Un-Official Unit 3 Control Room OPS - 04/17/2005
ML051460190
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/17/2005
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2005-0207
Download: ML051460190 (3)


Text

  • Un-Official
  • Un-Official
  • Un-Official
  • Un-Officlal
  • Un-Offliclal
  • Un-Offidcal
  • Un-Offlcial -

Unit 3 Control Room OPS Day Shift ISunday, April fl, 2005 MM-14 GDL02 A 04117/2005 06:05 Performed dilution of the RCS, 45 gallons 0 80 gpm to maintain power. (NONIEWICZ, MARK Cntrt - Oprtr Secon Plant)

  • 04117/2005 06:23 Held Risk review meeting. No changes to scheduled activities are expected. PRA Condition remains GREEN as planned.(

CHRISTIANSON, SANDRA J. - STA)

A 04117/2005 07:32 Intake Structure Condition Determination Surveillance completed. Plant Factor Is 11. 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is 0. Environmental Factor forecast Plant Factoris 0, Environmental FactorIs 12. (CHRISTIANSON, SANDRA J. - STA)

A 04117/2005 07:46 Completed discharge of 3CND-TK1 1, WASTE NEUTRALIZATION SUMP. ( NONIEWICZ, MARK - CntriOprtr Secon Plant)

A 04117/2005 07:48 Chemistry placed 3CND-TK10, WASTE NEUTRAIiZATION SUMP, on recdrc for discharge. (NONIEWICZ, MARK - CntnOprtr Seon Plant)

A 04U17/2005 07:52 Entered Unit 3 Type: TS Section: 3.3.3.1 Action Statement b.29 (1), 3CMS'RE22Inoperable while performing noble gas sample.

3-P-3876-1.22N-05-040002 (KELLY, BRIAN - MISC)

A 047/2005 07:52 Entered Unit 3 Type: TS Section: 3.4.6.1 Action Statement a (1), 3CMS*RE22 Inoperable while performing noble gas sample.

3-P-3875-1.22N-05-04-0002 (KELLY, BRIAN - MISC)

A 04117/2005 08:01 Completed Unit 3 Type: TS Section: 3.3.3.1 Action Statement b.29 (1) Action: Comply with action of spec 3.4.6.1.

3-P-3875-1 .22N-05-04-0002 ( KELLY, BRIAN - MISC)

A 0417/2005 08:01 Completed Unit 3 Type: TS Section: 3.4.6.1 Action Statement a (1) Action: Verify redundant monitor OPERABLE 3-P-3875-1.22N-05-04-0002 (KELLY, BRIAN - MISC )

A 04/17/2005 08:11 Exdted Unit 3 Type: TS Section: 3.3.3.1 Action Statement b.29 (1), 3CMS-RE22 Inoperable while performing noble gas sample.,is restored and operable.

3-P-3875-1 .22N-05-04-0002 (KELLY, BRIAN - MISC)

A 04/17/2005 08:11 Exdted Unit 3 Type: TS Section 3.4.6.1 Action Statement a(1), 3CMS RE22 Inoperable while performing noble gas sample.is restored and operable.

3-P-3875-1.22N-05-04-0002 ( KELLY, BRIAN- MISC)

A 04/17/2005 08:29 Unit 3 Reactor Trip ( GAYNIER, BRIAN - MISC)

A 04/17/2005 08:29 First Out Steam Lne Pressure LowIsolation SI (GAYNIER, BRIAN - MISC)

A 041 7/2005 08:29 Entered Unit 3 Type: TS Section: 3.7.12 Action Statement a (0), 3FWA*P2 inoperable due to MSS'v5Inoperable. MSS'v5 appears to be dosed.

3-U-FWA03 04-0001 (GAYNIER, BRIAN - MISC)

-A -7471t20 08 Duty OfFIse rS iIt 3 Contr 6FRoom ( GAYMN Uin ER,BRIAN - MISC )

A 04117/200508:36 Diagnosed Reactor Trip with Safetyinfection. Only the A Safetyinfection Train acutateod. Manuallyinitiated cB Train Safety Injection. (GAYNIER, BRIAN - MISC)

A 04/17/2005 08:37 It was determined during Reactor Trip Immediate Actions that the steam supply to the Terry Turbine Aux feed pump did not actuate. (GAYNIER, BRIAN - MISC)

A 04/17/2005 08:39 Report from field: SIG*B Safety Valve stuck open. (GAYNIER, BRIAN - MISC)

A 04/17/2005 08:42 Event Classified as Alert Charlie One - BA2 Steam Uine Break Outside Containment (GAYNIER, BRIAN - MISC)

A 04/17/2005 08:44 Manually initiated*B Train MSI which failed to automatically acutate. (GAYNIER, BRIAN - MISC)

A 041172005 08:45 Indkications of PORV opening. (GAYNIER, BRIAN - MISC)

A 04117/2005 08:56 B S/G Safety Valve reopens; (GAYNIER, BRIAN - MISC)

A 04/17/2005 08:58 Report from field: 3-CHS-V661, Is ruptured. (GAYNIER, BRIAN - MISC)

A 0417/2005 08:59 Commenced implementation of ES 1.t, SI Termination. (GAYNIER, BRIAN - MISC)

A 0417/2005 09:00 ISO-NE notified of Unit3 reactortrip, IAW MP-01-SM-GDLO1.01. Rick Milardo was the ISO representative. ISO-NE Application Number 39125. (GOBEU, MIKE - MISC )

A 04/17/2005 09:09 TE-B1, CS-04 & TE-82, CS-02 have exceeded the EEQ Umit at approxrmately 119 degrees. (GAYNIER, BRIAN - MISC)

A 04117/2005 09:09 Entered Unit 3Type:TS Section: 3.7.14Action Statement a (0), CS-03 temperature Is greaterthan the tech spec limit on 130 dog F 3-U-EEQCS-03 -05.04-0001 (GAYNIER, BRIAN - MISC)

A 04117/2005 09:09 Entered Unit: 3 Type: TS Section: 3.7.14 Action Statement a (0). CS-03 temperature Is greater than the tech spec limit on 130 deg F 3-U-EEQCS-03 04-0002 (GAYNIER. BRIAN - MISC) -

A 04/17/200509:09 S/G B'Safety Valves and SIG 'CSafety Valves are open. (GAYNIER, BRIAN-MISC)

A 04117/200509:15 Terminated Safety injection In accordance with the EOP. (GAYNIER, BRIAN - MISC)

A 04117/2005 09:16 During attempts to re-energize 32-3T, the pre-charge light on INV-6 did not Illuminate. 32-3T has been re-energized on the alternate source. (GAYNIER, BRIAN - MISC)

Page 1 of 3

  • Un-Off'clal
  • Un-Officlal
  • Un-Official
  • Un-Official
  • Un-Official
  • Un-Officlal
  • Un-Official -

Unit 3 Control Room OPS Day Shift Sunday, April 17,2005 1

A 041i7/2005 09:18 Entered Unit 3Typo: TS Section: 3.7.14 Action Statement a (0), CS-02 temperature is greater than the tech spec limit on 120 dogF 3-U-EEQCS-02 04-0001 (GAYNIER, BRIAN - MISC)

A 04/1712005 09:18 Entered Unit 3 Type: TS Section: 3.7.14 Action Statement a (0), CS-04 temperature Is greater than the tech spec limit on 120 deg F 3-U-EEOCS-04 04-001 (GAYNIER, BRIAN - MISC)

A 04117/2005 09:20 Restored Normal Letdown (GAYNIER, BRIAN - MISC)

A 04/17/2005 09:23 NRC notified by SDO. NRC contact John Knoke. NRC Event Notification Number 41607. Conference call established.

GOBEUi. MIKE - MISC)

A 04117/2005 09:31 Report from Field: All S/G Safety Valves are Closed (GAYNIER, BRIAN - MISC)

A 04t17/2005 09:36 Reset Control Building Isolation. Supplying outside filitered air. (GAYNIER, BRIAN - MISC)

A 0411712005 09:43 The Unit 3 Shift Manager has been relieved as the CRDSEO and Is now the MCRO. (GAYNIER, BRIAN - MISC)

  • 04/17/2005 09:49 Shutdown both EDGs. (GAYNIER, BRIAN - MISC)

A 04/1712005 09:50 The only steam release remaining In progress Is from MOV-74D. (GAYNIER, BRIAN - MISC)

A 04/1712005 09:53 S/G sample results: A, B & C samples show no activity. (GAYNIER, BRIAN - MISC)

A 047/2005 09:59 The second Letdown Orifice has been placed hI service. (GAYNIER, BRIAN - MISC)

A 047/2005 10:05 Swapped to the'*' Charging Pump hI service. The *A Charging Pump Is stopped. (GAYNIER, BRIAN - MISC)

A 04W17/2005 10:05 Commencing activities to Isolate the leak at 3-CHS-V661. ( GAYNIER, BRIAN - MISC)

A 04/17/1200510:09 Turbine Rotor Is stopped. Turning Gear did not automatically engage & efforts manually engage the turning gear failed. (

GAYNIER, BRIAN - MISC)

A 04/1712005 10:11 BAT Level Low ( GAYNIER, BRIAN - MISC)

A 04/1712005 10:16 Pressurizer Level Is back on scale and lowering slowly. ( GAYNIER, BRIAN - MISC)

A 04W17/200510:19- MS-Vs I open and the Terry Turbine Aux Food PuInpsrunning. (GAYNIER, BRIAN -MISC) ____- __ _

A 04/172005 10:24 Main Turbine Turning Gear Is engaged. (GAYNIER, BRIAN - MISC)

A W1712005 0 1025 Manager of Communications took overcommrunications responsibility from the SDO. (GOBEU, MIKE - MISC) 04/171200 10:32 The leak at 3CHS-V661Is Isolated. The Isolation Is accomplished by shutting 3CHSV661 (Out of Normal Position) and 3CHS'V663 (Normally Closed). (GAYNIER, BRIAN - MISC)

A 04/17/2005 10:33 MP3 Door No. SV-49-2 (Security Door No. 393) In the Main Steam Valve Building has been deactivated by Security due to

-AiwA excessive alarms. This Isa SLCRS Door and It remains OPERABLE. (GAYNIER, BRIAN - MISC)

A 04/17/2005 10:36 Started the C CDS Chiller and reopened 3CCP-AOV178B and 3CCP-AOV178D (GAYNIER, BRIAN - MISC)

A 04/17/2005 10:36 After receiving concurrence from the NRC, and hearing the MOC on the line, the SDO secured communications wIth the NRC. (

GOBELI, MIKE - MISC)

A 04/1712005 10:38 Update Communication with the State of Connecticut Department of Environmental Protection: The DEP Is conducting a partial activation of the Hartford Armory. Dominion representatives are reporting to the armory. ( GAYNIER, BRIAN - MISC)

A 0/171200510:50 Stopped *A Auxdliary building Filter. (GAYNIER, BRIAN - MISC)

A 04/17/2005 10:55 The Manager of Nuclear Financial and Business Services was notified, iAW MP-01-SM-GDLO1.01. (GOBEU, MIKE - MISC) 04/17/2005 11:06 Closed 3CHS'AV8149A to Isolate the second Letdown Orifice. ( GAYNIER, BRIAN - MISC)

A 04/17/2005 11:09 Restored the Master Pressurizer Pressure Controller to auto. (GAYNIER, BRIAN - MISC)

A 04/17/2005 11:16 DGS-P3A started to Restore PRT Level to Normal. (GAYNIER, BRIAN - MISC)

A 04/17/200511:19 Secured DGS-P3Adue to highTemperatureson Boron RecoverySystem. (GAYNIER, BRIAN- MISC)

A, 04/1712005 11:27 Shift reviewing OP 3208. (GAYNIER, BRIAN - MISC)

A 04W17/2005 11:30 DGS-V949 Unlocked and Open. (GAYNIER, BRIAN - MISC)

A W047/2005 11:37 DGS-P3A re-started to continue restoring PRT Level to Normal. (GAYNIER, BRIAN - MISC)

A 04/17/2005 11:42 Reactor Coolant System Sampled For Depressurized Uquid. Boron Concentration Is 912 PPM Boron. [This Entry Copled From Unit 3 Chemistry - Day Dhift - 04/1712005 by WERNERDONALD, On Duty Chem Tech ] ( WERNER,DONALD - On Duty Chem Tech)

Page 2 of 3

Un-Official

  • Un-Official
  • Un-Official
  • Un-Officlal
  • Un-Official
  • Un-Official
  • Un-Official
  • Unit 3 Control Room OPS Day Shift Sunday, ApriI~i7, 2005 I

A 04117/200511:43 Condensate Polishers "A"A, OD & E have been removed from service. (GAYNIER, BRIAN - MISC)

A 04117/2005 11:47 DGS-P3A Isstopped, PRT Level Is 65%. (GAYNIER, BRIAN - MISC)

A 04117/2005 11:52 Commenced discharge of 3CND-TK10, WASTE NEUTRALIZATION SUMP, with tritium, permit # 5647. 3CND-FR246 channel check 140 gpm. 3CND-RE07 channel check Is sat. (GAYNIER, BRIAN - MISC)

A 04U17/200511:59 Charger-9 IsIn parallel with Battery-6. (GAYNIER, BRIAN - MISC)

A 04/17/2005 12:02 Completed Unit 3 Type: TS Section: 3.7.14 Action Statement a (0)Action: Record cumulative time and amount 3-U-EEOCS-02 044001 (GAYNIER, BRIAN - MISC)

A 04U17/2005 12:05 Filed the PRT from 65% to 85% forcooling. (GAYNIER, BRIAN - MISC)

A 04/17/200512:07 ENRS phones have been transfered to the Back Up Lines. (GAYNIER, BRIAN - MISC)

A 04/17/2005 12.07 DGS-P3A re-started to continue restoring PRT Level to Normal. (GAYNIER, BRIAN - MISC)

A 04/17/2005 12:15 DGS-P3A Is stopped, PRT Level is 65%. (GAYNIER, BRIAN - MISC) (GAYNIER, BRIAN - MISC)

A 04/17/2005 12:23 Stopped A & *B' CCI Pumps. (GAYNIER, BRIAN - MISC)

A 04/17/200512:28 Commenced a 5000 gallon boron addition to the RCS. (GAYNIER, BRIAN - MISC)

A 04/17/200512.30 Started the B CDS Chiller. (GAYNIER, BRIAN - MISC)

A 0417/2005 12.36 Filled the PRT from 65% to 85% for coolIng. (GAYNIER, BRIAN - MISC)

A 04/17/200512.39 The A &*B'AFW Pumps suctions have been aligned to the CST. (GAYNIER. BRIAN - MISC)

A 04/17/2005 12.40 DGS-P3A re-started to continue restoring PRT Level to Normal. (GAYNIER, BRIAN - MISC)

A, 04/17/200512:42 Completed Unit 3 Type: TS Section: 3.7.14 Action Statement a (0) Action: Record cumulative time and amount 3-U-EEOCS-03 04-0002 ( GAYNIER, BRIAN - MISC)

A 04/17/2005 12:43 Completed Unit 3 Type: TS Section: 3.7.14 Action Statement: a (0) Action: Record cumulative time and amount 3-U-EEOCS-04 04-0001 (GAYNIER, BRIAN - MISC)

A 04/17/2005 12:46 Exited Unit 3 Type: TS Section: 3.7.14 Action Statement a (0), CS-02 temperature Is greater than the tech spec limit on 120.

3-U-EEOCS-02 04-0001 (GAYNIER, BRIAN - MISC)

A 04/17200512-47 Exited Unit 3Type: TS Section: 3.7.14 Action Statement a (0). CS.03 temperature Is greater than the tech spec limit on 130 dog F.is restored and operable.

3-U-EEOCS-03 04-0002 (GAYNIER, BRIAN - MISC)

A 0417/2005 12.47 Exited Unit 3 Type: TS Section: 3.7.14 Action Statement: a (0), CS-04 temperature is greater than the tech spec limit on 120 dog F.Is restored and operable.

3-U-EEOCS-04 044001 ( GAYNIER, BRIAN - MISC)

A 04/17/2005 12:50 TE-137, CS-03 & TE-82, CS-02 remain above the EEO L-mit at approximately 128 and 117 degrees respectively. (GAYNIER, BRIAN - MISC)