Category:Status Report
MONTHYEARML23044A3662023-02-15015 February 2023 Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III L-2019-046, Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2019-03-25025 March 2019 Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2017-040, Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2017-03-30030 March 2017 Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan2015-12-16016 December 2015 Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan NRC 2015-0056, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NRC 2014-0013, NextEra Energy Point Beach. Llc'S Second Six-Month Status Report in Response to March 12 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event2014-02-28028 February 2014 NextEra Energy Point Beach. Llc'S Second Six-Month Status Report in Response to March 12 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event NRC 2014-0014, Second Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-28028 February 2014 Second Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) NRC 2013-0078, NextEra Energy Point Beach, Llc'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Numb2013-08-28028 August 2013 NextEra Energy Point Beach, Llc'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA NRC 2013-0077, NextEra Energy Point Beach, Llc'S First Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2013-08-28028 August 2013 NextEra Energy Point Beach, Llc'S First Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) L-2013-103, Decommissioning Funding Status Reports2013-03-25025 March 2013 Decommissioning Funding Status Reports ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 L-2009-055, Units 1 and 2, Decommissioning Funding Status Reports2009-03-27027 March 2009 Units 1 and 2, Decommissioning Funding Status Reports NRC 2007-0078, Corrective Action Program Commitment Status Update2007-08-30030 August 2007 Corrective Action Program Commitment Status Update L-HU-05-008, Decommissioning Funding Status Reports2005-03-31031 March 2005 Decommissioning Funding Status Reports L-HU-04-040, Nuclear Management Company, LLC, Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures2004-09-24024 September 2004 Nuclear Management Company, LLC, Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures ML0520301982004-06-0101 June 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520301912004-06-0101 June 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520301812004-05-31031 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520301712004-05-31031 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520302152004-05-30030 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520302092004-05-30030 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520302032004-05-28028 May 2004 U1R28 ML0520301742004-05-28028 May 2004 Plan-of-the-Day Meeting ML0520301002004-05-25025 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda with Handwritten Notes ML0520300972004-05-24024 May 2004 Plan-of-the Day Meeting with Handwritten Notes ML0520300912004-05-24024 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520300662004-05-23023 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520300672004-05-23023 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520300692004-05-22022 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520300622004-05-22022 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0520300612004-05-21021 May 2004 Plan-of-the Day Meeting with Handwritten Notations ML0520300582004-05-21021 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda with Handwritten Notations ML0519600652004-05-21021 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0519600622004-05-20020 May 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519600572004-05-20020 May 2004 U1R28 OCC Interactive Turnover Meeting Agenda ML0519600552004-05-20020 May 2004 U1R28 OCC Interactive Turnover with Handwritten Notations ML0519903882004-05-19019 May 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519903862004-05-19019 May 2004 U1R28 OCC Interactive Turnover ML0519903822004-05-19019 May 2004 U1R28 OCC Interactive Turnover ML0519903732004-05-18018 May 2004 Plan-of-the-Day Meeting ML0519506052004-05-18018 May 2004 U1R28 OCC Interactive Turnover ML0519505942004-05-18018 May 2004 U1R28 OCC Interactive Turnover ML0519505852004-05-17017 May 2004 U1R28 OCC Interactive Turnover with Handwritten Notations ML0519505872004-05-17017 May 2004 U1R28 OCC Interactive Turnover ML0519505902004-05-17017 May 2004 Plan-of-the-day Meeting, with Handwritten Notations ML0519505802004-05-16016 May 2004 U1R28 OCC Interactive Turnover ML0519505612004-05-16016 May 2004 U1R28 OCC Interactive Turnover ML0519505542004-05-15015 May 2004 U1R28 OCC Interactive Turnover ML0519504402004-05-15015 May 2004 U1R28 OCC Interactive Turnover ML0519504322004-05-14014 May 2004 U1R28 OCC Interactive Turnover 2023-02-15
[Table view] |
Text
/, 62f.-L 1 =$AA/ [eIr0 t Committed to Nuclear Excellence At S2tat,us Report V2&', 4 s'/ 5 Plant Status Report Plant: Point Beach Nuclear Plant Date: Thursday. May 06. 2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit 1 is in refueling shutdown (Mode 6). Unit 2 is at 100% power.
Days Without LTA: 592 Homeland Security Condition: Yellow
- UnitI - - Unit2 PWR PWNR MWE1 MWINVE PWR POSER MWE MIVE Mode Level (Gross) (Net) Mode Level (Gross) (Net) 6 0% 0 0 1 100% 544.2 522.0 Days On Line: 0 Days Since Last Reactor Trip: 293 Days On Line: 167 Days Since Last Reactor Trip: 299
- Technical Specification Action Conditions Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days) Spec Expected Number _ RTS Date Date Time Date Time So ce I Out of 5/3/04 2221 Immediate 3.9.2.C No None B. Dungan 5/5/04 Ranw service.0 Expiration AufiOk,_ RiT C'ount Rate 0 1: 0 l IB-42, PAB I Out of 5/4/04 1619 No 3.8.9.A No None J. Brander 5/8/04 Safeguards service. Expiration Expiration M CC _ _ _ _ _ _ _ _ _ _ __ _ _ _ _
2RC-508, 2 Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8/27/04 U2C RMW service.
IOPS 2 Out of 5/3/04 2123 72 Hours TLCO 5/6/04 2123 B. Dungan 5/5/04 service. 3.7.6 Ma or Equipment Out of Service or Degraded - - _i_-_-;_-_- _
Item Unit Condition Date Time Work Order Number Due Date Responsibility G-01, Emergency 0 Out of service due 5/4/04 2238 IWYP 01-128*E-BR 5/8/04 J. Brander Diesel Generator to IB-42 MCC work.
IT-6A, Boric 1 Out of service. 5/5/04 0000 None 5/5/04 Operations Acid Tank Needs recirc and IV/Heater sample.
_ _ -OperationalProblems/Concerns:
Item Unit Condition - Actions Needed Due Date Responsibility C-01 Buzzer 0 Buzzer doesn't work, no sound. Replace buzzer. 5/4/04 J. Helbing 2RC-508, U2C 2 Valve comes off shut seat Coordinate plan with Plant 5n/04 C. Hill Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2 Inadequate excess letdown flow. Open and inspect, 2CV-285. 5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2 Elevated indication, temperature 4 step action plan is developed. 5/14/04 B. Carberry Ejector Gas Monitor related. Scheduled completion is 5/14/04.
2TE-2259, 2P-28B 2 Minor steam leak. WO 0408028. Prepare work 5/7/04 J. Brander SGFP Discharge package to repair leak weekend of Temperature Element 05/22/04.
2P-15B, Safety 2 Missing setscrews on retaining nut - WO 0408109. 5/5/04 N. Stuart Injection Pump operable but degraded. Install setscrews.
Page 1 of2 - L" 0 J/-
Committed to Nuclear Excellence Plant Status Report NONE Item l Unit l i*
Condition !
Aggregate Review of Issues Actions Planned l Due Date l Responsibility Reportable Events AOP-13C, Severe Weather Entry. Courtesy call to NRC.
-- Outstanding Operability Determinations NONE Protected Equipment 2P-29, Aux Feedwater Turbine-Driven Pump / P-38A/B Aux Feedwater Motor-Driven Pump I P-32A,B,C,D,E,F Service Water Pumps / K-2A/B Instrument Air Compressors / K-3AIB Service Air Compressors I G-02/G-031G-04 Emergency Diesel Generators / Unit 1 Nozzle Dam Panels and Associated Equipment Load Changes (Planned or Unplanned)
NONE Reactor Coolant System Leakage' Unit 1 Unit 2 Unidentified (gpm) 0 0.09 (No leak rate determined due to draindown)
Identified (gpm) 0 0.03
--Major Tests and Evolutions Scheduled in Next 24 Hours Unit 2, 2RMP 9071-1, 2RMP 9071-2, Train A/B undervoltage relays. (Pending)
Unit 2, 2P-1 5B, safety injection pump, repair of setscrews.
IT-07D, E, F, G,service .waterpump testing.
TS-EP-001, power availability verifications.
Page 2 of 2