June 28, 2005 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1 AND 3 -
RESPONSE TO GENERIC LETTER 2004-01, REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS (TAC NOS. MC4837 AND MC4839)
Dear Mr. Overbeck:
On August 30, 2004, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2004-01, Requirements For Steam Generator Tube Inspections. The purpose of GL 2004-01 was to obtain information that would enable the NRC staff to determine whether licensees steam generator tube inspection programs comply with the existing tube inspection requirements (the plant technical specifications in conjunction with Appendix B to Title 10 of the Code of Federal Regulations Part 50).
By letter dated October 28, 2004, Arizona Public Service Company responded to GL 2004-01 for Palo Verde Nuclear Generating Station, Units 1 and 3. As discussed in the enclosed evaluation, the staff concludes that the licensees overall response to the GL is acceptable If you have any questions regarding this matter, please contact me at (301) 415-3062.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: STN 50-528 and STN 50-530
Enclosure:
As stated cc w/encl: See next page
EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO GENERIC LETTER 2004-01 REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS ARIZONA PUBLIC SERVICE COMPANY, ET AL.
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1 AND 3 DOCKET NOS. STN 50-528 AND STN 50-530 On August 30, 2004, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2004-01, Requirements For Steam Generator Tube Inspections. The purpose of GL 2004-01 was to obtain information that would enable the NRC staff to determine whether licensees steam generator tube inspection programs comply with the existing tube inspection requirements (the plant Technical Specifications (TSs)) in conjunction with Appendix B to Title 10 of the Code of Federal Regulations, Part 50 (10 CFR Part 50, Appendix B).
Licensees who concluded that their steam generator tube inspections have not been or are not being performed consistent with the NRCs position on the requirements in the TSs in conjunction with Appendix B, were requested to submit a safety assessment. As part of this safety assessment, licensees were to address whether their safety basis for limiting inspections within the tubesheet constitutes a change to the method of evaluation for establishing the structural and leakage integrity of the tube-to-tubesheet joint. The staff requested this information since it was expected that licensees' safety basis relied on a mechanical expansion joint rather than the tube-to-tubesheet weld. Since the original tube-to-tubesheet joint was most probably designed by demonstrating that the stresses in the tube, weld, and tubesheet satisfy the allowable stress values in Section III of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) (or other similar standard), the staff questioned whether the safety basis for limiting inspections relied on demonstrating that the expansion joint satisfied some criteria (e.g., minimum tube pullout load criteria, allowable leakage) beyond those specified in Section III of the ASME Code.
By letter dated October 28, 2004, Arizona Public Service Company responded to GL 2004-01 for Palo Verde Nuclear Generating Station (Palo Verde), Units 1 and 3. The licensee concluded that the safety basis used to support Palo Verde's tube inspection practices does not constitute a change to the method of evaluation. This conclusion appears to be based, in part, on an assumption that the GL was implying that the selection of non-destructive evaluation techniques defines the limits of the reactor coolant pressure boundary. The GL's discussion of the original design basis, however, was related to the "safety analysis" performed by certain licensees to support a conclusion that flaws located a certain distance below the top of the tubesheet do not have any safety implications. This safety basis relies on a mechanical interference fit between the tube and the tubesheet for establishing the tube-to-tubesheet joint (i.e., forming the reactor coolant pressure boundary). However, for many plants (if not all), the original design of the steam generator gave no credit for this interference fit since the weld between the tube and the tubesheet ensured the integrity of the tube-to-tubesheet joint. In fact, the design rules (ASME Code,Section III) do not address the use of an interference fit for maintaining pressure boundary integrity. As a result, the staff questioned whether licensees were using a different method of evaluation for assessing the adequacy of the tube-to-tubesheet joint.
Although Palo Verde's response to the "method of evaluation" item did not focus on the NRC staff's area of concern, the staff concludes that Palo Verde's overall response to the GL is acceptable, since it indicated that the tube inspection practices at Palo Verde Units 1 and 3 meet the NRC staff position, with one exception. The exception is that the Palo Verde, Unit 1 and Unit 3, SG tube inspection programs are not consistent with the NRC's position with respect to inspections performed within the tubesheet. This exception has been entered into the licensee's corrective action program and a license amendment to clarify steam generator tube inspection practices in the tubesheet region was submitted to the NRC on May 26, 2005.
Palo Verde Generating Station, Units 1, 2, and 3 cc:
Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 40 Buckeye, AZ 85326 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower & Pavillion 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040 Mr. Craig K. Seaman, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Hector R. Puente Vice President, Power Generation El Paso Electric Company 310 E. Palm Lane, Suite 310 Phoenix, AZ 85004 Mr. John Taylor Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Mr. Thomas D. Champ Southern California Edison Company 5000 Pacific Coast Hwy Bldg D1B San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. John Schumann Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Karen O'Regan Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix AZ 85003
June 28, 2005 Mr. Gregg R. Overbeck Senior Vice President, Nuclear Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION, UNITS 1 AND 3 -
RESPONSE TO GENERIC LETTER 2004-01, REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTIONS (TAC NOS. MC4837 AND MC4839)
Dear Mr. Overbeck:
On August 30, 2004, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2004-01, Requirements For Steam Generator Tube Inspections. The purpose of GL 2004-01 was to obtain information that would enable the NRC staff to determine whether licensees steam generator tube inspection programs comply with the existing tube inspection requirements (the plant technical specifications in conjunction with Appendix B to Title 10 of the Code of Federal Regulations Part 50).
By letter dated October 28, 2004, Arizona Public Service Company responded to GL 2004-01 for Palo Verde Nuclear Generating Station, Units 1 and 3. As discussed in the attached evaluation, the staff concludes that the licensees overall response to the GL is enclosed If you have any questions regarding this matter, please contact me at (301) 415-3062.
Sincerely,
/RA/
Mel B. Fields, Senior Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: STN 50-528 and STN 50-530
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION PUBLIC RidsNrrPMMFields RidsNrrDlpmLpdiv2(DCollins)
PDIV-2 r/f RidsNrrLADBaxley RidsNrrDlpmDpr RidsNrrDlpmLpdiv (HBerkow)
RidsAcrsAcnwMailCenter TBoyce RidsRgn4MailCenter (SSchwind)
RidsOgcRp GHill (6)
PKlein JTerrell MYoder ACCESSION NO: ML051750477 NRR-106 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME MFields DBaxley DCollins DATE 6-27-05 6/24/05 6/28/05 OFFICIAL RECORD COPY