License Amendment, Issuance of Amendment to Extend the Inspection Interval for Reactor Coolant Pump Flywheels
ML051510045
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/07/2005
From: Mahesh Chawla
NRC/NRR/DLPM/LPD3
To: Solymossy J
Nuclear Management Co
Chawla M, NRR/DLPM, 415-8371
Shared Package
ML05 List:
References
TAC MC4868, TAC MC4869
Download: ML051510045 (12)


Text

June 7, 2005 Mr. Joseph M. Solymossy Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -

ISSUANCE OF AMENDMENTS TO EXTEND THE INSPECTION INTERVAL FOR REACTOR COOLANT PUMP FLYWHEELS (TAC NOS. MC4868 AND MC4869)

Dear Mr. Solymossy:

The Commission has issued the enclosed Amendment No. 170 to Facility Operating License No. DPR-42 and Amendment No. 160 to Facility Operating License No. DPR-60 for the Prairie Island Nuclear Generating Plant, Units 1 and 2, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated October 15, 2004.

The amendments revise TS 5.5.6, "Reactor Coolant Pump Flywheel Inspection Program," to increase the inspection interval from 10 years to 20 years. A notice of availability for this TS improvement using the Consolidated Line Item Improvement Process was published in the Federal Register on October 22, 2003 (68 FR 60422).

A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Mahesh L. Chawla, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306

Enclosures:

1. Amendment No. 170 to DPR-42
2. Amendment No. 160 to DPR-60
3. Safety Evaluation cc w/encls: See next page

June 7, 2005 Mr. Joseph M. Solymossy Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 -

ISSUANCE OF AMENDMENTS TO EXTEND THE INSPECTION INTERVAL FOR REACTOR COOLANT PUMP FLYWHEELS (TAC NOS. MC4868 AND MC4869)

Dear Mr. Solymossy:

The Commission has issued the enclosed Amendment No. 170 to Facility Operating License No. DPR-42 and Amendment No. 160 to Facility Operating License No. DPR-60 for the Prairie Island Nuclear Generating Plant, Units 1 and 2, respectively. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated October 15, 2004.

The amendments revise TS 5.5.6, "Reactor Coolant Pump Flywheel Inspection Program," to increase the inspection interval from 10 years to 20 years. A notice of availability for this TS improvement using the Consolidated Line Item Improvement Process was published in the Federal Register on October 22, 2003 (68 FR 60422).

A copy of our related safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.

Sincerely,

/RA/

Mahesh L. Chawla, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306

Enclosures:

1. Amendment No. to DPR-42
2. Amendment No. to DPR-60
3. Safety Evaluation cc w/encls: See next page DISTRIBUTION PUBLIC OGC PDIII-1 Reading ACRS LRaghavan KOBrien, RGN-III MChawla GHill(4)

THarris DLPMDPR ADAMS ACCESSION NO.: ML051510045 ADAMS ACCESSION NO.: ML051600101(TS)

ADAMS ACCESSION NO.: ML051510053 (Package)

OFFICE CLIIP LPM PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME WReckley MChawla THarris LRaghavan DATE 05/20/05 06/02/05 06/01/05 06/07/05 OFFICIAL RECORD COPY

NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-282 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 170 License No. DPR-42

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Nuclear Management Company, LLC (the licensee), dated October 15, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-42 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 170, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of its issuance and shall be implemented within 90 days.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: June 7, 2005

ATTACHMENT TO LICENSE AMENDMENT NO. 170 FACILITY OPERATING LICENSE NO. DPR-42 DOCKET NO. 50-282 Replace the following page of the Appendix A Technical Specifications with the attached revised page . The revised page is identified by amendment number and contains a marginal line indicating the area of change.

REMOVE INSERT 5.0-11 5.0-11

NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-306 PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 160 License No. DPR-60

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Nuclear Management Company, LLC (the licensee), dated October 15, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-60 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 160, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of its issuance and shall be implemented within 90 days.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: June 7, 2005

ATTACHMENT TO LICENSE AMENDMENT NO. 160 FACILITY OPERATING LICENSE NO. DPR-60 DOCKET NO. 50-306 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains a marginal line indicating the area of change.

REMOVE INSERT 5.0-11 5.0-11

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 170 TO FACILITY OPERATING LICENSE NO. DPR-42 AND AMENDMENT NO. 160 TO FACILITY OPERATION LICENSE NO. DPR-60 NUCLEAR MANAGEMENT COMPANY, LLC PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DOCKET NOS. 50-282 AND 50-306

1.0 INTRODUCTION

By application dated October 15, 2004 (ADAMS Accession No. ML042990395), the Nuclear Management Company, LLC (the licensee), requested changes to the Technical Specifications (TSs) for the Prairie Island Nuclear Generating Plant, Units 1 and 2. The proposed changes would extend the reactor coolant pump (RCP) motor flywheel examination frequency from the currently approved 10-year inspection interval to an interval not to exceed 20 years. These changes are based on Technical Specification Task Force (TSTF) change traveler TSTF-421 (Revision 0) that has been approved generically for the Westinghouse Standard Technical Specifications, NUREG-1431. A notice announcing the availability of this proposed TS change using the consolidated line item improvement process was published in the Federal Register on October 22, 2003 (68 FR 60422).

2.0 REGULATORY EVALUATION

The function of the RCP in the reactor coolant system (RCS) of a pressurized-water reactor plant is to maintain an adequate cooling flow rate by circulating a large volume of primary coolant water at high temperature and pressure through the RCS. Following an assumed loss of power to the RCP motor, the flywheel, in conjunction with the impeller and motor assembly, provides sufficient rotational inertia to assure adequate primary coolant flow during RCP coastdown, thus resulting in adequate core cooling. A concern regarding the overspeed of the RCP and its potential for failure led to the issuance of Regulatory Guide (RG) 1.14, "Reactor Coolant Pump Flywheel Integrity," Revision 1, dated August 1975. RG 1.14 describes a method acceptable to the U.S. Nuclear Regulatory Commission (NRC) staff of addressing concerns related to RCP vibration and the possible effects of missiles that might result from the failure of the RCP flywheel. The need to protect components important to safety from such missiles are included in General Design Criterion 4, "Environmental and Dynamic Effects Design Basis," of Appendix A, "General Design Criteria for Nuclear Power Plants," to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Licensing of Production and Utilization Facilities," which is applicable to plants that obtained their construction permits after May 21, 1971.

Specific requirements to have an RCP Flywheel Inspection Program consistent with RG 1.14 or previously issued relaxations from the RG are included in the Administrative Controls Section of the TSs. The purpose of the testing and inspection programs defined in the TSs is to ensure that the probability of a flywheel failure is sufficiently small such that additional safety features are not needed to protect against a flywheel failure. The RG provides criteria in terms of critical speeds that could result in the failure of a RCP flywheel during normal or accident conditions.

In addition to the guidance in RG 1.14, the NRC has more recently issued RG 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," which provides guidance and criteria for evaluating proposed changes that use risk-informed justifications.

A proposed justification for extending the RCP flywheel inspections from a 10-year inspection interval to an interval not to exceed 20 years was provided by the Westinghouse Owners Group (WOG) in topical report WCAP-15666, "Extension of Reactor Coolant Pump Motor Flywheel Examination," transmitted by letter dated August 24, 2001. The topical report addressed the proposed extension for all domestic WOG plants. The NRC accepted the topical report for referencing in license applications in a letter and safety evaluation (SE) dated May 5, 2003 (ADAMS Accession No. ML031250595).

3.0 TECHNICAL EVALUATION

TS 5.5.6, Reactor Coolant Pump Flywheel Inspection Program, reflects the licensee's previous adoption of a TS change that defined the allowable alternative to the inspections described in RG 1.14. The inspections are defined as in-place ultrasonic examination over the volume from the inner bore of the flywheel to the circle of one-half the outer radius or an alternative surface examination (magnetic particle testing and/or liquid penetrant testing) of exposed surfaces of the removed flywheel. The allowable interval for these inspections was extended in the previous amendment to "approximately 10 year intervals coinciding with the Inservice Inspection schedule as required by ASME [American Society of Mechanical Engineers, Boiler and Pressure Vessel Code,] Section XI." The change proposed in this amendment application would revise the allowable inspection interval to "20 year intervals."

The justification for the proposed change was provided in WCAP-15666, which the staff accepted for referencing in license applications by a letter and safety evaluation dated May 5, 2003. The topical report addresses the three critical speeds defined in RG 1.14: (a) the critical speed for ductile failure, (b) the critical speed for non-ductile failure, and (c) the critical speed for excessive deformation of the flywheel. The staff found that the topical report adequately addressed these issues and demonstrated that acceptance criteria, for normal and accident conditions defined in RG 1.14, would continue to be met for all domestic WOG plants following an extension of the inspection interval. The topical report also provided a risk assessment for extending the RCP flywheel inspection interval. The staff's review, documented in the SE for the topical report, determined that the analysis methods and risk estimates are acceptable when compared to the guidance in RG 1.174.

In conclusion, the staff finds that the regulatory positions in RG 1.14 concerning the three critical speeds are satisfied, and that the evaluation indicating that critical crack sizes are not expected to be attained during a 20-year inspection interval is reasonable and acceptable. The potential for failure of the RCP flywheel is, and will continue to be, negligible during normal and accident conditions. The change is therefore acceptable.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Minnesota State official was notified of the proposed issuance of the amendment. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendment changes the requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (70 FR 12748). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: W. Reckley Date: June 7, 2005

Prairie Island Nuclear Generating Plant, Units 1 and 2 cc:

Jonathan Rogoff, Esquire Tribal Council Vice President, Counsel & Secretary Prairie Island Indian Community Nuclear Management Company, LLC ATTN: Environmental Department 700 First Street 5636 Sturgeon Lake Road Hudson, WI 54016 Welch, MN 55089 Manager, Regulatory Affairs Nuclear Asset Manager Prairie Island Nuclear Generating Plant Xcel Energy, Inc.

Nuclear Management Company, LLC 414 Nicollet Mall, R.S. 8 1717 Wakonade Drive East Minneapolis, MN 55401 Welch, MN 55089 John Paul Cowan Manager - Environmental Protection Division Executive Vice President & Chief Nuclear Minnesota Attorney Generals Office Officer 445 Minnesota St., Suite 900 Nuclear Management Company, LLC St. Paul, MN 55101-2127 700 First Street Hudson, WI 54016 U.S. Nuclear Regulatory Commission Resident Inspector's Office Craig G. Anderson 1719 Wakonade Drive East Senior Vice President, Group Operations Welch, MN 55089-9642 Nuclear Management Company, LLC 700 First Street Regional Administrator, Region III Hudson, WI 54016 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Administrator Goodhue County Courthouse Box 408 Red Wing, MN 55066-0408 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN 55101-2198 November 2004