ML051710382
| ML051710382 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 06/20/2005 |
| From: | Bo Pham NRC/NRR/DLPM |
| To: | |
| Pham B M/NRR/DLPM/PD-2,415-8450 | |
| Shared Package | |
| ML051710654 | List: |
| References | |
| Download: ML051710382 (1) | |
Text
AGENDA FOR MEETING WITH SOUTHERN CALIFORNIA EDISON NRC HEADQUARTERS IN ROCKVILLE, MARYLAND JULY 6, 2005
==
Introduction:==
Southern California Edisons Alloy 600 Management Strategy Reactor Pressure Vessel Head Penetrations
- Non-Destructive Examination plans
- Repair plans Pressurizer Heater Sleeves
- Non-Destructive Examination plans
- Elimination of Alloy 600 from the heater sleeve pressure boundary PUBLIC COMMENTS Reactor Coolant System Instrumentation Penetrations
- Mechanical Nozzle Seal Assemblies
- Non-Destructive Examination plans
- Replacement of Alloy 600 instrument nozzles with Alloy 690 Steam Generator tubing
- Non-Destructive Examination Plan
- Repair plans
- Technical Specification change requests PUBLIC COMMENTS Meeting adjourned