JAMES R MORRIS Duke BVice President, Nuclear Support
- r Powere Nuclear Generation Duke Power 526 South Church St.
April 28, 2005 Charlotte, NC 28202 Mailing Address.
EC07H / PO Box 1006 U.S. Nuclear Regulatory Commission Charlotte, NC 28201-1006 Washington D.C. 20555 704 382 6401 704 382 6056 fax ATTENTION: Document Control Desk james.morris@duke-energy.com Re:
Catawba Nuclear Station, Units 1 & 2 Docket Nos. 50-413, 414 McGuire Nuclear Station, Units 1 & 2 Docket Nos. 50-369, 370 Response to NRC Bulletin 2003-01:
Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors By letter dated December 16, 2004 Duke Energy Corporation (Duke) provided a revision to the commitments made in association with Duke's responses to NRC Bulletin 2003-01. The commitment that was revised adds procedure steps to direct an early manual start of a containment air return fan during certain small break loss of coolant accidents. Duke had committed to have these procedure changes and the associated operator training complete for Catawba and McGuire Nuclear Stations by December 31, 2004. However, Duke discovered the need to evaluate the effect of this procedure change for loss of coolant accident (LOCA) scenarios at reduced reactor coolant system temperatures. The potential concern was that for these scenarios this action could adversely affect Emergency Core Cooling System (ECCS) inventory margins.
Therefore, Duke revised this commitment to allow additional evaluation to be performed prior to completing these procedure changes.
In the December 16, 2004 letter, Duke committed to complete additional evaluation by April 30, 2005 of the impacts of procedure changes that would direct an early manual start of a containment air return fan for Catawba and McGuire. Duke has completed the additional evaluation of these changes and determined that these actions are prudent and will not adversely impact ECCS inventory margins; however, a license amendment is required for implementation. As committed in the December 16, 2004 letter from Duke to the NRC, a license amendment request regarding the early manual start of the containment air return fan will be submitted by June 30, 2005.
Please direct any questions or additional needs for information to Mary Hazeltine at (704) 382-5880.
Very truly yours, A 1 2OD James R. Morris www. dukepower. corn
U.S. NRC April 28, 2005 Page 2 Xc:
W. D. Travers, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 J. J. Shea, Project Manger (MNS) (Addressee Only)
U.S. Nuclear Regulatory Commission Mail Stop 0-7 D11 Washington, DC 20555-0001 S. E. Peters, Project Manager (CNS) (Addressee Only)
U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9 Washington, DC 20555-0001 J. B. Brady Senior Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station E. F. Guthrie Senior Resident Inspector U. S. Nuclear Regulatory Commission Catawba Nuclear Station
U.S. NRC April 28, 2005 Page 3 bcc:
L.F. Vaughn R. L. Gill, Jr. (ECO50)
C.J. Thomas (MG01 RC)
L. A. Keller (CN01 RC)
K.L. Crane (MG01 RC)
K.E. Nicholson (MG01 RC)
R. C. Harvey (EC08H)
H. T. Baumgardner (CN030P)
M. R. Weiner (MG01OP)
M. L. Murdock (CN03SE)
P.W. Roberson (MG05SE)
S.C. Ballard (MG05SE)
J.C. Bigham (CN03SE)
P. F. Guill (MG05EE)
R. M. Dickson (CN04MD)
Catawba Master File - 815.02 McGuire Master File - 815.02 ELL Saluda River Electric Corporation P.O. Box 929 Laurens, SC 29360-0929 NC Municipal Power Agency No. 1 P.O. Box 29513 Raleigh, NC 27626-0513 TR Puryear NC Electric Membership Corporation CN03G Piedmont Municipal Power Agency 121 Village Drive Greer, SC 29651
04/28/2005 12:45 I
7048754279 SAFTY REVIEW VERIFY HARD COPY AGAINST WEB SITE IMMEDIATELY PRIOR TO EACH USE Nuclear Policy Manual - Volume 2 NSD 227 NRC CORRESPONDENCE REVIEW AND CONCURRENCE FORM PAGE 02
\\'
Applicable Site(S)
ONS 0 MNS ONS l0 Submittal Title/
Subject:
NRC Bulletin 2003-01, Potential Debris Blockage on emergency Sump Recirculation at PWRs Background Infomnation: Due to NRC by April 30,05 Scheduled Submittal Date:
4/28/05 PORC Approval Date NIA N
Submittal Lead Name Mary Hazeltine Mandatory Submittal Date? (YIN)
No ISRS Approval Date NA Commitment Review YIN Ye Phone 392-5080 Content Development (Attach additional Information as needed)
Contributor Name/Site Scopelextent of Contribution or Portion Contributed Mike Wider Engineering Individual Review (Attach additional Information as needed)
Reviewer Name/Site Signatu Portions or Subjects Reviewed and Nature of Review Gary Peterson Site VP Approval Regulatory Review Reviewer Name Sigatre Nature of Review Submittal Lead Kay Crane Regulatory NRIA/ HGC Manager Jeff Thomas RGC Approval SA Manager (Optional)
Jim Kamm er 4
Senior Mgrmt Approval Legal Dept. Review (Optional)
Name Signature Nature of Review
.1.
This completed form must bc presented with the original submittal for signature. The form may be filled in with reference to e-mailed information in place of actual signatures and required information so long as the e-mailed information is maintained with the copy of this form that is sent to Master file.
REVISION I VERIFY HARD COPY AGAINST WEB SITE IMMEDIATELY PRIOR TO EACH USE 1 '
VERIFY HARD COPY AGAINST WEB SITE IMMEDIATELY PRIOR TO EACH USE Nuclear Policy Manual - Volume 2 NSD 227 Applicable Site(s) ONS Submittal Title/Subject o
MNS E
CNS g
4Ilefivi 2-tol-;9 SLpPei./J I4,c' Background Information:
thAis-re.5?01n~e c yvasAd- œn œXxc
.e f;//
he sb e:kitdJ bh, rI4d/o&
A ado1te a a. f),1se/&d 16i'1ASta 1,
- s-& l-'
d 7,
- A
,&'dr7 g&
4g,4
+4 even4 {a 64, Scheduled Submittal Date:
Mandatory Submittal Date? (Y/N)
-
PORC Approval Date N /A NSRB Approval Date X
Commitment Review Y/N Submittal Lead Name Af - HA 7e AFe Phone 8-3 g z-S go)
Content Development (Attach addItional Information as needed)
Contributor Name/Site Scopelextent of Contribution or Portion Contributed Individual Review (Attach additional Information as needed)
Reviewer Name/She Signature Portions or Subjects Reviewed and Nature of Review Regulatory Review Reviewer Name Signature Nature of Review Submittal Lead NR&WA RGC Manager l
c C (/i_
__/
SA Manager (Optional)
This completed form must be presented with the original submittal for signature. The form may be filled In with reference to e-mailed Information In place of actual signatures and required Information so long as the e-mailed Information Is maintained with the copy of this form that Is sent to Master file.
Revision 2
NRC CORRESPONDENCE REVIEW FORM Applicable Site(s) ONS El MNS 0
CNS 0 Submittal Title/
Subject:
Bulletin 2003-01 Commitment letter Background Information:
Scheduled Submittal Date:
Mandatory Submittal Date? (Y/N) N PORC Approval Date:n/a NSRB Approval Date n/a Commitment Review Y/N Submittal Lead Printed Name:Mary Hazeltine Phone:704-382-5880 Content Development (Attach additional Information as needed)
Contributor Name/Site Scope/extent of Contribution or Portion Contributed Letter Originator Mary Hazeitine Individual Review (Attach additional Information as needed)
Reviewer Name/Site Signature Portions or Subjects Reviewed/ Nature of Review R. C. Harvey See attached E-Mall Regulatory Review Attach additional Information as needed)
Reviewer Name Signature Nature of Review Submittal Lead Mary Hazeltine NRIAN RGC Manager Robert L Gill SA Manager (eu wLm Legal Dept. Review (optional)
Printed Name Signature Nature of Review This completed form must be presented with the original submittal for signature. The form may be filled In with reference to e-malled Information In place of actual signatures and required Information so long as the e-malled Information Is maintained with the copy to Master File.