Letter Sequence Other |
---|
|
|
MONTHYEARRS-05-025, Application for Approval of License Transfers2005-03-0303 March 2005 Application for Approval of License Transfers Project stage: Request LR-N05-0094, Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon Corporation2005-03-0404 March 2005 Proposed License Transfer and Conforming License Amendments Relating to the Merger of Public Service Enterprise Group and Exelon Corporation Project stage: Other ML0511805012005-05-10010 May 2005 Request for Additional Information for License Transfer Applications Project stage: RAI ML0511804052005-05-10010 May 2005 RAI, License Transfer Application Project stage: RAI ML0518100432005-07-26026 July 2005 Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML0518007302005-07-26026 July 2005 Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing - Project stage: Other ML0518006182005-07-26026 July 2005 Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing Project stage: Other LR-N05-0503, Additional Information Regarding License Transfer Application2005-10-0606 October 2005 Additional Information Regarding License Transfer Application Project stage: Other ML0529905482005-10-26026 October 2005 Commission Memorandum and Order (CLI-05-26) Project stage: Request ML0535702232006-01-17017 January 2006 Request for Withholding Information from Public Disclosure for Peach Bottom Project stage: Withholding Request Acceptance ML0603105332006-05-30030 May 2006 Order Approving Transfers of Licenses and Conforming Amendments Relating to Peach Bottom Atomic Power Station, Unit Nos. 2 and 3, Hope Creek Generating Station, and Salem Nuclear Generating Station, Unit Nos. 1 and 2 Project stage: Other ML0615101882006-05-30030 May 2006 Operating License Pages Associated with License Transfer Project stage: Request ML0615101792006-05-30030 May 2006 FOL Pages Associated W/License Transfer DPR-44 Project stage: Request ML0615101122006-05-30030 May 2006 Full Operating License Pages Associated with License Transfer Project stage: Request 2005-03-04
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML21091A0662021-04-23023 April 2021 FRN - Notice of Issuance of Multiple COVID-19 Exemptions Regarding Various Parts of 10 CFR Issued in March 2021 ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20243A0002020-09-23023 September 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020 ML19312A4712020-01-15015 January 2020 FRN: Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station - Environmental Assessment and Finding of No Significant Impact Related to Changes to Emergency Plan Staffing Requirements ML19312A4352020-01-15015 January 2020 Environmental Assessment and Finding of No Significant Impact Related to Changes to Emergency Plan Staffing Requirements ML19238A3692019-09-0303 September 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 09/10/2019 ML19140A4562019-05-28028 May 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 06/04/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 NRC-2018-0096, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 20182018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML18127B7232018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 NRC-2018-0011, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: Februar2018-01-24024 January 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: February 6, ML18002A3812018-01-24024 January 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: February 6, NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17248A2262017-09-15015 September 2017 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: October 3, 2017 NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20162016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 ML16215A2272016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 NRC-2016-0143, Federal Register Notice on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI2016-07-18018 July 2016 Federal Register Notice on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Au ML16187A2232016-07-18018 July 2016 Federal Register Notice on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Au ML15132A6682015-06-0404 June 2015 Hc and Salem, Unit 1 and 2 - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment to Update Appendix B to the Renewed Facility Operating Licenses ML14335A6482015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units NRC-2015-0009, G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units2015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14335A6302015-01-15015 January 2015 G20110262 - Final Response to Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 NRC-2012-0264, Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2 - Exemption from Certain Requirements of 10 CFR Part 26, Fitness for Duty Programs (TAC Nos. ME7651, ME7652 and ME7653)2012-10-26026 October 2012 Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2 - Exemption from Certain Requirements of 10 CFR Part 26, Fitness for Duty Programs (TAC Nos. ME7651, ME7652 and ME7653) ML12299A0712012-10-26026 October 2012 and Salem Nuclear Generating Station, Units 1 and 2 - Exemption from Certain Requirements of 10 CFR Part 26, Fitness for Duty Programs ML12299A0812012-10-26026 October 2012 and Salem Nuclear Generating Station, Units 1 and 2 - Exemption from Certain Requirements of 10 CFR Part 26, Fitness for Duty Programs NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0069, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments ML12056A0432012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1126504892011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1122302752011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 NRC-2011-0187, Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/20112011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 ML11116A1482011-07-20020 July 2011 Issuance of Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station ML11117A2062011-07-20020 July 2011 Notice of Issuance of Renewed Facility Operating License No. NPF-57 for an Additional 20-Year Period ML1112200122011-04-20020 April 2011 05/12-14/2011 - Meeting (583rd) of the Advisory Committee on Reactor Safeguards - Federal Register Notice ML1027207232010-09-29029 September 2010 Federal Register Notice Regarding the ACRS Subcommittee Meeting on Plant License Renewal (Hope Creek), November 3, 2010 ML1001203242010-02-25025 February 2010 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 Docket Nos. 50-272, 50-311 and 50-354 Exemption NRC-2010-0043, Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2 Docket Nos. 50-272, 50-311 and 50-354 Exemption2010-02-25025 February 2010 Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2 Docket Nos. 50-272, 50-311 and 50-354 Exemption ML1000500542010-01-29029 January 2010 FRN: General Notice. Hope Creek Generating Station & Salem Nuclear Generating Station, Unit Nos. 1 and 2 Environmental Assessment and Finding of No Significant Impact ML0928706352009-10-23023 October 2009 11/05/2009 Notice of Meeting to Discuss License Renewal Process and Environmental Scoping for Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Generating Station, License Renewal Application Review ML0927801472009-10-15015 October 2009 Notice of Acceptability for Docketing of the Application and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. NPF-57 for an Additional 20-Year Period, PSEG Nuclear, LLC, Hope Creek Nuclear Generating Sta ML0927404212009-10-15015 October 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct the Scoping Process for Salem Nuclear Generating Station, Units 1 and 2, and Hope Creek Nuclear Generating Station ML0922908012009-08-31031 August 2009 FRN: General Notice. Notice of Receipt and Availability of Application for Renewal of Hope Creek Generating Station ML0816205382008-06-12012 June 2008 Federal Register Notice Regarding the Meeting of the ACRS Subcommittee on Power Uprates (Hope Creek), July 8, 2008 ML0802205552008-03-0303 March 2008 Enclosure Hope Creek, Final Environmental Assessment and Findings of No Significant Impact Related to the Proposed License Amendment to Increase the Maximum Reactor Power Level 2022-02-15
[Table view] Category:Letter
MONTHYEARIR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 ML23121A1412023-05-0101 May 2023 Senior Reactor and Reactor Operator Initial License Examinations LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 2024-02-01
[Table view] |
Text
July 26, 2005 Mr. William Levis Senior Vice President & Chief Nuclear Officer PSEG Nuclear LLC-X04 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
NOTICE OF CONSIDERATION OF APPROVAL OF TRANSFER OF FACILITY OPERATING LICENSE AND CONFORMING AMENDMENT, AND OPPORTUNITY FOR A HEARING - HOPE CREEK GENERATING STATION (TAC NO. MC6365)
Dear Mr. Levis:
Enclosed is a copy of a "Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing" related to the application dated March 4, 2005 (ML050750110) filed by PSEG Nuclear LLC. The application (pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.80) seeks approval of the proposed transfer of the Hope Creek Generating Station, Facility Operating License No. NPF-57 to Exelon Generation Company, LLC from the current holder of the license, PSEG Nuclear LLC. The application also seeks (pursuant to 10 CFR 50.90) the issuance of a conforming amendment to the license to reflect the transfer.
This notice is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Stewart N. Bailey, Sr. Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
As stated cc w/encl: See next page
ML051800618 *NLO w/ changes OFFICE PDIII-2/PM PDI-2/LA PDI-2/PM OGC PDI-2/SC PDIII-2/SC NAME GDick CRaynor SBailey SUttal* DRoberts GSuh DATE 07/18/05 7/18/05 7/22/05 7/19/05 7/25/05 7-26-05 Hope Creek Generating Station cc:
Mr. Michael P. Gallagher Jeffrie J. Keenan, Esquire Vice President - Eng/Tech Support PSEG Nuclear - N21 PSEG Nuclear P.O. Box 236 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Ms. R. A. Kankus Mr. Michael Brothers Joint Owner Affairs Vice President - Nuclear Assessments Exelon Generation Company, LLC PSEG Nuclear Nuclear Group Headquarters KSA1-E P.O. Box 236 200 Exelon Way Hancocks Bridge, NJ 08038 Kennett Square, PA 19348 Mr. George P. Barnes Lower Alloways Creek Township Site Vice President - Hope Creek c/o Mary O. Henderson, Clerk PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Mr. George H. Gellrich Radiation Protection Programs Plant Support Manager NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Michael J. Massaro Brian Beam Plant Manager - Hope Creek Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Ms. Christina L. Perino U.S. Nuclear Regulatory Commission Director - Regulatory Assurance 475 Allendale Road PSEG Nuclear - N21 King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Hope Creek Generating Station Eric Epstein U.S. Nuclear Regulatory Commission TMI Alert Drawer 0509 4100 Hillsdale Road Hancocks Bridge, NJ 08038 Harrisburg, PA 16803
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION PSEG NUCLEAR LLC HOPE CREEK GENERATING STATION DOCKET NO. 50-354 NOTICE OF CONSIDERATION OF APPROVAL OF TRANSFER OF FACILITY OPERATING LICENSE AND CONFORMING AMENDMENT AND OPPORTUNITY FOR A HEARING The Nuclear Regulatory Commission (NRC or the Commission) is considering the issuance of an order under Title 10 of the Code of Federal Regulations (10 CFR) Section 50.80 approving the transfer of Facility Operating License No. NPF-57 for the Hope Creek Generating Station (Hope Creek) currently held by PSEG Nuclear LLC (PSEG), as owner and licensed operator of Hope Creek to Exelon Generation Company, LLC (Exelon). The transfer of PSEG's ownership interests and operating authority to Exelon is part of the proposed merger of PSEG's parent corporation, Public Service Enterprise Group, into Exelon Corporation, the indirect parent company of Exelon. The Commission is also considering amending the license for administrative purposes to reflect the proposed transfer.
According to an application for approval filed by PSEG, Exelon would assume title to the facility following approval of the proposed license transfer, and would be responsible for the operation, maintenance, and eventual decommissioning of Hope Creek. No physical changes to the Hope Creek facility or operational changes are being proposed in the application.
The proposed amendment would replace references to PSEG in the license with references to Exelon to reflect the proposed transfer.
Pursuant to 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission shall give its consent in writing. The Commission will approve an application for the transfer of a license, if the Commission determines that the proposed transferee is qualified to hold the license, and that the transfer is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto.
Before issuance of the proposed conforming license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations.
As provided in 10 CFR 2.1315, unless otherwise determined by the Commission with regard to a specific application, the Commission has determined that any amendment to the license of a utilization facility which does no more than conform the license to reflect the transfer action involves no significant hazards consideration. No contrary determination has been made with respect to this specific license amendment application. In light of the generic determination reflected in 10 CFR 2.1315, no public comments with respect to significant hazards considerations are being solicited, notwithstanding the general comment procedures contained in 10 CFR 50.91.
The filing of requests for hearing and petitions for leave to intervene, and written comments with regard to the license transfer application, are discussed below.
Within 20 days of the date of publication of this notice, any person whose interest may be affected by the Commissions action on the application may request a hearing and, if not the applicant, may petition for leave to intervene in a hearing proceeding on the Commissions action. Requests for a hearing and petitions for leave to intervene should be filed in accordance with the Commissions rules of practice set forth in Subpart C Rules of General Applicability: Hearing Requests, Petitions to Intervene, Availability of Documents, Selection of
Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings, of 10 CFR Part 2. In particular, such requests and petitions must comply with the requirements set forth in 10 CFR 2.309. Untimely requests and petitions may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for failure to file on time is established. In addition, an untimely request or petition should address the factors that the Commission will also consider, in reviewing untimely requests or petitions, set forth in 10 CFR 2.309(c)(1)(i)-(viii).
Requests for a hearing and petitions for leave to intervene should be served, pursuant to 10 CFR 2.302 and 2.305, upon Thomas S. O'Neill, Vice President and Counsel, Exelon Nuclear, 4300 Winfield Road, Warrenville, Illinois 60555, telephone 630-657-3770, fax 630-657-4335, and e-mail thomas.oneill@exeloncorp.com; Jeffrie J. Keenan, Esq., PSEG Nuclear LLC, P.O. Box 236, N-21, Hancocks Bridge, New Jersey 08038, telephone 856-339-5429, fax 856-339-7-1234, and e-mail jeff.keenan@pseg.com; the General Counsel, NRC, Washington, DC 20555-0001 e-mail address for filings regarding license transfer cases only: OGCLT@NRC.gov; and the Secretary of the Commission, NRC, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff.
The Commission will issue a notice or order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held, and designating the Presiding Officer. A notice granting a hearing will be published in the FEDERAL REGISTER and served on the parties to the hearing.
As an alternative to requests for hearing and petitions to intervene, within 30 days after the date of publication of this notice, persons may submit written comments regarding the license transfer application, as provided for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise constitute part of the decisional record. Comments should be submitted to the Secretary, NRC,
Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, and should cite the publication date and page number of this FEDERAL REGISTER notice.
For further details with respect to this action, see the application dated March 4, 2005, (ML050750110), available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site, http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, 301-415-4737 or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland this 26th day of July 2005.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stewart N. Bailey, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation