Request for Additional Information, Emergency Diesel Generator (EDG) Allowed Outage Time (AOT) Extension to 14 Days
ML050870100
Person / Time
Site: Beaver Valley
Issue date: 04/06/2005
From: Colburn T
NRC/NRR/DLPM/LPD1
To: Pearce L
FirstEnergy Nuclear Operating Co
Colburn T, NRR/DLPM, 415-1402
References
TAC MC3331, TAC MC3332
Download: ML050870100 (4)


Text

April 6, 2005 Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -

REQUEST FOR ADDITIONAL INFORMATION (RAI) - EMERGENCY DIESEL GENERATOR (EDG) ALLOWED OUTAGE TIME (AOT) EXTENSION TO 14 DAYS (TAC NOS. MC3331 AND MC3332)

Dear Mr. Pearce:

The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in your May 26, 2004, as supplemented October 29 and December 3, 2004, and January 18, 2005, license amendment application to extend the BVPS-1 and 2 EDG AOTs from 3 to 14 days. The NRC staff has determined that the additional information contained in the enclosure to this letter is needed to complete its review. As discussed with your staff, we request your response within 30 days of receipt of this letter, in order for the NRC staff to complete its review of your submittal.

Sincerely,

/RA/

Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

RAI cc w/encl: See next page

Mr. L. William Pearce Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2) -

REQUEST FOR ADDITIONAL INFORMATION (RAI) - EMERGENCY DIESEL GENERATOR (EDG) ALLOWED OUTAGE TIME (AOT) EXTENSION TO 14 DAYS (TAC NOS. MC3331 AND MC3332)

Dear Mr. Pearce:

The Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in your May 26, 2004, as supplemented October 29 and December 3, 2004, and January 18, 2005, license amendment application to extend the BVPS-1 and 2 EDG AOTs from 3 to 14 days. The NRC staff has determined that the additional information contained in the enclosure to this letter is needed to complete its review. As discussed with your staff, we request your response within 30 days of receipt of this letter, in order for the NRC staff to complete its review of your submittal.

Sincerely,

/RA/

Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412

Enclosure:

RAI cc w/encl: See next page DISTRIBUTION:

PUBLIC MO'Brien ACRS PDI-1 R/F TColburn OGC RLaufer GMatakas, RGN-I TKoshy RJenkins DLPM DPR ACCESSION NO. ML050870100 OFFICE PDI-1/PM PDI-2/LA EEIB/SC PDI-1/SC NAME TColburn MOBrien RJenkins RLaufer DATE 3/30/05 4/01/05 4/04/05 4/04/05 OFFICIAL RECORD COPY

ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION RELATED TO FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 (BVPS-1 AND 2)

EMERGENCY DIESEL GENERATOR (EDG)

ALLOWED OUTAGE TIME (AOT) EXTENSION DOCKET NOS. 50-334 AND 50-412 By letter dated May 26, 2004, as supplemented October 29 and December 3, 2004, and January 18, 2005, FENOC (the licensee), proposed changes to the BVPS-1 and 2 Technical Specifications. The proposed changes would extend the AOT from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days to restore an inoperable EDG to operable status. In order for the Nuclear Regulatory Commission staff to proceed with its review of the proposed change, the following commitment is needed.

The present license amendment request proposes supplying the power needs of a blacked-out unit from the nonblacked-out unit. The proposal involves establishing this cross connection in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and providing power for both units for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. In light of the recent operating experience that indicates increased duration on loss of offsite power, the proposed approach does not seem to provide for defense in depth measures to deal with an extended outage for an EDG. The approach to supply power to the blacked-out unit by rescheduling the safety system operation in the unaffected unit (disconnecting loads for short term on the unaffected unit to allow for the affected to unit to operate another load) is not acceptable because of the undue risk and operational complications imposed on the unaffected unit. NUMARC 87-00 Revision 1, addresses this concern in B-9 (page B-3) and in question 126 (pages I-25 and 26)

Provide details on what alternate onsite power source will be available for powering a blacked-out unit (because of the extended outage for one EDG) for the duration of the extended outage.

As discussed with your staff during February 3 and 10, 2005, conference calls, this should involve the submission of a formal commitment to provide an operable standby (capable of supplying load within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of entering the EDG 14-day AOT) alternate alternating current power supply of sufficient capacity that it can be substituted for the inoperable EDG.

Beaver Valley Power Station, Unit Nos. 1 and 2 cc:

Mary OReilly, Attorney FirstEnergy Nuclear Operating Company FirstEnergy Corporation 76 South Main Street Akron, OH 44308 FirstEnergy Nuclear Operating Company Regulatory Affairs/Performance Improvement Larry R. Freeland, Manager Beaver Valley Power Station Post Office Box 4, BV-A Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Ohio EPA-DERR ATTN: Zack A. Clayton Post Office Box 1049 Columbus, OH 43266-0149 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 J. H. Lash, Plant Manager (BV-IPAB)

FirstEnergy Nuclear Operating Company Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P O Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station ATTN: R. G. Mende, Director Work Management (BV-IPAB)

Post Office Box 4 Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mr. B. F. Sepelak Post Office Box 4, BV-A Shippingport, PA 15077