-, -4 Committed to Nuclear Excetlenc Plant Status Report Plant: Point Beach Nuclear Plant Date: Wednesday, May 05, 2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit I is in refueling shutdown (Mode 6). Unit 2 is at 100% power.
Days Without LTA: 591 Homeland Security Condition: Yellow Unit 1 '
Unit2-PNVR PWR MWE1 MVE PVR PWSR MNNT1 MWNTE Mode Level (Gross)
(Net)
Mode Level (Gross)
(Net) 6 0%
0 0
1 100%
542.1 520.1 Days On Line: 0 Days Since Last Reactor Trip: 292 Days On Line: 166 Days Since Last Reactor Trip: 298
_______Technical pecification Action Conditions -
Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days)
Spec Expected Number RTS Date Date Time Date Time Source I
Out of 5/3/04 2221 Immediate 3.9.2.C No None B. Dungan 5/5/04 Range service.
Expiration Audible Count Rate___
2RC-508, 2
Out of 11/9/03 0749 31 Days 3.6.3.A 5/23/04 1600 M. Rosseau 8/27/04 U2C RMW service.
lOPS 2
Out of 5/3/04 2123 72 Hours TLCO 5/5/04 1700 5/5/04 B. Dungan service 3.7.6 Ma or Equipment Out of Service or Degraded Item Unit Condition Date Time Work Order Number l Due Date Responsibility NONE l
Operational Problems / Concerns Item Unit Condition Actions Needed Due Date Responsibility C-01 Buzzer 0
Buzzer doesn't work, no sound.
Replace buzzer.
5/4/04 J. Helbing 2RC-508, U2C 2
Valve comes off shut seat Coordinate plan with Plant 5/7/04 C. Hill Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2
Inadequate excess letdown flow.
Open and inspect, 2CV-285.
5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2
Elevated indication, temperature 4 step action plan is developed.
5/14/04 B. Carberry Ejector Gas Monitor related.
Scheduled completion is 5/14/04.
Minor steam leak.
Prepare work package to repair leak 5/7/04 J. Brander SGFP Discharge weekend of 05/22/04.
Temperature Element WO Initiation Tag #204297 l ___________________
A ggregate Review of Issues
-_-___-_-_-_-_:_-a
___- _ :-_ l N
Item j Unit j Condition j
Actions Planned Due Date lResponsibility lNONEl lllll
'e 8g, Page 1 of 2
Committed to Nuclear Excellence Plant Status Report Reportable Events Inadvertent TSAC 3.9.2.C, Source Range Audible Count Rate
-Outstanding Operability Determinations NONE Protected Equipment 2P-29, Aux Feedwater Turbine-Driven Pump I P-38A/B Aux Feedwater Motor-Driven Pump I P-32A,B,C,D,E,F Service Water Pumps I K-2A/B Instrument Air Compressors I K-3A/B Service Air Compressors I G-021G-03/G-04 Emergency Diesel Generators / Unit 1 Nozzle Dam Panels and Associated Equipment Load Changes (Planned or Unplanned)
NONE Reactor Coolant System Leakage Unit 1 Unit 2 Unidentified (gpm) 0 0.12 (No leak rate determined due to draindown)
Identified (gpm) 0 0.03 Major Tests and Evolutions Scheduled in Next 24 Hours Unit 2, 2RMP 9071-1, 2RMP 9071-2, Train A/B undervoltage relays.
Unit 2, 21CP 2. 1, reactor protection and safeguards analog. (White)
Unit 2, 2P-I A, component cooling water pump maintenance.