ML051230256

From kanterella
Jump to navigation Jump to search

ANO, Unit 1 - Correction to SE on Amendment No. 223
ML051230256
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/05/2005
From: Alexion T
NRC/NRR/DLPM/LPD4
To: Forbes J
Entergy Operations
Alexion T W, NRR/DLPM, 415-1326
References
TAC MC5449
Download: ML051230256 (4)


Text

May 5, 2005 Mr. Jeffrey S. Forbes Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 1 - CORRECTION TO SAFETY EVALUATION DATE ON AMENDMENT 223 (TAC NO. MC5449)

Dear Mr. Forbes:

By letter dated April 14, 2005, the Nuclear Regulatory Commission (NRC) issued License Amendment No. 223 and the related Safety Evaluation (SE) which deleted the technical specification requirements for the Occupational Radiation Exposure Report and the Monthly Operating Reports. Your staff identified an error on page 5 of the SE. Specifically, the date of the SE is listed as August 14, 2005, when it should be April 14, 2005.

Therefore, the NRC is issuing a corrected page 5 of the SE, which is enclosed. We regret any inconvenience this may have caused.

Sincerely,

/RA/

Thomas W. Alexion, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-313

Enclosure:

Revised page 5 cc w/encl: See next page

May 5, 2005 Mr. Jeffrey S. Forbes Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 1 - CORRECTION TO SAFETY EVALUATION DATE ON AMENDMENT 223 (TAC NO. MC5449)

Dear Mr. Forbes:

By letter dated April 14, 2005, the Nuclear Regulatory Commission (NRC) issued License Amendment No. 223 and the related Safety Evaluation (SE) which deleted the technical specification requirements for the Occupational Radiation Exposure Report and the Monthly Operating Reports. Your staff identified an error on page 5 of the SE. Specifically, the date of the SE is listed as August 14, 2005, when it should be April 14, 2005.

Therefore, the NRC is issuing a corrected page 5 of the SE, which is enclosed. We regret any inconvenience this may have caused.

Sincerely,

/RA/

Thomas W. Alexion, Project Manager, Section 1 Docket No. 50-313 Project Directorate IV

Enclosure:

Revised page 5 Division of Licensing Project Management cc w/encl: See next page Office of Nuclear Reactor Regulation DISTRIBUTION:

PUBLIC PDIV-1 Reading RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDlpmLpdiv1 (AHowe)

RidsNrrPMTAlexion RidsNrrLADBaxley RidsRgn4MailCenter (AHowell)

Accession No.:ML051230256 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME TAlexion DBaxley AHowe DATE 5/5/05 5/5/05 5/5/05 OFFICIAL RECORD COPY Enclosure

6.0 ENVIRONMENTAL CONSIDERATION

The amendment relates to changes in recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.

7.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: W. Reckley Date: April 14, 2005

July 2004 Arkansas Nuclear One cc:

Senior Vice President

& Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Director, Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Mr. Mike Schoppman Framatome ANP 3815 Old Forest Road Lynchburg, VA 24501 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 Vice President, Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205