Plant Status Report - Point Beach Nuclear Plant
ML050870086
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/22/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML050870086 (2)


Text

Committed to Nuclear Excellence Plant Status Report Plant: Point Beach Nuclear Plant Date: Thursday, April 22, 2004 Operations Report (Summary of Last 24 Hours of Operations):

Unit I is in refueling shutdown (Mode 6). Reactor coolant system is at 70% reactor vessel level. Unit 2 is at 100% power.

Days Without LTA: 578 Homeland Security Condition: Yellow Unit I '--Unit 2 -

PAVR PWR MWE MWE PWR PWR MWE MWE Mode Level (Gross) (Net) Mode Level (Gross) (Net) 6 0% 0 0 1 100% 542.5 520.5 Days On Line: 0 Days Since Last Reactor Trip: 279 Days On Line: 153 Days Since Last Reactor Trip: 285

- Technical Specification Action Conditions Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (Hr/Days) Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2 Out of 11/9/03 0749 31 Days 3.6.3.A 4/26/04 1900 M. Rosseau 8/27/04 U2C RMV service.

M or Equipment Out of Service or Degraded -  ; ' '  : _-_--

Item Unit Condition Date Time Work Order Number Due Date Responsibility NONE C_________________ ' ---'-'-'.Operational Problems / Concerns  :-_*-------_

Item Unit Condition Actions Needed Due Date Responsibility 2RC-508, U2C 2 Valve comes off shut seat Provide decision tree to Engineering 4/23/04 K. Krause Reactor Makeup momentarily wvhen RMW pump Manager.

Supply starts.

Unit 2, Excess 2 Inadequate excess letdown flow. Open and inspect, 2CV-285. 5n/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2 Elevated indication, temperature 4 step action plan is developed. 5/14/04 B. Carberry Ejector Gas Monitor related. Scheduled completion is 5/14/04.

2P-2A, Charging 2 Excessive seal leakage/prevents WO 0400329, Priority 3, Status 71. 4/27/04 J. Strharsky Pump continuous use of pump. Item discussed w/J. Strharsky. 4/26/04 R. Brittingham Maintenance to perform work order walk down. Production Planning to schedule work.

"B" Safety Injection 2 4% difference between LT-934 and IC continue troubleshooting to 4/23/04 J. Helbing Accumulator Level LT-935. determine cause of deviation.

Transmitter Deviation

-__:_--_-__-._-_.-__L____-_- Aggregate Review of Issues - -'

Item l Unit Condition Actions Planned Due Date l Responsibility NONE;ll Reportable Events NONE Page 1 of 2 _r_ 6 q.

NMCC N Committed to Nuclear ExcetlencP Plant Status Report Outstanding Operability Determinations NONE Protected Equipment 2P-29, Aux Feedwater Turbine-Driven Pump I P-38A/B Aux Feedwater Motor-Driven Pumps I P-32A-F Service Water Pumps I K-2AIB Instrument Air Compressors I K-3AIB Service Air Compressors I G-O1/G-02/G-03/G-04 Emergency Diesel Generators / Unit I Nozzle Dam Panels and Associated Equipment

. Load Changes (Planned or Unplanned):- -

NONE Reactor Coolant System Leakage - ....

Unit I Unit 2 Unidentified (gpm) 0 0.05 (No leak rate determined due to draindown)

Identified (gpm) 0 0.04

. - - Major Tests and Evolutions Scheduled in Next 24 Hours Unit 1, IRMP 9071-1 and 9075-1, test Unit I "A"4160 voltundervoltagerelays. (Pending resolution of plant conditions)

Unit 1, IRMP 9071-2 and 9075-2, test Unit I "B"4160 volt undervoltage relays. (Pending resolution of plant conditions)

IT-7C, P-32C service water pump test

  • Protected equipment requires Shift Management approval.

Page 2 of 2