PAM Instrumentation 3.3.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME RCS Cold Leg Temperature (Wide Range) channel inoperable and no OPERABLE SG Pressure channel for the associated SG.

D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Table 3.3.3-1 Time of Condition C not for the channel or train.

met.

E. As required by Required E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action D.1 and referenced in AND Table 3.3.3-1.

E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. As required by Required F.1 Initiate action in Immediately Action D.1 and accordance with referenced in Specification 5.6.6.

Table 3.3.3-1.

SURVEILLANCE REQUIREMENTS

- NOTE -

SR 3.3.3.1 and SR 3.3.3.3 apply to each PAM instrumentation Function in Table 3.3.3-1.

SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.

SR 3.3.3.2 Perform CHANNEL CALIBRATION of the following: 92 days

a. Function 22, RWST Level Instruments.

INDIAN POINT 2 3.3.3 - 2 Amendment No. 243

PAM Instrumentation 3.3.3 Table 3.3.3-1 (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITION FUNCTION REQUIRED CHANNELS REFERENCED FROM REQUIRED ACTION D.1

1. Reactor Coolant System (RCS) Hot Leg 1 per loop (a) E Temperature (Wide Range)
2. RCS Cold Leg Temperature (Wide Range) 1 per loop (b) E
3. RCS Pressure (Wide Range) 2 E
4. Reactor Vessel Level Indication System (RVLIS) 2 F
5. Containment Sump Water Level (Recirculation 2 E Sump)
6. Containment Water Level (Containment Sump) 3 E
7. Containment Pressure 2 E
8. Containment Pressure (High Range) 2 E
9. Containment Area Radiation (High Range) 2 F
10. NOT USED I
11. Pressurizer Level 2 E
12. Steam Generator (SG) Water Level (Narrow Range) 2 per steam generator E
13. Steam Generator Water Level (Wide Range) 4 E
14. Condensate Storage Tank level 2 F
15. Core Exit Temperature - Quadrant 1 2 trains(c) E
16. Core Exit Temperature - Quadrant 2 2 trains(c) E
17. Core Exit Temperature - Quadrant 3 2 trains(c) E
18. Core Exit Temperature - Quadrant 4 2 trains(C) E
19. Auxiliary Feedwater Flow 4 E
20. Steam Generator Pressure 2 per steam line E
21. RCS Subcooling Margin Monitor 2 E
22. RWST Level 2 E (a) The required redundant channel for each of the four loops of RCS hot leg temperature is a qualified Core Exit Temperature train in the quadrant associated with that loop.

(b) The required redundant channel for each of the four loops of RCS cold leg temperature is any channel of steam generator pressure for that loop.

(c) A CET train consists of two core exit thermocouples (CETs).

INDIAN POINT 2 3.3.3 - 4 Amendment No. 243

Hydrogen Recombiners 3.6.8 3.6 CONTAINMENT SYSTEMS 3.6.8 Not Used INDIAN POINT 2 3.6.8 - I Amendment No. 243

PAM Instrumentation 3.3.3 Table 3.3.3-1 (page 1 of 2)

Post Accident Monitoring Instrumentation CONDITION REFERENCED FROM REQUIRED SR 3.3.3.2 FUNCTION REQUIRED CHANNELS ACTION D.1 FREQUENCY

1. Neutron Flux 2 F 24 months
2. RCS Hot Leg Temperature (Wide Range) 1 per loop E 24 months (TM)
3. RCS Cold Leg Temperature (Wide Range) 1 per loop E 24 months (Tcold)
4. RCS Pressure (Wide Range) 2 E 24 months
5. Reactor Vessel Water Level 2 E 24 months
6. Containment Water Level (Wide Range) 2 E 24 months
7. Containment Water Level (Recirculation 2 E 24 months Sump)
8. Containment Pressure 2 E 18 months
9. Automatic Containment Isolation Valve. 2 per penetration flow F 24 months Position path(axb)
10. Containment Area Radiation (High Range) 2 F 24 months
11. NOT USED
12. Pressurizer Level 2 E 24 months I
13. SG Water Level (Narrow Range) 2 per SG E 24 months
14. SG Water Level (Wide Range) and 1 each per SG E 24 months, SGL Auxiliary Feedwater Flow 18 months, AFF
15. NOT USED
16. Steam Generator Pressure 2 per SG E 24 months
17. Condensate Storage Tank Level 2 F 24 months
18. Core Exit Thermocouples-Quadrant 1 2 (d) E 24 months
19. Core Exit Thermocouples-Quadrant 2 2 (d) E 24 months
20. Core Exit Thermocouples-Quadrant 3 2 (d) E 24 months
21. Core Exit Thermocouples-Quadrant 4 2 (d) E 24 months
22. Main Steam Line Radiation 1 per steam line F 24 months
23. Gross Failed Fuel Detector 2 F 24 months
24. RCS Subcooling Margin 2 E 24 months See NOTES, next page.

INDIAN POINT 3 3.3.3-4 Amendment 228

PAM Instrumentation 3.3.3 TABLE 3.3.3-1 (page 2 of 2)

Post Accident Monitoring Instrumentation NOTES:

(a) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.

(c) A channel consists of two core exit thermocouples (CETs).

INDIAN POINT 3 3.3.3-5 Amendment 228

Hydrogen Recombiners 3.6.8 3.6 CONTAINMENT SYSTEMS 3.6.8 Not Used INDIAN POINT 3 3.6.8-1 Amendment 22P