Commitment Change Annual Report
ML051090026
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/05/2005
From: Rosalyn Jones
Duke Energy Corp, Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML051090026 (3)


Text

p Duke 15Powere A Duke Energy Company RON A. JONES Vice President Oconee Nuclear Site Duke Power ONOI VP / 7800 Rochester Highway Seneca, SC 29672 April 5, 2005 864 885 3158 864 885 3564 fax U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:Document Control Desk

Subject:

Duke Energy Corporation Oconee Nuclear Station, Units 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 Commitment Change Annual Report Attached is a summary report for Oconee commitment changes made for the last annual reporting period. These changes were made per the guidance defined in NEI 99-04. The changes to these commitments have no adverse effect on compliance with NRC rules and regulations.

If there are any questions, please contact Judy E. Smith @ 864-885-4309.

Very trul s,

R. A. Je ite Vice President Attachment 6-1 www. dukepower. corn

  • 1 U. S. Nuclear Regulatory Commission Commitment Change Evaluation Annual Report for 2004 April 5, 2005 Page 2 xc:

W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 L. N. Olshan NRC Senior Project Manager (ONS)

U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 NRC Senior Resident Inspector Oconee Nuclear Station

U. S. Nuclear Regulatory Commission Commitment Change Evaluation Annual Report for 2004 April 5, 2005 NRC Number Source Original Notification Document Commitment Modified.

Required Commitment Response to The acceptance The acceptance Generic Letter criteria will be criteria will be Yes 2004-0-001 88-14, dated based on air based on air May 8, 1989, operated valve operated valve from Hal Tucker vendor vendor recommendations recommendations and the Instrument and the Instrument Air Standard Air Standard ANSL/ISA-S7.3-ANSL/ISA-1975 edition.

7.0.01-1996 edition.

Responses to Periodically The LPSW cross-Yes 2004-0-001 Generic Letter inspect the LPSW connect piping 89-13, dated cross-connect will be September 1, piping, which is periodically 1994, and April buried, large bore flushed. The high 4, 1995.

piping.

velocity flush assures the pipe passes flow and therefore can perform its safety function.