Category:Meeting Briefing Package/Handouts
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23090A1392023-04-0404 April 2023 April 4, 2023 Presubmittal Meeting Presentation - LAR to Adopt TSTF-266, Eliminate the Remote Shutdown System Table of Instrumentation and Controls (EPID: L?2023?LRM-0017) ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19192A0972019-07-11011 July 2019 License Amendment Request for Emergency Plan, July 11, 2019 ML18299A0722018-09-26026 September 2018 Ionizing Radiation Factsheet-Veterans - Information for Veterans and Their Families ML17320A1932017-11-15015 November 2017 NRC Public Meeting, Treatment of Mitigating Strategies in Risk Informed Decision Making ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML16357A6872016-12-20020 December 2016 One-Time License Amendment Request Unit 3 Train B Diesel Generator ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15156B3522015-06-0404 June 2015 Draft Slides for Public Meeting with Arizona Public Service Company Ongoing Resolution of Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13308C3402013-11-0404 November 2013 SG Unit 3 Telephone Call ML13025A2832013-01-29029 January 2013 NRC Comments on Draft Integrated Plans, Palo Verde ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12243A4352012-08-30030 August 2012 8/30/2012 Meeting RR 48 - Phased Array Ultrasonic Examination in Lieu of Radiography ML12243A4382012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT Vs Rt Discussion ML12243A4472012-08-30030 August 2012 8/30/2012 Meeting - RR 48 UT in Lieu of Rt for Nuclear Power Plant Applications ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML11188A0722011-07-0606 July 2011 NRC Meeting with NEI and Licensees June 28, 2011 Workshop Engineering Approach Rev F 2024-02-07
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24038A1742024-02-0707 February 2024 Pre-submittal Meeting Slides ML24019A1512024-01-22022 January 2024 Slides - Modification of Browns Ferry Technical Specifications to Eliminate LCO 3.3.2.1 Actions C.2.1.1 and C.2.1.2 for Rod Worth ML24003A8532024-01-0303 January 2024 January 4, 2024 Presubmittal Meeting Presentation-Risk Informed Process for Evaluations (RIPE) License Amendment Request for Safety Injection Tank (SIT) LCO (EPID: L?2023?LRM-0108) ML23296A0162023-10-20020 October 2023 October 20, 2023 Presubmittal Meeting Presentation - 1R24 Pressurizer Nozzle Repair - RR-70 (EPID: L?2023?LLR-0057) ML23240A3232023-08-31031 August 2023 APS Presentation Slides for Pre-Submittal Meeting on 8/31/23, Alloy-600 Management Program Plan ML23192A0102023-07-11011 July 2023 NRC RIPE 7-11-23 Public Meeting Presentation Slides ML23144A0252023-05-25025 May 2023 APS Presentation Slides for Pre-Submittal Meeting on 5/25/23, Przr Surge Line ML23093A0252023-04-30030 April 2023 April 5, 2023, Presubmittal Meeting Presentation - Containment Temperature and Safety Injection Tank Volume Requirements LAR ML23055B0572023-03-0101 March 2023 March 1, 2023 Presubmittal Meeting Presentation - Request for Use of Mururoa V4F1 and MTH2 Supplied Air Suits (EPID: L?2023?LRM-0012) ML22312A5952022-11-0808 November 2022 Independent Spent Fuel Storage Installation, Submittal of Annual Financial Reports 2021 ML22299A1812022-10-26026 October 2022 Presubmittal Meeting Presentation - License Amendment Request - Adoption of TSTF-107-A Separate Control Rods That Are Untrippable Versus Inoperable and Change to TS 3.1.5 Condition B (EPID: L?2021?LRM-0081) ML22096A0052022-04-0606 April 2022 TSTF-487 LAR Pre-submittal Public Meeting Presentation Slides ML22025A0012022-01-25025 January 2022 1/25/22 Pre-submittal Meeting Presentation Slides for RR-69 to Extend Containment Tendon Inspection by Three Months Beyond 2/8/22 ML21342A0502021-12-0808 December 2021 TSTF-567 LAR Pre-submittal Public Meeting Presentation Slides ML21320A1032021-11-17017 November 2021 RIPE Exemption 11-17-21 Pre-submittal Public Meeting Presentation Slides ML21278B0912021-10-0606 October 2021 Presubmittal Meeting with Arizona Public Service Company Regarding Relief Request No. 68 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (EPID L-2021-LRM-0104) (Slides) ML21243A5432021-09-0101 September 2021 Request for Partial Exemption from 10 CFR 50.62(c)(1) Risk-Informed Process for Evaluations (RIPE) ML21194A2502021-08-10010 August 2021 RIC 2021 - Ai EPRI-Artificial Intelligence and Development at EPRI ML21165A1832021-06-14014 June 2021 RR-67 6-16-21 Pre-Submittal Public Meeting Presentation Slides ML21131A0132021-05-13013 May 2021 License Transfer from Pnm to SRP, 5-13-21 Pre-submittal Public Meeting Presentation Slides ML21130A6462021-05-13013 May 2021 Pre-Submittal Meeting with NRC on May 13, 2021 Application for Transfer of Minority Interests in Palo Verde Nuclear Generating Station, Units 1 and 2 Subject to Expiring Leases ML21055A8502021-02-24024 February 2021 Public Meeting Summary ML21025A0032021-01-26026 January 2021 Risk-Informed Process for Evaluations (RIPE) - NEI Public Meeting Presentation Slides ML21025A0042021-01-25025 January 2021 Risk-Informed Process for Evaluations (RIPE) - NRC Public Meeting Presentation Slides ML21011A2752021-01-0606 January 2021 License Amendment Request (LAR) to Revise Containment Leakage Rate Testing Program Frequencies - NRC Pre-Submittal Meeting, January 6, 2021 (Presentation Slides) ML20171A2352020-06-24024 June 2020 Inservice Testing - Supplemental Position Indication Relief Request - NRC Pre-Application Meeting - June 24, 2020 ML19060A2982019-03-0101 March 2019 Transmittal of Audit Presentation Slides Regarding License Amendment Request and Exemption Request to Support the Implementation of Framatome CE16HTP Fuel ML17003A0762017-01-10010 January 2017 Regulatory Audit Report for the November 2-3, 2016, Audit at the Westinghouse Facility in Rockville, MD, for the License Amendment and Exemption Requests Associated with Next Generation Fuel (CAC Nos. MF8076-MF8081) ML17003A0352017-01-0404 January 2017 Summary of Pre-Application Meeting with Arizona Public Service to Discuss a Proposed Second Emergency License Amendment Request to Revise Technical Specification 3.8.1, AC (Alternating Current) Sources - Operating, for Palo Verde Nuclear ML17003A0332016-12-29029 December 2016 Enclosure 2 - APS Meeting Slides ML17003A0862016-11-0303 November 2016 Enclosure 2 Slides Regulatory Audit Report for November 2-3, 2016 ML16253A4112016-09-0707 September 2016 Palo Verde Nuclear Generating Station Generic Letter 2004-02 - September 7, 2016 ML16083A4722016-03-24024 March 2016 NRC Subsequent Pre-Submittal Meeting Next Generation Fuel - Palo Verde, Units 1, 2, and 3 ML16014A1102016-01-20020 January 2016 Draft APS Slides for January 20, 2015, Public Meeting with APS Regarding Upcoming Next Generation Fuel License Amendment Request for Palo Verde, Units 1, 2, and 3 ML15348A0542015-12-15015 December 2015 Slides for December 17, 2015 Public Meeting with APS on Resolution of GL 2004-02 ML15244B2632015-08-27027 August 2015 Slides for Public Meeting with Arizona Public Service Company to Discuss License Amendment Request for Palo Verde Regarding Revised Methodology for Spent Fuel Pool Criticality Analysis ML15236A1342015-08-26026 August 2015 Presentation Slides for Public Meeting with Arizona Public Service Generic Letter 2004-02 for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML15159B2972015-06-0909 June 2015 Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Arizona Public Service, Palo Verde Nuclear Generating Station Public Meeting - June 9, 2015 ML15156B3312015-06-0909 June 2015 Public Meeting Slides on R2.1 Seismic Hazard Re-Evaluation ML15134A3592015-05-11011 May 2015 5/11/2015, Meeting Slide Regarding Pre-Submittal Meeting for Palo Verde Unit 1, 2, and 3 Updated Spent Fuel Pool Criticality Analysis ML15126A2072015-05-11011 May 2015 Presentation Slides for Prelicensing Meeting with Arizon Public Service Company to Discuss License Amendment Request for Palo Verde, Units 1, 2, and 3, ML15103A2882015-04-0909 April 2015 Presentation on Potential Relief Request About Pressure Boundary Leakage on Reactor Coolant Pump 2A Pipe Nozzle ML15070A2522015-02-18018 February 2015 Pre-Submittal Public Meeting Final Slides on Risk-Informed Completion Times. ML15042A4152015-02-11011 February 2015 Pre-Submittal Public Meeting Draft Slides on Risk- Informed Completion Times ML14184B4112014-06-11011 June 2014 Nrc/Nei/Utility MTG 6/11/14 ML14149A5092014-04-23023 April 2014 4/23/14 Meeting Slide for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Re. Sig Tube Inspection ML14098A1832014-04-0202 April 2014 4/2/2014 Meeting Slide for Bottom-Mounted Instrument (Bmi) Relief Request 52 Pre-Submittal Meeting ML13309A7202013-11-0505 November 2013 Meeting Presentation for November 5, 2013 Public Meeting Regarding Incorporation of NEI 11-04 Into the QA Program at Palo Verde Nuclear Generating Station, Units 1, 2, and 3 ML13308B3322013-11-0404 November 2013 Meeting Presentation for November 4, 2013 Public Meeting Regarding Bmi Leakage ML13197A0952013-07-11011 July 2013 7/11/13 Meeting Slides - Implementation of STAR Program and Replacement of the 2/3 Cycle Mtc Measurement 2024-02-07
[Table view] |
Text
Palo Verde ,\\I-//
-I M
7I-,-I - W--
Station Black Out Presentation To The Nuclear Regulatory Commission May 24, 2005
Palo Verde Agenda
- Introductions Carl Churchman/
Mel Fields
- Description of Proposed M. Karbassian Changes to Station Blackout Coping Strategy
- Closing Remarks C. Churchman/
M. Fields
Palo Verde B ackground
- Increase Power by 2.94% for U1 & U3
- 3876 MWt to 3990 MWt
- Currently being reviewed by NRC Staff
- June 14, 2004 Loss of Off-site Power
- Unit 1,2 & 3
- SBO Category P3 Plant with 16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> Coping Strategy
Palo Verde 41 Purpose
- Identify Actions Necessary to Comply With 16 Hour Coping Strategy
Palo Verde What is PV's SBO Design Basis
- Alternate AC (AAC) Plant Per Reg Guide 1.155 &
NUMARC 87-00
- Ltr 161-04146-WFC/MEP, dated August 31, 1991
- SE Dated February 11, 1992 (section 2.2.2)
- Requirement for an AAC Plant
- Demonstrate Coping W/O Power for 1 Hour
- 4.2 MW GTG On Line within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
- Demonstrate Coping With GTG available for an additional 3 Hours (Now 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />)
Palo Verde Existing Strategy (4 hr Coping)
Existing Analysis
- Assumes 120 GPM RCS Leak Rate
- Uses ADVs for Heat Removal
- Start GTG Within 1 hr
- Load EW/SP/EC/HVAC/Battery Chargers
- Establish Charging for Inventory Control
- Maintain Hot Standby Using ADVs
- Remain @ Hot Standby for the Following 3 Hours
Palo Verde (Cor Credited Future Strategy (16 hr Coping
- Assume 83 GPM RCS Leak Rate
- Minimize Operator Action During 1St hr
- Start GTG, Within 1 hr
- Load EW/SP/EC/HVAC/Battery Chargers
- Use ADV for Heat Removal
- Use HPSI for RCS Inventory Control
- Uses Pressurizer Vent for Pressure Control
- Cool Down to SDC Condition in 16 hrs
Palo Verde Evaluation of Design Basis RCS Inventory
- Core Remains Covered - Core Remains Covered
- Credits Reflux Boiling - Natural Circulation
Palo Verde Hot Leg Temperatures (OF) tL5s ja:- am0 31 CI.,
I-I U10 Wo.
Palo Verde Cold Leg Temperatures (OF) 550 ARCl 450 2t~ 4cMJ.
2CU n DO Time (seconds,)
Palo VerdePressurizer Pressure
-\\I /.,
Hawley (PSIA) 2500 2000 1500 1 000 SOD 0l Time (seconds)
Palo Verde Pressurizer Level (ft) 25 -
0 - 15
- - - - - - - . . . . . . . . . l ID 5 ---- ......... . . .. .. . ..
15 0 1OOD 20000 30000 4000D 50000 0i000 lime (seconds)
Palo Verde Leak Flow (per RCP)
(Ibmlsec) 2 - - - - . . . . . .. - -.-- - -
1.2j . .
I
Palo1Vrde Evaluation of Condensate Inventory
- 156000 gallons - 266000 gallons
- Decay Heat - Decay Heat (ANSI + 2a)
- Sensible Heat - Sensible Heat
- SG Inventory Recovery - RSG Inventory Recovery
Palo Verde Integrated AFWS Flow (Ibm)
. ' liE l
-15 ' - .
_- /9 41 ~ I I*
I X)
Palo Verde -\ I/
Evaluation of Condensate Inventory
- Available Condensate Inventory
- CST 300,000 gallons (Minimum Tech Spec)
- RMWT 300,000 gallons Available (Not Tech Spec)
Palo Verde XW -
Evaluation of Class IE Battery Capacity
- No Effect on Class lE Battery Capacity From 16 hr Coping
- Battery Chargers are Loaded on to GTG Within 1 hr
- Original Analysis Sized the Batteries to Support SBO for 2 Hours
- Equipment Credited in the First Hour Remains Bounding
Palo Verde ,S I/
Evaluation of Compressed Air Capacity
- ADVs - ADVs
- RCP Seal Bleedoff Nitrogen Accumulator.
- Portable Diesel Driven Air Compressor Will be
- 3082 gallon Tank Available for Connection
- 65000 ft3 HP Cylinder to Support 1 hr Duration to Instrument Air Header
- RCP Seal Bleedoff
- July 28, 1992
- April 13, 1994
Palo Verde Evaluation of Loss of Ventilation Control, AFWP, DC Equip and Battery Rooms
- Cooling is Loaded on to GTG - No Effect on the Heat loads for the Following Rooms Due to 16 hr Coping or Power Within 1 hr. Uprate
- Control Room - Cooling will Be Loaded on to
- AFWP Room the GTG within 1 hr.
- Feb 11, 1992 Coping Strategy Change
- July 28, 1992
Palo Verde Evaluation of Loss of Ventilation Charging Pump Room and MSSS Bldg Upper Elev.
- No Credit was Given for Room - No Credit is Given for Cooling for the Following: Room Cooling for the
- Charging Pump Room Identified Rooms,
- MSSS Upper Elevation - Steady State Temperature in
- Review by the NRC Chg Pump Room &MSSS Building Remains Below
- Feb 11, 1992 Equipment Qualification
- July 28, 1992 Temperature Criteria
Palo Verde X1/
Evaluation of Loss of Ventilation Containment
- In house Code - COPPATA Code
- Utilizes NUMARC Criteria
- Heat Sinks Per NUMARC
- Perform Temperature P/T analysis for LOCA Transient Analysis Vs
- Heat Sinks Per UFSAR Steady State Solution 6.2
- Results Demonstrate
- Results Demonstrate containment P/T remains Containment P/T remains bounded by the LOCA bounded by the LOCA P/T - Methodology Change
Palo Verde Comparson of Containment Vapor temperature 1-SBO and limiting LOCA 300 280 260 240 L.
I-E1 80 160 140 120 100 0 10 20 Time (hr)
Palo Verde Comparson of Containment pressure SBO and limiting LOCA 80
-SBO @120gpm leakage
- LOCA 70-60 -
50 1C) a 40-Max i 27.5 PSIA 16 hr 30-20 5 10 0.00 5.00 10.00 15.00 20.00 Time (hr)
Palo Verde Evaluation of Containment Isolation
- Containment Isolation Valves
- Will Not Reach RAS at 16 hrs Were reviewed for the
- No Impact to the Containment applicability or exclusion to Isolation capability due to NUMARC 87-00 Criteria and PUR Or 16 hr Coping found acceptable
- Located in UFSAR Tables 6.2.4-1 & 6.2.4-2
- April 13, 1994
Palo Verde Evaluation of Communication
- EPABX (Telephone) 8 hr battery
- Plant 2 Way Radio 4 hr battery, Transfer Switch
Palo Verde Evaluation of Communication
- Primary Mode of Communication Communication
- EPABX Telephone - EPABX Telephone
- Sound Power Phone * (8 hr Battery back-up)
- Radios - Radios
- Sound Power Phone
- April 13, 1994
- Sufficient Battery Back-up to Cope for 1 Hour Until GTG Loads the Radio System
Palo Verde r Summary
- Methodology Changes Will Be Introduced for Consistency With the Current Safety Analysis Methods
- New Equipment and Procedure Changes Are Necessary for Implementation of the 16 hr Coping Strategy