Palo Verde
,\\\\ I-//
7I-,-I -I -M W--
Station Black Out Presentation To The Nuclear Regulatory Commission May 24, 2005
Palo Verde Agenda
- Introductions Carl Churchman/
Mel Fields
- Description of Proposed M. Karbassian Changes to Station Blackout Coping Strategy
- Closing Remarks C. Churchman/
M. Fields
Palo Verde B ackground
- APS Power Uprate License Amendment Request
- Increase Power by 2.94% for U1 & U3
- 3876 MWt to 3990 MWt
- Currently being reviewed by NRC Staff
- June 14, 2004 Loss of Off-site Power
- Unit 1,2 & 3
- SBO Category P3 Plant with 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> Coping Strategy
Palo Verde 41 Purpose
- Identify Actions Necessary to Comply With 16 Hour Coping Strategy
Palo Verde What is PV's SBO Design Basis
- Alternate AC (AAC) Plant Per Reg Guide 1.155 &
- Ltr 161-04146-WFC/MEP, dated August 31, 1991
- SE Dated February 11, 1992 (section 2.2.2)
- Requirement for an AAC Plant
- Demonstrate Coping W/O Power for 1 Hour
- 4.2 MW GTG On Line within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
- Demonstrate Coping With GTG available for an additional 3 Hours (Now 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />)
Palo Verde Existing Strategy (4 hr Coping)
Existing Analysis
- Assumes 120 GPM RCS Leak Rate
- Uses ADVs for Heat Removal
- Start GTG Within 1 hr
- Load EW/SP/EC/HVAC/Battery Chargers
- Establish Charging for Inventory Control
- Maintain Hot Standby Using ADVs
- Remain @ Hot Standby for the Following 3 Hours
Palo Verde
( Cor (16 hr Coping Credited Future Strategy
- Revised Analysis
- Assume 83 GPM RCS Leak Rate
- Minimize Operator Action During 1St hr
- Start GTG, Within 1 hr
- Load EW/SP/EC/HVAC/Battery Chargers
- Use ADV for Heat Removal
- Use HPSI for RCS Inventory Control
- Uses Pressurizer Vent for Pressure Control
- Cool Down to SDC Condition in 16 hrs
Palo Verde Evaluation of Design Basis RCS Inventory
- 4 hr Coping
- Core Remains Covered
- Credits Reflux Boiling
- 16 hr Coping
- Core Remains Covered
- Natural Circulation
- Reviewed by NRC
- February 11, 1992
Palo Verde Hot Leg Temperatures (OF) tL5s ja:-
am0 31 CI.,
I-I U 10 Wo.
Palo Verde Cold Leg Temperatures (OF) 550 ARCl 450 2t~
4cMJ.
2CU n DO Time (seconds,)
Palo Verde Pressurizer Pressure (PSIA)
-\\\\ I /.,
Hawley 2500 2000 1500 1 000 SOD 0l Time (seconds)
Palo Verde Pressurizer Level (ft) 25 -
0 15 l
ID 5
15 0
1 OOD 20000 30000 4000D 50000 0i000 lime (seconds)
Palo Ve rde Leak Flow (per RCP)
(Ibmlsec) 2 -
-4 1.2j..
I
Palo1 Vrde Evaluation of Condensate Inventory
- 4 hr Coping
- 16 hr Coping
- Required Condensate 156000 gallons
- Decay Heat Sensible Heat SG Inventory Recovery
- Per NUMARC Guidelines
- Reviewed By NRC
- February 11, 1992
- Required Condensate
- 266000 gallons
- Decay Heat (ANSI + 2a)
Sensible Heat
- RSG Inventory Recovery
- Analyzed Using CENTS Code
- Methodology Change
Palo Verde Integrated AFWS Flow (Ibm)
-15 E l
li 41
~
I I*
/9 I X)
Palo Verde
-\\ I /
Evaluation of Condensate Inventory
- Available Condensate Inventory CST 300,000 gallons (Minimum Tech Spec) 300,000 gallons Available (Not Tech Spec)
- RMWT
Palo Verde XW -
Evaluation of Class IE Battery Capacity
- No Effect on Class lE Battery Capacity From 16 hr Coping
- Battery Chargers are Loaded on to GTG Within 1 hr Original Analysis Sized the Batteries to Support SBO for 2 Hours
- Equipment Credited in the First Hour Remains Bounding
Palo Verde
,S I /
Evaluation of Compressed Air Capacity
- 4 hr Coping
- 16 hr Coping ADVs ADVs
- Nitrogen Accumulator RCP Seal Bleedoff
- Reviewed By NRC July 28, 1992
- Insufficient Margin with Nitrogen Accumulator.
- Portable Diesel Driven Air Compressor Will be Available for Connection to Instrument Air Header
- RCP Seal Bleedoff
- No Change to IA Backup April 13, 1994
Palo Verde Evaluation of Loss of Ventilation Control, AFWP, DC Equip and Battery Rooms
- 4 hr Coping Cooling is Loaded on to GTG for the Following Rooms Within 1 hr.
- Control Room
- AFWP Room
- 16 hr Coping No Effect on the Heat loads Due to 16 hr Coping or Power Uprate Cooling will Be Loaded on to the GTG within 1 hr.
- DC Equipment Room
- Switchgear Room
- Battery Room
- Reviewed by the NRC
- Feb 11, 1992 July 28, 1992
- No Effect Due to 16 hr Coping Strategy Change
Palo Verde Evaluation of Loss of Ventilation Charging Pump Room and MSSS Bldg Upper Elev.
- 4 hi-Coping
- No Credit was Given for Room Cooling for the Following:
- Charging Pump Room
- MSSS Upper Elevation
- Review by the NRC
- Feb 11, 1992
- July 28, 1992
- 16 hr Coping No Credit is Given for Room Cooling for the Identified Rooms, Steady State Temperature in Chg Pump Room &MSSS Building Remains Below Equipment Qualification Temperature Criteria
Palo Verde X1/
Evaluation of Loss of Ventilation Containment
- 4 hr Coping
- 16 hr Coping
- Containment In house Code
- Utilizes NUMARC Criteria
- Heat Sinks Per NUMARC Perform Temperature Transient Analysis Vs Steady State Solution
- Results Demonstrate Containment P/T remains bounded by the LOCA P/T Containment COPPATA Code
- NRC Approved
- Used for Containment P/T analysis for LOCA
- Heat Sinks Per UFSAR 6.2 Results Demonstrate containment P/T remains bounded by the LOCA Methodology Change
Palo Verde Comparson of Containment Vapor temperature SBO and limiting LOCA 1-
300 280 260 240 L.I-E1 80 160 140 120 100 0
10 20 Time (hr)
Palo Verde Comparson of Containment pressure SBO and limiting LOCA 80
-SBO @120gpm leakage LOCA 70-60 -
50 1C) a 40-Max i 27.5 PSIA 16 hr 30-20 5
10 0.00 5.00 10.00 15.00 20.00 Time (hr)
Palo Verde Evaluation of Containment Isolation
- 4 hr Coping
- Containment Isolation Valves Were reviewed for the applicability or exclusion to NUMARC 87-00 Criteria and found acceptable
- Located in UFSAR Tables 6.2.4-1 & 6.2.4-2
- Reviewed by the NRC
- April 13, 1994
- 16 hr Coping
- Will Not Reach RAS at 16 hrs
- No Impact to the Containment Isolation capability due to PUR Or 16 hr Coping
Palo Verde Evaluation of Communication
- EPABX (Telephone)
- Plant 2 Way Radio 8 hr battery 4 hr battery, Transfer Switch
- Sound Power Phones
Palo Verde Evaluation of Communication
- 4 hr Coping
- Primary Modes of Communication EPABX Telephone Sound Power Phone Radios
- Reviewed by the NRC April 13, 1994
- 16 hr Coping
- Primary Mode of Communication EPABX Telephone
- (8 hr Battery back-up)
Radios
- (4 hr Battery back-up)
- (Transfer Switch)
Sound Power Phone
- Sufficient Battery Back-up to Cope for 1 Hour Until GTG Loads the Radio System
Palo Verde r
Summary
- Regulatory Guide 1.155 Acceptance Criteria for 16 hr Coping Can Be Successfully Demonstrated
- Methodology Changes Will Be Introduced for Consistency With the Current Safety Analysis Methods