ML051250511
| ML051250511 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 01/31/2005 |
| From: | Hironori Peterson NRC/RGN-III/DRS/OLB |
| To: | |
| References | |
| 50-331/05-301 50-331/05-301 | |
| Download: ML051250511 (7) | |
Text
ES-401 Written Examination Review Worksheet Form ES-401-9 Duane Arnold Jan-Feb 2005 Exam Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 1
F 2
S New.
2 H
3 U
E Modified. In distractor a, add the following words at the end of the distractor:... under the above conditions.
RESOLUTION: Comment incorporated.
3 H
2 S
New.
4 H
3 X
U U
New. 1) Page 41 of the EHC Logic System reference states that if the Main Generator load is NOT reduced to less than 25% within 3.5 minutes, that the turbine is tripped. The question stem states that at 1455 hours0.0168 days <br />0.404 hours <br />0.00241 weeks <br />5.536275e-4 months <br /> that the Main Generator load is at 25% (i.e., NOT less than 25%), thus it could be argued that a turbine trip is required (distractor B being correct). 2) Does a Main Generator trip always result in a Turbine Trip? If so, then distractors B and D are NOT independent distractors.
- 3) Change should to would in the distractors.
RESOLUTION: Comments incorporated. Changed 25% to 24%.
Instructions
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
1.
Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2.
Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy - difficult) rating scale (questions in the 2 - 4 range are acceptable).
3.
Check the appropriate box if a psychometric flaw is identified:
The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
The answer choices are a collection of unrelated true/false statements.
The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
4.
Check the appropriate box if a job content error is identified:
The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
The question requires reverse logic or application compared to the job requirements.
5.
Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6.
Based on the reviewers judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
7.
At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).
Note: (T) for K/A also indicates technical reviews. First 20 RO and first 10 SRO were the 30 initial review.
ES-401 2
Form ES-401-9 Duane Arnold Jan-Feb 2005 Exam Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 5
F 2
X U
E New. Since the Flood-up indicator is calibrated cold, it could be argued that it is NOT reliable and that there are NO correct answers.
RESOLUTION: Comment incorporated to clarify stem, level instrument that could be used to monitor and trend RPV level.
6 H
3 U
E New. Time for C/D IAW T/S is 100 deg/hr would be a simple elimination of two distractors. Change the question stem to delete the determination of the time required to be at a certain RPV pressure.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated.
7 H
3 U
S Bank.
8 H
3 S
Modified.
9 F
2 S
New.
10 H
3 X
U U
New. Distractors a & b not plausible for Rad monitors would most always be required. Change the question stem to ask what compensatory action is required based on the plant condition. Change distractor b to Secure in-vessel inspections and perform shiftly area radiation surveys.
Change distractor c to also include stationing an Operator in the Control Room to monitor the source ranges.
RESOLUTION: Comments incorporated. Rewrote question & distractors.
11 H
3 E
Modified. In the question stem, change the word INOPERATIVE to INOPERABLE so that it is a Tech Spec defined term.
RESOLUTION: Comment incorporated.
12 H
3 U
E New. The RED and BLACK needles at the top of the Figure do NOT appear to match the position of the chart recorder.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated. Picture corrected to better indicate the recorder info. Also, rearranged answer choices from shortest to longest.
13 H
3 X
U E
New. Reword the question stem to: Which of the following would be appropriate per procedure to raise the rate of heat rejection from the Torus? RESOLUTION: Comment incorporated.
Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 14 H
3 U
E Bank. 1) In the question stem, delete the word hatched. 2) Change LOK to Higher Cognitive Level instead of Fundamental. 3) Change answer justification to appropriately reflect why distractor b is the correct answer. RESOLUTION: Comments incorporated.
15 F
2 U
E Modified. Editorial: In distractor b, change an SRVs open to SRV(s) open. RESOLUTION: Comment incorporated.
16 H
3 U
S Bank.
17 H
3 S
Modified.
18 H
3 U
E New. In the question stem, change Battery Room Exhaust Fans to Battery Room Exhaust Fan(s).
RESOLUTION: Comment incorporated.
19 F
3 U
E Bank. In the question stem, change the question to Where would one operate these fans. RESOLUTION: Comment incorporated.
20 F
2 U
S New.
21 F
2 U
S Modified.
22 F
2 U
S New.
23 F
3 U
S Bank.
24 F
2 S
New.
25 H
2 U
E New. Change LOK to Higher Cognitive Level instead of Fundamental.
RESOLUTION: Comment incorporated.
26 F
2 U
S Modified.
27 H
3 U
S Bank.
28 H
3 S
New. NOTE: Question requires a reference.
29 H
3 U
S New.
30 F
2 U
S New.
31 F
2 S
Bank.
Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 32 H
2 U
E New. 1) In distractors a and b, state that SBLC is NOT injecting.
- 2) In distractor a, state the actual location in the plant where the SBLC pump was started.
NOTE: Question requires a reference.
RESOLUTION: Comments incorporated.
33 H
2 S
Bank.
34 F
2 U
S New.
35 F
2 E
Modified. Change electronic trip to auxiliary trip to clarify based on answer justification.
36 F
2 U
S Modified.
37 H
2 U
S New.
38 F
2 U
E Bank. 1) Change LOK to Fundamental instead of Higher Cognitive Level, since the question is basically just asking what plant conditions actuates ADS. 2) Delete the first two sentences in the stem, and preface the third sentence with After an accident.
RESOLUTION: Comments incorporated.
39 H
3 S
New.
40 F
2 U
S New.
41 F
3 U
E New. 1) Editorial: In the question stem, change effect to affect.
- 2) Change LOK to Fundamental instead of Higher Cognitive Level, since the question is basically just asking what equipment affects RPV level.
RESOLUTION: Comments incorporated.
42 H
3 U
E New. In the distractors, specify which valve one is referring to.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated. Choices reworded to note valve descriptions.
43 F
3 U
E New. 1) Change distractor a from 832 VAC to 800 VAC to make it more realistic as to what an operator could read on the Main Control Board. 2) Change distractor d to mention an actual voltage number instead of <65% of rated voltage (similar to distractor a) (2500 VAC).
RESOLUTION: Comments incorporated.
Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 44 H
3 U
E New. 1) Do not see any reference to show HPCI/RCIC auto transfer would occur. 2) In the question stem, add the following for clarity:
Which of the following...during the restoration of UPS to the preferred power supply?
RESOLUTION: Comments incorporated, during restoration.
45 F
2 U
E New. Change LOK to Fundamental instead of Higher Cognitive Level.
RESOLUTION: Comment incorporated.
46 H
1 X
U U
New. Distractors c and d are NOT plausible that the DG would be aligned to a Bus that is locked out.
RESOLUTION: Comment incorporated. Choices c & d rewritten to be plausible, and not tied to a dead bus.
47 F
2 U
S New. NOTE: Question requires a reference.
48 F
2 S
Bank.
49 F
2 U
E New. In the question stem, change to The bases for injecting....
RESOLUTION: Comment incorporated.
50 H
2 U
S New. NOTE: Question requires a reference.
51 F
2 X
U E
New. 1) In the question stem, state that a plant cooldown is in progress. 2) In the question stem, change SRVs to SRV(s).
RESOLUTION: Comments incorporated. Added more detail of plant condition in the stem.
52 H
3 U
E New. Change LOK to Higher Cognitive Level instead of Fundamental.
RESOLUTION: Comment incorporated.
53 F
3 U
S New.
54 H
3 S
Bank.
55 H
3 U
S Bank. NOTE: Question requires a reference.
56 F
2 S
New.
57 H
2 U
E New. 1) In the question stem, reword to state that a plant startup is in progress with certain plant conditions. 2) Based on the changes to the question stem, change LOK to Higher Cognitive Level instead of Fundamental, since an evaluation of the required action is necessary based on the stated plant conditions.
RESOLUTION: Comments incorporated. More details in stem.
Shortened the choices to be more concise.
Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 58 H
3 E
New. In the distractors, add the word Figure before the letter designation of A, B, C, and D.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated.
59 H
3 U
S New. NOTE: Question requires a reference. Rearranged choices from shortest to longest.
60 F
3 X
U E
New. 1) Change the question stem from applicable heatup to PREFERRED heatup to ensure the question is properly understood.
- 2) In distractors a and c delete the degF/hour, and in distractor b delete the degF/15 min RESOLUTION: Comments incorporated.
61 H
3 U
S New. NOTE: Question requires a reference.
62 H
3 U
S New. NOTE: Question requires a reference.
63 H
3 X
U E
New. Change the question stem to state that thermal power is 25%
instead of 37% to make distractor c more implausible.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated.
64 H
3 U
E New. In distractor d, add the word level after the word RPV.
RESOLUTION: Comment incorporated.
65 H
3 U
E New. Need an additional reference on system flow paths to support distractor d as the correct answer.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated. Added SD-672 Figure 1.
66 F
2 X
U E
Bank. In the question stem, change NSOE to ANSOE.
RESOLUTION: Comment incorporated.
67 H
3 U
S Modified.
68 F
3 X
U E
New. In distractors a and c, delete the phrase whether or not and reword as necessary.
RESOLUTION: Comment incorporated.
69 H
3 X
U E
New. To make distractor d more plausible, make it say that all three operators are required to be briefed and sign on the STP.
RESOLUTION: Comment incorporated.
70 H
3 U
S New.
Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 71 F
2 U
S Bank.
72 F
3 U
S New.
73 F
2 X
U E
Bank. 1) To make distractor c more plausible, change from EOP 3" to ALC. 2) Reword the question stem to state in more general terms the bases for EOP 1. RESOLUTION: Comments incorporated. Stem reworded to remove the 1500 deg F info.
74 H
3 U
E New. In the question stem, change CRS request permission to CRS consulting the OSM. RESOLUTION: Comment incorporated.
75 H
3 U
E Bank. Editorial: In the question stem, delete the word is in the question asked. RESOLUTION: Comment incorporated.
76 SRO (1)
H 2
X E
New. For symmetry, have two distractors (instead of one) with no forced flow in the RPV. RESOLUTION: Comment incorporated.
Changed choice c to note that no forced circulation in the RPV.
77 (2)
H 3
X S
New. NOTE: Question requires a reference.
78 (3)
H 2
U X
E New. 1) The references (i.e., EOP-1 and the ATWS EOP) should NOT be required to be supplied to the applicants, since the applicants should be able to answer the question based on their knowledge of EOP mitigation strategies. 2) Reword the distractors to be more general, such that mention of ATWS Steps 1 and 2 is NOT reuqired.
NOTE: Question requires a reference.
RESOLUTION: Comments incorporated. Corrected in the stem, Instrument AC to Uninterruptible power.
79 (4)
H 2
X U
X U
New. Distractors a and b are NOT plausible that one would read the vertical axis of the Heat Capacity Limit curve to obtain Reactor pressure.
Consider that variations in Reactor pressure and Torus water level may occur concurrently. The distractors could be:
- a. 400 psig, 1.0 feet (correct answer)
- b. 400 psig, 2.0 feet
- c. 500 psig, 1.0 feet
- d. 500 psig, 2.0 feet NOTE: Question requires a reference.
RESOLUTION: Comment incorporated.
80 (5)
H 3
U X
S Modified.
Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 81 (6)
H 3
X E
New. 1) Supply a picture of SPDS that shows that one is just inside the curve (i.e., that would imply that drywell spray is NOT needed). 2) Do NOT supply EOP-1 and EOP-2 as references, since the graphs from these EOPs will already be supplied as references.
NOTE: Question requires a reference.
RESOLUTION: Comments incorporated.
82 (7)
H 3
U X
U New. 1) Answer is a direct lookup. 2) Reword stem so that it does NOT directly state that there is a fire in the Turbine Building, but instead that one has to determine that such is the case. 3) Reword question so that one needs to determine the correct answer concerning damper operation during the fire condition.
NOTE: Question requires a reference.
RESOLUTION: Comments incorporated. Rewrote the question.
83 (8)
H 2
X U
X E
New. 1) The reference (i.e., RPV Flooding) should NOT be required to be supplied to the applicants, since the applicants should be able to answer the question based on their knowledge of EOP mitigation strategies. 2) Distractor a is NOT plausible that the start time for the minimum core flooding interval would be the time of the reactor scram.
Add another bullet to the timeline such that at 0815 hours0.00943 days <br />0.226 hours <br />0.00135 weeks <br />3.101075e-4 months <br /> all RPV level indication was lost.
RESOLUTION: Comments incorporated. Also, changed choice a to 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> to be more plausible.
84 (9)
H 3
U X
E New. In the question stem, delete the phrase assume that.
RESOLUTION: Comment incorporated.
85 (10)
H 3
U X
E New. In the question stem, change the torus water temperature from exceeded 95 degF to a value just under 95 degF(93). 2) In distractor b, delete the words as appropriate. 3) In distractor c, delete the words after administratively exiting EOP 2".
NOTE: Question requires a reference.
RESOLUTION: Comments incorporated.
86 (11)
H 3
U X
E New. Reword the question stem so that it is NOT asking for a Yes/No answer. NOTE: Question requires a reference.
RESOLUTION: Comments incorporated. Changed stem into a two part fill in the blanks.
87 (12)
H 2
U X
E New. In the question stem, change the second bullet to say: Level is being restored at 0.1 ft every 15 minutes and is presently at 7.5 ft.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated. Changed presently to currently.
Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 88 (13)
F 2
U X
S New.
89 (14)
F 3
U X
E New. In the question stem state that it is a venting process.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated. Reworded stem for more diagnostic type question and procedure transition.
90 (15)
H 3
U X
U New. Delete the reference provided, since otherwise the answer to the question is a direct lookup. RESOLUTION: Comment incorporated.
Rewrote stem of question.
91 (16)
H 3
U X
U New. 1) Reword question to focus on the K/A (i.e., actions necessary to predict and mitigate). 2) In the question rewrite, delete the requirement to have the Tech Spec reference provided.
RESOLUTION: Comments incorporated. Rewrote question and choices.
92 (17)
H 3
U X
E New. In distractors b and d, reword to state that the rod has NOT been withdrawn far enough to be a mispositioned rod, instead of being specific about more than one notch withdrawn.
RESOLUTION: Comment incorporated.
93 (18)
H 2
U X
U New. Distractor c is NOT correct (and thus there is NO correct answer),
since Tech Spec LCO 3.6.3.2 does NOT even apply until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is > 15% RTP (which starts at 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> of the next day). Thus, the correct answer is that there are 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> (instead of 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />) remaining to reduce Oxygen to < 4%.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated. Rewrote the question.
94 (19)
H 3
X U
X E
Bank. There is NO reason to include the reference for the alarm response procedures for LUBE OIL MAKE UP TANK LEVEL LOW-LOW and for LUBE OIL MAKE UP TANK LEVEL LOW, since the question stem already includes all the required information that the applicant would need from the ARPs.
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated. Clarified the distractors.
95 (20)
H 2
U X
S New. NOTE: Question requires a reference.
Q#
1.
LOK (F/H) 2.
LOD (1-5)
- 3. Psychometric Flaws
- 4. Job Content Flaws
- 5. Other 6.
U/E/S 7.
Explanation Stem Focus Cues T/F Cred.
Dist.
Partial Job-Link Minutia
- /
units Back-ward Q=
K/A SRO Only 96 (21)
H 4
U X
E New. The definitions in procedure RFP 403 for Easy Right, Hard Right, Easy Left, and Hard Left refer to mast rotations of 90 degF or 180 degF counter clockwise direction (or clockwise direction). However, the distractors refer to these rotations as either 45 degF or 135 degF?
NOTE: Question requires a reference.
RESOLUTION: Comment incorporated.
97 (22)
F 2
X U
X U
New. 1) Distractor a could also be considered correct, since procedure MD-024 only states that the Work Orders may be closed out by including the test in the startup package (it does NOT preclude one from holding the Work Orders open until the testing is complete). 2) Editorial: In distractor a make Package plural (i.e., Packages), and in distractor c make Orders plural (i.e., Orders).
RESOLUTION: Question was replaced with a Modified question from a previous exam.
98 (23)
F 3
X U
X E
New. 1) Distractor c is NOT plausible that isolating the engine coolant valve would prevent making the DG inoperable. 2) Change distractor d to state that one must immediately declare the SBDG inoperable.
RESOLUTION: Comments incorporated.
99 (24)
F 3
U X
E New. Editorial: In the question stem, in the second paragraph delete the comma (,) before the period (.) at the end of the first sentence.
RESOLUTION: Comment incorporated.
100 (25)
H 3
U X
U New. Q SRO only level.
RESOLUTION: Question was replaced with a New question.