May 24, 2005

R. T. Ridenoure

Vice President

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION -NOTIFICATION OF AN NRC TRIENNIAL FIRE

PROTECTION BASELINE INSPECTION (05000285/2005008)

Dear Mr. Ridenoure:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at the Fort Calhoun

Station in July and August of 2005. The inspection team will be comprised of reactor inspectors

from the NRC Region IV office, a resident inspector, and a contractor. The inspection will be

conducted in accordance with Inspection Procedure 71111.05T, "Fire Protection (Triennial),"

the NRCs baseline fire protection inspection procedure.

The schedule for the inspection is as follows:

Information gathering visit: July 12-14, 2005

Onsite inspection: July 25 - 29, 2005

August 8 - 12, 2005

Members of the inspection team will visit the Fort Calhoun Station on July 12-14, 2005, to

gather information and documents needed to support the inspection, obtain unescorted access,

to become familiar with your fire protection program, and to select the fire areas of interest for

the inspection. The enclosure to this letter provides a list of documents the team will need to

review. You are requested to transmit copies of some of the documents to the NRC Region IV

office for team use in preparation for the inspection. We would appreciate it if you could send

this information so that it will arrive in our office in Arlington, Texas, no later than noon on

July 18, 2005.

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest are those documents that establish that your fire

protection program satisfies NRC regulatory requirements and conforms to applicable NRC

and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room, (2) the electrical aspects of the post-fire safe shutdown analyses,

Omaha Public Power District

-2-

(3) reactor plant fire protection systems, and (4) the fire protection program and its

implementation should be available to support the team at the site during the inspection.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact Neil O'Keefe at 817-860-8269.

Sincerely,

/RA/

Linda J. Smith, Chief

Plant Engineering Branch

Division of Reactor Safety

Docket: 50-285

License: DPR-40

Enclosure: Triennial Fire Protection

Inspection Supporting Documentation

cc w/enclosure:

John B. Herman, Manager

Nuclear Licensing

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550

Fort Calhoun, NE 68023-0550

David J. Bannister

Manager - Fort Calhoun Station

Omaha Public Power District

Fort Calhoun Station FC-1-1 Plant

P.O. Box 550

Fort Calhoun, NE 68023-0550

James R. Curtiss

Winston & Strawn

1400 L. Street, N.W.

Washington, DC 20005-3502

Chairman

Washington County Board of Supervisors

P.O. Box 466

Blair, NE 68008

Omaha Public Power District

-3-

Sue Semerena, Section Administrator

Nebraska Health and Human Services System

Division of Public Health Assurance

Consumer Services Section

301 Centennial Mall, South

P.O. Box 95007

Lincoln, NE 68509-5007

Daniel K. McGhee

Bureau of Radiological Health

Iowa Department of Public Health

401 SW 7th Street, Suite D

Des Moines, IA 50309

Omaha Public Power District

-4-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (KSW)

Senior Resident Inspector (JDH1)

Branch Chief, DRP/C (KMK)

Senior Project Engineer, DRP/C (WCW)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

RidsNrrDipmIipb

ADAMS: Yes

G No Initials: _LJS____

Publicly Available G Non-Publicly Available

G Sensitive Non-Sensitive

R:\\_FCS\\2005\\FCS2005-008-ltr-nfo.wpd

RIV: DRS/PEB/SRI C: PEB

NFO'Keefe

LJSmith

/ra/

/RA/

05/ 19 /2005

05/19 /2005

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax

Enclosure

ENCLOSURE

Triennial Fire Protection Inspection Supporting Documentation

1.

The current version of your fire protection program and fire hazards analysis.

2.

Post-fire safe shutdown analysis.

3.

A listing of the fire protection program implementing procedures (e.g., administrative

controls, maintenance, surveillance testing, fire brigade).

4.

A copy of the operating procedure(s) used to implement alternative shutdown (III.G.3

areas) capability with or without control room evacuation.

5.

A copy of the operating procedure(s) used to implement post-fire operator action for

III.G.2 areas (non-alternative shutdown).

6.

Pre-fire plans for the selected fire areas (to be determined by the team leader during the

information-gathering trip).

7.

A list of equipment used to achieve and maintain hot standby and cold shutdown in the

event of a fire, and two copies of the piping and instrumentation (flow) diagrams for

these systems. These should include the systems used for RCS makeup, RCS

pressure control, decay heat removal, and reactivity control, including the essential

support systems.

8.

Plant layout drawings for the selected fire areas that identify (a) the physical plant

locations of major hot standby and cold shutdown equipment; (b) plant fire area and/or

fire zone delineation; and ©) the locations of fire protection equipment, such as

detection, suppression, and post-fire emergency lighting units.

9.

Electrical schematics and cable raceway listings for circuits supplying power to

components used to achieve and maintain hot standby and cold shutdown for fires

outside the control room and those components used for those areas requiring

alternative shutdown capability.

10.

A listing of design change packages, which were determined to impact fire protection

and post-fire safe shutdown, performed in the last 3 years.

11.

A listing of Generic Letter 86-10 evaluations performed in the last 3 years.

12.

A summary of open and closed fire protection Condition Reports initiated in the last 3

years which relate to the fire protection program or equipment.

13.

Copies of the licensing basis documents for fire protection. This should include all NRC

Safety Evaluation Reports discussing the fire protection program or equipment,

correspondence requesting or approving exemptions, deviations, etc., and other

pertinent documents.

-2-

Enclosure

14.

A listing of applicable codes and standards related to the design of plant fire protection

features and evaluations of any code deviations.

15.

A copy of the most current PRA information relating to plant response to fires, such as

the plants individual plant examination external event report (IPEEE). Also, the results

of any post-IPEEE reviews, and listings of actions taken or plant modifications

conducted in response to IPEEE information.

16.

Organization charts of site personnel down to the level of fire protection staff personnel.

17.

Drawings showing the emergency lights which support fire response.

18.

Procedures used to remove smoke from safety-related areas and the engineering

studies or calculations which support the bases for these procedures.

19.

Drawings of communication systems credited fire firefighting and plant operations during

fires where control room is occupied or evacuated.

20.

Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

21.

Maintenance Rule performance criteria and 3 years worth of performance history for fire

protection program systems or functions monitored within the Maintenance Rule

program.

22.

A copy of fire protection program requirements (e.g. limiting conditions for operation,

surveillance test requirements) covered by Technical Specifications, Technical

Requirements Manual, UFSAR, or similar documents.

23.

A listing of surveillance, testing, and preventive maintenance procedures used for fire

protection program equipment.

24.

Copies of any internal and external assessment reports of post-fire safe shutdown

capability and the fire protection program conducted since the last fire protection

inspection. This should include the widest interpretation of assessment (peer reviews,

contractor reports, QA audits or assessments, performance indicators, etc.)

25.

A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

26.

Design Basis Documents or operator study guides (lesson plan text and graphics

preferred) that describe the purpose/function/operating characteristics of the safe

shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and

reactivity control, including the essential support systems).

-3-

Enclosure

27.

Two copies of one-line diagrams of the electrical distribution system. These should

depict how power gets from the switchyard to ESF loads (480V and 4160V). Also

include the vital DC distribution system one-line diagrams. (One copy to Ken Sullivan,

one copy to the NRC team members).

28.

A list of fire areas which have been analyzed for potential to cause or not cause loss of

offsite power. If there is no such analysis, please provide a list of fire areas where

offsite power cables are routed, or where key breakers, protective relaying, or

transformers are located that deliver/controls offsite power from the switchyard to the

4160V ESF buses.

29.

A list of automatic and manually initiated gaseous fire suppression systems in the plant.

30.

A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or

maintain hot shutdown; b) reach and/or maintain cold shutdown.

31.

A list of high to low pressure interface valves.

32.

A copy of procedures governing the training and operation of the fire brigade.