May 27, 2005 LICENSEE:
FirstEnergy Nuclear Operating Company (FENOC)
FACILITY:
Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2)
SUBJECT:
SUMMARY
OF APRIL 20, 2005, CATEGORY 1 MEETING WITH FENOC TO DISCUSS THE LICENSEES IMPROVED TECHNICAL SPECIFICATION CONVERSION LICENSE AMENDMENT APPLICATION DATED FEBRUARY 25, 2005 (AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS)
ACCESSION NO. ML050610340)
On April 20, 2005, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of FENOC, the licensee for BVPS-1 and 2, and its contractor, EXCEL Services Corporation (EXCEL) at the NRC headquarters located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the staffs acceptance review results regarding the proposed license amendment application to convert the BVPS-1 and 2 current Technical Specifications to the Improved Technical Specifications (ITS). The proposed ITS is intended to be consistent with the Improved Standard Technical Specifications as described in NUREG-1431, "Standard Technical Specifications - Westinghouse Plants," Revision 2, with additional changes to make the resulting BVPS-1 and 2 ITS more consistent with Revision 3 of NUREG-1431.
The staff reviewed the proposed application according to its conversion screening criteria and determined that the proposed license amendment request provided sufficient information for the staff to proceed with the review. During the meeting the staff discussed lessons learned from the Donald C. Cook Nuclear Plant ITS conversion, scheduling, and review procedures. A training session was provided by the licensee and its contractors regarding the use of the open item database. This web-based system which is open to the public provides an efficient means of communication between the staff and the licensee to resolve licensing and technical issues generated during the review process.
A list of attendees is provided in the Enclosure. No members of the public were in attendance.
CONTACT: T. Colburn, NRR Robert A. Clark 301-415-1402 301-415-2297 tgc@nrc.gov rlc2@nrc.gov
FENOC Please direct any inquiries to Messrs. Timothy G. Colburn, Senior Project Manager, at 301-415-1402, or Robert A. Clark, Lead Reviewer, Technical Specification Section, at 301-415-2297.
/RA/
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
List of Attendees cc w/encl: See next page
ML051320022 OFFICE PDI-1/PM PDI-2/LA IROB/SC PDI-1/SC NAME TColburn MOBrien TBoyce RLaufer DATE 5/23/05 5/24/05 5/25/05 5/26/05
LIST OF ATTENDEES CATEGORY 1 MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC), ET AL.
LICENSE AMENDMENT APPLICATION FOR IMPROVED TECHNICAL SPECIFICATION CONVERSION FOR BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 and 2)
APRIL 20, 2005, 8:30 AM-4:30 PM NAME ORGANIZATION
- 1. T. Colburn NRC
- 2. R. Clark NRC
- 3. T. Tjader NRC
- 4. P. Hearn NRC
- 5. T. Boyce NRC
- 6. C. Schulten NRC
- 7. N. Salgado NRC
- 8. C. Harbuck NRC
- 9. R. Laufer NRC
- 10. A. Demetrovich FENOC
- 11. R. Scheile EXCEL
- 12. F. Ferri EXCEL
- 13. J. Voll EXCEL
- 14. B. Sepelak FENOC
- 15. D. Hoffman EXCEL Enclosure
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)
FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)
Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077