ML051110704
| ML051110704 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/21/2005 |
| From: | Conte R NRC/RGN-I/DRS/OSB |
| To: | Spina J Nine Mile Point |
| Shared Package | |
| ML050770291 | List: |
| References | |
| Download: ML051110704 (4) | |
Text
April 21, 2005 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
REACTOR OPERATOR RETAKE EXAMINATION -
NINE MILE POINT, UNIT 1
Dear Mr. Spina:
In a telephone conversation on April 18, 2005, between Mr. Ralph Hoffman, Nine Mile Point Initial Operator Training Supervisor, and Mr. Stephen Barr, USNRC Region I Senior Operations Engineer, arrangements were made for the administration of a licensing examination at Nine Mile Point, Unit 1 on June 17, 2005.
As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in Revision 9 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRCs regional office will discuss with your staff any changes that might be necessary before the examination is administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by April 22, 2005. The written examination and the supporting reference materials identified in Attachment 2 of ES-201 will be due by May 3, 2005. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines and examination before they are submitted to the NRC for review and approval. All materials should be complete and ready-to-use. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examination to be rescheduled.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.
To permit timely NRC review and evaluation, your staff should submit the preliminary reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)
(OMB approval number 3150-0090) at least 30 days before the first examination date. If the application is not received at least 30 days before the examination date, a postponement may be necessary. A signed application certifying that all training has been completed should be submitted at least 14 days before the examination date.
Mr. James A. Spina This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, under approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for this collection of information is estimated to average 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Hoffman has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Stephen Barr at (610) 337-5316, or me at (610) 337-5183.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-220 License No. DPR-63
Mr. James A. Spina cc w/encl:
M. J. Wallace, President, Constellation Generation M. Heffley, Senior Vice President and Chief Nuclear Officer C. W. Fleming, Esquire, Senior Counsel, Constellation Energy Group, LLC M. J. Wetterhahn, Esquire, Winston and Strawn Mr. William Flynn, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network R. Godley, Acting Manager - Nuclear Training T. Evans, Manager - Nuclear Training S. Glenn, INPO General Supervisor Outage Management, Niagara Mohawk Power Corporation
Mr. James A. Spina Distribution w/encl:
(via E-mail)
S. Collins, RA J. Wiggins, DRA W. Lanning, DRS R. Conte, DRS S. Barr, DRS C. Bixler, DRS J. Trapp, DRP S. Lee, RI OEDO R. Laufer, NRR P. Tam, PM, NRR T. Colburn, PM, NRR (Backup)
G. Hunegs, SRI - Nine Mile Point B. Fuller, RI - Nine Mile Point E. Knutson, RI - Nine Mile Point K. Kolek, DRP, OA DOCUMENT NAME: E:\\Filenet\\ML051110704.wpd SISP Review Complete: STB ADAMS PKG: ML050770291 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CJBixler/CJB STBarr/STB RJConte/RJC DATE 04/19/05 04/19/05 04/21/05 OFFICIAL RECORD COPY