Thomas Alexion - Additional_(Draft) Information onTcold in Footnote to TS 3.2.6 e -----

-- I -

.-...... S. -... 0...

Page 1 From:

To:

Date:

Subject:

MILLER, D BRYAN" <dmill14@entergy.com>

"Thomas Alexion'" <TWA@nrc.gov>

5/5/05 2:22PM Additional (Draft) Information on Tcold in Footnote to TS 3.2.6

<<Draft for NRC 5-5-05.pdf>>>

CC:

ISICARD, PAUL A" <PSICARD~entergy.com>

c:\\temn\\GWI00001.TMP Page 1 c-7mn\\W 1000.TMP Paea Mail Envelope Properties (427A6474.423: 2: 21539)

Subject:

Additional (Draft) Information on Tcold in Footnote to TS 3.2.6 Creation Date:

5/5/05 2:22PM From:

"MWiER, D BRYAN" <dmilIl4@entergy.com>

Created By:

dmill14@entergy.com Recipients nrc.gov owf4po.OWFNDO TWA (Thomas Alexion) entergy.com PSICARD CC (PAUL A SICARD)

Post Office Route owf4_po.OWFN_DO nrc.gov entergy.com Files Size Date & Time MESSAGE 33 05/05/05 02:22PM TEXT.htm 456 Draft for NRC 5-5-05.pdf 20819 Mime.822 30998 Options Expiration Date:

None Priority:

Standard Reply Requested:

No Return Notification:

None Concealed

Subject:

No Security:

Standard

Technical Specification 3.2.6 Footnote

  • to Technical Specification 3.2.6 allows the upper limit on Tcold to increase to 559OF for up to 30 minutes following a reactor power cutback in which (1) regulating groups 5 and/or 6 are dropped or (2) regulating groups 5 and/or 6 are dropped and the remaining regulating groups are sequentially inserted. This value is considered an arbitrary value to which uncertainty need not be applied. Footnote
  • to Technical Specification 3.2.6 was in the Waterford-3 Technical Specifications at the time of initial licensing. There has been no change to that footnote between initial licensing and EPU.

A reactor power cutback is a non-safety system which is in!

such as a turbine trip or a loss of one of two main feedwat of the turbine bypass valves. The reactor power cutbac$

more preselected CEA groups. This rapid reduction o than that provided by the normal high speed CEA ins prescribed operating ranges. Reactor power cutback safety analyses.

The reactor power cutback system will also throttle the t feedwater pump) to rebalance turbine and reactor wer. I power is greater than turbine demand, cold le rE negative MTC, the increasing temperature s

turbine demand, resulting in a stable pow he re power is substantially below full power, e is n len povm the ey of a load rejection, E

Jx ceeds the capacity Bathe dropping of one or te which is greater he plant to within iin a

RChapbr15 f tl ion valve (for a loss of a minor mismatch and core hgcrease. With a

.se to match the 1fbe turbine. Since this al margins.

Control system analyses conduc response to transients involving would result in a core poweriag operator actio drive in a nominal 543F ut 550F.

As stated in AttacW Amendment R Unglue with the char the T new range OF to 549 difference t maximum TX 1PU have modeled the plant Ixample, reactor power cutback e (EOC) Turbine Trip. With no about a 7F rise in Tcold from a F1VQ L0074, the 3716 MWt Extended Power Uprate License is be ised from 5680F to 5590F for EPU, in conjunction

O; the Logs being revised from a range of 541 0F to 558OF to a bie revision of this value to 5590F maintains the existing 1 0F Waterford-3 ensed wi Tcold range of 541 OF to 558OF, based on a nominal temperature rat Hot Zero Power (HZP) to 553OF at Hot Full Power (HFP).

Under 10CFR50.

a d-3 revised this nominal temperature program to a constant 5450F value in the early 1990's. For power uprate, a 20F ramp is being adopted, with nominal Tcold ranging from 5410F at HZP to 543OF at HFP. Thus, with the implementation of EPU, there will be a more restrictive range of 160F (559OF versus 5430F) to the footnote value compared to the pre-EPU range of 230F (5680F versus 545OF).

The original 568OF value in Technical Specifications was arbitrarily chosen to be 100F above the upper limit of the LCO, on the basis that it is reasonable to allow some deviation for a short period of time (30 minutes) to allow recovery and subsequent plant stabilization after the reactor power cutback. This also prevents unnecessary plant entries into Technical Specification ACTION statements. The 10F offset is unchanged for 3716 MWt Power Uprate.

5/5/2005, 1:20 PM Page 1 of 3

Operators select the appropriate CEA group(s) to drop during a reactor power cutback. The selection ensures that the reactor power following cutback will be less than the capacity of the turbine bypass valves of about 65%. Because a reactor power cutback is a plant transient of short duration, no additional accident or transient is postulated to occur simultaneously during the 30 minute time period of the TS 3.2.6 footnote where TCOd may be above the explicitly analyzed range. Also, due to the reduced power, there is significantly less energy and latent heat in the reactor core after the cutback.

Because the 559F value for the TS 3.2.6 footnote approved via Amendment 199 is not based on a specific analysis but is intended as a reasonable allowance for operator action to restore the plant within the normal LCO band of TS 3.2.6, there is no need to address instrument uncertainty with respect to this parameter. This footnote is not i onsisteyith many other Technical Specifications for which there is not any expliciit al tWa orts the time required for ACTION statements.

5/5/2005, 1:20 PM Page 2 of 3

Power Level for OPERABILITY of ADV Automatic Actuation Technical Specification 3.7.1.7 New Technical Specification 3.7.1.7 is being added due to EPU to specify OPERABILITY requirements for the Atmospheric Dump Valves. This TS is being added since the EPU Small Break LOCA Emergency Core Cooling System (ECCS) analysis credits one Atmospheric Dump Valve for the purpose of secondary pressure control; the ADV's were previously credited only for cooldown to shutdown cooling entry conditions and for their containment isolation function.

The small break LOCA analyses assume a maximum ADV setpoint of 1040 psia. This value is specified in the footnote to TS 3.7.1.7 and explicitly accounts for the instrument uncertainty offset from the nominal setpoint of 1007 psia.

Adz The footnote to the LCO also documents that the ADV required to be operable when the reactor has been at d Power for greater than 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (following long-term oje 3716 MWt). The value of 70% is specified based on r power level below which automatic actuation of the ADS acceptability of this arbitrary value, a calculation was pE heat load associated with operation for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> at 70%

ADV's need not be credited to demonstrate acceptable credited in the Waterford 3 Cycle 13 pre-uprata leads to the conclusion that long-term oper Rated Thermal Power) is acceptable with editi hour time frame supports the Bases for ONs c

exiting TS applicability within 6 hourfte edu Thermal Power.

i channels are not 70% Rated Thermal hjrhermal PQwer of a

pto demonstral&lHe decay Wnal Power is such that the ance. The ADV's are not

)C S analyses, which 3of 3J Wt (92.6% of EPU -

the SB§CA analysis. The 6 s TS 3.7.1.7, which calls for 1Nhan or equal to 70% of Rated Margin exists in the decay h lysis betwe ate power where ADV's are not required (e.g.2 term opno at 3441 MWt) ecay heat corresponding to operation at 70% of uprN rmal PO 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or less. The decay heat for a reactor trip after operation for sixh t 70% o d thermal power after long-term operation at 3716 MWt is around 10% bel from Ion operation at 3441 MWt. A strict analytical approach would result in creasing Thermal Power as a function of time, that is, the reactor powe d be s crease o approximately 92.6% in order for this decay heat logic to be ained. In eration of this margin and the fact that the decay heat load associated M70% power o will decrease with longer times, it is not considered necessary t Ny any explic e to account for power measurement uncertainty to the 70%

value specifi e hn ifications.

Based upon this ntergy considers this to be an arbitrary value to which uncertainty need not be applied and therefore a Category D parameter. If explicit analysis were performed this value could be raised to a value closer to 92.6%.

5/5/2005, 1:20 PM Page 3 of 3