July 13, 2005 LICENSEE:
DUKE ENERGY CORPORATION FACILITY:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3
SUBJECT:
SUMMARY
OF JUNE 30, 2005, MEETING TO DISCUSS THE LICENSING BASIS FOR HIGH ENERGY LINE BREAK (TAC NO. MC5457)
On June 30, 2005, the Nuclear Regulatory Commission (NRC) met with Duke Energy Corporation (the licensee) to discuss the licensing basis for high energy line break (HELB) for Oconee Nuclear Station, Units 1, 2, and 3. Attachment 1 provides a list of the attendees. contains the slides presented by the licensee during the meeting.
The licensee discussed its HELB Revalidation Project that began in 1999. The objective of the project is to revalidate and update, as necessary, the conclusions reached in the original licensing basis (based on a 1973 report) for the current plant configuration. The licensee is expecting to submit license amendment requests (LARs) that will clearly define the licensing basis. The LARs are scheduled to be submitted for Unit 1 in the fourth quarter of 2006, for Unit 2 in the first quarter of 2007, and for Unit 3 in the second quarter of 2007.
The licensee stated that it believes that Oconee is in compliance with its original licensing basis for HELB. However, the NRC staff raised several concerns regarding Oconees compliance with its original licensing basis for HELB. Therefore, the licensee and NRC staff will have further discussions on the following issues:
(1) Does the original licensing basis require that the plant be designed to withstand the effects of jet impingement from pipe cracks?
(2) Does the original licensing basis require that the plant be brought to cold shutdown following an HELB?
(3) What modifications are needed to achieve compliance with the licensing basis with respect to flooding in the east penetration room and the effects of this flooding on the high-pressure injection pumps?
/RA/
Leonard N. Olshan, Senior Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.05-269, 05-270, and 05-287
Attachment:
As stated
ML051860343 : ML051960178 NRC-001 OFFICE PDII-/PM PDII-1/LA PDII-1/SC NAME LOlshan CHawes EMarinos DATE 07/ 12/ 05 07/ 12/ 05 07/ 13/ 05
LIST OF ATTENDEES MEETING TO DISCUSS LICENSING BASIS FOR HIGH ENERGY LINE BREAK JUNE 30, 2005 NRC DUKE M. Ernstes (by telephone)
D. Baxter J. Fair T. Brown E. Hackett G. Davenport S. Jones*
R. Gambrell (by telephone)*
E. Marinos C. Gray L. Olshan G. McAninch M. Shannon (by telephone)
A. Park J. Tatum
- Part-time participation
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Ms. Lisa F. Vaughn Duke Energy Corporation Mail Code - PB05E 422 S. Church St.
P.O. Box 1244 Charlotte, NC 28201-1244 Ms. Anne W. Cottingham, Esq.
Winston and Strawn LLP 1700 K St, NW Washington, DC 20006 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Ms. Karen E. Long Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Energy Corporation 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Mr. Richard M. Fry, Director Division of Radiation Protection NC Dept of Environment, Health, &
Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006