Status Report for Tuesday, April 06, 2004
ML050840459
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/06/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML050840459 (2)


Text

-

NMm Committed to Nuclear Exceflence

,,tP Plant Status Report Plant: Point Beach Nuclear Plant Date: Tuesday. April 06. 2004 Operations Report (Summary of Last 24 Hours of Operations):

Unit I is at 100 degf cold shutdown (Mode 5). Unit 2 is at 100% power.

Days Without LTA: 563 Homeland Security Condition: Yellow Omnify

-Unit 2-- -

P'"'R PWER MW\\\\E MWVEPWR PWtR MNNT

'WE IV Mode Level (Gross)

(Net)

Mode Level (Gross)

(Net)

F 0%

0 0

1 100%

544.6 521.7 Days On Line: 0 Days Since Last Reactor Trip: 264 Days On Line: 138 Days Since Last Reactor Trip: 270 Technical Specification Action Conditions Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (llr/Days)

Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2

Out of 11/9/03 0749 31 Days 3.6.3.A 4126/04 1900 M. Rosseau 8/27/04 U2C RMW service.

Supply

__-__-_M orEquipmentOut of Service or Degraded Item l Unit l Condition Date Time l

Work Order Number Due Date Responsibility NONE l

Operational Problems / Concerns, Item Unit Condition Actions Needed Due Date Responsibility W-30B, F-23/F-29 0

Motor failed.

Motor shipped off-site for rebuild.

4/9/04 D. Laing PAB Exhaust Filter Due back 4/6/04.

Fan 2RC-508, U2C 2

Valve comes off shut seat Discuss soft start issue with Plant 4/6/04 M. Rosseau Reactor Makeup momentarily when RMW pump Manager.

Supply starts.

Unit 2, Excess 2

Inadequate excess letdown flow.

Open and inspect, 2CV-285.

5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2

Elevated indication, temperature 4 step action plan is developed.

5/14/04 B. Carberry Ejector Gas Monitor related.

Scheduled completion is 5/14/04.

2P-2A, Charging 2

Seal leak.

Schedule seal repair.

4/6/04 N. Stuart Pum p__

-( ~

Aggregate Review of Issues 7 -

Item Unit j Condition j

Actions Planned Due Date Responsibility NONEll Reportable Events NONE Page I of 2

'-

Committed to Nuclear Excellence P

Plant Status Report

-'-Outstanding Operability Determinations' NONE Protected Equipment 2P-29, Aux Feedwater Turbine-Driven Pump I P-38A/B Aux Feedwater Motor-Driven Pumps /

P-32A-F Service Water Pumps / K-2A/B Instrument Air Compressors / K-3A/B Service Air Compressors I G-O1/G-02/G-031G-04 Emergency Diesel Generators

-Load Changes (Planned or Unplanned)

NONE Reactor Coolant System Leakage Unit I Unit 2 Unidentified (gpm) 0 0.06 No leak rate determined due to cooldown)

Identified (gpm) 0 0.03

. Major Tests and Evolutions Scheduled in Next 24 Hours.

Unit I, I ORT-3A, safety injection actuation with loss of safeguards AC, Train A.

Page 2 of 2