,,tP Plant Status Report Plant: Point Beach Nuclear Plant Date: Tuesday. April 06. 2004 Operations Report (Summary of Last 24 Hours of Operations):
Unit I is at 100 degf cold shutdown (Mode 5). Unit 2 is at 100% power.
Days Without LTA: 563 Homeland Security Condition: Yellow Omnify
-Unit 2-- -
P'"'R PWER MW\\\\E MWVEPWR PWtR MNNT
'WE IV Mode Level (Gross)
(Net)
Mode Level (Gross)
(Net)
F 0%
0 0
1 100%
544.6 521.7 Days On Line: 0 Days Since Last Reactor Trip: 264 Days On Line: 138 Days Since Last Reactor Trip: 270 Technical Specification Action Conditions Item Unit Condition Out of Service Length Tech Expires Responsibility Equip (llr/Days)
Spec Expected Number RTS Date Date Time Date Time 2RC-508, 2
Out of 11/9/03 0749 31 Days 3.6.3.A 4126/04 1900 M. Rosseau 8/27/04 U2C RMW service.
Supply
__-__-_M orEquipmentOut of Service or Degraded Item l Unit l Condition Date Time l
Work Order Number Due Date Responsibility NONE l
Operational Problems / Concerns, Item Unit Condition Actions Needed Due Date Responsibility W-30B, F-23/F-29 0
Motor failed.
Motor shipped off-site for rebuild.
4/9/04 D. Laing PAB Exhaust Filter Due back 4/6/04.
Fan 2RC-508, U2C 2
Valve comes off shut seat Discuss soft start issue with Plant 4/6/04 M. Rosseau Reactor Makeup momentarily when RMW pump Manager.
Supply starts.
Unit 2, Excess 2
Inadequate excess letdown flow.
Open and inspect, 2CV-285.
5/7/04 N. Stuart Letdown Flow 2RE-215, 2HX-46 Air 2
Elevated indication, temperature 4 step action plan is developed.
5/14/04 B. Carberry Ejector Gas Monitor related.
Scheduled completion is 5/14/04.
2P-2A, Charging 2
Seal leak.
Schedule seal repair.
4/6/04 N. Stuart Pum p__
-( ~
Aggregate Review of Issues 7 -
Item Unit j Condition j
Actions Planned Due Date Responsibility NONEll Reportable Events NONE Page I of 2
'-
Committed to Nuclear Excellence P
Plant Status Report
-'-Outstanding Operability Determinations' NONE Protected Equipment 2P-29, Aux Feedwater Turbine-Driven Pump I P-38A/B Aux Feedwater Motor-Driven Pumps /
P-32A-F Service Water Pumps / K-2A/B Instrument Air Compressors / K-3A/B Service Air Compressors I G-O1/G-02/G-031G-04 Emergency Diesel Generators
-Load Changes (Planned or Unplanned)
NONE Reactor Coolant System Leakage Unit I Unit 2 Unidentified (gpm) 0 0.06 No leak rate determined due to cooldown)
Identified (gpm) 0 0.03
. Major Tests and Evolutions Scheduled in Next 24 Hours.
Unit I, I ORT-3A, safety injection actuation with loss of safeguards AC, Train A.