May 23, 2005 MEETING
SUMMARY
LICENSEE:
Exelon Generation Company, LLC FACILITY:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 & 3
SUBJECT:
SUMMARY
OF MARCH 29, 2005, ANNUAL ASSESSMENT MEETING WITH EXELON On March 29, 2005, at 7:00 p.m., an Annual Assessment Meeting was conducted at the Peach Bottom Inn, Delta, PA, between the Nuclear Regulatory Commission (NRC) and Exelon. The NRC requested the meeting with Exelon management to discuss NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2004.
The NRC presented and discussed its assessment of the safety performance of Peach Bottom Units 2 and 3 for the period between January 1 through December 31, 2004. The NRC presentation included background on both plants, performance assessment results, an overview of calendar year 2005 planned inspections and oversight, and a discussion of general NRC issues. As part of this regulatory performance meeting, Exelon presented an overview of their performance.
NRCs assessment letter can be found in ADAMS with an accession number of ML050610708.
The meeting notice with the attached meeting agenda, and the meeting slides can be located in ADAMS with accession numbers of ML050680522 and ML051040366.
The time selected for this meeting was intended to increase attendance and encourage more participation from the public. Twelve members of the public attended. The public members who attended were from various organizations, or were local citizens. The public observed this meeting and were offered the opportunity to communicate with the NRC regarding Exelons
performance at Peach Bottom and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Exelon, the NRC answered questions from the public.
Sincerely,
/RA/
Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects Attachments: Meeting Attendees Exelon Slides
DOCUMENT NAME: E:\\Filenet\\ML051440057.wpd SISP Review Complete: MMS (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME GOttenberg/GKO MShanbaky/MMS1 DATE 05/23/05 05/23/05 OFFICIAL RECORD COPY
MEETING ATTENDEES NAME TITLE/ORGANIZATION Exelon Robert Braun Site Vice President/ Peach Bottom-Exelon Pam Cowan Director of Licensing/ Exelon Jose R. Dubon Exelon Joseph Grimes Plant Manager/ Peach Bottom-Exelon David Helker Exelon Ken Langdon Director, Work Management/ Peach Bottom-Exelon Jamie Mallon Manager, Regulatory Assurance/ Peach Bottom-Exelon Matthew D. Smith Exelon Garey L. Stathes Director, Maintenance/ Peach Bottom-Exelon Tony Wasong Director, Training/ Peach Bottom-Exelon NRC Fred Bower Senior Resident Inspector, NRC (Peach Bottom)
Geoffrey Ottenberg Region I, DRP, Reactor Engineer, NRC Daniel Schroeder Resident Inspector, NRC (Peach Bottom)
Mohamed Shanbaky Branch Chief, NRC George Wunder NRR Project Manager-Peach Bottom, NRC Others Tom Alexander None Beth Birchall None Bill Birchall None Ernie Crist Harford County Emergency Operations Eric Epstein TMI-Alert Ernest Guyll Peach Bottom Alliance Rich Janati Pennsylvania Department of Environmental Protection, Bureau of Radiation Protection Rich McLean Maryland Department of Natural Resources Robert M. Scarborough State Senator, Mike Waugh Bill Stairs None Kathy Stevens Reporter-York Dispatch Kathy Wasong None