ML050870321

From kanterella
Jump to navigation Jump to search
Plant Status Report with Handwritten Notations
ML050870321
Person / Time
Site: Point Beach  
(DPR-024, DPR-027)
Issue date: 05/06/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML050870321 (2)


Text

Committed to Nuclear Excellence

/, 62f.-L 1

=$AA/

At S2tat, us Report Plant Status Report

[eIr0 t V2&', 4 s'/

5 Plant: Point Beach Nuclear Plant Date: Thursday. May 06. 2004 Operations Report (Summary of Last 24 Hours of Operations):

Unit 1 is in refueling shutdown (Mode 6). Unit 2 is at 100% power.

Days Without LTA: 592 Homeland Security Condition: Yellow UnitI Unit2 PWR PWNR MWE1 MWINVE PWR POSER MWE M IVE Mode Level (Gross)

(Net)

Mode Level (Gross)

(Net) 6 0%

0 0

1 100%

544.2 522.0 Days On Line: 0 Days Since Last Reactor Trip: 293 Days On Line: 167 Days Since Last Reactor Trip: 299 Technical Specification Action Conditions Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days)

Spec Expected Number RTS Date Date Time Date Time So ce I

Out of 5/3/04 2221 Immediate 3.9.2.C No None B. Dungan 5/5/04 Ranw service.0 Expiration AufiOk,_

RiT C'ount Rate 0 1: 0 l

IB-42, PAB I

Out of 5/4/04 1619 No 3.8.9.A No None J. Brander 5/8/04 Safeguards service.

Expiration Expiration M CC 2RC-508, 2

Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8/27/04 U2C RMW service.

IOPS 2

Out of 5/3/04 2123 72 Hours TLCO 5/6/04 2123 B. Dungan 5/5/04 service.

3.7.6 Ma or Equipment Out of Service or Degraded

_i_-_-;_-_-

Item Unit Condition Date Time Work Order Number Due Date Responsibility G-01, Emergency 0

Out of service due 5/4/04 2238 IWYP 01-128*E-BR 5/8/04 J. Brander Diesel Generator to IB-42 MCC work.

IT-6A, Boric 1

Out of service.

5/5/04 0000 None 5/5/04 Operations Acid Tank Needs recirc and IV/Heater sample.

-OperationalProblems/Concerns:

Item Unit Condition Actions Needed Due Date Responsibility C-01 Buzzer 0

Buzzer doesn't work, no sound.

Replace buzzer.

5/4/04 J. Helbing 2RC-508, U2C 2

Valve comes off shut seat Coordinate plan with Plant 5n/04 C. Hill Reactor Makeup momentarily when RMW pump Manager.

Supply starts.

Unit 2, Excess 2

Inadequate excess letdown flow.

Open and inspect, 2CV-285.

5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2

Elevated indication, temperature 4 step action plan is developed.

5/14/04 B. Carberry Ejector Gas Monitor related.

Scheduled completion is 5/14/04.

2TE-2259, 2P-28B 2

Minor steam leak.

WO 0408028. Prepare work 5/7/04 J. Brander SGFP Discharge package to repair leak weekend of Temperature Element 05/22/04.

2P-15B, Safety 2

Missing setscrews on retaining nut -

WO 0408109.

5/5/04 N. Stuart Injection Pump operable but degraded.

Install setscrews.

Page 1 of 2

- L" 0 J/-

Committed to Nuclear Excellence Plant Status Report i*

Aggregate Review of Issues Item l Unit l Condition Actions Planned l

Due Date l Responsibility NONE Reportable Events AOP-13C, Severe Weather Entry. Courtesy call to NRC.

Outstanding Operability Determinations NONE Protected Equipment 2P-29, Aux Feedwater Turbine-Driven Pump / P-38A/B Aux Feedwater Motor-Driven Pump I P-32A,B,C,D,E,F Service Water Pumps / K-2A/B Instrument Air Compressors / K-3AIB Service Air Compressors I G-02/G-031G-04 Emergency Diesel Generators / Unit 1 Nozzle Dam Panels and Associated Equipment Load Changes (Planned or Unplanned)

NONE Reactor Coolant System Leakage' Unit 1 Unit 2 Unidentified (gpm) 0 0.09 (No leak rate determined due to draindown)

Identified (gpm) 0 0.03

--Major Tests and Evolutions Scheduled in Next 24 Hours Unit 2, 2RMP 9071-1, 2RMP 9071-2, Train A/B undervoltage relays. (Pending)

Unit 2, 2P-1 5B, safety injection pump, repair of setscrews.

IT-07D, E, F, G, service.water pump testing.

TS-EP-001, power availability verifications.

Page 2 of 2