UNIT 20:00 22:59 (TRI-NUKE)
I 0123A-15 EM 01-23A PHASE CHECK AND 3
15APR04 15APR04 START TRI NUKE 20:00 22:59 FILTRATION UNIT IT760-BRF OPS 77 0215926 O-IT-0760 BRIEF PRIOR TO HH SI T 15APR04 15APR04 CHECK FULL FLOW 21:00 21:59 TEST PREPS 1
MM-8480D MM1 76 0214134 R-1 IPTE BRIEF FOR HEAD 2
15APR04 15APR04 LIFT 21:00 22:59 1
TG-9090 TGG 76 0302150 TG-01 NDE THRUST BEARING 4
15APR04 16APR04 SHOES 21:00 00:59 1
EM0407743 EMV 05 0407743 AF-04000-O IAF-4000-0 RHEOSTAT 6
15APR04 16APR04 BROKEN 21:00' 02:59 1
TG-30540R TGG 76 0302153 TG-01-T PERFORM REPAIRS TO 20 15APR04 16APR04 HP BLADE RINGS 21:00 20:59 I
TG-30625 TGG 76 0302153 TG-01-T OBTAIN TIGHT-WIRE 20 15APR04 16APR04 MEASUREMENTS OF 21:00 20:59 HP CYLINDER PM-BRIEF' MM-84801 02141:
CAVFIL 021!
IT-30 021!
0123 0121
- 1176, 02 MM-02 TG.
03 EM04 04 TG-31 TG-EA INTIRACTIVE TIU TINFb SHARING I lRECTOR VESE JlT INFO SHARING ELINIT 1 HIGH HE RAISt B SIG TO 5
- B:SG MAIN FE NSTALL PORTABI
_INSTALWCO PHASE CHECK ANl INSTALUCO tFBRIEF PRIOR TC 2LI4LrIT 1 HIGH 1-IDIPTE BRIEF FO0 I1REACTOR V RNDt THRUST BE SIPTR13INEt 01Al-4000O0 RHE 13_i1P-2~
pPERFORM REPA PVER 3R TC AND )
'SIG I LINE I
'AVrr
.CT C, TrARTl tCT Cq
)SICp
{EL Atl
!NENI TrAT i 1P DISR 2O and FOLLOV HEAD UFT SSEMBLY fITY FILL I'
ECK VALVE,
%W IT-300B
'HECK VAL\\
FILTER UN PVITY FILTE TRI NUlKE Fl pVITY FILTE ECK FULL F riECK VALVE
- T ID ASSEMBL HOES TOR (GENE ROKEN
,HARGE 1H
'BLADE RIN, 06 Z5OBfAIN TIGHT 4 # i
~UEENT{
21 I3 EMN-l-I EM-8480D I EM 76 0214134 R-1 DISCONNECT PATCH CABLES FOR DEDICATED TtCS I
15APR04 15APR04 22:00 22:59 21' B0DDISCONNECT E I34IREACTOR VI
'Al CH C EL Al
,BLES FOR I D ASSEMBI Run Date 14APR04 15:59l LT-51 PRIORITY PUBLICATION-ES Sheet 13 of 18 O Primavera Systems, Inc.
I FL-50 Priority Publication T
after 14APR04 12:00 U1R28 WORKING SCHEDULE I
after 14APR04 12:00 U
ID RESP WO WO I
_A...A
&_ST l.,,l4 A_.l_
l.2_A._.___.._.___.0112*.16 8 20*221 0.2
.4 l6 e8
.10112 *1 4*16.l1 8.l20.221 0ol2.4, 416 18.l10112.*4.1l6l I
MM-4851B1 MMJ 76 0214119 P-001B PLACE BACKSEAT COLLECTION SYS IN SERVICE (8 FT.)
1 15APR04 22:00 15APR04 22:59 1
NRC-CALL-7 ADM MILESTONE OD. CALL NRC TO I
15APR04 15APR04 WITNESS REACTOR 22:00 22:59 HEAD LIFT I
IT-30082 OPS 77 0215905 O-IT-03000 CS-476AA & CS-476-88 3
15APR04 16APR04 SEAT LEAKAGE TEST 22:00 00:59 1
IT-760-A OPS 77 0215926 O-IT-0760 HIGH HEAD SI CHECK 6
15APR04 16APR04 FULL FLOW TEST 22:00 03:59 PREPS 1
T-3426-H WCC 0013426 P-001B 1 RC P-1B RMP 2
15APR04 16APR04 9002-8119 MM REVO-1 23:00 00:59 1
MM-8480D1 MM1 76 0214134 R-1 MOVE REACTOR 4
15APR04 16APR04 VESSEL HEAD TO 23:00 02:59 RHLDA IC4.1C IC2 76 0300824 ICP.04.001 ICP4.ICDELTATSPI 47 15APR04 19APR04 CALIB 23:00 21:59 1
MM0301146 MMI 76 0301146 HX-015B6 HX-015B6-CFCCOIL 8
16APR04 16APR04 INTERNAL 00:00 19:59 INSP/CLEANING 1
EP0301963A EPT 76 0301963 HX-021A HX-021A - EDDY 24 16APR04 16APR04 CURRENT 00:00-23:59 REVIEWIRERUN 1
HEADLIFT PPG MILESTONE REACTOR VESSEL 0
16APR04 HEAD LIFT 01:00 1
RP4A-030 EM O-RP-004A CLEAR WALKWAY FOR 2
16APR04 16APR04 MANIPULATOR 01:00 02:59 I
CAMP-113B CH HX-0018 CAMP-113 SAMPLE B 3
16APR04 16APR04 STEAM GENERATOR 01:00 03:59 (NO SPARGE)
I MM NRC M
E SBjEwACE BACKE 119 REACTOR C
£.701D. CALL NR N
OB2CS47S6M & C 90_B SG M
- IAHIGH HEAD SI 92_UN 1264 RC P-1B RI 13426U1 RC P-1 8OD MOVE REAC 141 34REAI RWP
- Reactc
-4.1cCP4.1C DE r COt ANT 6-..
EED
- CK F HIGIH 002-!
APP9(
VES:
R VEl ad U TSP LECTION SY UMP IESS REACT 1 SEAT LEAK C INE CHECK ULL FLOWT HEAD SI CH 19 MM REVt 1 02-8/19 MM I
'EL HEAD T I SEL AND A! S CAUB
__n nnR7AMEMOM MI HE Cj Il 301146HX OISB8 - CF coI INTERNALI
- 011 1-0196i XO021A -
RENT REVI 3019 ADUFT REACTO
- OSAFET P4A'O3ICLEAR V MP-J13BCAMP-11 tP1A06F11L CA%
I F
4AL (IV~
L1, ESSE
)NIT MWA)
MPiL FOR I IPPEI L HEAD UFT pR PLANT O FOR MANIPI FBSTEAMG tOD UNLAT t CAVIlY FC I
RP1A-060 IOPS I O-RP-001A FILL CAVITY FOR ROD UNLATCH 4
16APR04 16APR04 01:00 04:59 1'
I_
Run Date 14APR04 I5:591 LT-51 PRIORITY PUBLICATION-ES Sheet 14 of 18 O Primavera Systems. Inc.
l FL-50 Priority Publication I
after 14APR04 12:00 U1R28 WORKING SCHEDULE after 14APR04 12:00 U
RESI WO WO EQID DESCRIPTION RD I
_O WO 0._2; I
ST__
__ti I
- 1. 6 8,102,4,1818,2,220, 2 4 6 8,PLETE4L16 1
01124-10 OPS HX-001A DRAIN A SIG COMPLETELY 12 16APR04 01:00 16APR04 12:59 1
TGRF-230 TGG 76 0215878 O-RF-230 EH FILTER 8
16APR04 16APR04 CHANGEOUT AND 01:00 12.59 MAGNETIC 1
TG-9100 TGG 76 0302150 TG-01 ASSEMBLE TURBINE 20 16APR04 19APR04 THRUST BEARING 01:00 00:59 1
EM0303679A EMV 76 0303679 AF-04000 1AF-4000 IND. NOT 2
16APR04 16APR04 WORKING CORRECTLY 03:00 04:59 (RE-START) 1 0156-020 OPS 01-56 FILL TRANSFER CANAL 16 16APR04 16APR04 03:00 18:59 1
IT-760-B OPS 77 0215926 OIT-0760 HIGH HEAD Si CHECK 4
16APR04 16APR04 FULL FLOW TEST 04:00 07:59 CE-1600-05 CE4 76 0213472 R-1 BUILD SCAFFOLDING 12 16APR04 16APR04 TO SUPPORT t600 04:00 15:59 INSPECTION 1
01124-20 OPS HX-W01B DRAIN B SIG 12 16APR04 16APR04 COMPLETELY 04:00 15:59 I
MM-8485K MM3 76 0214119 P-001B P-1 B. ALIGN SEAL I
16APR04 16APR04 COLLECTION TO 05:00 05:59 CAVITY RMP9002-8 1
0123A-20 OPS01-23A INMATE CAVITY I
16APR04 16APR04 PURIFICATION 05.00 05:59 1
T-8433-R WCC 0018433 AF-04000-M 1 AF AF4000 1
16APR04 16APR04 INDICATION EM REVO-2 05:00 05:59 I
IC5.7.1 ICS 76 0300849 ICP-05.007 ICP 5.7 EM CNTL CAL 112 16APR04 26APR04 THRU STEP 4.49.11 05:00 08:59 RESTART I.
ILECROI 0112810ODRAIN Al I
_~
-GR~tE FILT 0214 TG.4100ASSEMB 030215clj EM03036T9 IAF4 0303 0156-020FILU IT-760.BHIG 021592w OE4600.0sUI 0213474U
'01124.20DRiU
,MM48485K4 0214119U 0123A.20t, I
I T41433-Ril 001 8433U IC5.7-11C l _ _ _ l t
N-1 1 11 1 1 1 1 PLETELY A
EOUT AND &
EH FIL1 B
THRUST 1
.MM 1-2!
IND.
AFP NSFE OT WORKIM DISCHARGE R CANAL l
- I-f..1 43.
EAD:
UNIT 3CAF
'I CHECK FU I HIGH HEAt TOLDING TO i
RE 1,:
FRE p-r AUG kCTO TE C IATE F-40 7 ElI COMPLETE N SEAL COL I COOLANT MVTy PURIF CAVITY PUF 0 INDICATIC bNTL CAL TF l
l tfDFAULUt GOVERNOk (j UTAI E)030084 TG02141 02141 1
TG0214112 TGG 76 0214112 1 MS-02026 MS-2026 - OVERHAUL AIR PILOT VALVE 8
16APR04 116APR04 07:00 14:59 I
I-OVERHAL HP TI Run Date 14APR04 15:59 T
LT-51 PRIORITY PUBLICATION-ES Sheet 15 of 18 C Puimavera Syslems. Inc.
I FL-50 Priority Publication I
after 14APR04 12:00 U1R28 WORKING SCHEDULE after 14APR04 12:00 I
I APR U
I RESPW WO I J
EQID IDESCRIPTION RD ES EF 114 15 16 ST
_01_12 14_16_18,20 2210 L2 4, Q 6 8 i1 1214 I
TGHX22CVIS TGG 76 0302110 HX-022C MSR C INTERNALS INSPECTION (SHELL SIDE) 10 16APR04 07:00 16APR04 16:59 1
TG-30520 TGG 76 0302153 TG-01-T MEASURE HP INNER 16 16APR04 16APR04 STEAM GLAND 07:00 22:59 CASINGS 1
IT-760-C OPS 77 0215926 O-IT-0760 HIGH HEAD SI CHECK 3
16APR04 16APR04 FULL FLOW TEST 08:00 10:59 RECOVERY 1
RP4A-020 OPS O-RP-004A UNLATCH CONTROL 4
16APR04 16APR04 RODS 08:00 11:59 1
CE300869SI CE4 76 0300869 ICP-05.049 BUILD SCAFFOLDING 8
16APR04 16APR04 ICP 5.49 SEC CONTROL 08:00 15:59 VALVES 1
MM0216612 MM2 76 0216612 CS-02181 ICS-2181 - EXCESSIVE 10 16APR04 17APR04 VIBRATION 08:00' 05:59 TG0306590 TGG 76 0306590 LO-00256-0 LO-256 CANNOT 20 16APR04 17APR04 ADJUST AIR SIDE SO 08:00 07:59 PRESS REG VLV 1
MM0214091 MM2 76 0214091 HX-027 HX-27, HYDROLANCE 4
16APR04 16APR04 CLEAN GENERATOR 09:00 12:59 BUS 1
MM0306061 MM2 76 0306061 T-052A OPENICLEAN AND 10 16APR04 17APR04 INSPECT LO 09:00-06:59 RESERVOIR 1 CEDIVSURCH CE1 76 0400396 Ul-FOREBAY INSPECT & CLEAN 20 16APR04 19APRO4 SURGE CHAMBER /
09:00-08:59 SEAL WELL 1
MM0213960 MM2 76 0213960 HX-053A HXs053A -
4 16APR04 16APR04 HYDROLANCE CLEAN 10:00-13:59 AIR SIDE SEAL OIL 1
MM-848oE2 MM1 76 0214134 R-1 JIT INFO SHARING 2
16APR04 16APR04 PRIOR TO UPPER 11:00 12:59 INTERNALS LIFT II I
III II..
TGHX22Cv 03021 TG-305 03021 IT.7E 021.
RP4A CE3008i SR C NIERNALS EAS4 RHP INNEF
_I _W __
0,-C 021.
19S HIGH UNLj BUIU HEAD SI CHI UNIT 1 HIGH TCH CONTR, EUNLATCH,
) SCAFFOLD MM TG M
M CEI 030 16 IS E
1021 61 ICS-,1s1 - EXCES 3 021 61 030 t9 0-2l 6 CANNOT 030 59 M02 4 jHX. U. HYDROUt 024 1 o-1Tc I
M03 66 l0PfNICLEANA 03 6 0.".I5(I' DIVS
- NS ECT&C 04 03 MM, M
9642 I80Em 14134 lA-0i l-053A - HYr AIR Sll LIT INFO SHK EREACTO iontLL CAVn lFILL Cl 1
RP1A-080 OPS O-RP-4O1A FILL CAVITY FOR INTERNALS LIFT 2
16APR04 16APR04 12:00 13:59 l
l l
l Run Date 14APR04 15:591 LT-51 PRIORITY PUBLICATION-ES Sheet 16 of 18 a Primavera Systems, Inc.
I FL-50 PrIority Publication T
I after 14APR04 12:00 U1R28 WORKING SCHEDULE after 14APR04 12:00 U
ID RESF WO WO I
EQID DESCRIPTION RD ES EF 1 4 APR 11____
_IST 14 15 16 I
I__
I TI1112,41,82.2U 2
.61 1202.+/-.l6.1.20.22".
. 2 4.6.8.1U 2ji14I1%i 1
RP4A-031 EM O-RP-004A RESTORE WALKWAY POST ROD UNLATCHING 2
16APR04 15APR04 12:00 13:59 RI 4A-0 M 2140!
02140!
1 MM0214095 MM2 76 0214095 HX-053B HX-053B -
3 16APR04 16APR04 HYDROLANCE CLEAN 12:00-14:59 HYDROGEN SIDE SEAL 1
CE937787TI CE4 76 9937787 FD-02543A INSTALL INSULATION 5
16APR04 16APR04 FOR 1FD-2543A 12:00 16:59 1
TG0302116 TGG 76 0302116 T-036 T-036 - LUBE OIL 6
16APR04 16APR04 RESERVOIR 12:00 17:59 INSPECTION 1
MM-8480E1 MM1 76 0214134 R*1 UPPER INTERNALS 1
16APR04 16APR04 LIFT IPTE BRIEF 13:00 13:59 1
NGNDE18X NDE NDE-18 MINI-SUB 3
16APR04 16APR04 SPECTIONS-INTERNAL 14:00 16:59 LIFT (NDE-18)
RPSH0811 RPI PACKAGE 81 INSTALL SHADOW 3
16APR04 16APR04 SHIELDING (FROM RX 14:00 16:59 HEAD) 1 RPSH082-l RP1 PACKAGE 82 INSTALL SHIELDING 3
16APR04 16APR04 FOR D-FAN (FROM RX 14:00 16:59 HEAD)
I MM-8480E MM1 76 0214134 R-1 REMOVE UPPER 4
16APR04 16APR04 INTERNALS 14:00 17:59 1
MM0214100 MM2 76 0214100 HX-056B HX-056B -
2 16APR04 16APR04 HYDROLANCE CLEAN 15:00-16:59 SGFP OIL COOLER 1
TG0215001 TGG 76 0215001 HX-053B HX-53B - REPLACE 8
16APR04 16APR04 BRASS RING 15:00' 22:59 1
MM0214098 MM2 76 0214098 HX-056A HX-056A.
3 16APR04 17APR04 HYDROLANCE CLEAN 15:00' 07:59 SGFP OIL COOLER 17787 93771 3021 3021 A44M 0214 4GNI RPSI RPSI MM-02 MMC C
TGO C
MMC c
11RESTORE EW
~sX-053B -
_HYOD TNSTALL IN 7_H 6T-036 - LUE w_
DE1UPPER It 134REACT E18XMINI-St.
081-4NSTAL 1082-lNSTAL
[480FREMOV I413_
RWP:
2141 00HX-05 21410MP 215001HX-5 215001_
21409)HX-0o 21409wI I
MM-1600-20 I MM1 76 0213472 R-1 INSTALL CONOSEAL COVERS 3
16APR04 I 16APR04 16:00 18:59 I.....
, 1 M 4-600 2di!i 021 347 I
I.
L _ _ _ _ _.
J
.... L.I..... J Run Date 14APR04 15:591 LT-51 PRIORITY PUBLICATION-ES Sheet 17 of 18 C Pdmavera Systems, Inc.
I FL-50 Priority Publication T
after 14APR04 12:00 after 14APR04 12:00 after 14APR04 12:00 I
U1R28 WORKING SCHEDULE after 14APR04 12:00 U
ID RES WO WO EQID DESCRIPTION RD ES EF 14 15 A 16 ST I_
121_4__186 8
2.14.1 2
1 2
4 1
EM0302132A EM 76 0302132 LO-00291 P-059B - DE-TERM 2
16APR04 16APR04 E 0302132 AIRSIDE SEAL OIL B/U 17:00' 18:59 0302132 PUMP MOTOR l
1 TGO306774 TGG 76 0306774 LO-00254 1 LO-254 -
6 16APR04 16APR04
.03067741
-1 REPACK/GLAND 17:00-22:59 0306774 l FOLLOWER COCKED Rtm Date 14APR04 15:59l LT-51 PRIORITY PUBLICATION-ES Shoat 18 of 18 C PrimfaveraSystems. Inc.
I FL-50 Priority Publication I
after 14APR04 12:00 I
WORKWEEK SCHEDULE I
thru 16APR04 1700 U
APR ID RESPITI WO Y
0 CE0210986 CEE M ST 77 EOID SEC DESCRIPTION SEC SUPPORT MR 99-011-B RD 139 ES 05APR04 07:OOA EF RISK DR-N ML-N ORT3-N R-L 07MAY04 14:59 IA ID 926 A. fi. R^1Afts4-3 A-liaqnnq-- n. 3.. 4.6.8.101214.161 4.6.8.101Z14J1E 61CFl210ASEC SUPPORT MR 99-O11B I
NOW I
nre-appro cE02109s ad tedC spec ST - Restan C
A AEC, INSTALL NEW EC CL not reqd UIP MR 99-0"1'E
_0 CE0210989 CH0300510 r
CE6 M 76 U
77 SEC HEM-SAMPI T
SEC. INSTALL NEW EQUIP MR 99-011-E RCS DO TSR 3.4.5.1 139 30 05APR04] 07MAY04 I DR-N ML-N 07:00A 14:59 ORT3-N R-L 926
_~
I Pre-approd tedt spec ST - RestarI CL not reqd l
r I 9
,Hiit5CS C0 TSR 3.4.5
.1_1
~
2 CH 9
11APR04 05:OOA 17APR04 11:59 DR-N ML-N ORT3-N R-L Cre-appro gHO30041 wl 4-4-4
+
4-4 4
4 ed ted spec ST - Restar
!RCS OL TSR 3.4.5.2 CL not req'd I
2 CH0300497 CH p
77
-HEM-SAMPI RCS CL TSR 3A.5.2 36 t1APR04 07:WOA 17APR04 11:59 DR-N ML-N ORT3-N R-L l
U 5re-appro H03003t ed teelt spec ST - Restar rRCS CL TSR 3.4.5.2 CL not reqd i-t-4-4
+
4-4 4
4 1
CH0300357 CH p
77
-HEM-SAMPI RCS CL TSR 3.4.5.2 36 12APR04 05:OOA 17APR04 11:59 DR-N ML-N ORT3-N R-L 0-
-+
4-4-4-4
.4.
4-4 4
'H03003A ed tecI spec ST - Restarb ERS DO TSR 3.4.5.1 CL not reqd II t
1:
CH0300370 CH 9
77
_HEM-SAMPI RCS DO TSR 3.4.5.1 36 12APR04 05:00A 17APR04 11:59 DR-N ML-N ORT3-N R-L U -
I -
-4 444..4
.4.
4-4 4
4 4
're-appro
- H03004(
ed tecq spec ST - Restar RCS EBORON SR 3.9.1.1 CL not reqd 1
CH0300400 p
77
^HEM-SAMPI RCS BORON SR 3.9.1.1 36 12APR04 05:OOA 17APR04 11:59 DR-N ML-N ORT3-N R-L I -
I -
+
4-4 4
4 I-I
're-appro
..H....
tech spec ST - Restat
.... -S EAST )ORON TSR 3.5.
CL not req-d
.2.
I II 0
CH03W0194 CH p
77 HEM-SAMPI BAST BORON TSR 3.5.1.2 16 12APR04 07:OOA 16APR04 11:59 DR-N ML-N ORT3-N R-L mm MMISC I
Pre-appro 1H03005 ad tech spec ST - Restar jSGBDFO GAMMA SCAl CL not reqd 2
CH0300523 CH 77
_HEM-SAMPI SG8DFO GAMMA SCAN 16 12APR04 07:OOA 16APR04 11:59 DR-N ML-N ORT3-N R-L Imu C :
M IS C
.HgLQQ5, ad tect spec ST - Restar fE-22? ISOTOPIC CL not req'd I
II
-
4-4-4-4
+
4-4 4
4 4
2 CH0300549 CH r
77
_HEM-SAMPI RE-229 ISOTOPIC 16 12APRo4 07:OOA 16APR04 11:59 DR-N ML-N ORT3-N R-L
-I!
_MISC i 3re-appro 0
CH0300230 CH _P 77 3HEM-SAMPI SFP BORON SR 3.7.11.1 1 15APR04 15APR04 DR-N ML-N 07:00-07:59 ORT3-N R-L ed tech spec ST - Restarl CH0300 0300 CH0300 0300 CL not req'd oSFP BORON SR 3.7.11.1 3ICMISC CHEMIPTRY SAMPLING Pre-approved ttch spec ST - Res t43WASTEWATER EFFLUENT COP
?43MISC CHEMIhTRY SAMPLING Pre-approved t~ch spec ST-Res 0
CH0300243 CH 77
-HEM-SAMPI WASTEWATER EFFLUENT COMPOSITE I
15APR04 15APR04 DR-N ML-N 07:00-07:59 1 ORT3-N R-L art CL not reqd IPOSITE art CL not reqd
-
-.-.--.----
.1.
£ I
I
£..............L A
I I
Run Date 14APR04 15:57l LT-52 WORKWEEK ACTIVITIES DURING U1R28 Sheet I of 3 O Primavera Systems. Inc.
I FL-52 Workweek Activities during UI R28 _I h
after 14APR04 12:00 WORKWEEK SCHEDULE I
thru 16APR04 1700 U l ID RESP T WO EQID DESCRIPTION RD ES EF RISK Resrce APR
_Y ST
_I e68111.682.2
.2*4*6.8
.101Z,14.1&lR20221l0.*2.4.6 *8.101214,lE Iql=.ni# -
i*~~
15 16 1
CH0300459 CH 7P n
15APR04 15APR04 DR-N ML-N CH0300 5 9RWST BORON SR 3.05.04.3 3.05.04.3 07:00-07:59 ORT3-N R-L 0300 5I1MISC CHEMISTRY SAMPLING Pre-approved tech spec ST - Res art CL not reqd 2
CH0300588 CH _
77
15APR04 15APR04 DR-N ML-N CH0300 88IRWST BORON SR 3.05.04.3 3.05.04.3 07:00' 07:59 ORT3-N R-L 0300 8;MISC CHEMIPTRY SAMPLING Pre-approved tech spec ST - Res rt CL not reqd Q
- lkllPl:l;lI 9:
I 0
EP0306798 EPI 77 SERVICE FLAMMABLE STORAGE 1
15APR04 15APR04 DR-Y ML-Y EP0306798FLAM ABLE STORAGE:LOCKER INSPE TION LOCKER INSPECTION 00:00 00:59 ORT3-Y R-L 0306799MISC EQUIPMENT REI'AIRISERVICE 1
- § Pre-ap roved tech spec ST - Restart CL not req'd U -
.I i
I _ tS Li III C1w1 122= 1 111^1g1VA U1111_1111 0
FG0302073 FG1 77 MANHOLE PUMP ELECTRICAL 8
16APR04 16APR04 DR-Y ML-Y 160,451 FG03020 3PUMP ELECTRI6 PM MANHOLESUMPS 06:00' 13:59 ORT3-Y R-L Ft03020 3PO I
I l,
Pre-approved te4 0
FG0309950 FG3 P 77 SERVICE FLAMMABLE STORAGE 24 14APR04 16APR04 DR-Y ML-Y 453 003099 FLAMMABLE STORAG CABINET INSPECTION OUTSIDE A
N CABINET INSPECTION 12:00' 11:59 ORT3-Y R-L 030995 MISC ocOUTSIDE PA re-apriroved tech spec
-Rstart CL not freqd lFG0309945 FG3 P 77 SERVICE FLAMMABLE STORAGE 24 15APR04 16APR04 DR-Y ML-Y 453 IFG30994 MMABLESTORAGE CABINETI SPECTONINSID CABINET INSPECTION 05:00-16:59 ORT3-Y R-L 030994
_I INSIDE PA re-approved tecspec ST - Resta CLrntreq'd I_:
ZI-1 N.
F-i I [SI II IllaU tll, 0
RE-234-B04 HP HP RMS RE-234/235 AIR I
14APR04 14APR04 DR-Y ML-Y RMS RE-34-B04RE-234235 AIR AMPLE CHANGEqOUT SAMPLE CHANGE OUT 17:00-17:59 ORT3-Y R-L I
Pre-approved tect spec ST -Restar CL not req'd O
RE-211-B04 HP HPRMS RE-2111212AIR I
15APR04 15APR04 DR-Y ML-Y RMS R'E-211-B04RE-211212AIRSAMPLICHANGEOUT l
SAMPLE CHANGE OUT 00:00' 00:59 ORT3-Y R-L
.Pre-aproved tech spec gr - Restart CL not reqd 0
HP0301850 HP 77 HPRMS QUARTERLY 16 15APR04 15APR04 DR-Y ML-Y HP030185 UARTERLY FUNCTIONAL TEST F RMS FUNCTIONAL TEST OF 05:00*
20:59 ORT3-Y R-L 0301854 EHEALTH PI SICS; RADIATIQI I
rn-approved ted" spec ST - Restail CL not req'd O ICMSCFLTR1 IC1Pl 76 I&CMISC MISCELLANEOUS FANl 2 114APR04 14APR04 DR-Y ML-Y 330 CMSCFL MISCELLANEOUS F AND FILTER PM (4wk)
AND FILTER PM (4wk) 12:00-13:59 ORT3-Y R-L 030066 MISC IC WORK A ITIES re-approved tech spec
- Restart CL not eq'd Run Date 14APR0415:57 LT-52 WORKWEEK ACTIVITIES DURING UR28 _Sheet2of3 OPrImavera Systems, Inc.
FL-52 Workweek Activities during U1R28
after 14APR04 12:00 WORKWEEK SCHEDULE--,--T-thru 16APR04 1700 U
ID RESP T WO EQID DESCRIPTION RDI ES EF RISK Res APR Y
T I.16,8.1012.14,1618,2210.2,4.6.8.1012Z14,1618202210.2.4,6. 8'1GtIZ14.1 3ST
__~
0 ICRMFLTR1 ICI 77 RM RMS FAN AND FILTER 2
14APR04 14APRW4 DR-Y ML-Y 330 CRMFL 1RMS FAN AND FILTER PM (4wk)
I PM (4w4k) 12:00 13:59 ORT3-Y R-L 03006 RM SYSTEM MULTIA NDIOR NON-NUMt3ERED EQUIPM NT reapproved tech spec ' r - Restart CL not eq'd 0
IC0302523 ICi P
76 ICP-06.028 LEFM ELECTRONICS 2
16APR04 16APR04 DR-Y ML-Y 330 IC030252-LEFM ELECTRO4(
REBOOT 05:00' 06:59 ORT3-Y R-L S
03025 LEFM ELECTMC re-approved tec" I
0 OP0215353 OPI 76 O-PC-MIDS OPERATIONS MID 21 09APR04 17APR04 DR-Y ML-Y 02153 PERK4TIONS MID SHII WEEKLY ROUll NE SHIFT WEEKLY 00:00A 06:59 ORT3-N R-L.
__ROUNE re-appro ed tecH spec ST - Resta CL not reqqd 0
OP0215372 OPI 77 TS-EP-001 POWER AVAILABILITlY 1
15APR04 15APR04 DR-N ML-N
-C9P02153OPOWE AVAILABILITY VERIFICATIONS VERIFICATIONS 00:00' 00:59 ORT3-N R-L 1 0215372 POW R AVAILABILITYVERIFICATIONS Pre-ap roved tech spec
- Restart CL not reqd 2
OP0216031 OPI P 77 O-TS-010AB TS-10A. U2C AIR LOCK 2
16APR04 16APR04 DR-N ML-N 221 (5Po 2 l603lT5-10A U2C AIR LOCK C DOOR SEAL TEST 00:00' 01:59 ORT3-N R-M 0216031lU2 ONT AIR LOCK DC Pre-ap roved tech spec ST 0
OP0215354 OPI 9 77 O-PC-MIDS OPERATIONS MID 49 16APR04 22APR04 DR-Y ML-Y I
Qpo 215354OPE OHS MID SHIFT WEEKLY 00:00' 06:59 ORT3-N R-L PERAjIONS MID SHIFT EEKLY ROUTI IE 02153-ROUTINE _
Pre-ap roved tech spec ST 0
OP0215432 OP2 76 O-PC-DAYS OPERATIONS DAY 38 13APR04 19APR04 DR-N ML-N p
O PERATIONS DAY SHIT WEEKLY ROUt1NE SHIFTWEEKLY 08:OOA 14:59 ORT3-N R-1.
I ROUTINE
_p t-t spec ST - Resta CL not reqd 0 lOP025548 OP3 77 0-PC-SWING OPSSWINGSHIFT 49 14APR04 20APR04 DR-NML-N O0!: 1554 PSSVINGSHI1WEEKLYROJTIhE WEEKLY ROUTINE 16:00' 22:59 ORT3-N R-L 0 5OlI 14e-apprved tech! pec ST - Restart (:L not req'd 2 lU2GNDR001 lOP3 ll lTC-01 DRAIN U2 MAIN l1 l14APRW l 14APRW l 524 U2( NDROq1DRAIN U2MAIN ELECTRICAL GENERATOR PER FC 21.3 ELECTRICAL 18:00' 18:59 1
1 2 UINDRO IP3 TI-IGENERATORIN 2
I 14A0 1
G P
21.3
- Pre-approved le(h spec ST-Restart CL not reqd Run Date 14APR04 15:571 LT-52 WORKWEEK ACTIVITIES DURING U1 R28 Sheet 3 of 3 OPrimavera Syslems, Inc FL-52 Workweek Activities during U1R21 R
RunDate 14APR0415:56J Work Activity Risk Assignment I
Sheet1 of1 U
ACT WOI GRP HPE EQUIPMENT Activity Cal DUR START FINISH d 14. Thu. 15. FrI 16. Satl 1920TW21T;T i
ID ST l
RISK Description ID u15.6 n2Ile0 Wed 21- 0.
1 EZMRCP-K 76 EM DR-Y ML-Y P-001B-M P1B MOVE MOTOR FROM I1I 6
15APR04 15APR04
- REACTOR COOLANT PUMP MOTOR ORT3-N R-H PUMP TO STAND 01:00' 06:59 0215205 - 128EM 1
MM-848001 76 MM1 DR-N ML-N R-1 MOVE REACTOR VESSEL 1
4 15APR04 16APR04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-H HEAD TO RHLDA 23:00 02.59 0214134 - 128MM I
MM-8480E 76 MM1 DR-N ML-N R-1 REMOVE UPPER INTERNALS 1
4 15APR04 16APR04 EREACTOR VESSEL AND ASSEMBLY I
ORT3-N R-H 14:00 17:59 0214134 - 128MM 1
MM-8485B1 76 MM3 DR-Y ML-Y P-001B PLACE BACKSEAT I1 1
15APR04 15APR04 IREACTOR COOLANT PUMP ORT3-Y R-M COLLECTION SYS IN 22:00 22:59 0214119 - 128MM 1
MM-8485K 76 MM3 DR-N ML-N P-001B P-1B. ALIGN SEAL 1
1 16APR04 16APR04 OREACTOR COOLANT PUMP ORT3-N R-M COLLECTION TO CAVITY 05:00 05:59 0214119 - 128MM 2 l OP0216031 77 OP1 DR-N ML-N O-TS-OlOAB.1 ITS-10AU2CAIRLOCK 4 1 2 16APR04 16APR04 OU2 CONT AIR LOCK DOOR SEAL TEST ORT3-NR-M DOORSEALTEST 00:00-01:59 0216031 - B04B2 1
RP1A-060 l
OPS DR-N ML-N O-RP-OIA FILL CAVITY FOR ROD 1
4 16APR04 I 16APR04 EFILL UPPER CAVITY FOR UNLATCHING RODS (RP-1A)
ORT3-N R-M UNLATCH j
01:00 I 04:59 1280P RP4A-020 l
OPS DR-N ML-N I O-RP-004A UNLATCH CONTROL RODS 1
4 16APR04 l16APR04
.UNLATCH CONTROL RODS (RP-4A) 1 ORT3-N R-M 08:00 11:59 1280P NMC I WE ILT-81 HUMAN ERROR RISK BARCHART
__________IWEFL-81 HUMAN ERROR POTENTnAL A-r"aer yses.
PBNP U1 Refueling 28 Outage