MONTHYEARML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML22307A0452023-11-17017 November 2023 Enclosure 1 - Amendment No. 297 to Rfl No. DPR-26 for Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements with Spent Fuel Transfer to Dry Storage ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML20297A3262020-11-23023 November 2020 Enclosure 2, Draft Conforming Amendments for Transfer of Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator ML20100H9922020-06-0202 June 2020 Issuance of Amendment No. 269 Proposed Technical Specification Changes to City Water Surveillance Requirement and Condensate Storage Tank Required Action A.1 ML20081J4022020-04-28028 April 2020 Issuance of Amendment No. 294 Permanently Defueled Technical Specifications ML20110A0052020-04-27027 April 2020 Correction to Amendment No. 267 Issued April 10, 2020, Changes to Technical Specifications for a Permanently Defueled Condition ML20071Q7172020-04-10010 April 2020 Issuance of Amendment Nos. 292 and No. 267 Changes to Technical Specification Sections 1.1, 4.0, and 5.0 for a Permanently Defueled Condition ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19072A1342019-03-15015 March 2019 Amended Provisional Operating License DPR-5, 3-22-2019 ML18212A1902018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix a ML18212A1852018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix B ML18212A1942018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix B ML18212A1952018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix C ML16064A2152016-04-12012 April 2016 Issuance of Amendments Cyber Security Plan Implementation Schedule NL-16-027, Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2016-03-0202 March 2016 Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement ML15349A7942016-02-23023 February 2016 Generation, Unit No. 2 - Issuance of Amendment Extension of the Containment Integrated Leak Rate Test to 15 Years NL-15-144, License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-144, Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 32015-09-0303 September 2015 Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 ML15226A1592015-09-0303 September 2015 Issuance of Amendment Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML15110A0092015-05-26026 May 2015 Issuance of Amendment Re Implementation of Technical Specification Task Force Traveler 510, Revision 2, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection(Tac Nos. MF3752 & MF3753) ML15083A4902015-04-0202 April 2015 Issuance of Amendment Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems ML15028A3082015-03-13013 March 2015 Issuance of Amendment Extension of the Type a Containment Integrated Leak Rate Test Frequency from 10 to 15 Years NL-14-128, Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years2014-12-0909 December 2014 Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years ML14265A3292014-09-24024 September 2014 Issuance of Amendment Temporary Change to Technical Specification 3.8.6 Battery 22 Surveillance Requirement (Exigent Circumstances) ML14287A2942014-09-17017 September 2014 Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual ML14198A1612014-09-0505 September 2014 Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (Tac No. MF3369) ML14169A5832014-07-17017 July 2014 Issuance of Amendment Revised Containment Integrity Analysis (Tac No. MF0591) NL-14-053, Response to Request for Additional Information Regarding Emergency Diesel Generator Fuel Oil Storage Supplies2014-04-14014 April 2014 Response to Request for Additional Information Regarding Emergency Diesel Generator Fuel Oil Storage Supplies NL-14-035, Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves2014-04-0101 April 2014 Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves ML14045A2482014-03-0505 March 2014 Issuance of Amendment Pressure-Temperature Limit Curves and Low Temperature Over Pressure Requirements NL-14-032, Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 22014-02-24024 February 2014 Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 2 NL-14-001, Indian Point, Unit 2 - Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair2014-01-16016 January 2014 Indian Point, Unit 2 - Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair NL-14-001, Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair2014-01-16016 January 2014 Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications NL-12-039, Proposed License Amendment Regarding Atmospheric Dump Valves2012-05-23023 May 2012 Proposed License Amendment Regarding Atmospheric Dump Valves NL-12-002, Proposed Change to Containment Purge System and Pressure Relief Line Isolation Instrumentation Technical Specifications2012-01-11011 January 2012 Proposed Change to Containment Purge System and Pressure Relief Line Isolation Instrumentation Technical Specifications NL-11-119, Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication2011-10-18018 October 2011 Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication NL-10-072, Proposed Technical Specification Change Regarding RWST Surveillance Requirement2010-10-0606 October 2010 Proposed Technical Specification Change Regarding RWST Surveillance Requirement NL-09-167, Proposed Exigent License Amendment Re One Time Extension of the Auxiliary Boiler Feedwater Pump Allowed Outage Time2009-12-15015 December 2009 Proposed Exigent License Amendment Re One Time Extension of the Auxiliary Boiler Feedwater Pump Allowed Outage Time NL-09-129, Indian Point, Unit 3, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2009-11-19019 November 2009 Indian Point, Unit 3, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources NL-09-129, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2009-11-19019 November 2009 Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources NL-09-119, Proposed License Amendment Regarding Diesel Generator Air Start Receiver Pressure, Indian Point Units 2 & 32009-11-17017 November 2009 Proposed License Amendment Regarding Diesel Generator Air Start Receiver Pressure, Indian Point Units 2 & 3 ML0834304242009-05-29029 May 2009 License Amendment, Technical Specifications Regarding Removal of Spent Fuel from Unit 1 and Drain Down of the Spent Fuel Pool NL-08-137, Reply to Request for Additional Information Regarding Amendment Application on Control Room Envelope Habitability2008-09-18018 September 2008 Reply to Request for Additional Information Regarding Amendment Application on Control Room Envelope Habitability ML0811401772008-06-0909 June 2008 Tec Specs to Amedment 236, License No. DPR-64 for Indian Point, Unit 3 ML0727805822007-10-0404 October 2007 Technical Specifications, Change of Pressure-temperature and Low Temperature Protection System Limits ML0722901282007-08-16016 August 2007 Technical Specifications 2023-12-05
[Table view] |
Text
PAM Instrumentation 3.3.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME RCS Cold Leg Temperature (Wide Range) channel inoperable and no OPERABLE SG Pressure channel for the associated SG.
D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Table 3.3.3-1 Time of Condition C not for the channel or train.
met.
E. As required by Required E.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Action D.1 and referenced in AND Table 3.3.3-1.
E.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> F. As required by Required F.1 Initiate action in Immediately Action D.1 and accordance with referenced in Specification 5.6.6.
Table 3.3.3-1.
SURVEILLANCE REQUIREMENTS
- NOTE -
SR 3.3.3.1 and SR 3.3.3.3 apply to each PAM instrumentation Function in Table 3.3.3-1.
SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.
SR 3.3.3.2 Perform CHANNEL CALIBRATION of the following: 92 days
- a. Function 22, RWST Level Instruments.
INDIAN POINT 2 3.3.3 - 2 Amendment No. 243
PAM Instrumentation 3.3.3 Table 3.3.3-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITION FUNCTION REQUIRED CHANNELS REFERENCED FROM REQUIRED ACTION D.1
- 1. Reactor Coolant System (RCS) Hot Leg 1 per loop (a) E Temperature (Wide Range)
- 2. RCS Cold Leg Temperature (Wide Range) 1 per loop (b) E
- 3. RCS Pressure (Wide Range) 2 E
- 4. Reactor Vessel Level Indication System (RVLIS) 2 F
- 5. Containment Sump Water Level (Recirculation 2 E Sump)
- 6. Containment Water Level (Containment Sump) 3 E
- 7. Containment Pressure 2 E
- 8. Containment Pressure (High Range) 2 E
- 9. Containment Area Radiation (High Range) 2 F
- 10. NOT USED I
- 11. Pressurizer Level 2 E
- 12. Steam Generator (SG) Water Level (Narrow Range) 2 per steam generator E
- 13. Steam Generator Water Level (Wide Range) 4 E
- 14. Condensate Storage Tank level 2 F
- 15. Core Exit Temperature - Quadrant 1 2 trains(c) E
- 16. Core Exit Temperature - Quadrant 2 2 trains(c) E
- 17. Core Exit Temperature - Quadrant 3 2 trains(c) E
- 18. Core Exit Temperature - Quadrant 4 2 trains(C) E
- 19. Auxiliary Feedwater Flow 4 E
- 20. Steam Generator Pressure 2 per steam line E
- 21. RCS Subcooling Margin Monitor 2 E
- 22. RWST Level 2 E (a) The required redundant channel for each of the four loops of RCS hot leg temperature is a qualified Core Exit Temperature train in the quadrant associated with that loop.
(b) The required redundant channel for each of the four loops of RCS cold leg temperature is any channel of steam generator pressure for that loop.
(c) A CET train consists of two core exit thermocouples (CETs).
INDIAN POINT 2 3.3.3 - 4 Amendment No. 243
Hydrogen Recombiners 3.6.8 3.6 CONTAINMENT SYSTEMS 3.6.8 Not Used INDIAN POINT 2 3.6.8 - I Amendment No. 243
PAM Instrumentation 3.3.3 Table 3.3.3-1 (page 1 of 2)
Post Accident Monitoring Instrumentation CONDITION REFERENCED FROM REQUIRED SR 3.3.3.2 FUNCTION REQUIRED CHANNELS ACTION D.1 FREQUENCY
- 1. Neutron Flux 2 F 24 months
- 2. RCS Hot Leg Temperature (Wide Range) 1 per loop E 24 months (TM)
- 3. RCS Cold Leg Temperature (Wide Range) 1 per loop E 24 months (Tcold)
- 4. RCS Pressure (Wide Range) 2 E 24 months
- 5. Reactor Vessel Water Level 2 E 24 months
- 6. Containment Water Level (Wide Range) 2 E 24 months
- 7. Containment Water Level (Recirculation 2 E 24 months Sump)
- 8. Containment Pressure 2 E 18 months
- 9. Automatic Containment Isolation Valve. 2 per penetration flow F 24 months Position path(axb)
- 10. Containment Area Radiation (High Range) 2 F 24 months
- 11. NOT USED
- 12. Pressurizer Level 2 E 24 months I
- 13. SG Water Level (Narrow Range) 2 per SG E 24 months
- 14. SG Water Level (Wide Range) and 1 each per SG E 24 months, SGL Auxiliary Feedwater Flow 18 months, AFF
- 15. NOT USED
- 16. Steam Generator Pressure 2 per SG E 24 months
- 17. Condensate Storage Tank Level 2 F 24 months
- 18. Core Exit Thermocouples-Quadrant 1 2 (d) E 24 months
- 19. Core Exit Thermocouples-Quadrant 2 2 (d) E 24 months
- 20. Core Exit Thermocouples-Quadrant 3 2 (d) E 24 months
- 21. Core Exit Thermocouples-Quadrant 4 2 (d) E 24 months
- 22. Main Steam Line Radiation 1 per steam line F 24 months
- 23. Gross Failed Fuel Detector 2 F 24 months
- 24. RCS Subcooling Margin 2 E 24 months See NOTES, next page.
INDIAN POINT 3 3.3.3-4 Amendment 228
PAM Instrumentation 3.3.3 TABLE 3.3.3-1 (page 2 of 2)
Post Accident Monitoring Instrumentation NOTES:
(a) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
(c) A channel consists of two core exit thermocouples (CETs).
INDIAN POINT 3 3.3.3-5 Amendment 228
Hydrogen Recombiners 3.6.8 3.6 CONTAINMENT SYSTEMS 3.6.8 Not Used INDIAN POINT 3 3.6.8-1 Amendment 22P