March 29, 2005 Mr. Dennis L. Koehl Site Vice President Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Koehl:
By letter dated February 25, 2004, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Point Beach Nuclear Plant (PBNP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.
These RAIs were discussed with your staff, Mr. Jim Knorr, and a mutually agreeable date for this response is within 30 days from the date of this letter. These questions on the time-limited aging analysis for the spent fuel pool storage rack boraflex, supercedes the Boraflex Monitoring Program questions previously submitted in the letter dated February 23, 2005. If you have any questions, please contact me at 301-415-3703 or e-mail VMR1@nrc.gov.
Sincerely,
/RA/
Veronica M. Rodriguez, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc w/encls: See next page
March 29, 2005 Mr. Dennis L. Koehl Site Vice President Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION
Dear Mr. Koehl:
By letter dated February 25, 2004, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to 10 CFR Part 54, to renew the operating licenses for Point Beach Nuclear Plant (PBNP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.
These RAIs were discussed with your staff, Mr. Jim Knorr, and a mutually agreeable date for this response is within 30 days from the date of this letter. These questions on the time-limited aging analysis for the spent fuel pool storage rack boraflex, supercedes the Boraflex Monitoring Program questions previously submitted in the letter dated February 23, 2005. If you have any questions, please contact me at 301-415-3703 or e-mail VMR1@nrc.gov.
Sincerely,
/RA/
Veronica M. Rodriguez, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
As stated cc w/encls: See next page Adams Accession No.: ML050880194 E:\\Filenet\\ML050880194.wpd OFFICE PM:RLEP PM:RLEP LA:RLEP SC:RLEP NAME VRodriguez GSuber (VRodriguez for)
MJenkins SLee (JZimmerman for)
DATE 03/29/05 03/05/05 03/29/05 03/29/05 OFFICIAL RECORD COPY
Point Beach Nuclear Plant, Units 1 and 2 cc:
Jonathan Rogoff, Esq.
Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Mr. Frederick D. Kuester President and Chief Executive Officer We Generation 231 West Michigan Street Milwaukee, WI 53201 James Connolly Manager, Regulatory Affairs Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Mr. Jeffrey Kitsembel Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 David Weaver Nuclear Asset Manager Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, MI 49043 Fred Emerson Nuclear Energy Institute 1776 I Street, NW., Suite 400 Washington, DC 20006-3708 Roger A. Newton 3623 Nagawicka Shores Drive Hartland, WI 53029 James E. Knorr License Renewal Project Nuclear Management Company, LLC 6610 Nuclear Road Point Beach Nuclear Plant Two Rivers, WI 54241
DISTRIBUTION: Letter to D. Koehl, Re: RAI for review of Point Beach Nuclear Plant, Units 1 and 2, Dated: March 29, 2005 Adams Accession No.: ML050880194 HARD COPY RLEP RF E-MAIL:
RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff P. Lougheed, RIII J. Strasma, RIII A. Stone, RIII H. Chernoff W. Ruland C. Marco L. Raghavan T. Mensah OPA
Enclosure POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION (LRA)
REQUEST FOR ADDITIONAL INFORMATION (RAI)
Spent Fuel Pool Storage Rack Boraflex RAI 4.6.1-1 In LRA Section B2.1.5, under the operating experience element, blackness tests along with Spent Fuel Pool (SFP) silica level measurements were completed during the August 1991, September 1996, and August 2001 scheduled surveillances. The staff requests the applicant to provide the most recent results of these tests to demonstrate that unexpected degradation of the Boraflex will be detected in a timely manner.
In addition, under the program description element in LRA Section B2.1.5, the applicant stated that blackness testing and areal density testing will be performed at a frequency of once every 5-years. Justification and approval of the 5-year frequency for blackness testing was provided in a Wisconsin Electric letter dated April 13, 1989, and U.S. Nuclear Regulatory Commission letter dated February 21, 1990. The staff requests the applicant to provide justification of the 5-year frequency for areal density testing using the requested data to demonstrate that the current rate of degradation will not exceed the acceptance criteria if the panels are tested at this frequency.
RAI 4.6.1-2 In LRA Section B2.1.5, under the program description element of the Boraflex Monitoring Program, the applicant stated that a predictive code, EPRI RACKLIFE or its equivalent, will be used to determine which panels will be subjected to full length testing (i.e., blackness testing, neutron attenuation, and areal density testing) and to trend and analyze SFP silica level measurement results. The input to the predictive code includes areal density and SFP silica level measurements. If areal density testing is first completed after the beginning of the period of extended operation, the staff requests the applicant to justify the ability of the predictive code to accurately project the condition of the panels to ensure that the degradation does not exceed the acceptance criteria with one set of data, or commit to conducting baseline testing prior to entering the period of extended operation.
RAI 4.6.1-3 In LRA Section B2.1.5, under the acceptance criteria element, the applicant stated that this element is consistent with NUREG-1801, Generic Aging Lessons Learned (GALL) Report.
The staff request the applicant to provide more information regarding your acceptance criteria and what specific corrective actions will be taken if trends indicate that the acceptance criteria may be met.